CN207793792U - A kind of road surface permeable pavement structure - Google Patents

A kind of road surface permeable pavement structure Download PDF

Info

Publication number
CN207793792U
CN207793792U CN201820076358.6U CN201820076358U CN207793792U CN 207793792 U CN207793792 U CN 207793792U CN 201820076358 U CN201820076358 U CN 201820076358U CN 207793792 U CN207793792 U CN 207793792U
Authority
CN
China
Prior art keywords
header
permeable pavement
waterproof layer
base
road surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820076358.6U
Other languages
Chinese (zh)
Inventor
杨有军
张建设
李实�
黄宁
姜涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Sponge City Engineering Technology Service Center Co Ltd
Jiaozuo Bureau Of Housing And Urban Rural Development
Original Assignee
Henan Sponge City Engineering Technology Service Center Co Ltd
Jiaozuo Bureau Of Housing And Urban Rural Development
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Sponge City Engineering Technology Service Center Co Ltd, Jiaozuo Bureau Of Housing And Urban Rural Development filed Critical Henan Sponge City Engineering Technology Service Center Co Ltd
Priority to CN201820076358.6U priority Critical patent/CN207793792U/en
Application granted granted Critical
Publication of CN207793792U publication Critical patent/CN207793792U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of road surface permeable pavement structure, it is related to urban pavement structure, including permeable pavement layer, screed-coat, base and the soil matrix set gradually from top to bottom, waterproof layer is equipped between the base and soil matrix, waterproof layer is obliquely installed, base positioned at that side of the tilting bottom of waterproof layer is embedded with header, and several flow concentration holes are laid on header, and the side wall of the header is connected with drainpipe.The utility model is by being arranged waterproof layer, the water assembled in base is collected and is drained, the amount of rainfall penetrated into through road surface in the soil matrix of road lower part can largely be reduced, it reduces inbuilt pipeline and its auxiliary device in the soil matrix of road lower part and the risk that water damages occurs by water logging and soil matrix, it is also beneficial to the Collection utilization of permeable pavement region rainfall runoff simultaneously, it can accelerate the infiltration rate of road permeable pavement surface rain water runoff, reduce surface pond risk.

