CN206157878U - Biological stagnant water pond system in sponge city - Google Patents
Biological stagnant water pond system in sponge city Download PDFInfo
- Publication number
- CN206157878U CN206157878U CN201621011156.0U CN201621011156U CN206157878U CN 206157878 U CN206157878 U CN 206157878U CN 201621011156 U CN201621011156 U CN 201621011156U CN 206157878 U CN206157878 U CN 206157878U
- Authority
- CN
- China
- Prior art keywords
- layer
- rainwater
- biological
- pipe
- sponge city
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
本实用新型公开一种海绵城市的生物滞水池系统,包括:雨水过滤系统,包括生态滞水池,其基底和斜坡内侧分别铺设有HDPE膜层,基底的HDPE膜层上依次铺设有排水层、过渡层、过滤层以及景观层;排水层设有若干个并列铺设在HDPE膜层上的第一排水管以及第一雨水管;雨水收集系统,其包括溢流井以及通过第二雨水管连接到溢流井的集水井;集水井设有向外排水的第二排水管;溢流井的井口高度高于景观层在生态滞水池中的高度;第一排水管为穿孔管,第一雨水管一端连通第一排水管、另一端延伸到溢流井中。本实用新型提供的生物滞水池系统,具有收集雨水、下渗、蓄水、补给雨水等类似“海绵”体功能,还可以美化环境。
The utility model discloses a biological stagnant pool system for a sponge city, comprising: a rainwater filtration system, including an ecological stagnant pool, HDPE film layers are respectively laid on the base and the inner side of the slope, and a drainage layer, transition layer, filter layer and landscape layer; the drainage layer is provided with several first drainage pipes and first rainwater pipes laid side by side on the HDPE film layer; rainwater collection system, which includes an overflow well and is connected to the overflow well through a second rainwater pipe The water collection well; the water collection well is provided with a second drainage pipe for outward drainage; the height of the wellhead of the overflow well is higher than the height of the landscape layer in the ecological stagnant pond; the first drainage pipe is a perforated pipe, and one end of the first rainwater pipe is connected to the first The other end of the drain pipe extends into the overflow well. The biological stagnant pool system provided by the utility model has functions similar to "sponge" such as collecting rainwater, infiltrating, storing water, and replenishing rainwater, and can also beautify the environment.
Description
技术领域technical field
本实用新型涉及生物滞水池技术领域,更具体地说,本实用新型涉及一种海绵城市的生物滞水池系统。The utility model relates to the technical field of biological stagnant ponds, more specifically, the utility model relates to a biological stagnant pond system for a sponge city.
背景技术Background technique
现有技术中,城市雨水的收集系统通常采用挖填快排模式,有些城市的雨水径流未经任何处理直接排至河流,雨水污染径流直接入河会形成污染冲击负荷,造成汛期城市景观河道突发水质恶化,也不利于雨水收集至干旱期供应。In the existing technology, the urban rainwater collection system usually adopts the excavation-fill fast-drainage mode. In some cities, the rainwater runoff is directly discharged to the river without any treatment. The rainwater polluted runoff directly entering the river will form a pollution impact load, causing the urban landscape river to burst in the flood season. The deterioration of water quality is also not conducive to rainwater collection and supply during drought.
随着现代环境的日益严重,人们越发对环境保护重视,海绵城市的概念被提出。海绵城市,是新一代城市雨洪管理概念,是指城市在适应环境变化和应对雨水带来的自然灾害等方面具有良好的“弹性”,也可称之为“水弹性城市”。“海绵城市”的建设作为国家战略被提出,一改传统过去粗放的城市发展形势,而是建设具有自然积存、自然渗透、自然净化功能的海绵城市。With the increasingly severe modern environment, people pay more and more attention to environmental protection, and the concept of sponge city was put forward. Sponge city is a new generation of urban stormwater management concept. It refers to the city's good "elasticity" in adapting to environmental changes and responding to natural disasters caused by rainwater. It can also be called "water elastic city". The construction of "sponge city" has been proposed as a national strategy, changing the traditional situation of extensive urban development in the past, but building a sponge city with natural accumulation, natural infiltration, and natural purification functions.
实用新型内容Utility model content
针对上述技术中存在的不足之处,本实用新型提供一种海绵城市的生物滞水池系统,具有收集雨水、下渗、蓄水、补给雨水等类似“海绵”体功能,还可以美化环境。Aiming at the deficiencies in the above technologies, the utility model provides a biological stagnant pond system for a sponge city, which has functions similar to "sponge" such as collecting rainwater, infiltrating, storing water, and replenishing rainwater, and can also beautify the environment.
