CN106284011B - Roadbed construction method - Google Patents

Roadbed construction method Download PDF

Info

Publication number
CN106284011B
CN106284011B CN201610674178.3A CN201610674178A CN106284011B CN 106284011 B CN106284011 B CN 106284011B CN 201610674178 A CN201610674178 A CN 201610674178A CN 106284011 B CN106284011 B CN 106284011B
Authority
CN
China
Prior art keywords
making
layer
construction method
roadbed
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610674178.3A
Other languages
Chinese (zh)
Other versions
CN106284011A (en
Inventor
殷永生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA ZHONGHUA GEOTECHNICAL ENGINEERING GROUP Co.,Ltd.
Original Assignee
TONGCHENG YONGJIN CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TONGCHENG YONGJIN CONSTRUCTION ENGINEERING Co Ltd filed Critical TONGCHENG YONGJIN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201610674178.3A priority Critical patent/CN106284011B/en
Publication of CN106284011A publication Critical patent/CN106284011A/en
Application granted granted Critical
Publication of CN106284011B publication Critical patent/CN106284011B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention discloses a kind of roadbed construction method, includes the following steps:Rhone, S2 are excavated in S1, in situ roadbed outside, and the unwrapping wire positioning of pile for prestressed pipe, determines stake at piling;S3, original place road excavation to target depth form base, and element soil adulterates levelling grinding compacting with lime;S4, point two layers of making blotter are 90 100mm per layer thickness;S5, making geogrids layer:Divide two layers of making, first making steel plastic geogrid that it is levelling to repave mountain flour;S6, making reinforced concrete floor:Assembling reinforcement is welded around pile for prestressed pipe forms tiling grid shape bar-mat reinforcement, the casting concrete on bar-mat reinforcement and pile for prestressed pipe;S7, making anti-filter geotextile layer;Anti-filter geotextile layer includes anti-filter geotextiles and the geomembrane for being covered in anti-filter Geotextile;S8 pours bitumen layer;Divide three layers to pour, every layer of 5cm.The present invention has the advantages that stability is good, settling amount is low.

