CN103991787A - Electric precipitation anode plate installing and lifting device for power plants - Google Patents

Electric precipitation anode plate installing and lifting device for power plants Download PDF

Info

Publication number
CN103991787A
CN103991787A CN201410246059.9A CN201410246059A CN103991787A CN 103991787 A CN103991787 A CN 103991787A CN 201410246059 A CN201410246059 A CN 201410246059A CN 103991787 A CN103991787 A CN 103991787A
Authority
CN
China
Prior art keywords
anode plate
clamping bar
main
frame
lifting
Prior art date
Application number
CN201410246059.9A
Other languages
Chinese (zh)
Other versions
CN103991787B (en
Inventor
戚加元
林海
吕延波
Original Assignee
山东电力建设第一工程公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 山东电力建设第一工程公司 filed Critical 山东电力建设第一工程公司
Priority to CN201410246059.9A priority Critical patent/CN103991787B/en
Publication of CN103991787A publication Critical patent/CN103991787A/en
Application granted granted Critical
Publication of CN103991787B publication Critical patent/CN103991787B/en

Links

Abstract

The invention relates to an electric precipitation anode plate installing and lifting device for power plants. The device comprises a slide rail arranged on the ground, a main body frame rotatably arranged on the slide rail through road wheels fixed at the lower end, a plurality of anode plate clamping devices arranged on the main body frame, an anode plate movable clamping device movably arranged above the main body frame, a winch which is arranged at one side of the main body frame and is higher than the main body frame and a crane. The electric precipitation anode plate installing and lifting device for the power plants, disclosed by the invention, has the advantages that a group of anode plates can be lifted in a combination manner, so that the installation efficiency is increased; the anode plate clamping devices and the anode plate movable clamping device can play the role of limit in the lifting process, so that the situation that the anode plates are deformed is effectively prevented, the bending strength of the anode plates is increased and the use of lifting machinery is reduced.