为了实现根据本实用新型的这些目的和其它优点,本实用新型通过以下技术方案实现:In order to achieve these purposes and other advantages according to the utility model, the utility model is realized through the following technical solutions:
本实用新型提供一种海绵城市的生物滞水池系统,包括:The utility model provides a biological stagnant pool system for a sponge city, comprising:
雨水过滤系统,其包括生态滞水池,所述生态滞水池的基底和斜坡内侧分别铺设有HDPE膜层,所述基底的所述HDPE膜层上依次铺设有排水层、过渡层、过滤层以及景观层;所述排水层设有若干个并列铺设在所述HDPE膜层上的第一排水管以及若干个并列设置的第一雨水管;The rainwater filtration system includes an ecological stagnant pond, the base of the ecological stagnant pond and the inner side of the slope are respectively laid with HDPE film layers, and the HDPE film layers of the base are sequentially laid with a drainage layer, a transition layer, a filter layer and a landscape layer; the drainage layer is provided with several first drainage pipes laid side by side on the HDPE film layer and several first rainwater pipes arranged side by side;
雨水收集系统,其包括溢流井以及通过第二雨水管连接到所述溢流井的集水井;所述集水井设有向外排水的第二排水管;A rainwater collection system, which includes an overflow well and a water collection well connected to the overflow well through a second rainwater pipe; the water collection well is provided with a second drainage pipe for outward drainage;
其中,所述溢流井为上小下大的梯形容腔;所述溢流井的井口高度等于所述景观层在所述生态滞水池中的高度;Wherein, the overflow well is a trapezoidal cavity with a small top and a large bottom; the wellhead height of the overflow well is equal to the height of the landscape layer in the ecological stagnant pool;
所述第一排水管为穿孔管,所述第一雨水管一端连通所述第一排水管、另一端延伸到所述溢流井中。The first drainage pipe is a perforated pipe, one end of the first rainwater pipe communicates with the first drainage pipe, and the other end extends into the overflow well.
优选的是,所述基底和所述斜坡内侧分别与所述HDPE膜层之间设有压实的沙找平层;所述压实度大于87%;所述沙找平层的平整度满足±2cm/m2。Preferably, a compacted sand leveling layer is provided between the base and the inner side of the slope and the HDPE film layer respectively; the degree of compaction is greater than 87%; the flatness of the sand leveling layer satisfies ±2cm /m 2 .
优选的是,所述生态滞水池的放坡坡度为1:3。Preferably, the slope of the ecological stagnant pond is 1:3.
优选的是,所述溢流井周围设有井周加固层,所述井周加固层为掺有钢筋的混凝土,所述混凝土的厚度不小于20cm。Preferably, a reinforcement layer around the well is provided around the overflow well, and the reinforcement layer around the well is concrete mixed with steel bars, and the thickness of the concrete is not less than 20cm.
优选的是,所述排水层具有包裹所述第一排水管的细砾;Preferably, the drainage layer has fine gravel wrapping the first drainage pipe;
所述过渡层铺设有压实的中粗砂;The transition layer is laid with compacted medium-coarse sand;
所述过滤层设有与所述景观层种植植物匹配的种植土;The filter layer is provided with planting soil that matches the plants planted in the landscape layer;
其中,所述细砾的直径为2.0-3.5mm;Wherein, the diameter of the fine gravel is 2.0-3.5mm;
所述第一排水管与所述HDPE膜层之间的距离为20-30cm;The distance between the first drainage pipe and the HDPE film layer is 20-30cm;
所述中粗砂的厚度为10cm、直径为0.5-1.5mm。The medium-coarse sand has a thickness of 10 cm and a diameter of 0.5-1.5 mm.
优选的是,所述第一排水管的孔径小于2mm,所述第一排水管的外侧与所述细砾之间设有土工布层。Preferably, the hole diameter of the first drainage pipe is less than 2 mm, and a geotextile layer is arranged between the outer side of the first drainage pipe and the fine gravel.
优选的是,并列铺设中最靠近坡脚的两个所述第一排水管分别与坡脚的距离为40cm;每个所述第一排水管的两端分别与坡脚的距离为1m。Preferably, the distance between the two first drainage pipes closest to the toe of the slope during laying side by side is 40 cm; the distance between the two ends of each of the first drainage pipes and the toe of the slope is 1 m.
