CN108385460A - The construction method of road base course on a kind of basement roof - Google Patents

The construction method of road base course on a kind of basement roof Download PDF

Info

Publication number
CN108385460A
CN108385460A CN201810060337.XA CN201810060337A CN108385460A CN 108385460 A CN108385460 A CN 108385460A CN 201810060337 A CN201810060337 A CN 201810060337A CN 108385460 A CN108385460 A CN 108385460A
Authority
CN
China
Prior art keywords
road
construction method
basement roof
curb
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810060337.XA
Other languages
Chinese (zh)
Inventor
谭国良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201810060337.XA priority Critical patent/CN108385460A/en
Publication of CN108385460A publication Critical patent/CN108385460A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/02Concrete base for bituminous paving

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention provides a kind of construction method of road base course on basement roof, and after 37 lime earth densification qualification, assembling reinforcement immediately pours C35 concrete, prevents 37 lime earth from being impregnated and being ensured the construction quality of underlayment by rainwater;Purpose is that solution general basement top plate area is all larger, the minimum problem of filter layer drainage grade.

Description

The construction method of road base course on a kind of basement roof
Technical field
The present invention relates to technical field of buildings, and in particular to the construction method of road base course on a kind of basement roof.
Background technology
Nearly recent decades, in order to which right combination utilizes limited land resource, in civilian and public building planning and designing, Basement is more and more widely used, and the basement useful space is taken full advantage of.Outdoor ground surface is then integrated into utilization, and just It often realizes original function, buries various energy medium comprehensive pipelines, lay road, landscape, greenbelt etc..But in cell road In construction, many technology barriers have been encountered.It is relatively thin because banketing on basement roof, generally between the ㎜ of 700 ㎜ -1200.Top plate Flexible waterproof roll layer is done in structure, then adds fish tail and waterproof layer and filter layer.General basement top plate area is all larger, filtering Layer drainage grade is minimum, when a few days heavy rain is come when attacking, backfill is already impregnated with by rainwater, and keeps a large amount of rainwater on top plate, It can not drain into other than basement roof immediately.
And specific Road base way is designed, still routinely way:General underlayment is the ㎜ of 250 ㎜~300 thick 37 lime earth mix uniform compaction, cement bonded sand stone step matches steady layer of water after base is 300 ㎜, and face layer is+40 ㎜ bitumen layers of 80 ㎜.By It finishes up in building, various energy medium comprehensive pipelines are in full swing, and can not have underlayment to concentrate execution conditions;Therefore, only one The a bit of mix 37 lime earth compacting of segment, applies because amount is small and can not contact steady layer of water professional contingent, often only equal complete After portion's underlayment is finished, contact steady layer of water professional contingent applies.And before steady layer of water professional contingent constructs, carry out underlayment Rainwater impregnates for several times, and personnel's walking, vehicle roll, and early have become mud, until fine day arrival, is exposed to the sun through 2~3 days, Wind blows ash and rises, dusty, when road roller rolls for the second time, is gushed on muddy water, mud turns over, and becomes mud spring layer, can only Excavate and reform, brings difficulty to Road base layer construction, the duration is caused to lag.A kind of completely new meet reality so only inventing The construction technical method of border situation, to ensure the construction quality and constructing aims of cell road foundation underlayment.
Invention content
The present invention provides a kind of construction method of road base course on basement roof, it is therefore intended that solves above-mentioned background skill The general basement top plate area proposed in art is all larger, the minimum problem of filter layer drainage grade.
To achieve the above object, the present invention provides a kind of construction method of road base course on basement roof, includes Construction content and step below:
Step 1 is planned center line on the fish tail and waterproof layer or trap drainage layer of basement roof, and is put along center line Outlet based underlayment side slope line, in over-the-counter mix dirt.
Dirt thickness control elevation line is determined in step 2, testing, is layered the dirt that paves.Stop compacting surplus.Road roller rolls It is closely knit.Various base tube lines of passing by one's way are buried in time.
