CN207608234U - A kind of assembly type curtain wall hanging apparatus - Google Patents
A kind of assembly type curtain wall hanging apparatus Download PDFInfo
- Publication number
- CN207608234U CN207608234U CN201721338190.3U CN201721338190U CN207608234U CN 207608234 U CN207608234 U CN 207608234U CN 201721338190 U CN201721338190 U CN 201721338190U CN 207608234 U CN207608234 U CN 207608234U
- Authority
- CN
- China
- Prior art keywords
- steel
- curtain wall
- truss
- circular orbit
- wall hanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑施工技术领域,具体地说是一种组装式幕墙吊装装置。The utility model relates to the technical field of building construction, in particular to an assembled curtain wall hoisting device.
背景技术Background technique
多面体单元板块幕墙因为具有立体视觉效果强、配合低辐射镀膜夹层玻璃增加室内自然采光、减少反射与眩光等优点被新型建筑大量运用。但单元板块幕墙由于体积大,构造复杂,重量大等特点在现场工期紧张、大型垂直机械资源分配少的情况下给施工带来了困难。The polyhedral unit panel curtain wall is widely used in new buildings because of its strong stereoscopic effect, low-emissivity coated laminated glass to increase indoor natural lighting, and reduce reflection and glare. However, due to the large volume, complex structure, and heavy weight of the unit panel curtain wall, it has brought difficulties to the construction under the condition of tight construction schedule and less allocation of large vertical machinery resources.
传统单元板块幕墙安装低层一般采用汽车吊,高层采用固定悬臂吊进行单元体板块的垂直运输,这种施工方法对吊装设备要求较高,在楼层内操作困难,吊装完成后进行拆除后挪移至下一个位置,安装好后进行吊装作业,施工工艺复杂,施工效率低,危险性大。若采用外架配合塔吊安装则危险性较高同时影响外架拆除,而且需要搭设外架,使用塔吊,成本高。Traditional unit panel curtain wall installation generally uses truck cranes for lower floors, and fixed cantilever cranes for vertical transportation of unit panels for upper floors. This construction method has high requirements for hoisting equipment, and it is difficult to operate in the floor. In one position, the hoisting operation is carried out after installation, the construction process is complicated, the construction efficiency is low, and the danger is great. If the outer frame is installed with the tower crane, the risk will be higher and the removal of the outer frame will be affected, and the outer frame needs to be erected, and the tower crane will be used, which will cost a lot.
发明内容Contents of the invention
本实用新型的技术任务是针对以上不足之处,提供一种组装式幕墙吊装装置,将吊装装置组装固定于楼顶,实现环绕建筑一周的外装饰面的吊装施工,施工方便,效率高。The technical task of this utility model is to provide an assembled curtain wall hoisting device for the above deficiencies. The hoisting device is assembled and fixed on the roof to realize the hoisting construction of the outer decorative surface around the building. The construction is convenient and efficient.
本实用新型解决其技术问题所采用的技术方案是:The technical scheme that the utility model solves its technical problem adopts is:
一种组装式幕墙吊装装置,包括预埋底座、钢立柱、钢桁架梁和三角桁架,并设置有双排环形轨道和提升装置;An assembled curtain wall hoisting device, which includes a pre-embedded base, steel columns, steel truss beams and triangular trusses, and is provided with double-row circular tracks and lifting devices;
钢立柱底部设置有底部连接板,钢立柱通过底部连接板与预埋底座连接固定,在需要安装吊装装置的楼层混凝土浇筑时将预埋底座预埋,从而将钢立柱固定在楼层顶板上;钢桁架梁水平固定在钢立柱上,钢桁架梁的上部固定有三角桁架,双排环形轨道相互平行并排设置并与钢桁架梁平行,双排环形轨道固定在三角桁架的下部;三角桁架下部的两端分别固定钢桁架梁和双排环形轨道,三角桁架可以分解双排环形轨道的施加力,保证双排环形轨道的稳定。The bottom of the steel column is provided with a bottom connecting plate, and the steel column is connected and fixed with the embedded base through the bottom connecting plate, and the embedded base is pre-buried when the floor concrete needs to be installed with a hoisting device, so as to fix the steel column on the roof of the floor; The truss beam is fixed horizontally on the steel column, and the upper part of the steel truss beam is fixed with a triangular truss. The steel truss beams and the double-row circular track are respectively fixed at the ends, and the triangular truss can decompose the applied force of the double-row circular track to ensure the stability of the double-row circular track.