优选的是,所述第一雨水管与所述HDPE膜层之间的高度距离为20-30cm。Preferably, the height distance between the first rainwater pipe and the HDPE film layer is 20-30cm.
优选的是,所述第一雨水管与所述第一排水管一一匹配;所述第一雨水管一端连通一个所述第一排水管、另一端延伸到所述溢流井中。Preferably, the first rainwater pipe is matched with the first drainage pipe one by one; one end of the first rainwater pipe communicates with one of the first drainage pipes, and the other end extends into the overflow well.
优选的是,每个所述第一雨水管的一端连通若干个所述第一排水管、另一端延伸到所述溢流井中。Preferably, one end of each first rainwater pipe communicates with several first drainage pipes, and the other end extends into the overflow well.
本实用新型至少包括以下有益效果:The utility model at least includes the following beneficial effects:
1)本实用新型提供的生物滞水池系统,雨水过滤系统的生态滞水池中依次铺设HDPE膜层、排水层、过渡层、过滤层以及景观层;排水层的第一排水管通过第一雨水管连通到雨水收集系统的溢流井,溢流井的雨水超过一定水位经第二雨水管流至集水井存储,集水井的蓄水超过一定水位排出;从而形成了收集雨水、下渗、蓄水、补给雨水、美化环境等一体化类似“海绵”体功能;1) In the biological stagnant pond system provided by the utility model, HDPE film layer, drainage layer, transition layer, filter layer and landscape layer are successively laid in the ecological stagnant pond of the rainwater filtration system; the first drainage pipe of the drainage layer is connected through the first rainwater pipe To the overflow well of the rainwater collection system, the rainwater in the overflow well exceeds a certain water level and flows to the water collection well for storage through the second rainwater pipe, and the water stored in the water collection well exceeds a certain water level to be discharged; thus forming a system of rainwater collection, infiltration, water storage, and replenishment The integration of rainwater and landscaping is similar to the "sponge" body function;
2)HDPE(High Density Polyethylene Impermeable membrane)膜具有很好的防腐性能、电性能、防潮性能、防渗漏性能、抗冲击性,拉伸强度高,用于生态滞水池的防渗;2) HDPE (High Density Polyethylene Impermeable membrane) membrane has good anti-corrosion performance, electrical performance, moisture-proof performance, anti-leakage performance, impact resistance, high tensile strength, and is used for anti-seepage of ecological stagnant pools;
3)溢流井为上小下大的梯形容腔,溢流井的井口高度等于景观层在生态滞水池中的高度;一方面,保证溢普通雨水通过生态滞水池过滤、净化进入溢流井;另一方面,当雨水较大超过生物滞水池的储存能力时,能快速通过溢流井口快速排入溢流井;3) The overflow well is a trapezoidal cavity with a small top and a large bottom. The height of the wellhead of the overflow well is equal to the height of the landscape layer in the ecological stagnant pool; ; On the other hand, when the rainwater is larger than the storage capacity of the biological stagnation pool, it can be quickly discharged into the overflow well through the overflow wellhead;
4)基底和斜坡内侧分别与HDPE膜层之间设有压实的沙找平层,压实度大于87%,沙找平层的平整度满足±2cm/m2;压实的沙找平层为HDPE膜的平整铺设打下基础;4) There is a compacted sand leveling layer between the base and the inner side of the slope and the HDPE film layer, the degree of compaction is greater than 87%, and the flatness of the sand leveling layer meets ± 2cm /m2; the compacted sand leveling layer is HDPE Lay the foundation for the flat laying of the membrane;
5)生态滞水池的放坡坡度为1:3,保证雨水可以顺流至生态滞水池的同时,保证生态滞水池的施工安全;5) The grading slope of the ecological stagnant pond is 1:3, which ensures that the rainwater can flow downstream to the ecological stagnant pond and at the same time ensures the construction safety of the ecological stagnant pond;
6)排水层具有包裹第一排水管的细砾,细砾表面光滑,使得沙找平层的沙与第一排水管直接接触;6) The drainage layer has fine gravel wrapping the first drainage pipe, and the surface of the fine gravel is smooth, so that the sand in the sand leveling layer is in direct contact with the first drainage pipe;
7)第一排水管与HDPE膜层之间的距离为20-30cm,保证至少可以蓄水20-30cm;7) The distance between the first drainage pipe and the HDPE film layer is 20-30cm, ensuring that at least 20-30cm of water can be stored;
8)第一排水管为穿孔管,穿孔管的孔径小于2mm,第一排水管的外侧与细砾之间设有土工布层,防止第一排水管被堵塞。8) The first drainage pipe is a perforated pipe, and the diameter of the perforated pipe is less than 2mm. A geotextile layer is arranged between the outside of the first drainage pipe and the fine gravel to prevent the first drainage pipe from being blocked.