Description

Power plant electric precipitation anode plate is installed lifting appliance
Technical field
The present invention relates to lifting appliance technical field, be specifically related to a kind of power plant electric precipitation anode plate lifting appliance is installed.
Background technology
Power plant electric precipitation anode plate install be subject to equipment itself and environmental concerns larger, in combination and lifting, easily cause that equipment distortion, lifting speed are slow, wind-force causes equipment swinging when larger, in hoisting process, require wind-force to be less than 2 grades, to equipment, install and bring difficulty, general run of thins needs two cranes to coordinate lifting, therefore very inconvenient.
Summary of the invention
The present invention, in order to overcome the deficiency of above technology, provides a kind of anode plate distortion that prevents, the power plant electric precipitation anode plate that efficiency is high is installed lifting appliance.
The present invention overcomes the technical scheme that its technical matters adopts:
This power plant electric precipitation anode plate is installed lifting appliance, comprise and be arranged on ground slide rail, by being fixed on the road wheel rolling of lower end, be installed on the main body frame on slide rail, be installed on the some anode plate holding devices on main body frame, be movably set in the movable holding device of anode plate of main body frame top, be arranged at main body frame one side and height higher than winch and the crane of main body frame, described main body frame outside is fixed with hanger I, after walking around pulley, the steel rope I that described winch kills that is fixed in hanger I, one lifting cross beam upper end is fixed with hanger II, steel rope III one end is fixed on the suspension hook of crane, its other end is fixed in hanger II, described lifting cross beam lower end is fixed with respectively some steel rope II, some anode plate active card are placed in anode plate holding device, and be slidably mounted in the movable holding device of anode plate, the movable holding device of described anode plate is lifted on lifting cross beam by the rope made of hemp, the other end of described some steel rope II is individually fixed on each anode plate.
Above-mentioned anode plate holding device comprises the some clamping bar group I that are vertically fixed on respectively rear and front end on main body frame, described each clamping bar group I consists of two clamping bar I that are parallel to each other, spacing between two clamping bar I of described each clamping bar group I and the thickness of anode plate match, and described each anode plate respectively vertical activity is plugged in each clamping bar group I.
The movable holding device of above-mentioned anode plate comprises portable plate and is vertically fixed on the some clamping bar group II on portable plate, described each clamping bar group II consists of two clamping bar II that are parallel to each other, spacing between two clamping bar II of described each clamping bar group II and the thickness of anode plate match, described each anode plate respectively vertical activity is plugged in each clamping bar group II, and the upper end of described each clamping bar group II is provided with lock pin.
In order to prevent that anode plate from moving in lifting process, the tail end of aforementioned body framework is provided with some baffle plates, and the tail end of each anode plate is resisted against on baffle plate respectively.
The invention has the beneficial effects as follows: because this power plant electric precipitation anode plate installation lifting appliance can combine lifting to one group of anode plate, therefore improved installation effectiveness.At lifting process Anodic plate holding device and the movable holding device of anode plate, can play spacing effect, therefore effectively prevent that the situation of anode plate distortion from occurring, strengthen the bending strength of anode plate, reduce the use of lifting machine.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the plan structure schematic diagram of main body frame;
Fig. 3 is the side-looking structural representation of main body frame;
Fig. 4 is that A-A in Fig. 1 is to cross-sectional view;
Fig. 5 is lifting cross beam structural representation;
Fig. 6 is anode plate lifting view;
Fig. 7 is after anode plate lifting and main body frame disengaged position schematic diagram;
Fig. 8 is anode plate stationary state structural representation;
In figure, 1. main body frame 2. slide rail 3. winch 4. pulley 5. steel rope I 6. hanger I 7. road wheel 8. portable plate 9. clamping bar I 10. lifting cross beam 11. clamping bar II 12. lock pin 13. steel rope II 14. steel rope III 15. crane 16. baffle plate 17. rope made of hemp 18. hanger II.
The specific embodiment
Below in conjunction with accompanying drawing 1, to accompanying drawing 8, the present invention will be further described.