Description

Roadbed construction method
Technical field
The present invention relates to road construction territories, it is more particularly related to a kind of roadbed construction method.
Background technology
There is considerable muddy soft soil in coastal area, and muddy soft soil layer is thicker, and some areas are even more than 15 Rice.For so deep Soft Roadbed, embankment stability is very poor, using change fill out, drain bar consolidation, powder-spray pile, water Treated that soft base construction quality is difficult to achieve the effect that ideal, treatment of soft foundation road for the conventional construction methods such as mud mixing pile The settlement after construction and jump vehicle phenomenon of section are extremely serious.
Invention content
Shortcoming present in view of the above technology, the present invention provide a kind of stability it is good, reduce settling amount roadbed Construction method.
In order to realize these purposes and other advantages according to the present invention, the invention is realized by the following technical scheme:
Roadbed construction method of the present invention,
S1 removes original place surface irregularities, rhone is excavated on the outside of in situ roadbed,
S2, the unwrapping wire positioning of pile for prestressed pipe, determine stake at piling;
S3, original place road excavation to target depth form base, and lime and the element soil of the base are adulterated levelling roll It is closely knit;
S4, making blotter, point two layers of making are 90-100mm, the rubble insertion element soil of lower level floor per layer thickness In;
S5, making geogrids layer:Divide two layers of making, first making steel plastic geogrid that it is levelling to repave mountain flour;
S6, making reinforced concrete floor:In the geogrids layer, assembling reinforcement shape is welded around pile for prestressed pipe At tiling grid shape bar-mat reinforcement, the casting concrete on the bar-mat reinforcement and the pile for prestressed pipe, the concrete is by weight Score is poured in the ratio of stone 10%-15%, cement 22%-35%, sand 30%-40%, water 20%-30%;
S7, making anti-filter geotextile layer;The anti-filter geotextile layer include anti-filter geotextiles and be covered in anti-filter geotechnique The geomembrane on cloth surface;
S8 pours bitumen layer;Divide three layers to pour, every layer of 5cm.
Preferably, the rhone is less than original place roadbed 1.6m;The excavation target depth is 50mm.
Preferably, the weight fraction ratio of the lime and the element soil is 0.18:1, the compactness of the base is 90%.
Preferably, the blotter is rolled in the crushed stone of 30~40mm by cobble or particle size range and is laid with.
Preferably, stone in the mountain flour, stone powder, lime particle, miscellaneous soil weight fraction ratio be 42:37: 11:10。
The present invention includes at least following advantageous effect:
Roadbed construction method of the present invention is opened after excavating rhone on the outside of roadbed, placing pile for prestressed pipe After digging base, making blotter, geogrids layer, reinforced concrete floor, anti-filter geotextile layer and bitumen layer successively, effectively Ground consolidates base, improves antiseepage, to reduce settling amount.
Part is illustrated to embody by further advantage, target and the feature of the present invention by following, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Description of the drawings
Fig. 1 is the flow chart of roadbed construction method of the present invention.
Specific implementation mode
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art with reference to specification text Word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or more The presence or addition of a other elements or combinations thereof.
As shown in Figure 1, the present invention provides a kind of roadbed construction method, include the following steps:
S1 removes original place surface irregularities, rhone is excavated on the outside of in situ roadbed,
S2, the unwrapping wire positioning of pile for prestressed pipe, determine stake at piling;
S3, original place road excavation to target depth form base, and lime and the element soil of the base are adulterated levelling roll It is closely knit;
S4, making blotter, point two layers of making are 90-100mm, the rubble insertion element soil of lower level floor per layer thickness In;
S5, making geogrids layer:Divide two layers of making, first making steel plastic geogrid that it is levelling to repave mountain flour;
S6, making reinforced concrete floor:In the geogrids layer, assembling reinforcement shape is welded around pile for prestressed pipe At tiling grid shape bar-mat reinforcement, the casting concrete on the bar-mat reinforcement and the pile for prestressed pipe, the concrete is by weight Score is poured in the ratio of stone 10%-15%, cement 22%-35%, sand 30%-40%, water 20%-30%;
S7, making anti-filter geotextile layer;The anti-filter geotextile layer include anti-filter geotextiles and be covered in anti-filter geotechnique The geomembrane on cloth surface;
S8 pours bitumen layer;Divide three layers to pour, every layer of 5cm.
Wherein, rhone is less than original place roadbed 1.6m;It is 50mm to excavate target depth.The weight fraction ratio of lime and element soil Example is 0.18:1, the compactness of base is 90%.The element soil doping levelling grinding compacting of lime of base, significantly reduces plain soil Water content.Pile for prestressed pipe is placed, the bearing capacity of roadbed is improved.Blotter is by cobble or particle size range in the broken of 30~40mm Stone, which rolls, to be laid with, and making blotter further improves the bearing capacity of roadbed.It is stone in mountain flour, stone powder, white Ash particle, miscellaneous soil weight fraction ratio be 42:37:11:10, it is levelling to repave mountain flour after making steel plastic geogrid, anti-aging, Oxidation susceptibility, can the adverse circumstances such as acid and alkali resistance, salt corrosion, there is stronger bearing capacity.Anti-filter geotextiles are good ventilative Property and water penetration, make flow pass through, and the soil particle that effectively shuts off, fine sand, small building stones etc., to keep the stability of roadbed.
Comparative example
By the roadbed construction method of the present invention compared with 2 construction method of comparative example 1 and comparative example, such as 1 institute of table Show:
1 construction technology of table and parameter compare
By above-mentioned table 1 it is found that parameters ratio is set in roadbed construction method provided by the invention and work progress It sets, subgrade moisture content is relatively low, compacting counting is higher;Have the advantages that stability is good, settling amount is low.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With.It can be applied to various suitable the field of the invention completely.It for those skilled in the art can be easily Realize other modification.Therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (5)