提升装置连接有行走电机和行走轮,两提升装置通过行走轮分别滑动安装在双排环形轨道上,提升装置连接有钢丝绳,钢丝绳上连接有承吊件,钢丝绳的两端分别连接两提升装置。吊装幕墙单元板时,幕墙单元板通过承吊件被吊起,调节两个提升装置分别调整钢丝绳的两端,调整多面体单元板至合适位置;安装完一块单元板后,启动行走电机,使行走轮带动提升装置行走到下一安装位置。The hoisting device is connected with a traveling motor and a traveling wheel, and the two hoisting devices are respectively slidably installed on the double-row circular rails through the traveling wheels. When hoisting the curtain wall unit board, the curtain wall unit board is hoisted by the hanging parts, adjust the two hoisting devices to adjust the two ends of the wire rope respectively, and adjust the polyhedron unit board to a suitable position; after installing a unit board, start the walking motor to make the walking The wheel drives the lifting device to walk to the next installation position.
优选的,环形轨道采用工字钢,工字钢与钢桁架梁平行设置并焊接固定在三角桁架的底部。工字钢的槽可作为轨道与行走轮配合。Preferably, the circular track is made of I-shaped steel, and the I-shaped steel is arranged parallel to the steel truss beam and fixed to the bottom of the triangular truss by welding. The groove of the I-beam can be used as a track to cooperate with the traveling wheels.
进一步的,环形轨道包括承重导轨和行走轨道,相应的,提升装置上设置有支撑座,支撑座与承重导轨滑动配合,行走轮与行走轨道配合。Further, the circular track includes a load-bearing guide rail and a running track. Correspondingly, the lifting device is provided with a support seat, the support seat is slidingly matched with the load-bearing guide rail, and the traveling wheels are matched with the running track.
优选的,所述提升装置的提升部件为电葫芦,电葫芦通过固定座滑动设置在环形轨道上,钢丝绳的两端分别连接两个电葫芦。Preferably, the lifting part of the lifting device is an electric hoist, and the electric hoist is slidably arranged on the circular track through the fixing seat, and two ends of the steel wire rope are respectively connected to two electric hoists.
优选的,预埋底座与底部连接板通过紧固螺栓连接,便于施工完毕后的拆卸。Preferably, the pre-embedded base and the bottom connecting plate are connected by fastening bolts, which is convenient for disassembly after construction.
优选的,钢立柱底部与底部连接板焊接固定。Preferably, the bottom of the steel column is welded and fixed to the bottom connecting plate.
优选的,钢立柱与钢桁架梁、钢桁架梁与三角桁架以及三角桁架与双排环形轨道均通过紧固螺栓连接,进行现场安装,施工完毕后进行现场拆除,周转再利用。Preferably, steel columns and steel truss beams, steel truss beams and triangular trusses, and triangular trusses and double-row circular tracks are all connected by fastening bolts for on-site installation, and on-site dismantling after construction is completed for turnover and reuse.
所述钢立柱为桁架钢立柱,具有斜向支撑。The steel column is a truss steel column with oblique support.
本实用新型的一种组装式幕墙吊装装置和现有技术相比,具有以下有益效果:Compared with the prior art, an assembled curtain wall hoisting device of the present invention has the following beneficial effects:
设置双排导轨,安全可靠,吊重量大,可以控制提升装置在双排环形轨道上移动并调整钢丝绳使多面体单元板块幕墙吊至合适位置安装,双排环形轨道环绕建筑一周,实现建筑一周的外装饰面吊装,一次性安装,方便施工,提高施工效率;Set up double-row guide rails, which are safe and reliable, and have a large lifting weight. You can control the lifting device to move on the double-row circular rails and adjust the wire rope to hoist the polyhedron unit panel curtain wall to a suitable position for installation. Decorative surface hoisting, one-time installation, convenient construction, improve construction efficiency;
该幕墙吊装装置个部件通过紧固螺栓连接,可拆卸,构件在工厂加工,现场拼装,施工完成后现场拆除,可重复利用。The components of the curtain wall hoisting device are connected by fastening bolts and are detachable. The components are processed in the factory and assembled on site. After the construction is completed, the components are dismantled on site and can be reused.