This power plant electric precipitation anode plate is installed lifting appliance as shown in Figures 1 and 2, comprise and be arranged on ground slide rail 2, by being fixed on road wheel 7 rollings of lower end, be installed on the main body frame 1 on slide rail 2, be installed on the some anode plate holding devices on main body frame 1, be movably set in the movable holding device of anode plate of main body frame 1 top, be arranged at main body frame 1 one sides and height higher than winch 3 and the crane 15 of main body frame 1, main body frame 1 outside is fixed with hanger I 6, after walking around pulley 4, the steel rope I 5 that winch 3 kills that is fixed in hanger I 6.Lifting cross beam 10 upper ends are fixed with hanger II 18 as shown in Figure 5, steel rope III 14 one end are fixed on the suspension hook of crane 15, its other end is fixed in hanger II 18, lifting cross beam 10 lower ends are fixed with respectively some steel rope II 13, some anode plate active card are placed in anode plate holding device, and are slidably mounted in the movable holding device of anode plate.As shown in Figure 8, the movable holding device of anode plate is lifted on lifting cross beam 10 by the rope made of hemp 17, and the other end of some steel rope II 13 is individually fixed on each anode plate.The movable clamping of anode plate device lateral is placed on to the middle part of main body frame 1.Workmen lies in a horizontal plane in piece of anode plate in the anode plate holding device and the movable holding device of anode plate on theme framework 1, makes anode plate be edge-on state.After anode plate has been put, start winch 3 and slowly sling in main body frame 1 upper end, main body frame 1 will freely move forward by road wheel 7 in the process of slinging on slide rail 2, as shown in Figure 7, make main body framework 1 be vertical state with anode plate.Crane 15 is synchronizeed and is hooked up with winch, the lifting cross beam 10 that plays is followed on main body frame 1 upper end and is risen, in uphill process, steel rope II 13 does not stress, until anode plate during in vertical state winch 3 stop action, crane 15 continues to hook up, in anode plate holding device by each anode plate from main body frame 1, hang out and its disengaging, finally hang electric precipitation top, directly over installation site slowly by anode plate to whereabouts, dropping to a half by the movable holding device disengagement of anode plate, then continue to fall anode plate installation in position, disengagement steel rope II 13 is connected with anode plate, lifting cross beam 10 and the movable holding device of anode plate are lifted on ground.After anode plate and main body frame 1 disengagement, start winch 3 main body frame 1 is slowly fallen and revert to horizontality, complete this time lifting, and realize reset.Because this power plant electric precipitation anode plate installation lifting appliance can combine lifting to one group of anode plate, therefore improved installation effectiveness.At lifting process Anodic plate holding device and the movable holding device of anode plate, can play spacing effect, therefore effectively prevent that the situation of anode plate distortion from occurring, strengthen the bending strength of anode plate, reduce the use of lifting machine.
As shown in Figure 3, anode plate holding device can for following structure, it comprises the some clamping bar group I that are vertically fixed on respectively rear and front end on main body frame 1, each clamping bar group I consists of two clamping bar I 9 that are parallel to each other, spacing between two clamping bar I 9 of each clamping bar group I and the thickness of anode plate match, and each anode plate respectively vertical activity is plugged in each clamping bar group I.The clamping bar group I upper end open forming due to two clamping bar I 9, therefore, when anode plate rises while winching to vertical state, it can conveniently depart from main body frame 1 from opening, simple in structure, easily manufactured.The movable holding device of anode plate can for following structure, it comprises portable plate 8 and is vertically fixed on the some clamping bar group II on portable plate 8 as shown in Figure 4, each clamping bar group II consists of two clamping bar II 11 that are parallel to each other, spacing between two clamping bar II 11 of each clamping bar group II and the thickness of anode plate match, each anode plate respectively vertical activity is plugged in each clamping bar group II, and the upper end of each clamping bar group II is provided with lock pin 12.Before using, portable plate 8 is laterally placed into the middle part on main body frame 1, holding is slided respectively with in clamping bar group I in each anode plate two ends, slide and be placed in clamping bar group II in position, intermediate portion, anode plate is fixed to lock pin 12 in clamping bar group II and can prevents that anode plate from coming off in lifting process after placing.When anode plate hangs while putting in place, lock pin 12 is removed, now portable plate 8 and anode plate can be departed from, simple in structure, convenient to use.
As shown in accompanying drawing 1 and accompanying drawing 3, the tail end of main body frame 1 can be provided with some baffle plates 16, and the tail end of each anode plate is resisted against respectively on baffle plate 16.In anode plate lifting process, because it contacts with baffle plate 16 under Action of Gravity Field always, therefore can prevent that anode plate from lifting process, sliding phenomenon occurring, further improved the stability of lifting.