1. a kind of roadbed construction method, which is characterized in that construction method includes the following steps:
S1 removes original place surface irregularities, rhone is excavated on the outside of in situ roadbed,
S2, the unwrapping wire positioning of pile for prestressed pipe, determine stake at piling;
S3, original place road excavation to target depth form base, and the element soil of lime and the base is adulterated levelling grinding compacting;
S4, making blotter, point two layers of making is 90-100mm per layer thickness, and the rubble of lower level floor is embedded in element soil;
S5, making geogrids layer:Divide two layers of making, first making steel plastic geogrid that it is levelling to repave mountain flour;
S6, making reinforced concrete floor:In the geogrids layer, around pile for prestressed pipe weld assembling reinforcement formed it is flat Lapping trellis bar-mat reinforcement, the casting concrete on the bar-mat reinforcement and the pile for prestressed pipe, the concrete is by weight fraction It is poured in the ratio of stone 10%-15%, cement 22%-35%, sand 30%-40%, water 20%-30%;
S7, making anti-filter geotextile layer;The anti-filter geotextile layer includes anti-filter geotextiles and is covered in anti-filter geotextiles table The geomembrane in face;
S8 pours bitumen layer;Divide three layers to pour, every layer of 5cm.
2. roadbed construction method as described in claim 1, which is characterized in that the rhone is less than original place roadbed 1.6m;Institute It is 50mm to state and excavate target depth.
3. roadbed construction method as described in claim 1, which is characterized in that the weight fraction ratio of the lime and the element soil Example is 0.18:1, the compactness of the base is 90%.
4. roadbed construction method as described in claim 1, which is characterized in that
The blotter is rolled in the crushed stone of 30~40mm by cobble or particle size range and is laid with.
5. roadbed construction method as described in claim 1, which is characterized in that
Stone in the mountain flour, stone powder, lime particle, miscellaneous soil weight fraction ratio be 42:37:11:10.
CN201610674178.3A 2016-08-16 2016-08-16 Roadbed construction method Active CN106284011B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610674178.3A CN106284011B (en) 2016-08-16 2016-08-16 Roadbed construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610674178.3A CN106284011B (en) 2016-08-16 2016-08-16 Roadbed construction method

Publications (2)

Publication Number Publication Date
CN106284011A CN106284011A (en) 2017-01-04
CN106284011B true CN106284011B (en) 2018-08-28

Family

ID=57678074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610674178.3A Active CN106284011B (en) 2016-08-16 2016-08-16 Roadbed construction method

Country Status (1)

Country Link
CN (1) CN106284011B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419630B (en) * 2017-06-13 2023-06-20 华中科技大学 Soft soil foundation high-filling embankment capable of effectively controlling post-construction settlement and construction method
CN109778986A (en) * 2017-11-15 2019-05-21 北京建工路桥集团有限公司 A kind of prestressed concrete pipe road preventing differential settlement and its construction method
CN108385460A (en) * 2018-01-22 2018-08-10 中国十七冶集团有限公司 The construction method of road base course on a kind of basement roof
CN108560344B (en) * 2018-04-28 2020-04-17 长沙理工大学 Old roadbed treatment depth determination method based on PFWD modulus
CN108611932B (en) * 2018-05-15 2019-07-12 中铁第六勘察设计院集团有限公司 A kind of construction method for passing through pool, fish pond location multiply road railway high-fill roadbed
CN109183539A (en) * 2018-09-05 2019-01-11 辽宁工程技术大学 A kind of soft soil roadbed construction method
CN109537385A (en) * 2018-10-23 2019-03-29 中交公局第七工程有限公司 Construction process for filling foundation with silt
CN109750572A (en) * 2019-03-13 2019-05-14 岩土科技股份有限公司 A kind of steelframe geotechnique frame is used for the construction method of dirt road base instead of block stone
CN110144783B (en) * 2019-04-26 2020-04-28 福建省昊立建设工程有限公司 Roadbed construction method
CN110184870B (en) * 2019-06-17 2020-12-01 中交第三公路工程局有限公司 Method for filling mixed material roadbed of expressway in subtropical mountain area
CN110273339B (en) * 2019-07-18 2021-03-05 厦门东翔工程设计有限公司 Ground sinking anti-cracking structure and construction method thereof
CN110499682A (en) * 2019-08-02 2019-11-26 广州市绿化公司 A kind of two pass formula jogging track and construction method
CN110593292A (en) * 2019-09-05 2019-12-20 广州市花木公司 Foundation cushion structure and construction method
CN110670437B (en) * 2019-10-16 2021-12-10 陕西建工东方蓝海岩土集团有限公司 Method for reinforcing and treating soft foundation of newly-built highway engineering
CN111041930A (en) * 2019-12-25 2020-04-21 华润建筑有限公司 Expressway anti-scouring roadbed pavement and construction method
CN111535103B (en) * 2020-04-15 2022-01-28 中建力天集团有限公司 Municipal roadbed construction method
CN112227123A (en) * 2020-10-23 2021-01-15 中民集团第二工程有限公司 Construction method for backfilling road subgrade by matching excavator
CN112227124A (en) * 2020-10-26 2021-01-15 温州展业建设工程有限公司 Construction method for highway subgrade treatment