附图说明Description of drawings
图1是本实用新型的组装式幕墙吊装装置的结构示意图;Fig. 1 is a schematic structural view of the assembled curtain wall hoisting device of the present invention;
图2是组装式幕墙吊装装置使用时的示意图;Fig. 2 is a schematic diagram of the assembled curtain wall hoisting device in use;
图3是预埋底座与钢立柱的连接示意图。Figure 3 is a schematic diagram of the connection between the embedded base and the steel column.
图中,1、钢立柱,2、底部连接板,3、钢桁架梁,4、三角桁架,5、环形轨道,6、电葫芦,7、钢丝绳,8、预埋底座,9、高强螺栓,10、斜向支撑,11、幕墙单元板。In the figure, 1. Steel column, 2. Bottom connection plate, 3. Steel truss beam, 4. Triangular truss, 5. Ring track, 6. Electric hoist, 7. Steel wire rope, 8. Embedded base, 9. High-strength bolts, 10. Oblique support, 11. Curtain wall unit board.
具体实施方式Detailed ways
下面结合附图和具体实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing and specific embodiment the utility model is further described.
一种组装式幕墙吊装装置,包括预埋底座8、钢立柱1、钢桁架梁3和三角桁架4,并设置有双排环形轨道5和提升装置。An assembled curtain wall hoisting device includes a pre-embedded base 8, a steel column 1, a steel truss beam 3 and a triangular truss 4, and is provided with a double-row circular track 5 and a lifting device.
钢立柱1底部设置有底部连接板2,钢立柱1通过底部连接板2与预埋底座8连接固定,在需要安装吊装装置的楼层混凝土浇筑时将预埋底座8预埋,从而将钢立柱1固定在楼层顶板上。钢立柱1为桁架钢立柱,具有斜向支撑10。钢立柱1底部与底部连接板2焊接固定,预埋底座8与底部连接板2通过高强螺栓9连接,便于施工完毕后的拆卸。The bottom of the steel column 1 is provided with a bottom connecting plate 2, and the steel column 1 is connected and fixed with the embedded base 8 through the bottom connecting plate 2. Fixed on the roof of the floor. The steel column 1 is a truss steel column with oblique supports 10 . The bottom of the steel column 1 is welded to the bottom connecting plate 2, and the embedded base 8 and the bottom connecting plate 2 are connected by high-strength bolts 9, which is convenient for disassembly after the construction is completed.
钢桁架梁3水平固定在钢立柱1上,钢桁架梁3的上部固定有三角桁架4,双排环形轨道5相互平行并排设置并与钢桁架梁3平行,横向轨道与纵向轨道交接处设置为圆弧过渡。双排环形轨道5固定在三角桁架4的下部。三角桁架4下部的两端分别固定钢桁架梁3和环形轨道5,三角桁架4可以分解双排环形轨道5的施加力,保证环形轨道5的稳定。The steel truss beam 3 is horizontally fixed on the steel column 1, the upper part of the steel truss beam 3 is fixed with a triangular truss 4, the double row of circular tracks 5 are arranged parallel to each other and parallel to the steel truss beam 3, and the intersection of the transverse track and the longitudinal track is set as Arc transition. The double-row circular track 5 is fixed on the bottom of the triangular truss 4 . The two ends of the lower part of the triangular truss 4 fix the steel truss beam 3 and the circular track 5 respectively, and the triangular truss 4 can decompose the applied force of the double-row circular track 5 to ensure the stability of the circular track 5 .
环形轨道5采用工字钢制作,工字钢与钢桁架梁3平行设置并固定在三角桁架4的底部。工字钢的槽可作为轨道与行走轮配合。环形轨道5包括承重导轨和行走轨道,相应的,提升装置上设置有支撑座,支撑座与承重导轨滑动配合,行走轮与行走轨道配合。The circular track 5 is made of I-shaped steel, and the I-shaped steel is arranged parallel to the steel truss beam 3 and fixed on the bottom of the triangular truss 4 . The groove of the I-beam can be used as a track to cooperate with the traveling wheels. The annular track 5 includes a load-bearing guide rail and a walking track. Correspondingly, a support seat is provided on the hoisting device, and the support seat and the load-bearing guide rail are slidably matched, and the traveling wheels cooperate with the walking track.
