CN109750572A - A kind of steelframe geotechnique frame is used for the construction method of dirt road base instead of block stone - Google Patents
A kind of steelframe geotechnique frame is used for the construction method of dirt road base instead of block stone Download PDFInfo
- Publication number
- CN109750572A CN109750572A CN201910186672.9A CN201910186672A CN109750572A CN 109750572 A CN109750572 A CN 109750572A CN 201910186672 A CN201910186672 A CN 201910186672A CN 109750572 A CN109750572 A CN 109750572A
- Authority
- CN
- China
- Prior art keywords
- frame
- geotechnique
- steelframe
- layer
- steel bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The present invention relates to a kind of steelframe geotechnique frames, and block stone to be replaced to be used for the construction method of dirt road base, solves existing dirt road base and block stone or cement stabilized soil etc. is used to be frequently encountered in whole process of deployment as roadbase and roll the problems such as insufficient, stability is insufficient.This method uses steelframe geotechnique's frame of prefabrication, the steelframe geotechnique frame steel bar framework rectangular using reinforcement welding, frame is sheathed in steel bar framework with the soil engineering bag of size, soil engineering bag upper surface opening, excavates roadbed foundation trench, and roadbed foundation trench is successively laid with lower layer's TGXG, single-layer or multi-layer steelframe geotechnique's frame, every layer of steelframe geotechnique's frame calculates the construction of the amount of banketing fill compaction after being laid with, pour lightweight concrete base, casting concrete surface layer/asphalt surface course.Steelframe geotechnique's frame is replaced block stone to be used for roadbase by the present invention, and road foundation resistance can be made stronger, reduces roadbed subsidence.
Description
Technical field
The invention belongs to municipal construction fields, are related to a kind of road construction method, in particular to a kind of steelframe geotechnique frame generation
The construction method of dirt road base is used for for block stone.
Background technique
Roadbed is the basis on track or road surface, is the earthen structure by excavating or filling and formed.The master of roadbed
Act on be for track or road surfacing and train or driving operation necessary condition is provided, and bear track and rolling stock or
The dead load and dynamic load of person road surface and traffic loading, while load being transmitted and being spread to ground depths.In civil engineering,
Roadbed is all occupied an important position in construction quantity, occupied area and investing.Roadbed is different according to the orographic condition locating for it, has
Two kinds of citation forms: embankment and cutting are commonly called as embankment and excavation.The material for building roadbed, no matter filling out or digging, mainly native stone class
Discrete material is often subject to the variation of the natural conditions such as geology, water, rainfall, weather, earthquake so roadbed is a kind of earth structure
Invasion and destruction, resistivity is poor.Sub-surface is with homogenous material on roadbed (or bed course) surface according to certain skill
The quality of layer structure made of art measure layering making, material and quality directly affects the quality and service performance on road surface.
Base is the supporting course of entire road.Play a part of to stablize road surface.In practical projects, either filled-up ground or excavation
Roadbed can all use block stone or cement stabilized soil etc. and be frequently encountered and roll not in whole process of deployment as roadbase
Sufficiently, the problems such as stability is insufficient, this also gives the road after entirely building up to bring hidden danger, and later period roadbed subsidence, flatness are not
The problems such as enough, is quite serious.
Summary of the invention
It is an object of the invention to solve existing dirt road base to use block stone or cement stabilized soil etc. as roadbase, in entirety
It in process of deployment, is frequently encountered and rolls the problems such as insufficient, stability is insufficient, cause later period roadbed subsidence, flatness inadequate
The problem of, a kind of construction method that steelframe geotechnique frame replaces block stone to be used for dirt road base is provided, steelframe geotechnique frame and geotechnological lattice are passed through
Grid form composite construction, guarantee the globality and stability of structure.
The technical solution adopted by the present invention to solve the technical problems is: a kind of steelframe geotechnique frame replaces block stone to be used for dirt road
The construction method of base, it is characterised in that: using steelframe geotechnique's frame of prefabrication, the steelframe geotechnique frame using reinforcement welding at
The steel bar framework of rectangle is sheathed on soil engineering bag of the frame with size, soil engineering bag upper surface opening, subgrade construction in steel bar framework
The following steps are included:
Step 1 excavates roadbed foundation trench, forbids phenomenon of backbreaking in digging process, guarantee the flatness and levelness of excavation face;
Step 2, making lower layer TGXG makees reinforcement processing in the banketing of compacting after the compacting of roadbed foundation trench bottom surface, enables
It is enough to become entirety in the cohesive strength that lacing wire direction obtains and the tensile strength of lacing wire is adaptable, become one can support it is outer
The composite construction of power self weight;
Step 3, by prefabricated steelframe geotechnique's frame proper alignment on roadbed, it is ensured that adjacent steel bar framework fits closely, simultaneously
Guarantee flatness and levelness;
It is real to fill soil pressure in steelframe geotechnique's frame for step 4, it is ensured that each framework compacting is abundant, uniform force;
Step 5 is laid with single layer multilayer steelframe geotechnique frame or repeats Step 3: four are laid with multilayer steelframe geotechnique's frame, in top layer
Making topsoil work grid on steelframe geotechnique's frame forms a whole composite construction with lower layer's grid collective effect;
Step 6 pours lightweight concrete base;
Step 7, casting concrete surface layer/asphalt surface course.