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3528950B2 (en) * 1997-05-19 2004-05-24 株式会社ダイヤコンサルタント Road construction method
CN103806433A (en) * 2014-03-06 2014-05-21 四川雅豪房地产开发有限公司 Foundation backfill reinforcement method
CN104894937A (en) * 2015-04-10 2015-09-09 成军 Construction method for mucky soft soil roadbase tubular pile
CN205223768U (en) * 2015-12-17 2016-05-11 杨继峰 Road subgrade sedimentation preventing facility
CN105648867B (en) * 2016-03-02 2017-10-31 杭州江润科技有限公司 A kind of construction method of comprehensive ecological roadbed system

Also Published As

Publication number Publication date
CN106284011A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106284011B (en) Roadbed construction method
CN106320123B (en) Construction of Soft Soil Subgrade method
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN101343852B (en) Method for filling highroad roadbed by waste steel slags
CN104131555B (en) A kind of outsourcing water penetration concrete reinforced pipe crushed stone grouting pile and construction method thereof
CN103334357B (en) Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method
CN109056786A (en) Face upward inclined road shoulder wall water drainage behind the wall system and construction method
CN107905089A (en) A kind of reinforcement platform back of the body for preventing bumping at bridge-head and its construction method
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN108560542B (en) Waste tire coated building slag bidirectional reinforcement and construction method thereof
CN103981876B (en) For deep soft foundation river course be close to combined member and the construction method that river embankment is built together
CN113445396B (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN110144783B (en) Roadbed construction method
CN107190602A (en) A kind of river degradation section pile formula foam concrete light road bank structure and construction method
CN108412016A (en) Underground tube body assures construction method
CN209039896U (en) The soft soil roadbed three-dimensional reinforced structure of convolution is knitted in a kind of stake-
CN110093823A (en) A kind of soft soil roadbed construction method
CN110965416A (en) Bamboo reinforcement system for reinforcing high-fill roadbed in mountainous area and construction method
CN116377780A (en) Mountain highway high-fill roadbed filling construction method
CN114045808A (en) Deep soft soil foundation reinforcement treatment structure formed by combining concrete lattice walls and discrete material piles and construction method
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN108824412B (en) Soft foundation treatment method based on gabion wall reinforced soil and dynamic compaction combination
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN106012971A (en) Vegetation concrete protection slope and construction method thereof
CN113005839A (en) Treatment process of bad soil roadbed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200331

Address after: 102600 No. 1 Building, No. 13 Keyuan Road, Daxing District, Beijing

Patentee after: CHINA ZHONGHUA GEOTECHNICAL ENGINEERING GROUP Co.,Ltd.

Address before: 231400 Anhui city of Anqing province Tongcheng city longmian Street sand road Tongcheng Yongjin Construction Engineering Company Limited

Patentee before: TONGCHENG YONGJIN BUILDING ENGINEERING Co.,Ltd.

TR01 Transfer of patent right