Claims (4)

1. a power plant electric precipitation anode plate is installed lifting appliance, it is characterized in that: comprise and be arranged on ground slide rail (2), by being fixed on road wheel (7) rolling of lower end, be installed on the main body frame (1) on slide rail (2), be installed on the some anode plate holding devices on main body frame (1), be movably set in the movable holding device of anode plate of main body frame (1) top, be arranged at main body frame (1) one side and height higher than winch (3) and the crane (15) of main body frame (1), described main body frame (1) outside is fixed with hanger I (6), after walking around pulley (4), the steel rope I (5) that described winch (3) kills that is fixed in hanger I (6), one lifting cross beam (10) upper end is fixed with hanger II (18), steel rope III (14) one end is fixed on the suspension hook of crane (15), its other end is fixed in hanger II (18), described lifting cross beam (10) lower end is fixed with respectively some steel rope II (13), some anode plate active card are placed in anode plate holding device, and be slidably mounted in the movable holding device of anode plate, the movable holding device of described anode plate is lifted on lifting cross beam (10) by the rope made of hemp (17), the other end of described some steel rope II (13) is individually fixed on each anode plate.
2. power plant according to claim 1 electric precipitation anode plate is installed lifting appliance, it is characterized in that: described anode plate holding device comprises the some clamping bar group I that are vertically fixed on respectively the upper rear and front end of main body frame (1), described each clamping bar group I consists of two clamping bar I (9) that are parallel to each other, spacing between two clamping bar I (9) of described each clamping bar group I and the thickness of anode plate match, and described each anode plate respectively vertical activity is plugged in each clamping bar group I.
3. power plant according to claim 1 electric precipitation anode plate is installed lifting appliance, it is characterized in that: the movable holding device of described anode plate comprises portable plate (8) and is vertically fixed on the some clamping bar group II on portable plate (8), described each clamping bar group II consists of two clamping bar II (11) that are parallel to each other, spacing between two clamping bar II (11) of described each clamping bar group II and the thickness of anode plate match, described each anode plate respectively vertical activity is plugged in each clamping bar group II, the upper end of described each clamping bar group II is provided with lock pin (12).
4. according to the power plant electric precipitation anode plate described in claim 1 or 2 or 3, lifting appliance is installed, is it is characterized in that: the tail end of described main body frame (1) is provided with some baffle plates (16), the tail end of each anode plate is resisted against respectively on baffle plate (16).
CN201410246059.9A 2014-06-05 2014-06-05 Power plant electric precipitation anode plate installs lifting appliance CN103991787B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410246059.9A CN103991787B (en) 2014-06-05 2014-06-05 Power plant electric precipitation anode plate installs lifting appliance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410246059.9A CN103991787B (en) 2014-06-05 2014-06-05 Power plant electric precipitation anode plate installs lifting appliance

Publications (2)

Publication Number Publication Date
CN103991787A true CN103991787A (en) 2014-08-20
CN103991787B CN103991787B (en) 2015-10-07

Family

ID=51306174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410246059.9A CN103991787B (en) 2014-06-05 2014-06-05 Power plant electric precipitation anode plate installs lifting appliance

Country Status (1)

Country Link
CN (1) CN103991787B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104743437A (en) * 2015-04-16 2015-07-01 山东电力建设第二工程公司 Electric precipitation anode plate hoisting device
CN105236258A (en) * 2015-11-18 2016-01-13 中国神华能源股份有限公司 Lifting method
CN106861908A (en) * 2017-03-03 2017-06-20 中冶宝钢技术服务有限公司 Sintering machine electric cleaner maintenance process
CN108622784A (en) * 2017-03-24 2018-10-09 中国二十冶集团有限公司 RS or BS discharge lines deduster electric field combined hanging methods
FR3098806A1 (en) * 2019-07-18 2021-01-22 Soc Dapplications Electriques Et Mecaniques Sapem Anti-router device, associated system and method, for tipping a heavy load.

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3073833B1 (en) * 2017-11-21 2020-06-19 Societe D'applications Electriques Et Mecaniques - Sapem ANTI-FOX DEVICE.

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09249986A (en) * 1996-03-13 1997-09-22 Nikko Kinzoku Kk Hanging device for electrode plate transporting device
CN2920418Y (en) * 2006-04-03 2007-07-11 朝阳双凌环保设备有限公司 Single point eccentric suspension structure of electric dust collector anode plate
CN202199428U (en) * 2011-08-02 2012-04-25 北票市波迪机械制造有限公司 Anode plate suspension device for electric deduster
CN102978668A (en) * 2012-12-20 2013-03-20 株洲天桥起重机股份有限公司 Method and tool for lifting electrolysis cathode plate and electrolysis anode plate
CN203474230U (en) * 2013-10-08 2014-03-12 铜陵有色金属集团股份有限公司金昌冶炼厂 Lifting appliance for lifting cathode plate and anode plate of electrodeposition technology
CN203593524U (en) * 2013-11-12 2014-05-14 宁夏天元锰业有限公司 Traveling crane hanger for metal manganese anode plate discharging
CN203922465U (en) * 2014-06-05 2014-11-05 山东电力建设第一工程公司 Power plant electric precipitation anode plate is installed lifting appliance