This method replaces block stone using prefabricated steelframe geotechnique's frame, and the steel bar framework of steelframe geotechnique's frame can provide better branch
Support effect, improves roadbed bearing capacity, reduces roadbed subsidence.Compared to the existing simple form of construction work using soil engineering bag, we
The steel bar framework of method not only acts as supporting role, and confines to soil engineering bag and banketing, when avoiding using soil engineering bag merely,
Soil engineering bag breakage flowing of banketing causes roadbed irregular, and pit etc. is generated under long term, causes surface evenness to be deteriorated, influences to hand over
Logical safety.
Preferably, in step 3, the adjacent steel bar framework fissure of displacement cloth before and after road direction of same layer steelframe geotechnique's frame
It sets.
Preferably, repeat Step 3: four be laid with multilayer steelframe geotechnique's frame when, the reinforcing bar of neighbouring layer steelframe geotechnique's frame
Frame or so layout of the wrong seam.
Preferably, repeat Step 3: four be laid with multilayer steelframe geotechnique's frame when, the reinforcing bar of neighbouring layer steelframe geotechnique's frame
Layout of the wrong seam before and after frame.
Preferably, first calculating the amount of fill of each steelframe geotechnique frame, addition first artificial preliminary bat after banketing in step 4
It is real, then practical road roller compacting.
Preferably, the length and width of the steelframe geotechnique frame is 0.8-1.2m, and it is highly 0.4-0.6m, the steelframe
The steel bar framework of geotechnological frame selects the molding of diameter 6mm reinforcement welding.
Steelframe geotechnique's frame is replaced block stone to be used for roadbase by the present invention, and road foundation resistance can be made stronger, is reduced
Roadbed subsidence.
Detailed description of the invention
The present invention will be further described below with reference to the drawings.
Fig. 1 is a kind of roadbed the schematic diagram of the section structure of the present invention.
Fig. 2 is a kind of steelframe geotechnique mount structure schematic diagram of the present invention.
Fig. 3 is a kind of same layer steelframe geotechnique frame layout of the wrong seam structural schematic diagram of the present invention.
Fig. 4 is a kind of double-deck steelframe geotechnique's frame of the present invention or so layout of the wrong seam structural schematic diagram.
In figure: 1, lower layer's TGXG, 2, double-deck steelframe geotechnique's frame, 21, upper layer steelframe geotechnique's frame, 22, lower layer's steelframe soil
Work frame, 3, upper layer TGXG, 4, lightweight concrete base, 5, concrete topping/asphalt surface course, 6, gutter, 7, reinforcing steel bar frame
Frame, 8, soil engineering bag, 9, banket.
Specific embodiment
Below by specific embodiment and in conjunction with attached drawing, the present invention is further described.
Embodiment: a kind of steelframe geotechnique frame is used for the construction method of dirt road base instead of block stone, as shown in Figure 1.The present embodiment
Using steelframe geotechnique's frame of prefabrication, the steelframe geotechnique frame is as shown in Fig. 2, the steel bar framework rectangular using reinforcement welding
7, it is highly 0.4-0.6m that the length and width of steelframe geotechnique's frame, which is 0.8-1.2m, the steel bar framework choosing of the steelframe geotechnique frame
It is formed with diameter 6mm reinforcement welding.Soil engineering bag 8 of the frame with size is sheathed in steel bar framework, soil engineering bag upper surface is open,
Subgrade construction the following steps are included:
Step 1 excavates roadbed foundation trench, forbids phenomenon of backbreaking in digging process, guarantee the flatness and levelness of excavation face;
Step 2, making lower layer TGXG 1 makees reinforcement processing in the banketing of compacting after the compacting of roadbed foundation trench bottom surface, enables
It is enough to become entirety in the cohesive strength that lacing wire direction obtains and the tensile strength of lacing wire is adaptable, become one can support it is outer
The composite construction of power self weight;
Step 3, by prefabricated steelframe geotechnique's frame proper alignment on roadbed, it is ensured that adjacent steel bar framework fits closely, simultaneously
Guarantee flatness and levelness;
It is real to fill soil pressure in steelframe geotechnique's frame for step 4, it is ensured that each framework compacting is abundant, uniform force;First calculate each steel
The amount of fill of frame geotechnique's frame is added after banketing 9 and first manually tentatively makes real, then practical road roller compacting,
Step 5 repeats Step 3: four are laid with the double-deck steelframe geotechnique frame 2, the making topsoil work on top layer's steelframe geotechnique's frame
Grid 3 forms a whole composite construction with lower layer's grid collective effect;
Step 6 pours lightweight concrete base 4;
Step 7, casting concrete surface layer/asphalt surface course 5.