Description

A kind of road surface permeable pavement structure
Technical field
The utility model is related to urban pavement structures, and in particular to a kind of road surface permeable pavement structure.
Background technology
With the fast development of urbanization, with the wide of the large area of the impermeable materials such as stone material, cement, concrete construction The Municipals facility such as field, road, and covering of the vast waterproof pavement of these areas to original naturally permeable underlying surface, lead It causes the rainfall runoff that city underlying surface generates when rainfall to be difficult to down ooze, and is advanced by the time to form flood peak, be easy to cause city Ponding effectiveness factors.Road surface ratio shared in the waterproof underlying surface in urban area is higher, the rainfall runoff that surface generates Amount is also larger, and the ponding that road surface generates not only influences traffic, makes troubles to the trip of people, while also increasing urban waterlogging Risk.
Recently as the continuous propulsion of sponge urban construction, many areas start gradually by the impervious blanket of road with Permeable pavement is replaced, but has replaced two main problems of road generally existing of permeable pavement at present, when, due to before Road surface under the facilities such as inbuilt line equipment be all to be designed construction according to non-Soaking environment mostly, therefore, replace saturating Water is permeated or is stored in road lower structural layer and soil matrix through the rainwater oozed under mating formation after mating formation, to inbuilt below road Line equipment etc. affects, or even damage subsurface equipment;Second is that under being permeated by porous pavement after replacing permeable pavement The amount of rainfall come is more, is easy to impregnate the vulnerable area of soil matrix below damage road, and then cause harmful effect to road.
Utility model content
The utility model aim is to provide a kind of road surface permeable pavement structure.
Based on above-mentioned purpose, the utility model takes following technical scheme:
A kind of road surface permeable pavement structure, including the permeable pavement layer, screed-coat, base and the soil that set gradually from top to bottom Base is equipped with waterproof layer between the base and soil matrix, waterproof layer is obliquely installed, and is located at the base of that side of the tilting bottom of waterproof layer Layer is embedded with header, several flow concentration holes is laid on header, the side wall of the header is connected with drainpipe.
The flow concentration hole is distributed in the upper side wall of header;The outer wall of header is additionally provided with filter screen.
The filter screen is gauze, and gauze is wound on the outer wall of header.
The drainpipe has several, and several drainpipes are arranged along the length direction of header, and drainpipe is located at flow concentration hole Lower section.
Bed course is additionally provided between the waterproof layer and soil matrix, the bottom of base, the top of bed course are obliquely installed.
The angle of inclination of the waterproof layer is 3 ° -5 °;The waterproof layer is made of polyethylene waterproof coating, the thickness of waterproof layer Degree is 5cm.
Compared with prior art, the utility model has the advantages that:
The water assembled in base is collected and is drained, can largely reduced by the way that waterproof layer is arranged by the utility model Cross the amount of rainfall that road surface is penetrated into the soil matrix of road lower part, reduce in the soil matrix of road lower part inbuilt pipeline and its auxiliary device by The risk of water damage occurs for water logging and soil matrix, while being also beneficial to the Collection utilization of permeable pavement region rainfall runoff, can accelerate The infiltration rate of Reuter's water pavement surfaces rainfall runoff reduces surface pond risk.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is A-A schematic diagrames in Fig. 1;
Fig. 3 is the side view of header;
Wherein:1, permeable pavement layer;2, screed-coat;3, base;4, waterproof layer;5, bed course;6, soil matrix;7, underground city Political affairs pipeline and its affiliated facility;8, header;9, drainpipe;10, flow concentration hole.
Specific implementation mode
A kind of road surface permeable pavement structure, as shown in Figs. 1-3, including set gradually from top to bottom permeable pavement layer 1, look for Flat bed 2, base 3, bed course 5 and soil matrix 6 are equipped with waterproof layer 4 between the base 3 and bed course 5, waterproof layer 4 is obliquely installed, described The angle of inclination of waterproof layer 4 is 3 °(4 ° or 5 °), the waterproof layer 4 is made of polyethylene waterproof coating, and the thickness of waterproof layer 4 is 5cm, the bottom of the base 3, the top of bed course 5 are obliquely installed, and are located at the base 3 of that side of the tilting bottom of waterproof layer 4 It is embedded with header 8, several flow concentration holes 10 are laid on header 8, the flow concentration hole 10 is distributed in the upper side wall of header 8, The outer wall of header 8 is additionally provided with filter screen, and the filter screen is gauze, and gauze is wound on the outer wall of header 8, the collection The side wall of flow tube 8 is connected with drainpipe 9, and the drainpipe 9 has several, and several drainpipes 9 are set along the length direction of header 8 It sets, drainpipe 9 is located at the lower section of flow concentration hole 10.
Wherein:Permeable pavement layer 1 is the permeable face layer such as water-permeable brick, pervious asphalt or pervious concrete;Screed-coat 2:It is thoroughly Aqueous to be not less than permeable pavement layer, sand, coarse sand, dry cement mortar are constructed in general use, thickness 2-3cm;Base 3:Its Rigid base, semi-rigid type base, flexbile base three classes are generally included, permeable pellet, permeable may be selected according to regions resources difference The materials such as cement concrete, stabilization gravel are built, it is desirable that this layer has enough intensity, water penetration, water stability, continuous hole Rate is not less than 10%;Bed course 5:Bed course should be generally set when the earth base of road is cohesive soil, mainly use water penetration preferable The granular materials such as sand, gravel or harmless industrial residue are built, and particle accounting of the material particle size less than 0.075mm should not exceed 5%; Soil matrix 6:Natural soils layer below road.
When rainfall occurs, gradually converged in base 3 after being stopped by waterproof layer 4 by the rainwater oozed under the permeable pavement of road surface Collection, since the bottom of base 3 is there are certain gradient, under the rainwater that infilters in base 3 assemble and collected to its bottom of slope rapidly Flow tube 8 is collected, and municipal administration of the row to road periphery is guided by the drainpipe 9 being connect with header 8 into the rainwater in header 8 At Storm Sewer Network or low-lying permeable greenery patches.Accelerate the infiltration rate of road permeable pavement surface rain water runoff to a certain extent, Facilitate walk, while can also reduce down the burden for oozing rainwater in lower part soil matrix 6 of mating formation, reduces embedded underground of mating formation Underground municipal pipeline and its auxiliary device 7 risk that water damages occurs by water logging and soil matrix 6.