本实用新型的其它优点、目标和特征将部分通过下面的说明体现,部分还将通过对本实用新型的研究和实践而为本领域的技术人员所理解。Other advantages, objectives and features of the utility model will partly be embodied through the following description, and partly will be understood by those skilled in the art through the research and practice of the utility model.
附图说明Description of drawings
图1为本实用新型所述的海绵城市的生物滞水池系统的剖面结构示意图;Fig. 1 is the sectional structure schematic diagram of the biological stagnant pond system of the sponge city described in the utility model;
图2为图1的俯视剖面图中第一排水管与第一雨水管相对位置的一个示例;Fig. 2 is an example of the relative positions of the first drainage pipe and the first rainwater pipe in the top sectional view of Fig. 1;
图3为图1的俯视剖面图中第一排水管与第一雨水管相对位置的另一个示例。Fig. 3 is another example of the relative positions of the first drainage pipe and the first rainwater pipe in the top sectional view of Fig. 1 .
图中:In the picture:
100-雨水过滤系统;100 - rainwater filtration system;
10-生态滞水池;10- Ecological stagnant pool;
11-基底;12-斜坡;13-HDPE膜层;11-base; 12-slope; 13-HDPE film layer;
14-排水层;14 - drainage layer;
141-第一排水管;142-第一雨水管;143-土工布层;141-the first drainage pipe; 142-the first rainwater pipe; 143-geotextile layer;
15-过渡层;16-过滤层;17-景观层;18-沙找平层;15-transition layer; 16-filter layer; 17-landscape layer; 18-sand leveling layer;
20-溢流井;20 - overflow well;
21-第二雨水管;21 - the second rainwater pipe;
200-雨水收集系统;200 - rainwater harvesting system;
30-集水井;31-第二排水管。30-collecting well; 31-the second drainage pipe.
具体实施方式detailed description
下面结合附图对本实用新型做进一步的详细说明,以令本领域技术人员参照说明书文字能够据以实施。The utility model will be described in further detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it by referring to the description.
应当理解,本文所使用的诸如“具有”、“包含”以及“包括”术语并不配出一个或多个其它元件或其组合的存在或添加。It should be understood that terms such as "having", "comprising" and "including" as used herein do not entail the presence or addition of one or more other elements or combinations thereof.
如图1至图3所示,本实用新型提供一种海绵城市的生物滞水池系统,包括:As shown in Figures 1 to 3, the utility model provides a biological stagnant pond system for a sponge city, including:
雨水过滤系统100,其包括生态滞水池10,生态滞水池10的基底11和斜坡12内侧分别铺设有HDPE膜层13,基底11的HDPE膜层13上依次铺设有排水层14、过渡层15、过滤层16以及景观层17;排水层14设有若干个并列铺设在HDPE膜层13上的第一排水管141以及若干个并列设置的第一雨水管142;The rainwater filtration system 100 comprises an ecological stagnant pond 10, the base 11 and the inner side of the slope 12 of the ecological stagnant pond 10 are respectively laid with HDPE film layers 13, and the HDPE film layer 13 of the substrate 11 is successively laid with a drainage layer 14, a transition layer 15, The filter layer 16 and the landscape layer 17; the drainage layer 14 is provided with several first drainage pipes 141 laid side by side on the HDPE film layer 13 and several first rainwater pipes 142 arranged side by side;
雨水收集系统200,其包括溢流井20以及通过第二雨水管21连接到溢流井20的集水井30;集水井30设有向外排水的第二排水管31;Rainwater collecting system 200, it comprises overflow well 20 and is connected to the sump well 30 of overflow well 20 by the second rainwater pipe 21; The sump well 30 is provided with the second drainage pipe 31 of outward drainage;
其中,溢流井20为上小下大的梯形容腔;溢流井20的井口高度等于景观层17在生态滞水池10中的高度;Wherein, the overflow well 20 is a trapezoidal cavity with a small top and a large bottom; the wellhead height of the overflow well 20 is equal to the height of the landscape layer 17 in the ecological stagnant pool 10;
第一排水管141为穿孔管,第一雨水管142一端连通第一排水管141、另一端延伸到溢流井20中。The first drain pipe 141 is a perforated pipe, one end of the first rainwater pipe 142 is connected to the first drain pipe 141 , and the other end extends into the overflow well 20 .