As shown in figure 3, the adjacent steel bar framework layout of the wrong seam before and after road direction of same layer steelframe geotechnique's frame.Such as Fig. 4
It is shown, steel bar framework of neighbouring layer steelframe geotechnique's frame or so layout of the wrong seam.The reinforcing steel bar frame of neighbouring layer steelframe geotechnique's frame
Layout of the wrong seam before and after frame.
This method replaces block stone using prefabricated steelframe geotechnique's frame, and the steel bar framework of steelframe geotechnique's frame can provide better branch
Support effect, improves roadbed bearing capacity, reduces roadbed subsidence.Compared to the existing simple form of construction work using soil engineering bag, we
The steel bar framework of method not only acts as supporting role, and confines to soil engineering bag and banketing, when avoiding using soil engineering bag merely,
Soil engineering bag breakage flowing of banketing causes roadbed irregular, and pit etc. is generated under long term, causes surface evenness to be deteriorated, influences to hand over
Logical safety.
Claims (6)
1. a kind of steelframe geotechnique frame replaces block stone for the construction method of dirt road base, it is characterised in that: use the steel of prefabrication
Frame geotechnique's frame, the steelframe geotechnique frame steel bar framework rectangular using reinforcement welding, it is same to be sheathed on frame in steel bar framework
The soil engineering bag of size, soil engineering bag upper surface opening, subgrade construction the following steps are included:
Step 1 excavates roadbed foundation trench, forbids phenomenon of backbreaking in digging process, guarantee the flatness and levelness of excavation face;
Step 2, making lower layer TGXG makees reinforcement processing in the banketing of compacting after the compacting of roadbed foundation trench bottom surface, enables
It is enough to become entirety in the cohesive strength that lacing wire direction obtains and the tensile strength of lacing wire is adaptable, become one can support it is outer
The composite construction of power self weight;
Step 3, by prefabricated steelframe geotechnique's frame proper alignment on roadbed, it is ensured that adjacent steel bar framework fits closely, simultaneously
Guarantee flatness and levelness;
It is real to fill soil pressure in steelframe geotechnique's frame for step 4, it is ensured that each framework compacting is abundant, uniform force;
Step 5 is laid with single layer multilayer steelframe geotechnique frame or repeats Step 3: four are laid with multilayer steelframe geotechnique's frame, in top layer
Making topsoil work grid on steelframe geotechnique's frame forms a whole composite construction with lower layer's grid collective effect;
Step 6 pours lightweight concrete base;
Step 7, casting concrete surface layer/asphalt surface course.
2. a kind of steelframe geotechnique frame according to claim 1 replaces block stone for the construction method of dirt road base, feature exists
In: in step 3, the adjacent steel bar framework layout of the wrong seam before and after road direction of same layer steelframe geotechnique's frame.
3. a kind of steelframe geotechnique frame according to claim 1 replaces block stone for the construction method of dirt road base, feature exists
In: repeatedly Step 3: when four are laid with multilayer steelframe geotechnique's frame, steel bar framework of neighbouring layer steelframe geotechnique's frame or so fissure of displacement cloth
It sets.
4. a kind of steelframe geotechnique frame according to claim 1 replaces block stone for the construction method of dirt road base, feature exists
In: repeatedly Step 3: when four are laid with multilayer steelframe geotechnique's frame, fissure of displacement cloth before and after the steel bar framework of neighbouring layer steelframe geotechnique's frame
It sets.
5. a kind of steelframe geotechnique frame according to claim 1 replaces block stone for the construction method of dirt road base, feature exists
In: in step 4, the amount of fill of each steelframe geotechnique frame is first calculated, addition first manually tentatively makes real after banketing, then practical pressure
The compacting of road machine.
