CN106284011A - Roadbed construction method - Google Patents

Roadbed construction method Download PDF

Info

Publication number
CN106284011A
CN106284011A CN201610674178.3A CN201610674178A CN106284011A CN 106284011 A CN106284011 A CN 106284011A CN 201610674178 A CN201610674178 A CN 201610674178A CN 106284011 A CN106284011 A CN 106284011A
Authority
CN
China
Prior art keywords
layer
making
construction method
roadbed
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610674178.3A
Other languages
Chinese (zh)
Other versions
CN106284011B (en
Inventor
殷永生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA ZHONGHUA GEOTECHNICAL ENGINEERING GROUP Co.,Ltd.
Original Assignee
TONGCHENG YONGJIN CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TONGCHENG YONGJIN CONSTRUCTION ENGINEERING Co Ltd filed Critical TONGCHENG YONGJIN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201610674178.3A priority Critical patent/CN106284011B/en
Publication of CN106284011A publication Critical patent/CN106284011A/en
Application granted granted Critical
Publication of CN106284011B publication Critical patent/CN106284011B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The open a kind of roadbed construction method of the present invention, comprises the following steps: S1, excavates rhone outside the roadbed of original place, and S2, the unwrapping wire of pile for prestressed pipe positions, press-fits, determines stake;S3, original place road excavation to target depth forms basic unit, element soil and the Calx levelling grinding compacting of doping;S4, point two-layer making blotter, every layer thickness is 90 100mm;S5, making geogrids layer: point two-layer making, first making steel plastic geogrid, repave stone powder levelling;S6, making reinforced concrete floor: form tiling grid shape bar-mat reinforcement, casting concrete on bar-mat reinforcement and pile for prestressed pipe in pile for prestressed pipe assembling reinforcement weld around;S7, making anti-filter geotechnique's layer of cloth;Anti-filter geotechnique's layer of cloth includes anti-filter geotextiles and covers the geomembrane at anti-filter Geotextile;S8, pours bitumen layer;Divide three layers to pour, every layer of 5cm.The present invention has the advantage that steadiness is good, settling amount is low.

