Natural permeable quarrying paving structure for sponge city
Technical Field
The utility model relates to a quarrying technical field that permeates water, in particular to natural structure of mating formation of quarrying that permeates water in sponge city.
Background
The permeable road is a new environment-friendly and ecological road type, and is increasingly concerned by people, particularly the industry, the permeable road is paved by ecological permeable concrete (concrete), so that rainwater can rapidly permeate into the ground surface, underground water is effectively supplemented, the urban heat island effect is relieved, an urban ecological system can be balanced, the permeable ground can also permeate ground air, the ground is warm in winter and cool in summer, permeable in rainy seasons and snow melted in winter, the comfort level of urban living can be increased, in addition, the permeable ground has more pores and large ground surface area, has stronger adsorption force on dust, can reduce dust pollution and can also reduce noise; the existing permeable quarrying paving structure has some defects, firstly, rainwater is inconvenient to treat in a rainfall day, secondly, the constructed road is inconvenient to use for a longer time, an anti-skidding effect is not achieved, and finally, the problem of water and soil loss is inconvenient to treat.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a natural quarrying structure of mating formation that permeates water in sponge city can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a natural stone quarrying structure that permeates water in sponge city, includes the connection fragment of brick that permeates water, the infiltration hole has been seted up to the upper end of the connection fragment of brick that permeates water, the one end of the connection fragment of brick that permeates water is provided with the stopper, the spacing groove has been seted up to the other end of the connection fragment of brick that permeates water, the lower extreme of the connection fragment of brick that permeates water is provided with the infiltration layer, the discharge flume has been seted up to the inside of infiltration layer, the lower extreme of infiltration layer is provided with the metal mesh, the lower extreme of metal mesh is provided with the pitch layer that permeates water, the lower extreme on pitch layer that permeates water and the one end of infiltration fragment of brick that permeates water are provided with horizontal drainage pipe, the lower extreme of infiltration fragment of brick is provided with the ground.
Preferably, the infiltration hole is seted up in the upper end of the connection fragment of brick that permeates water, stopper fixed mounting is in the one end of the connection fragment of brick that permeates water, the inside of the connection fragment of brick that permeates water is seted up in the spacing groove.
Preferably, the upper end of the water seepage layer is fixedly connected with the lower end of the water-permeable connecting brick, and the water flowing hole is formed in the water seepage layer.
Preferably, the flume is arranged at the upper end of the water seepage layer, and the upper end of the metal mesh is fixedly connected with the lower end of the water seepage layer.
Preferably, the upper end on the asphalt layer that permeates water and the lower extreme fixed connection of metal mesh, the upper end of infiltration fragment of brick and the lower extreme fixed connection on the asphalt layer that permeates water.
Preferably, horizontal drainage pipe fixed mounting is at the lower extreme on the pitch layer that permeates water, the upper end of ground and the lower extreme fixed connection of infiltration fragment of brick.
Compared with the prior art, the utility model discloses following beneficial effect has: a natural permeable quarrying paving structure for sponge city, a user needs to lay a water-permeable brick at the upper end of a foundation, a transverse drainage pipe is arranged at one end of the water-permeable brick, a water drain hole is arranged at the upper end of the transverse drainage pipe, rainwater can be collected and discharged in rainy days conveniently, flood disasters are avoided, a permeable asphalt layer is arranged at the upper end of the water-permeable brick, the permeable asphalt layer can transmit rainwater to the upper end of the water-permeable brick conveniently, and finally the rainwater is transmitted to soil to protect the ground, a part of rainwater in the permeable asphalt layer is drained into the transverse drainage pipe, a metal net is arranged at the upper end of the permeable asphalt layer, the stability of the water-permeable layer is increased conveniently, the water-permeable layer is more stably arranged at the upper end of the permeable asphalt layer to play a role in connection, the upper end of the water-permeable layer is provided with water-permeable connecting bricks, the water-permeable connecting bricks are spliced to facilitate expansion and finishing of a road, the upper end of the permeable connection brick is provided with the infiltration hole, conveniently get rid of the rainwater, anti-skidding degree has been increased simultaneously, prevent that passerby from falling down in the walking, play the effect of protection infiltration layer, the upper end of infiltration layer is provided with the discharge orifice, more make things convenient for the drainage, get rid of the rainwater to the upper end on the asphalt layer that permeates water, until ground, this laying device can effectually carry out the ground drainage, can conveniently collect the rainwater, also play skid-proof effect, can not leave ponding on ground, can also effectual protection soil, protect ground, prevent that the loss of soil from causing the subside, it is more convenient.
Drawings
FIG. 1 is a schematic view of the overall structure of the natural permeable quarrying paving structure of the sponge city;
FIG. 2 is one of the schematic views of the partial structures of the natural permeable quarrying paving structure of the sponge city;
fig. 3 is a second schematic view of a partial structure of the natural permeable quarrying paving structure of the sponge city according to the present invention;
FIG. 4 is a bottom view of the permeable layer of the natural permeable quarrying paving structure in the sponge city;
FIG. 5 is a top view of a water seepage layer of the natural water permeable quarrying paving structure of the sponge city;
fig. 6 is a third schematic view of a partial structure of the natural permeable quarrying paving structure of the sponge city of the present invention;
FIG. 7 is a schematic structural view of a water-permeable connecting brick of the natural water-permeable quarrying paving structure of a sponge city of the present invention;
FIG. 8 is a cross-sectional view of the permeable connecting bricks of the natural permeable quarrying paving structure for sponge cities of the present invention;
fig. 9 is the utility model discloses a natural permeable quarrying of sponge city lays the structural sketch of the metal mesh of structure.