钢立柱1与钢桁架梁3、钢桁架梁3与三角桁架4以及三角桁架4与双排环形轨道5均通过紧固螺栓连接,进行现场安装,施工完毕后进行现场拆除,周转再利用。Steel columns 1 and steel truss beams 3, steel truss beams 3 and triangular trusses 4, and triangular trusses 4 and double-row circular rails 5 are all connected by fastening bolts for on-site installation.
提升装置连接有行走电机和行走轮,两提升装置通过行走轮分别滑动安装在双排环形轨道5上,提升装置的提升部件为电葫芦6,电葫芦6通过支撑座滑动设置在环形轨道5上,电葫芦6连接有钢丝绳7,钢丝绳7上连接有承吊件,钢丝绳7的两端分别连接两个电葫芦6。吊装幕墙单元板11时,幕墙单元板11通过承吊件被吊起,调节两个电葫芦6分别调整钢丝绳7的两端,调整多面体幕墙单元板11至合适位置;安装完一块幕墙单元板11后,启动行走电机,使行走轮带动电葫芦6行走到下一安装位置,进行施工作业。The hoisting device is connected with a traveling motor and a traveling wheel, and the two hoisting devices are respectively slidably installed on the double-row circular rail 5 through the traveling wheels. , The electric hoist 6 is connected with a steel wire rope 7, the steel wire rope 7 is connected with a hanging part, and the two ends of the steel wire rope 7 are respectively connected with two electric hoists 6. When hoisting the curtain wall unit panel 11, the curtain wall unit panel 11 is hoisted by the hanging parts, adjust the two electric hoists 6 to adjust the two ends of the wire rope 7 respectively, and adjust the polyhedral curtain wall unit panel 11 to a proper position; after installing a curtain wall unit panel 11 Finally, start the traveling motor, so that the traveling wheels drive the electric hoist 6 to walk to the next installation position for construction work.
在需要进行幕墙板块施工的楼层混凝土浇筑时预埋预埋底座8,预埋底座8根据临边距离预埋;预埋底座8预埋完成达到强度后,安装双排钢立柱1,通过高强螺栓9将底部连接板2与预埋底座8连接固定,根据吊装幕墙单元板11的质量确定钢立柱1的连接距离,选择合适的预埋底座8连接;通过螺栓连接安装钢桁架梁3和三角桁架4,三角桁架4安装完毕后在三角桁架4底部安装环形轨道5,双排环形轨道5并排安装;在两环形轨道5上分别安装电葫芦6,电葫芦6上带有钢丝绳7,钢丝绳7上有承吊件,两个电葫芦6共同完成幕墙单元板11的承吊;配备专用电箱,接入环形轨道5上的电葫芦6,通过行走轮带动电葫芦6在环形轨道5上移动;施工时,遥控控制电葫芦6带动钢丝绳7上下调整进行幕墙单元板11的吊装作业,一个部位安装完成后遥控控制电葫芦6沿环形轨道5移动至下一个部位作业,直至完成一周的外饰面的吊装;施工完毕,将幕墙吊装装置拆除。The pre-embedded base 8 is pre-embedded when pouring concrete on the floor where curtain wall construction is required, and the pre-embedded base 8 is pre-embedded according to the distance between the sides; after the pre-embedded base 8 reaches the strength, double-row steel columns 1 are installed, and high-strength bolts are used to install the pre-embedded base 8 9 Connect and fix the bottom connecting plate 2 with the embedded base 8, determine the connection distance of the steel column 1 according to the quality of the hoisted curtain wall unit plate 11, and select a suitable embedded base 8 for connection; install the steel truss beam 3 and the triangular truss through bolt connection 4. After the triangular truss 4 is installed, install the circular track 5 at the bottom of the triangular truss 4, and install the double-row circular tracks 5 side by side; install the electric hoist 6 on the two circular tracks 5 respectively. There are hanging parts, two electric hoists 6 jointly complete the hanging of the curtain wall unit panel 11; a special electric box is equipped, connected to the electric hoist 6 on the circular track 5, and the electric hoist 6 is driven to move on the circular track 5 through the traveling wheels; During construction, the remote control electric hoist 6 drives the steel wire rope 7 to adjust up and down to carry out the hoisting operation of the curtain wall unit panel 11. After the installation of one part is completed, the remote control electric hoist 6 moves to the next part along the circular track 5 until the outer finish of a week is completed. After the construction is completed, remove the curtain wall hoisting device.