Claims (6)

1. a kind of road surface permeable pavement structure, including the permeable pavement layer, screed-coat, base and the soil that set gradually from top to bottom Base, which is characterized in that waterproof layer is equipped between the base and soil matrix, waterproof layer is obliquely installed, and is located at the inclination bottom of waterproof layer The base of that side of portion is embedded with header, and several flow concentration holes are laid on header, and the side wall of the header is connected with row Water pipe.
2. permeable pavement structure in road surface as described in claim 1, which is characterized in that the flow concentration hole is distributed in the upper of header Side wall;The outer wall of header is additionally provided with filter screen.
3. permeable pavement structure in road surface as claimed in claim 2, which is characterized in that the filter screen is gauze, gauze winding In on the outer wall of header.
4. permeable pavement structure in road surface as claimed in claim 3, which is characterized in that the drainpipe has several, several drainings Pipe is arranged along the length direction of header, and drainpipe is located at the lower section of flow concentration hole.
5. permeable pavement structure in road surface as claimed in claim 4, which is characterized in that be additionally provided between the waterproof layer and soil matrix Bed course, the bottom of base, the top of bed course are obliquely installed.
6. permeable pavement structure in road surface according to any one of claims 1 to 5, which is characterized in that the angle of inclination of the waterproof layer It is 3 ° -5 °;The waterproof layer is made of polyethylene waterproof coating, and the thickness of waterproof layer is 5cm.
CN201820076358.6U 2018-01-17 2018-01-17 A kind of road surface permeable pavement structure Expired - Fee Related CN207793792U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820076358.6U CN207793792U (en) 2018-01-17 2018-01-17 A kind of road surface permeable pavement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820076358.6U CN207793792U (en) 2018-01-17 2018-01-17 A kind of road surface permeable pavement structure

Publications (1)

Publication Number Publication Date
CN207793792U true CN207793792U (en) 2018-08-31

Family

ID=63272484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820076358.6U Expired - Fee Related CN207793792U (en) 2018-01-17 2018-01-17 A kind of road surface permeable pavement structure

Country Status (1)

Country Link
CN (1) CN207793792U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797626A (en) * 2019-01-14 2019-05-24 广东省怡合高速公路工程有限公司 Quick drainage town road
CN112458825A (en) * 2020-11-21 2021-03-09 江苏永联精筑建设集团有限公司 Steel slag pavement structure and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797626A (en) * 2019-01-14 2019-05-24 广东省怡合高速公路工程有限公司 Quick drainage town road
CN112458825A (en) * 2020-11-21 2021-03-09 江苏永联精筑建设集团有限公司 Steel slag pavement structure and construction method thereof
CN112458825B (en) * 2020-11-21 2022-04-19 江苏永联精筑建设集团有限公司 Steel slag pavement structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN207793788U (en) Permeable pavement rainwater infiltration structure
CN106638918B (en) Construction method of sponge urban rainwater collection system
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN106917522B (en) A kind of Outdoor Parking position system based on sponge the idea of the city
CN107034767A (en) A kind of full pervious concrete pavement structure of regeneration aggregate and its construction method
CN209293141U (en) Water permeable sidewalk drainage system in sponge city
CN206571217U (en) Outdoor Parking position system based on sponge the idea of the city
CN207062672U (en) A kind of permeable pavement structure
CN110158650A (en) A kind of underground structure that waterproof and drainage system are set
CN207793792U (en) A kind of road surface permeable pavement structure
CN209338948U (en) A kind of water-permeable pavement structure
CN207700330U (en) A kind of concave herbaceous field grass-planting ecological ditch
CN207244389U (en) A kind of shallow-layer water storage road surface water-permeable brick
CN105484125B (en) A kind of step of Collection utilization rainwater
CN208685390U (en) Sponge city paved road structure
CN105421647B (en) A kind of step building block of Collection utilization rainwater
CN204780521U (en) Composite water storage and drainage environment-friendly ground
CN208362838U (en) A kind of porous pavement
CN206090204U (en) Height ecological road surface structure of permeating water
CN206971040U (en) A kind of special discharge structure in walking road surface
CN206752237U (en) Stealthy passageway for fire apparatus
CN109056897A (en) Radial pattern rain-water accumulating releases seepage well system
CN214656073U (en) Natural permeable quarrying paving structure for sponge city
CN206157878U (en) Biological stagnant water pond system in sponge city
CN211848696U (en) Type bituminous paving structure permeates water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831

Termination date: 20220117