上述实施方式中,海绵城市的雨水依次经过景观层17、过滤层16、过渡层15的过滤进入到排水层14中;当排水层14中的雨水高度高于第一排水管141时,雨水由与第一排水管141连通的第一雨水管142进入到溢流井20中,溢流井20的雨水进一步由第二雨水管21进入集水井30;当集水井30的蓄水水位超过第二排水管31,则雨水由集水井30排出。由此可见,本实施方式提供的生物滞水池系统,具有收集雨水、下渗、蓄水、补给雨水等类似“海绵”体功能,还可以通过景观层17种植植物美化环境。In the above-mentioned embodiment, the rainwater of the sponge city enters into the drainage layer 14 through the filtration of the landscape layer 17, the filter layer 16, and the transition layer 15 in sequence; The first rainwater pipe 142 communicated with the first drainpipe 141 enters in the overflow well 20, and the rainwater of the overflow well 20 further enters the water collection well 30 by the second rainwater pipe 21; 31, then the rainwater is discharged by the sump 30. It can be seen that the biological stagnant pond system provided by this embodiment has functions similar to a "sponge" body such as collecting rainwater, infiltrating, storing water, and replenishing rainwater, and can also plant plants through the landscape layer 17 to beautify the environment.
上述实施方式中,HDPE膜层13铺设的HDPE膜具有很好的防腐性能、电性能、防潮性能、防渗漏性能、抗冲击性,拉伸强度高,用于生态滞水池10的防渗。HDPE膜的铺设避免出现褶皱和波纹,铺设时应用沙袋及时将对正、搭齐的HDPE膜压住,防止风吹动。In the above embodiment, the HDPE film laid by the HDPE film layer 13 has good anti-corrosion properties, electrical properties, moisture-proof properties, anti-leakage properties, impact resistance, high tensile strength, and is used for the anti-seepage of the ecological stagnant pond 10 . The laying of HDPE film avoids wrinkles and ripples. When laying, sandbags should be used to press down the aligned and aligned HDPE film in time to prevent wind blowing.
上述实施方式中,溢流井20为上小下大的梯形容腔,溢流井20的井口高度等于景观层17在生态滞水池10中的高度;一方面,保证普通雨水通过生态滞水池10过滤、净化进入溢流井20;另一方面,当雨水较大超过生物滞水池10的储存能力时,能快速通过溢流井20的井口快速排入溢流井20。In the above-mentioned embodiment, the overflow well 20 is a trapezoidal cavity with a small top and a large bottom, and the height of the wellhead of the overflow well 20 is equal to the height of the landscape layer 17 in the ecological stagnant pond 10; Filtration and purification enter the overflow well 20; on the other hand, when the rainwater exceeds the storage capacity of the biological stagnation pool 10, it can be quickly discharged into the overflow well 20 through the wellhead of the overflow well 20.
上述实施方式中,基底11和斜坡12内侧分别与HDPE膜层13之间设有压实的沙找平层18。压实可采用小型压路机(不小于2t),压实度大于87%;沙找平层18的平整度满足±2cm/m2。基底11应清洁干净,不得有杂物和积水,清洁度满足垂直深度2.5cm内不得有树根、瓦砾、石子等尖棱杂物。斜坡应采用水平标尺进行检验,且坡面清洁干燥,无杂物。待基底11和斜坡12内侧清洁、压实和找平后方可铺上HDPE膜。In the above embodiment, a compacted sand leveling layer 18 is provided between the inner side of the base 11 and the slope 12 and the HDPE film layer 13 respectively. Small-sized road rollers (not less than 2t) can be used for compaction, and the compaction degree is greater than 87%; the flatness of the sand screed layer 18 satisfies ±2cm/m 2 . The base 11 should be clean, without sundries and stagnant water, and the cleanliness should meet the vertical depth of 2.5cm. There should be no sharp-edged sundries such as tree roots, rubble, and stones. The slope shall be inspected with a horizontal ruler, and the slope shall be clean and dry without debris. After the base 11 and the inside of the slope 12 are cleaned, compacted and leveled, the HDPE film can be laid.