Step 3, after dirt Density Detection qualification, the single layer reinforced mesh of timely assembling reinforcement concrete base layer.
Step 4, after steel corrosion quantity qualification, timely pouring reinforcement concrete base.
Step 5 cleans up after armored concrete base has all constructed, and cement bonded sand stone step matches steady layer of water.
Step 6, laying road curb, the road edge stone include curb kerbstone and the flat stone of curb.
Step 7, curb be laid with after, after qualification of inspecting for acceptance, clean up armored concrete base, dry or After wind is dry, pave asphalt base course and asphalt surface course.
Preferably, the dirt is 37 lime earth.
Preferably, the armored concrete base includes C35 concrete, and the thickness of the armored concrete base is 150 ㎜。
Preferably, reinforcing bar used in single layer reinforced mesh is 8 reinforcing bars of φ, the single layer reinforced mesh in the step 3 For the grid of 200 ㎜ of two-way spacing.
Preferably, paving thickness of the cement bonded sand stone step with steady layer of water is 150 ㎜ in the step 5.
Preferably, curb kerbstone and the flat stone absolute altitude error of curb are controlled in the step 6, ensure asphalt thickness
Description of the drawings
Fig. 1 illustrates the laying schematic diagram of the side slope line of the present invention;
Fig. 2 illustrates the laying schematic diagram of the road foundation of the present invention;
It illustrates:1. side slope line, 2. center lines, 3. basement roofs, 4. fish tail and waterproof layers, 5. trap drainage layers, 6. Dirt, 7. armored concrete bases, 8. cement bonded sand stone steps are with steady layer of water, 9. asphalt base courses, 10. asphalt surface courses, 11. curb sides Stone, the flat stone of 12. curbs.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to Limit the present invention.
Below in conjunction with the accompanying drawings and specific embodiment is further described the application principle of the present invention.
Embodiment one
The construction method of road base course on a kind of basement roof as depicted in figs. 1 and 2, includes in following construction Appearance and step:
Step 1 plans center line 2 on the fish tail and waterproof layer 4 or trap drainage layer 5 of basement roof 3, and along center Line 2 releases roadbed underlayment side slope line 1, in over-the-counter mix dirt 6.
6 thickness control elevation line of dirt is determined in step 2, testing, is layered the dirt 6 that paves.Stop compacting surplus.Road roller is ground Densification is real.Various base tube lines of passing by one's way are buried in time.
Step 3, after 6 Density Detection qualification of dirt, the single layer reinforced mesh of timely assembling reinforcement concrete base layer 7.
Step 4, after steel corrosion quantity qualification, timely pouring reinforcement concrete base 7.
Step 5 cleans up after armored concrete base 7 has all constructed, and cement bonded sand stone step matches steady layer of water 8.
Step 6, laying road curb, the road edge stone include curb kerbstone 11 and the flat stone of curb 12.
Step 7, curb be laid with after, after qualification of inspecting for acceptance, clean up armored concrete base 7, dry or After wind is dry, pave asphalt base course 9 and asphalt surface course 10.
Wherein, the dirt 6 is 37 lime earth;The armored concrete base 7 includes C35 concrete, and the reinforcing bar is mixed The thickness of solidifying soil matrix layer 7 is 150 ㎜;Reinforcing bar used in single layer reinforced mesh is 8 reinforcing bars of φ, the single layer in the step 3 Reinforced mesh is the grid of 200 ㎜ of two-way spacing;Paving thickness of the cement bonded sand stone step with steady layer of water 8 is in the step 5 150㎜;Curb kerbstone 11 and the flat 12 absolute altitude error of stone of curb are controlled in the step 6, ensure asphalt thickness.
After 37 lime earth densification qualification, assembling reinforcement immediately pours C35 concrete, prevents 37 lime earth from being soaked by rainwater Steep and ensure the construction quality of underlayment.
The present invention is applied on dozens of cell basement roof in construction subgrade subbase construction, through examining:It is vertical Pole is shown in shadow, with obvious effects, has effected a radical cure hidden danger of quality, ensure that the construction quality of underlayment, avoids and do over again, reduces cost, It ensure that constructing aims
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or equipment including a series of elements includes not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including institute State in the process, method, article or equipment of element that there is also other identical elements.
The above is only the specific implementation mode of the present invention, is made skilled artisans appreciate that or realizing this hair It is bright.Various modifications to these embodiments will be apparent to one skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.