通过上面具体实施方式,所述技术领域的技术人员可容易的实现本实用新型。但是应当理解,本实用新型并不限于上述的具体实施方式。在公开的实施方式的基础上,所述技术领域的技术人员可任意组合不同的技术特征,从而实现不同的技术方案。Through the above specific implementation methods, those skilled in the art can easily realize the utility model. However, it should be understood that the present utility model is not limited to the specific implementation manners described above. On the basis of the disclosed embodiments, those skilled in the art can arbitrarily combine different technical features, so as to realize different technical solutions.
除说明书所述的技术特征外,均为本专业技术人员的已知技术。Except for the technical features described in the instructions, all are known technologies by those skilled in the art.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721338190.3U CN207608234U (en) | 2017-10-17 | 2017-10-17 | A kind of assembly type curtain wall hanging apparatus |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721338190.3U CN207608234U (en) | 2017-10-17 | 2017-10-17 | A kind of assembly type curtain wall hanging apparatus |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207608234U true CN207608234U (en) | 2018-07-13 |
Family
ID=62793517
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721338190.3U Expired - Fee Related CN207608234U (en) | 2017-10-17 | 2017-10-17 | A kind of assembly type curtain wall hanging apparatus |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207608234U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110388066A (en) * | 2019-08-14 | 2019-10-29 | 中建八局第一建设有限公司 | A kind of unit type curtain wall plate construction machinery |
| CN111392603A (en) * | 2020-03-27 | 2020-07-10 | 中建八局装饰工程有限公司 | A high-strength concrete slab installation system using slide rails |
-
2017
- 2017-10-17 CN CN201721338190.3U patent/CN207608234U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110388066A (en) * | 2019-08-14 | 2019-10-29 | 中建八局第一建设有限公司 | A kind of unit type curtain wall plate construction machinery |
| CN110388066B (en) * | 2019-08-14 | 2024-04-30 | 中建八局第一建设有限公司 | A unitized curtain wall panel construction machine |
| CN111392603A (en) * | 2020-03-27 | 2020-07-10 | 中建八局装饰工程有限公司 | A high-strength concrete slab installation system using slide rails |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100549344C (en) | Adhered self-lifting highrise operation platform | |
| CN101514586B (en) | Hanger rail type electric hanging boat and construction method thereof | |
| CN106698208B (en) | A kind of hanging device and hanging method for being transported outside high-rise building | |
| CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
| CN203821720U (en) | High-altitude large roof panel installing tool trolley | |
| CN102877637A (en) | Method for implementing operating platform in bottom wall construction of cantilever beam | |
| CN107514145A (en) | A kind of removable steel roofing liner installation construction device and method | |
| CN113148857A (en) | Movable type quick-dismantling hoisting steel truss | |
| CN102912991A (en) | Track hosting device and track hoisting method of large curtain wall unit plate | |
| CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
| CN204703534U (en) | A kind of large-scale unit plates of curtain wall two-rail hanging apparatus | |
| CN201506692U (en) | Roofing steel structure simple lifting device and installation structure thereof | |
| CN102587678B (en) | Device for slipping node of steel structure | |
| CN106121253B (en) | Installation component adjustable auxiliary installation device and method | |
| CN102003074A (en) | Construction method for indoor long-span steel connecting bridge | |
| CN104060846B (en) | The construction equipment of girder steel interconnection system platform and construction method | |
| CN208732486U (en) | Roofing monorail crane | |
| CN208071235U (en) | A kind of bearing and lifting system of steel truss frame integral hoisting | |
| CN102677907A (en) | Method for manually installing steel beam at top of silo | |
| CN203257106U (en) | Multifunctional power-driven walking type walking system | |
| CN109838055A (en) | High-altitude is installed by steel frame and light concrete face-board for room special mounting vehicle | |
| CN203795459U (en) | Foundation structure of tower crane for high-altitude roofs | |
| CN215331380U (en) | Rail type suspension platform | |
| CN104060813B (en) | The constructing device of large-span steel girder framework connection mode platform and constructional method | |
| CN102259794A (en) | Method for installing overall combined type crane beam |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180713 |