Description

Roadbed construction method
Technical field
The present invention relates to road construction territory, it is more particularly related to a kind of roadbed construction method.
Background technology
There is considerable muddy soft soil coastal area, and muddy soft soil layer is thicker, and some areas are even more than 15 Rice.For the deepest Soft Roadbed, its embankment stability extreme difference, use change fill out, draining board consolidation, powder-spray pile, water Soft base construction quality after the conventional construction method process such as mud mixing pile is difficult to reach ideal effect, its treatment of soft foundation road Settlement after construction and the jumping car phenomenon of section are extremely serious.
Summary of the invention
For weak point present in above-mentioned technology, the present invention provides the roadbed that a kind of steadiness is good, reduce settling amount Construction method.
In order to realize according to object of the present invention and further advantage, the present invention is achieved through the following technical solutions:
Roadbed construction method of the present invention,
S1, removes original place surface irregularities, excavates rhone outside the roadbed of original place,
S2, the unwrapping wire of pile for prestressed pipe positions, press-fits, determines stake;
S3, original place road excavation forms basic unit to target depth, rolls levelling with the element soil doping of described basic unit for Calx Closely knit;
S4, making blotter, point two-layer making, every layer thickness is 90-100mm, and the rubble of lower level floor embeds element soil In;
S5, making geogrids layer: point two-layer making, first making steel plastic geogrid, repave stone powder levelling;
S6, making reinforced concrete floor: in described geogrids layer, in pile for prestressed pipe assembling reinforcement weld around shape Becoming tiling grid shape bar-mat reinforcement, casting concrete on described bar-mat reinforcement and described pile for prestressed pipe, described concrete is by weight Mark is poured formed in stone 10%-15%, cement 22%-35%, sand 30%-40%, the ratio of water 20%-30%;
S7, making anti-filter geotechnique's layer of cloth;Described anti-filter geotechnique's layer of cloth includes anti-filter geotextiles and covers anti-filter geotechnique The geomembrane on cloth surface;
S8, pours bitumen layer;Divide three layers to pour, every layer of 5cm.
Preferably, described rhone is less than original place roadbed 1.6m;Described excavation target depth is 50mm.
Preferably, the weight fraction ratio of described Calx and described element soil is 0.18:1, and the compactness of described basic unit is 90%.
Preferably, described blotter by cobble or particle size range 30~40mm crushed stone roll laying and form.
Preferably, in described stone powder, stone, stone powder, white lime granule, the weight fraction ratio of miscellaneous soil are 42:37: 11:10。
The present invention at least includes following beneficial effect:
Roadbed construction method of the present invention, after excavating rhone outside roadbed, placing pile for prestressed pipe, opens After digging basic unit, making blotter, geogrids layer, reinforced concrete floor, anti-filter geotechnique's layer of cloth and bitumen layer successively, effectively Consolidate basic unit, improve antiseepage, thus reduce settling amount.
Part is embodied by the further advantage of the present invention, target and feature by description below, and part also will be by this Invention research and practice and be understood by the person skilled in the art.
Accompanying drawing explanation
Fig. 1 is the flow chart of roadbed construction method of the present invention.
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to description literary composition Word can be implemented according to this.
Should be appreciated that used herein such as " have ", " comprising " and " including " term do not allot one or many Other element individual or the existence of a combination thereof or interpolation.
As it is shown in figure 1, the present invention provides a kind of roadbed construction method, comprise the following steps:
S1, removes original place surface irregularities, excavates rhone outside the roadbed of original place,
S2, the unwrapping wire of pile for prestressed pipe positions, press-fits, determines stake;
S3, original place road excavation forms basic unit to target depth, rolls levelling with the element soil doping of described basic unit for Calx Closely knit;
S4, making blotter, point two-layer making, every layer thickness is 90-100mm, and the rubble of lower level floor embeds element soil In;
S5, making geogrids layer: point two-layer making, first making steel plastic geogrid, repave stone powder levelling;
S6, making reinforced concrete floor: in described geogrids layer, in pile for prestressed pipe assembling reinforcement weld around shape Becoming tiling grid shape bar-mat reinforcement, casting concrete on described bar-mat reinforcement and described pile for prestressed pipe, described concrete is by weight Mark is poured formed in stone 10%-15%, cement 22%-35%, sand 30%-40%, the ratio of water 20%-30%;
S7, making anti-filter geotechnique's layer of cloth;Described anti-filter geotechnique's layer of cloth includes anti-filter geotextiles and covers anti-filter geotechnique The geomembrane on cloth surface;
S8, pours bitumen layer;Divide three layers to pour, every layer of 5cm.
Wherein, rhone is less than original place roadbed 1.6m;Excavation target depth is 50mm.Calx and the weight fraction ratio of element soil Example is 0.18:1, and the compactness of basic unit is 90%.The element soil doping levelling grinding compacting of Calx of basic unit, significantly reduces element soil Water content.Place pile for prestressed pipe, improve the bearing capacity of roadbed.Blotter by cobble or particle size range 30~40mm broken Stone rolls laying and forms, making blotter, further increases the bearing capacity of roadbed.Stone in stone powder, stone powder, white Ash particle, the weight fraction ratio of miscellaneous soil are 42:37:11:10, repave stone powder levelling after making steel plastic geogrid, aging resistance, Oxidation susceptibility, can the corrosion of the adverse circumstances such as acid and alkali resistance, salt, there is stronger bearing capacity.Good the breathing freely of anti-filter geotextiles Property and water penetration, make current pass through, and the soil particle that effectively dams, fine sand, little building stones etc., to keep the steadiness of roadbed.
Comparative example
The roadbed construction method of the present invention is compared with comparative example 1 and comparative example 2 construction method, such as table 1 institute Show:
Table 1 construction technology and parameter compare
From above-mentioned table 1, in the roadbed construction method of present invention offer and work progress, parameters ratio sets Putting, subgrade moisture content is relatively low, compacting counting is higher;There is the advantage that steadiness is good, settling amount is low.
Although embodiment of the present invention are disclosed as above, but it is not restricted in description and embodiment listed Use.It can be applied to various applicable the field of the invention completely.Can be easily for those skilled in the art Realize other amendment.Therefore, under the general concept limited without departing substantially from claim and equivalency range, the present invention does not limit In specific details with shown here as the legend with description.