6. a kind of steelframe geotechnique frame according to claim 1 replaces block stone for the construction method of dirt road base, feature exists
In: the length and width of the steelframe geotechnique frame is 0.8-1.2m, is highly 0.4-0.6m, the reinforcing steel bar frame of the steelframe geotechnique frame
Frame selects the molding of diameter 6mm reinforcement welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910186672.9A CN109750572A (en) | 2019-03-13 | 2019-03-13 | A kind of steelframe geotechnique frame is used for the construction method of dirt road base instead of block stone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910186672.9A CN109750572A (en) | 2019-03-13 | 2019-03-13 | A kind of steelframe geotechnique frame is used for the construction method of dirt road base instead of block stone |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109750572A true CN109750572A (en) | 2019-05-14 |
Family
ID=66408410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910186672.9A Pending CN109750572A (en) | 2019-03-13 | 2019-03-13 | A kind of steelframe geotechnique frame is used for the construction method of dirt road base instead of block stone |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109750572A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201933380U (en) * | 2010-12-02 | 2011-08-17 | 张国玉 | Novel geotechnical grid |
CN104358202A (en) * | 2014-10-22 | 2015-02-18 | 交通运输部公路科学研究所 | Pavement structure layer and paving method thereof |
CN104863031A (en) * | 2015-05-11 | 2015-08-26 | 长安大学 | Karst region ductile anti-collapse roadbed structure and construction method of Karst region ductile anti-sag roadbed structure |
CN105793492A (en) * | 2013-09-30 | 2016-07-20 | 吉欧泰克科技有限公司 | Pavement systems with geocell and geogrid |
CN205529731U (en) * | 2016-01-21 | 2016-08-31 | 黄海 | Prefabricated rubble book of adjustable intensity and modulus |
CN106284011A (en) * | 2016-08-16 | 2017-01-04 | 桐城市永锦建筑工程有限公司 | Roadbed construction method |
-
2019
- 2019-03-13 CN CN201910186672.9A patent/CN109750572A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201933380U (en) * | 2010-12-02 | 2011-08-17 | 张国玉 | Novel geotechnical grid |
CN105793492A (en) * | 2013-09-30 | 2016-07-20 | 吉欧泰克科技有限公司 | Pavement systems with geocell and geogrid |
CN104358202A (en) * | 2014-10-22 | 2015-02-18 | 交通运输部公路科学研究所 | Pavement structure layer and paving method thereof |
CN104863031A (en) * | 2015-05-11 | 2015-08-26 | 长安大学 | Karst region ductile anti-collapse roadbed structure and construction method of Karst region ductile anti-sag roadbed structure |
CN205529731U (en) * | 2016-01-21 | 2016-08-31 | 黄海 | Prefabricated rubble book of adjustable intensity and modulus |
CN106284011A (en) * | 2016-08-16 | 2017-01-04 | 桐城市永锦建筑工程有限公司 | Roadbed construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102966119B (en) | Geogrid reinforced wall and construction method thereof | |
CN104928996B (en) | Railway light soil side broad way based structures | |
CN103334357B (en) | Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method | |
CN102296507B (en) | Treatment method of subgrade cracks | |
CN101144256B (en) | Slag-free orbit reinforced concrete pile net structure roadbed and construction method thereof | |
CN105274922B (en) | A kind of antiskid key steel-pipe pile composite construction and method for repairing landslide roadbed | |
CN102359046A (en) | High fill subgrade connection method | |
CN104846840B (en) | A kind of shallow embedding reinforcement of soft soil integrated pipe canal device and construction method | |
CN109750571B (en) | Road collapse emergency and permanent retaining integrated structure and construction method | |
KR101006082B1 (en) | The soft foundation surface processing method of construction for which bamboo net was used | |
CN110777588A (en) | Pressure filling construction method for soil-stone mixed high-filling roadbed | |
CN210194361U (en) | Splicing structure for widening new and old roadbeds on road | |
CN203334154U (en) | Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct | |
DE19930701A1 (en) | Tub construction for an underpass of a traffic route | |
CN107288120A (en) | A kind of stabilization by drainage structure of new and old roadbed in the firm splicing of watersplash | |
CN207525567U (en) | A kind of pile plate composite structure suitable for Steep Slope Embankment | |
CN207331739U (en) | A kind of heightening and consolidation structure of in-service reinforced concrete retaining wall | |
CN110805049B (en) | Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure | |
CN111005278B (en) | Rapid repairing and reinforcing method for locally-reinforced embankment | |
CN111576118A (en) | Down-through type road culvert transition section foam light soil roadbed structure and construction method thereof | |
CN112681043A (en) | Roadbed splicing and widening structure and construction method | |
CN210946329U (en) | High embankment structure of filling up in subway top | |
CN112323559A (en) | Transverse new and old roadbed connecting structure and construction method | |
CN108677999B (en) | Silt bagged soil retaining wall structure and construction method | |
CN206752209U (en) | A kind of high-speed railway lattice embankment structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190514 |
|
RJ01 | Rejection of invention patent application after publication |