上述实施方式中,生物滞水池10开挖前,应采用全站仪进行定点,对四个角进行定点,不规则处进行加密。然后用石灰撒线,线迹清楚,一目了然。要保证线型优美、顺畅,使得生物滞水池10与周边地形或道路无缝对接,保证雨水的流入。生物滞水池10采用挖掘机进行土方开挖,开挖线性要顺畅美观,与周边地形顺接,保证雨水可以顺流至生态滞水池10中。挖掘机开挖的方式可采用90度垂直开挖,但施工难度较大且易塌方,存在安全隐患。为了方便施工、减少安全隐患,本实施方式采用1:3坡度进行放坡。In the above embodiment, before the excavation of the biological stagnant pond 10, a total station should be used to fix the points, the four corners should be fixed, and the irregularities should be encrypted. Then sprinkle the thread with lime, and the thread trace is clear and clear at a glance. It is necessary to ensure that the line is beautiful and smooth, so that the biological stagnation pool 10 is seamlessly connected with the surrounding terrain or roads, so as to ensure the inflow of rainwater. The biological stagnant pond 10 adopts an excavator to carry out earthwork excavation. The excavation line should be smooth and beautiful, and it should be connected with the surrounding terrain to ensure that rainwater can flow downstream into the ecological stagnant pond 10 . Excavator excavation can adopt 90-degree vertical excavation, but the construction is difficult and prone to landslides, posing safety hazards. In order to facilitate construction and reduce potential safety hazards, this embodiment uses a 1:3 slope for grading.
上述实施方式中,溢流井20的井内外采用1:3水泥砂浆进行粉刷,应无空鼓、表面平整。溢流井20的井周采用平板夯进行夯实,防止周边下沉。为了保证压实效果,作为优选,溢流井20周围设有井周加固层(图中未示出),井周加固层为掺有钢筋的混凝土,混凝土的厚度不小于20cm。作为进一步优选,混凝土中掺有8圆双层钢筋,进一步加固井周,防止下沉。In the above embodiment, the inside and outside of the overflow well 20 is painted with 1:3 cement mortar, and there should be no hollowing and the surface should be smooth. The well circumference of the overflow well 20 is compacted with a plate compactor to prevent the surroundings from subsidence. In order to ensure the compaction effect, preferably, a reinforcement layer around the overflow well 20 (not shown in the figure) is provided. The reinforcement layer around the well is concrete mixed with steel bars, and the thickness of the concrete is not less than 20cm. As a further preference, 8-round double-layer steel bars are mixed in the concrete to further reinforce the well circumference and prevent subsidence.
上述实施方式中,排水层14具有包裹第一排水管141的细砾(图中未世仇);排水层14的厚度为20cm,细砾的直径为2.0-3.5mm;细砾表面光滑,使得沙找平层18的沙与第一排水管141直接接触。In the above-described embodiment, the drainage layer 14 has fine gravels that wrap the first drainage pipe 141 (not shown in the figure); the thickness of the drainage layer 14 is 20cm, and the diameter of the fine gravels is 2.0-3.5mm; the surface of the fine gravels is smooth, so that the sand The sand in the leveling layer 18 is in direct contact with the first drainage pipe 141 .
过渡层15铺设有压实的中粗砂;过渡层15的厚度为10cm,中粗砂的直径为0.5-1.5mm。过渡层15尽量压实,以达到较好的过滤作用;可采用向中粗砂洒水的方式提高过渡层15的密实度。The transition layer 15 is laid with compacted medium-coarse sand; the thickness of the transition layer 15 is 10 cm, and the diameter of the medium-coarse sand is 0.5-1.5 mm. The transition layer 15 is compacted as much as possible to achieve a better filtering effect; the compactness of the transition layer 15 can be improved by sprinkling water on the medium-coarse sand.
过滤层16设有与景观层种植植物匹配的种植土,种植土的厚度为40cm,一般利用开挖出来的土进行改良,以减少对生态的破坏,且种植土应满足景观层17待种植植物的需求。The filter layer 16 is provided with planting soil that matches the planting plants in the landscape layer. The thickness of the planting soil is 40cm. Generally, the excavated soil is used for improvement to reduce ecological damage, and the planting soil should meet the requirements of the plants to be planted in the landscape layer 17. demand.
景观层17的种植植物应结合景观要求,选择美观、耐淹、去污能力强的植物。作为优选,景观层17可以选择多种植物掺杂种植,形成斑块生态,既美观,又能对生态平衡起到较好的调节作用。Planting plants in the landscape layer 17 should be combined with landscape requirements, and choose plants that are beautiful, flood-resistant, and have strong decontamination capabilities. As a preference, the landscape layer 17 can be planted with a variety of plants to form a patch ecology, which is not only beautiful, but also plays a good role in regulating the ecological balance.