Claims (5)

1. a roadbed construction method, it is characterised in that construction method comprises the following steps:
S1, removes original place surface irregularities, excavates rhone outside the roadbed of original place,
S2, the unwrapping wire of pile for prestressed pipe positions, press-fits, determines stake;
S3, original place road excavation forms basic unit to target depth, and adulterate levelling grinding compacting by the element soil of Calx with described basic unit;
S4, making blotter, point two-layer making, every layer thickness is 90-100mm, and the rubble of lower level floor embeds in element soil;
S5, making geogrids layer: point two-layer making, first making steel plastic geogrid, repave stone powder levelling;
S6, making reinforced concrete floor: in described geogrids layer, formed flat in pile for prestressed pipe assembling reinforcement weld around Lapping trellis bar-mat reinforcement, casting concrete on described bar-mat reinforcement and described pile for prestressed pipe, described concrete is by weight fraction Poured formed in stone 10%-15%, cement 22%-35%, sand 30%-40%, the ratio of water 20%-30%;
S7, making anti-filter geotechnique's layer of cloth;Described anti-filter geotechnique's layer of cloth includes anti-filter geotextiles and covers at anti-filter geotextiles table The geomembrane in face;
S8, pours bitumen layer;Divide three layers to pour, every layer of 5cm.
2. roadbed construction method as claimed in claim 1, it is characterised in that described rhone is less than original place roadbed 1.6m;Institute Stating excavation target depth is 50mm.
3. roadbed construction method as claimed in claim 1, it is characterised in that described Calx and the weight fraction ratio of described element soil Example is 0.18:1, and the compactness of described basic unit is 90%.
4. roadbed construction method as claimed in claim 1, it is characterised in that
Described blotter by cobble or particle size range 30~40mm crushed stone roll laying and form.
5. roadbed construction method as claimed in claim 1, it is characterised in that
In described stone powder, stone, stone powder, white lime granule, the weight fraction ratio of miscellaneous soil are 42:37:11:10.
CN201610674178.3A 2016-08-16 2016-08-16 Roadbed construction method Active CN106284011B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610674178.3A CN106284011B (en) 2016-08-16 2016-08-16 Roadbed construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610674178.3A CN106284011B (en) 2016-08-16 2016-08-16 Roadbed construction method

Publications (2)

Publication Number Publication Date
CN106284011A true CN106284011A (en) 2017-01-04
CN106284011B CN106284011B (en) 2018-08-28

Family

ID=57678074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610674178.3A Active CN106284011B (en) 2016-08-16 2016-08-16 Roadbed construction method

Country Status (1)