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09249986A (en) * 1996-03-13 1997-09-22 Nikko Kinzoku Kk Hanging device for electrode plate transporting device
CN2920418Y (en) * 2006-04-03 2007-07-11 朝阳双凌环保设备有限公司 Single point eccentric suspension structure of electric dust collector anode plate
CN202199428U (en) * 2011-08-02 2012-04-25 北票市波迪机械制造有限公司 Anode plate suspension device for electric deduster
CN102978668A (en) * 2012-12-20 2013-03-20 株洲天桥起重机股份有限公司 Method and tool for lifting electrolysis cathode plate and electrolysis anode plate
CN203474230U (en) * 2013-10-08 2014-03-12 铜陵有色金属集团股份有限公司金昌冶炼厂 Lifting appliance for lifting cathode plate and anode plate of electrodeposition technology
CN203593524U (en) * 2013-11-12 2014-05-14 宁夏天元锰业有限公司 Traveling crane hanger for metal manganese anode plate discharging
CN203922465U (en) * 2014-06-05 2014-11-05 山东电力建设第一工程公司 Power plant electric precipitation anode plate is installed lifting appliance

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104743437A (en) * 2015-04-16 2015-07-01 山东电力建设第二工程公司 Electric precipitation anode plate hoisting device
CN105236258A (en) * 2015-11-18 2016-01-13 中国神华能源股份有限公司 Lifting method
CN106861908A (en) * 2017-03-03 2017-06-20 中冶宝钢技术服务有限公司 Sintering machine electric cleaner maintenance process
CN108622784A (en) * 2017-03-24 2018-10-09 中国二十冶集团有限公司 RS or BS discharge lines deduster electric field combined hanging methods
FR3098806A1 (en) * 2019-07-18 2021-01-22 Soc Dapplications Electriques Et Mecaniques Sapem Anti-router device, associated system and method, for tipping a heavy load.

Also Published As

Publication number Publication date
CN103991787B (en) 2015-10-07

Similar Documents

Publication Publication Date Title
CN201842567U (en) Lifting frame for modular tube panel of waste heat boiler
CN201381166Y (en) Hanging-point adjustable transverse hanging beam
CN201220891Y (en) Bridge crane with guide elevating function
CN202346496U (en) Grounding wire winding storage vehicle
CN203531496U (en) Falling type double-holding-rod pole erecting device
CN203845712U (en) Heavy-duty equipment hoisting device
CN204297932U (en) A kind of clamping lifting device
CN203373022U (en) Self-lifting type cableway transportation device
CN204899238U (en) Unitized curtain wall plate hoist device
CN203411302U (en) Lifter
CN204185061U (en) Home lift beaming device
CN204324676U (en) Anchor ear lifting device
CN204434047U (en) A kind of Repair of Transformer adjustable lifting
CN201626764U (en) Coke oven fire door hanger
CN203568666U (en) Transformer substation GIS (gas insulated switchgear) current transformer hoisting tool
CN202038810U (en) Double-segment mousing-hook device for crane
CN202016798U (en) Special lifting appliance for tube bank of wind power generating tower
CN102759276A (en) Novel furnace door lifting device
CN202181165U (en) Cross lifting beam for box type transformer
GB201209006D0 (en) High rise building elevation concept
CN201517016U (en) Special sling for a centrifugal concrete pile long die
CN202594610U (en) I-shaped beam hoisting device for hoisting of pressure steel pipe tiles
CN204312958U (en) A kind of petroleum production platform monitoring apparatus lifting device
CN204607435U (en) Support type gauntry crane
CN204170002U (en) A kind of artificial digging pile safety apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model
CP03 Change of name, title or address

Address after: No.6 building, zone 2, Hanyu financial and business center, hi tech Zone, Jinan City, Shandong Province

Patentee after: SEPCO1 ELECTRIC POWER CONSTRUCTION CORPORATION Co.,Ltd.

Address before: 250131 No. 244 Industrial North Road, Jinan City, Shandong Province

Patentee before: SEPCO1 ELECTRIC POWER CONSTRUCTION Corp.