上述实施方式中,并列铺设中最靠近坡脚的两个第一排水管141分别与坡脚的距离为40cm;每个第一排水管141的两端分别与坡脚的距离为1m。第一排水管的孔径小于2mm,容易被堵塞。为了保证第一排水管141不被堵塞,第一排水管141的外侧与细砾之间设有土工布层143。土工布层144的土工布包裹在第一排水管141周围,对第一排水管141的周围起到了进一步的过滤作用。In the above embodiment, the distance between the two first drainage pipes 141 closest to the toe of the slope during laying side by side is 40 cm; the distance between the two ends of each first drainage pipe 141 and the toe of the slope is 1 m. The aperture of the first drainage pipe is less than 2mm, which is easy to be blocked. In order to ensure that the first drainage pipe 141 is not blocked, a geotextile layer 143 is provided between the outer side of the first drainage pipe 141 and the fine gravel. The geotextile of the geotextile layer 144 is wrapped around the first drainage pipe 141 to further filter the surrounding of the first drainage pipe 141 .
上述实施方式中,为了保证雨水顺利流入生态滞水池10、溢流井20以及集水井30后,实现雨水的收集、下渗、蓄水、以及后期的补给等一体化类似“海绵”体功能;在竖直方向上,并列铺设在HDPE膜层13上的第一排水管141与第一雨水管142齐平,第二雨水管21高于第一雨水管142,使得溢流井20有一定的蓄水量;第二排水管31高于第二雨水管21,使得集水井30有一定的储水功能;第二排水管31的高度略低于景观层17相对于生物滞水池的高度,使得干旱情况下,集水井30里的储水可以由第二排水管31排出进入景观层17下方的过滤层16,为景观层17供水。作为优选,第一雨水管141与HDPE膜层13之间的高度距离为20-30cm,用于保证生物滞水池10可以蓄水20-30cm。In the above embodiment, in order to ensure that the rainwater flows smoothly into the ecological stagnation pool 10, the overflow well 20 and the water collection well 30, the integration of rainwater collection, infiltration, water storage, and later replenishment is similar to a "sponge" body function; In the vertical direction, the first drainage pipe 141 laid side by side on the HDPE film layer 13 is flush with the first rainwater pipe 142, and the second rainwater pipe 21 is higher than the first rainwater pipe 142, so that the overflow well 20 has a certain water storage capacity. The second drainage pipe 31 is higher than the second rainwater pipe 21, so that the water collection well 30 has a certain water storage function; the height of the second drainage pipe 31 is slightly lower than the height of the landscape layer 17 relative to the biological stagnant pond, so that under the drought situation, The water stored in the water collection well 30 can be discharged into the filter layer 16 below the landscape layer 17 by the second drain pipe 31 to supply water for the landscape layer 17 . Preferably, the height distance between the first rainwater pipe 141 and the HDPE film layer 13 is 20-30 cm, which is used to ensure that the biological stagnation tank 10 can store water of 20-30 cm.
作为本实用新型的一种具体实施方式,第一排水管141为并列设置在排水层14的若干个,第一雨水管142与第一排水管141一一匹配;一个第一雨水管142一端连通一个第一排水管141、另一端延伸到溢流井20中。每个第一排水管141都有相应的一个第一雨水管142匹配连通,保障了每个第一排水管141的排水效率。As a specific embodiment of the present utility model, the first drainage pipe 141 is several arranged in parallel on the drainage layer 14, and the first rainwater pipe 142 is matched with the first drainage pipe 141 one by one; one end of a first rainwater pipe 142 is connected to a first A drain pipe 141 extends into the overflow well 20 at the other end. Each first drain pipe 141 is connected with a corresponding first rainwater pipe 142 , which ensures the drainage efficiency of each first drain pipe 141 .
作为本实用新型的另一种具体实施方式,第一排水管141为并列设置在排水层14的若干个,第一雨水管142为若干个;每个第一雨水管142的一端连通若干个第一排水管141、另一端延伸到溢流井20中。一个第一雨水管142的一端连通若干个第一排水管141,第一雨水管142有若干个,保障了第一排水管141和第一雨水管142中的一个或几个出现堵塞、故障无法通水时,雨水可以通过其他的第一排水管141和其他的第一雨水管142流至溢流井20。As another specific embodiment of the present utility model, the first drainage pipes 141 are several arranged in parallel on the drainage layer 14, and there are several first rainwater pipes 142; one end of each first rainwater pipe 142 is connected to several first drainage pipes. The other end of the pipe 141 extends into the overflow well 20 . One end of a first rainwater pipe 142 communicates with several first drainpipes 141, and there are several first rainwater pipes 142, which ensures that when one or more of the first rainwater pipes 141 and the first rainwater pipes 142 are blocked or fail to pass water , the rainwater can flow to the overflow well 20 through the other first drain pipe 141 and the other first rainwater pipe 142 .