Country Link
CN (1) CN106284011B (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419630A (en) * 2017-06-13 2017-12-01 华中科技大学 A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN108385460A (en) * 2018-01-22 2018-08-10 中国十七冶集团有限公司 The construction method of road base course on a kind of basement roof
CN108560344A (en) * 2018-04-28 2018-09-21 长沙理工大学 A kind of old road base punishment depth determination method based on PFWD modulus
CN108611932A (en) * 2018-05-15 2018-10-02 中铁第六勘察设计院集团有限公司 It is a kind of pass through pool, fish pond location multiply road railway high-fill roadbed construction method
CN109183539A (en) * 2018-09-05 2019-01-11 辽宁工程技术大学 A kind of soft soil roadbed construction method
CN109537385A (en) * 2018-10-23 2019-03-29 中交公局第七工程有限公司 Construction process for filling foundation with silt
CN109750572A (en) * 2019-03-13 2019-05-14 岩土科技股份有限公司 A kind of steelframe geotechnique frame is used for the construction method of dirt road base instead of block stone
CN109778986A (en) * 2017-11-15 2019-05-21 北京建工路桥集团有限公司 A kind of prestressed concrete pipe road preventing differential settlement and its construction method
CN110144783A (en) * 2019-04-26 2019-08-20 福建省昊立建设工程有限公司 A kind of roadbed construction method
CN110184870A (en) * 2019-06-17 2019-08-30 中交第三公路工程局有限公司 Subtropical mountains highway mixture roadbed filling method
CN110273339A (en) * 2019-07-18 2019-09-24 厦门东翔工程设计有限公司 A kind of land subsidence crack resistence structure and its construction method
CN110499682A (en) * 2019-08-02 2019-11-26 广州市绿化公司 A kind of two pass formula jogging track and construction method
CN110593292A (en) * 2019-09-05 2019-12-20 广州市花木公司 Foundation cushion structure and construction method
CN110670437A (en) * 2019-10-16 2020-01-10 王伟 Method for reinforcing and treating soft foundation of newly-built highway engineering
CN111041930A (en) * 2019-12-25 2020-04-21 华润建筑有限公司 Expressway anti-scouring roadbed pavement and construction method
CN111535103A (en) * 2020-04-15 2020-08-14 上海蓝彬新材料科技有限公司 Municipal roadbed construction method
CN112227123A (en) * 2020-10-23 2021-01-15 中民集团第二工程有限公司 Construction method for backfilling road subgrade by matching excavator
CN112227124A (en) * 2020-10-26 2021-01-15 温州展业建设工程有限公司 Construction method for highway subgrade treatment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10317307A (en) * 1997-05-19 1998-12-02 Dia Consultant:Kk Construction method for road
CN103806433A (en) * 2014-03-06 2014-05-21 四川雅豪房地产开发有限公司 Foundation backfill reinforcement method
CN104894937A (en) * 2015-04-10 2015-09-09 成军 Construction method for mucky soft soil roadbase tubular pile
CN205223768U (en) * 2015-12-17 2016-05-11 杨继峰 Road subgrade sedimentation preventing facility
CN105648867A (en) * 2016-03-02 2016-06-08 杭州江润科技有限公司 Comprehensive ecological roadbed system and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10317307A (en) * 1997-05-19 1998-12-02 Dia Consultant:Kk Construction method for road
CN103806433A (en) * 2014-03-06 2014-05-21 四川雅豪房地产开发有限公司 Foundation backfill reinforcement method
CN104894937A (en) * 2015-04-10 2015-09-09 成军 Construction method for mucky soft soil roadbase tubular pile
CN205223768U (en) * 2015-12-17 2016-05-11 杨继峰 Road subgrade sedimentation preventing facility
CN105648867A (en) * 2016-03-02 2016-06-08 杭州江润科技有限公司 Comprehensive ecological roadbed system and construction method