In the figure: 1. connecting bricks in a water-permeable manner; 2. a limiting block; 3. a water seepage hole; 4. a water seepage layer; 5. a metal mesh; 6. a water-permeable asphalt layer; 7. water seepage bricks; 8. a transverse drainage pipe; 9. a foundation; 10. a launder; 11. a water flowing hole; 12. a limiting groove.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-9, a natural permeable quarrying paving structure for a sponge city comprises water-permeable connecting bricks 1, water-permeable holes 3 are formed in the upper ends of the water-permeable connecting bricks 1, limit blocks 2 are arranged at one ends of the water-permeable connecting bricks 1, limit grooves 12 are formed in the other ends of the water-permeable connecting bricks 1, water-permeable layers 4 are arranged at the lower ends of the water-permeable connecting bricks 1, water-permeable holes 11 are formed in the water-permeable layers 4, water-permeable grooves 10 are formed in the upper ends of the water-permeable layers 4, metal nets 5 are arranged at the lower ends of the water-permeable layers 4, water-permeable asphalt layers 6 are arranged at the lower ends of the metal nets 5, water-permeable bricks 7 are arranged at the lower ends of the water-permeable asphalt layers 6 and one ends of the water-permeable bricks 7 are provided with transverse drainage pipes 8, and foundations 9 are arranged at the lower ends of the water-permeable bricks 7.
The upper end of the permeable connection brick 1 is opened in the infiltration hole 3, and the upper end of the permeable connection brick 1 is provided with the infiltration hole 3, conveniently gets rid of the rainwater, has increased the antiskid degree simultaneously, prevents that passerby from falling down in the walking, and stopper 2 fixed mounting is in the one end of the permeable connection brick 1, and the inside of the permeable connection brick 1 is opened in spacing groove 12.
The upper end of the water seepage layer 4 is fixedly connected with the lower end of the water-permeable connecting brick 1, the water flowing hole 11 is formed in the water seepage layer 4, the water flowing hole 11 is formed in the upper end of the water seepage layer 4, water can be drained conveniently, and rainwater is drained to the upper end of the water-permeable asphalt layer 6 and reaches the ground.
The launder 10 is seted up in the upper end of permeable layer 4, and the lower extreme fixed connection of the upper end of metal mesh 5 and permeable layer 4 is provided with metal mesh 5 in the upper end of permeable asphalt layer 6, conveniently increases the steadiness of permeable layer 4 for permeable layer 4 is more firm lays in the upper end of permeable asphalt layer 6, can play the effect of connection.
The upper end of the asphalt layer 6 that permeates water and the lower extreme fixed connection of metal mesh 5, the upper end of infiltration fragment of brick 7 and the lower extreme fixed connection of the asphalt layer 6 that permeates water, the asphalt layer 6 that permeates water conveniently transmits the rainwater to the upper end of infiltration fragment of brick 7, transmits soil at last, conveniently protects ground, and the asphalt layer 6 that permeates water has some rainwater to beat in the horizontal drainage pipe 8.
Horizontal drainage pipe 8 fixed mounting is in the lower extreme of the asphalt layer 6 that permeates water, and the rainwater is arranged to horizontal drainage pipe 8 in, the upper end of ground 9 and the lower extreme fixed connection of infiltration fragment of brick 7.
It should be noted that, the utility model relates to a natural permeable quarrying paving structure for sponge city, a user needs to lay out a water-permeable brick 7 on the upper end of a foundation 9 first, a transverse drainage pipe 8 is installed on one end of the water-permeable brick 7, the upper end of the transverse drainage pipe 8 is provided with a water-flowing hole, which is convenient for rainy days, the collection and discharge of rainwater, avoid flood disasters, a permeable asphalt layer 6 is arranged on the upper end of the water-permeable brick 7, the permeable asphalt layer 6 is convenient for transmitting the rainwater to the upper end of the water-permeable brick 7, and finally to soil, which is convenient for protecting the ground, a part of the rainwater on the permeable asphalt layer 6 is discharged into the transverse drainage pipe 8, a metal net 5 is arranged on the upper end of the water-permeable asphalt layer 6, which is convenient for increasing the stability of the water-permeable layer 4, so that the water-permeable layer 4 is more stably installed on the upper end of the water-permeable asphalt layer 6, which can play a role of connection, a water-permeable connection brick 1 is arranged on the upper end of the water-permeable layer 4, the water-permeable connecting bricks 1 are spliced to facilitate later expansion and finishing of roads, the upper ends of the water-permeable connecting bricks 1 are provided with the water seepage holes 3, rainwater can be conveniently discharged, the anti-skid degree is increased, pedestrians are prevented from falling down during walking, the water seepage layer 4 is protected, the upper ends of the water seepage layers 4 are provided with the water flowing holes 11, drainage is facilitated, and rainwater is discharged to the upper ends of the water-permeable asphalt layers 6 and reaches the ground.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.