尽管本实用新型的实施方案已公开如上,但其并不仅仅限于说明书和实施方式中所列运用。它完全可以被适用于各种适合本实用新型的领域。对于熟悉本领域的人员而言可容易地实现另外的修改。因此在不背离权利要求及等同范围所限定的一般概念下,本实用新型并不限于特定的细节和这里示出与描述的图例。Although the embodiments of the present invention have been disclosed above, they are not limited to the applications listed in the specification and implementation. It can be applied to various fields suitable for the utility model. Additional modifications can be readily effected by those skilled in the art. Therefore, the invention should not be limited to the specific details and examples shown and described herein, without departing from the general concept defined by the claims and their equivalents.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621011156.0U CN206157878U (en) | 2016-08-31 | 2016-08-31 | Biological stagnant water pond system in sponge city |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201621011156.0U CN206157878U (en) | 2016-08-31 | 2016-08-31 | Biological stagnant water pond system in sponge city |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206157878U true CN206157878U (en) | 2017-05-10 |
Family
ID=58649429
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201621011156.0U Expired - Fee Related CN206157878U (en) | 2016-08-31 | 2016-08-31 | Biological stagnant water pond system in sponge city |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206157878U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106193263A (en) * | 2016-08-31 | 2016-12-07 | 苏州金螳螂园林绿化景观有限公司 | The biological stagnant pool system in sponge city |
| CN115029987A (en) * | 2022-05-25 | 2022-09-09 | 中建八局第二建设有限公司 | Permeable pavement drainage structure and sponge urban rainwater collection device |
-
2016
- 2016-08-31 CN CN201621011156.0U patent/CN206157878U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106193263A (en) * | 2016-08-31 | 2016-12-07 | 苏州金螳螂园林绿化景观有限公司 | The biological stagnant pool system in sponge city |
| CN115029987A (en) * | 2022-05-25 | 2022-09-09 | 中建八局第二建设有限公司 | Permeable pavement drainage structure and sponge urban rainwater collection device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105089142B (en) | Concave rainwater storage and dispatching pool for green space and decentralized rainwater storage and dispatching pool system | |
| CN106638918B (en) | Construction method of sponge urban rainwater collection system | |
| CN204959952U (en) | Recessed formula greenery patches rainwater regulation dispatch pond and distributed rainwater regulation dispatch pond system | |
| CN106759825A (en) | A kind of construction method of sponge urban green space water storage system | |
| CN106193245B (en) | A kind of paddy field underground reservoir and its construction method for sponge city | |
| CN106193261B (en) | A kind of Collapsible Loess District rain flood harvests step man-made lake system and design method | |
| CN207567889U (en) | Residential quarters Rainwater collection system | |
| CN106193263A (en) | The biological stagnant pool system in sponge city | |
| CN204690903U (en) | Community system for reclaiming rainwater | |
| CN102747757A (en) | Rainwater collection and using method for desertification area | |
| CN106677011A (en) | Sidewalk and greenbelt water collecting and storing system | |
| CN107869151B (en) | Raw retaining wall and its construction method are planted in a kind of permeable water purification of layer-stepping | |
| CN205242205U (en) | a road drain | |
| CN207062672U (en) | A kind of permeable pavement structure | |
| CN206015460U (en) | A kind of town road drainage system | |
| CN206157878U (en) | Biological stagnant water pond system in sponge city | |
| CN107503426A (en) | A kind of wet land system and its construction method for integrating rainwater-collecting, regulating and storing, purifying | |
| CN207582619U (en) | A kind of Rain Garden based on sponge city | |
| CN207277483U (en) | A kind of wet land system for integrating rainwater-collecting, regulating and storing, purifying | |
| CN104652595B (en) | Half support water storage type greenery patches structure of a kind of urban flood defence and utilization of flood resources | |
| CN204780521U (en) | Composite water storage and drainage environment-friendly ground | |
| CN208501715U (en) | A kind of Rain Garden | |
| CN111599261A (en) | Urban runoff simulation system based on low-impact development | |
| CN207582228U (en) | A kind of roadside greening rainwater regulating pondage system | |
| CN215253153U (en) | Wetland rainwater recovery structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170510 |