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419630A (en) * 2017-06-13 2017-12-01 华中科技大学 A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN107419630B (en) * 2017-06-13 2023-06-20 华中科技大学 Soft soil foundation high-filling embankment capable of effectively controlling post-construction settlement and construction method
CN109778986A (en) * 2017-11-15 2019-05-21 北京建工路桥集团有限公司 A kind of prestressed concrete pipe road preventing differential settlement and its construction method
CN108385460A (en) * 2018-01-22 2018-08-10 中国十七冶集团有限公司 The construction method of road base course on a kind of basement roof
CN108560344A (en) * 2018-04-28 2018-09-21 长沙理工大学 A kind of old road base punishment depth determination method based on PFWD modulus
CN108560344B (en) * 2018-04-28 2020-04-17 长沙理工大学 Old roadbed treatment depth determination method based on PFWD modulus
CN108611932A (en) * 2018-05-15 2018-10-02 中铁第六勘察设计院集团有限公司 It is a kind of pass through pool, fish pond location multiply road railway high-fill roadbed construction method
CN109183539A (en) * 2018-09-05 2019-01-11 辽宁工程技术大学 A kind of soft soil roadbed construction method
CN109537385A (en) * 2018-10-23 2019-03-29 中交公局第七工程有限公司 Construction process for filling foundation with silt
CN109750572A (en) * 2019-03-13 2019-05-14 岩土科技股份有限公司 A kind of steelframe geotechnique frame is used for the construction method of dirt road base instead of block stone
CN110144783A (en) * 2019-04-26 2019-08-20 福建省昊立建设工程有限公司 A kind of roadbed construction method
CN110144783B (en) * 2019-04-26 2020-04-28 福建省昊立建设工程有限公司 Roadbed construction method
CN110184870A (en) * 2019-06-17 2019-08-30 中交第三公路工程局有限公司 Subtropical mountains highway mixture roadbed filling method
CN110273339A (en) * 2019-07-18 2019-09-24 厦门东翔工程设计有限公司 A kind of land subsidence crack resistence structure and its construction method
CN110499682A (en) * 2019-08-02 2019-11-26 广州市绿化公司 A kind of two pass formula jogging track and construction method
CN110593292A (en) * 2019-09-05 2019-12-20 广州市花木公司 Foundation cushion structure and construction method
CN110670437A (en) * 2019-10-16 2020-01-10 王伟 Method for reinforcing and treating soft foundation of newly-built highway engineering
CN110670437B (en) * 2019-10-16 2021-12-10 陕西建工东方蓝海岩土集团有限公司 Method for reinforcing and treating soft foundation of newly-built highway engineering
CN111041930A (en) * 2019-12-25 2020-04-21 华润建筑有限公司 Expressway anti-scouring roadbed pavement and construction method
CN111535103A (en) * 2020-04-15 2020-08-14 上海蓝彬新材料科技有限公司 Municipal roadbed construction method
CN112227123A (en) * 2020-10-23 2021-01-15 中民集团第二工程有限公司 Construction method for backfilling road subgrade by matching excavator
CN112227124A (en) * 2020-10-26 2021-01-15 温州展业建设工程有限公司 Construction method for highway subgrade treatment

Also Published As

Publication number Publication date
CN106284011B (en) 2018-08-28

Similar Documents

Publication Publication Date Title
CN106284011B (en) Roadbed construction method
CN106320123B (en) Construction of Soft Soil Subgrade method
CN101343852B (en) Method for filling highroad roadbed by waste steel slags
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN109056786A (en) Face upward inclined road shoulder wall water drainage behind the wall system and construction method
CN104131555B (en) A kind of outsourcing water penetration concrete reinforced pipe crushed stone grouting pile and construction method thereof
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN203383119U (en) Novel widening structure of highway embankment
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN108560542B (en) Waste tire coated building slag bidirectional reinforcement and construction method thereof
CN103334357B (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
CN103981876B (en) For deep soft foundation river course be close to combined member and the construction method that river embankment is built together
CN110144783B (en) Roadbed construction method
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
CN110093823B (en) Construction method of soft soil roadbed
CN108412016A (en) Underground tube body assures construction method
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN109610429A (en) Sedimentation treatment method under a kind of Collapsible Loess District prevention gas collection station ground and terrace
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN104099936A (en) Cascading waterfall waterscape structure on artificial stacked mountain and construction method thereof
CN116377780A (en) Mountain highway high-fill roadbed filling construction method
CN111794030A (en) Method for widening dyke foundation at through-dyke building
CN108824412B (en) Soft foundation treatment method based on gabion wall reinforced soil and dynamic compaction combination
CN106592363A (en) Construction method for municipal soft soil roadbed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200331

Address after: 102600 No. 1 Building, No. 13 Keyuan Road, Daxing District, Beijing

Patentee after: CHINA ZHONGHUA GEOTECHNICAL ENGINEERING GROUP Co.,Ltd.

Address before: 231400 Anhui city of Anqing province Tongcheng city longmian Street sand road Tongcheng Yongjin Construction Engineering Company Limited

Patentee before: TONGCHENG YONGJIN BUILDING ENGINEERING Co.,Ltd.