Claims (6)

1. the construction method of road base course on a kind of basement roof, which is characterized in that include following construction content and step Suddenly:
Step 1 plans center line (2), and edge on the fish tail and waterproof layer (4) or trap drainage layer (5) of basement roof (3) Center line (2) releases roadbed underlayment side slope line (1), in over-the-counter mix dirt (6).
Dirt (6) thickness control elevation line is determined in step 2, testing, is layered the dirt (6) that paves.Stop compacting surplus.Road roller is ground Densification is real.Various base tube lines of passing by one's way are buried in time.
Step 3, after dirt (6) Density Detection qualification, the single layer reinforced mesh of timely assembling reinforcement concrete base layer (7).
Step 4, after steel corrosion quantity qualification, timely pouring reinforcement concrete base (7).
Step 5 cleans up after armored concrete base (7) has all constructed, and cement bonded sand stone step matches steady layer of water (8).
Step 6, laying road curb, the road edge stone include curb kerbstone (11) and the flat stone of curb (12).
Step 7 after qualification of inspecting for acceptance, cleans up armored concrete base (7) after curb is laid with, and dries or wind After drying, the asphalt base course that paves (9) and asphalt surface course (10).
2. the construction method of road base course on a kind of basement roof according to claim 1, which is characterized in that described Dirt (6) is 37 lime earth.
3. the construction method of road base course on a kind of basement roof according to claim 1, which is characterized in that described Armored concrete base (7) includes C35 concrete, and the thickness of the armored concrete base (7) is 150 ㎜.
4. the construction method of road base course on a kind of basement roof according to claim 1, which is characterized in that described Reinforcing bar used in single layer reinforced mesh is 8 reinforcing bars of φ in step 3, and the single layer reinforced mesh is the side of 200 ㎜ of two-way spacing Grid.
5. the construction method of road base course on a kind of basement roof according to claim 1, which is characterized in that described Paving thickness of the cement bonded sand stone step with steady layer of water (8) is 150 ㎜ in step 5.
6. the construction method of road base course on a kind of basement roof according to claim 1, which is characterized in that described Curb kerbstone (11) and the flat stone of curb (12) absolute altitude error is controlled in step 6, ensures asphalt thickness.
CN201810060337.XA 2018-01-22 2018-01-22 The construction method of road base course on a kind of basement roof Pending CN108385460A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810060337.XA CN108385460A (en) 2018-01-22 2018-01-22 The construction method of road base course on a kind of basement roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810060337.XA CN108385460A (en) 2018-01-22 2018-01-22 The construction method of road base course on a kind of basement roof

Publications (1)

Publication Number Publication Date
CN108385460A true CN108385460A (en) 2018-08-10

Family

ID=63077220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810060337.XA Pending CN108385460A (en) 2018-01-22 2018-01-22 The construction method of road base course on a kind of basement roof

Country Status (1)

Country Link
CN (1) CN108385460A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101424063A (en) * 2008-12-11 2009-05-06 周水林 Interim and permanent roads single time construction method
CN102352589A (en) * 2011-07-21 2012-02-15 济南城建集团有限公司 Construction method for road base concrete side mold
CN104404838A (en) * 2014-11-20 2015-03-11 中铁八局集团有限公司 Collapsed loess subgrade base treatment method for railway with speed more than 200km
CN106284011A (en) * 2016-08-16 2017-01-04 桐城市永锦建筑工程有限公司 Roadbed construction method
CN206174103U (en) * 2016-11-10 2017-05-17 江苏博森建筑设计有限公司 District garage top road surface structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101424063A (en) * 2008-12-11 2009-05-06 周水林 Interim and permanent roads single time construction method
CN102352589A (en) * 2011-07-21 2012-02-15 济南城建集团有限公司 Construction method for road base concrete side mold
CN104404838A (en) * 2014-11-20 2015-03-11 中铁八局集团有限公司 Collapsed loess subgrade base treatment method for railway with speed more than 200km
CN106284011A (en) * 2016-08-16 2017-01-04 桐城市永锦建筑工程有限公司 Roadbed construction method
CN206174103U (en) * 2016-11-10 2017-05-17 江苏博森建筑设计有限公司 District garage top road surface structure

Similar Documents

Publication Publication Date Title
CN106638918A (en) Construction method for sponge city rainwater collection system
CN207793788U (en) Permeable pavement rainwater infiltration structure
US20110064517A1 (en) Reinforced pervious concrete
CN104878678A (en) Construction method for water-permeable and water-retaining water-permeable pavement structure
CN206928164U (en) A kind of drainage type concrete road
CN107100227B (en) A kind of pergola on the city road LID biology delay ditch construction method
RU2492290C1 (en) Method to construct motor roads and motor road design
CN110158650A (en) A kind of underground structure that waterproof and drainage system are set
CN114876117B (en) Multi-gradient planting roof structure and construction method thereof
RU2312181C1 (en) Road structure
CN108086087A (en) A kind of construction method of porous pavement
CN110042723B (en) Construction method of full-prefabricated assembled permeable road
CN110965420A (en) Construction structure and construction method for road reconstruction and upgrading sponge city
CN104695298A (en) Complete permeable compound type road surface structure
CN106555371B (en) Garden large area pervious concrete road construction technique
CN112681624A (en) Construction method of roof planted in independent basement
CN108086459A (en) A kind of construction method of sponge urban green space water storage system
CN208362838U (en) A kind of porous pavement
CN207793792U (en) A kind of road surface permeable pavement structure
CN208501715U (en) A kind of Rain Garden
CN108385460A (en) The construction method of road base course on a kind of basement roof
CN108611948A (en) A kind of urban road permeable pavement structure
CN208815366U (en) A kind of assembled macrovoid asphalt paving
CN212053981U (en) Outdoor parking lot
CN204589747U (en) A kind of water permeability composite pavement structure completely

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180810