CN207793788U - Permeable pavement rainwater infiltration structure - Google Patents

Permeable pavement rainwater infiltration structure Download PDF

Info

Publication number
CN207793788U
CN207793788U CN201820075899.7U CN201820075899U CN207793788U CN 207793788 U CN207793788 U CN 207793788U CN 201820075899 U CN201820075899 U CN 201820075899U CN 207793788 U CN207793788 U CN 207793788U
Authority
CN
China
Prior art keywords
soil matrix
header
water
waterproof layer
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820075899.7U
Other languages
Chinese (zh)
Inventor
李实�
黄宁
姜涛
杨有军
张建设
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bureau Of Housing And Urban-Rural Development Of Jiaozuo City
Henan Sponge City Engineering Service Center Co ltd
Original Assignee
Bureau Of Housing And Urban-Rural Development Of Jiaozuo City
Henan Sponge City Engineering Service Center Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bureau Of Housing And Urban-Rural Development Of Jiaozuo City, Henan Sponge City Engineering Service Center Co ltd filed Critical Bureau Of Housing And Urban-Rural Development Of Jiaozuo City
Priority to CN201820075899.7U priority Critical patent/CN207793788U/en
Application granted granted Critical
Publication of CN207793788U publication Critical patent/CN207793788U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a permeable pavement rainwater infiltrates structure, including the permeable pavement layer, screed-coat, basic unit and the soil matrix of mating formation that from the top down set gradually, be equipped with the waterproof layer that is the ridge shape between basic unit and the soil matrix, the pressure manifold has still been buried underground to the both sides portion of basic unit, has laid the several on the pressure manifold and has gathered the flow hole, the lateral wall of pressure manifold has the water storage tank through duct connection, and the bottom of water storage tank still is connected with the infiltration pipe, has laid the several infiltration hole on the infiltration pipe. The utility model discloses a set up the waterproof layer, collect the drainage with the water of gathering in the basic unit, the reduction that can great degree sees through the rainfall in the road surface infiltration road lower part soil matrix, reduces pipeline and the accessory equipment buried underground in the road lower part soil matrix and suffers the water logging and the risk that the soil matrix takes place the water damage, also can improve the seepage volume under the road surface rainwater runoff simultaneously, is favorable to the repayment of groundwater, can accelerate the road surface rainwater runoff dissipation speed of mating formation that permeates water, guarantees that pedestrian on road surface, the vehicle is current smooth and easy.

Description

A kind of porous pavement rain infiltration structure
Technical field
The utility model is related to urban pavement structures, and in particular to a kind of porous pavement rain infiltration structure.
Background technology
With the fast development of urbanization, with the wide of the large area of the impermeable materials such as stone material, cement, concrete construction The Municipals facility such as field, road, and covering of the vast waterproof pavement of these areas to original naturally permeable underlying surface, lead It causes the rainfall runoff that city underlying surface generates when rainfall to be difficult to down ooze, and is advanced by the time to form flood peak, be easy to cause city Ponding effectiveness factors.Road surface ratio shared in the waterproof underlying surface in urban area is higher, the rainfall runoff that surface generates Amount is also larger, and the ponding that road surface generates not only influences traffic, makes troubles to the trip of people, while also increasing urban waterlogging Risk.
Recently as the continuous propulsion of sponge urban construction, many areas start gradually by the impervious blanket of road with Permeable pavement is replaced, but has replaced two main problems of road generally existing of permeable pavement at present, when, due to before Road surface under the facilities such as inbuilt line equipment be all to be designed construction according to non-Soaking environment mostly, therefore, replace saturating Water is permeated or is stored in road lower structural layer and soil matrix through the rainwater oozed under mating formation after mating formation, to inbuilt below road Line equipment etc. affects, or even damage subsurface equipment;Second is that under being permeated by porous pavement after replacing permeable pavement The amount of rainfall come is more, is easy to impregnate the vulnerable area of soil matrix below damage road, and then cause harmful effect to road.
Utility model content
The utility model aim is to provide a kind of porous pavement rain infiltration structure.
Based on above-mentioned purpose, the utility model takes following technical scheme:
A kind of porous pavement rain infiltration structure, including set gradually from top to bottom permeable pavement layer, screed-coat, base And soil matrix, the waterproof layer in roof shape is equipped between the base and soil matrix, the both sides of base are also embedded with header, collect Several flow concentration holes are laid in flow tube, the side wall of the header is connected with water tank by delivery pipe, and the bottom of water tank is also It is connected with soakaway trench, several water seepage holes are laid on soakaway trench.
The flow concentration hole is distributed in the upper side wall of header;The outer wall of header and soakaway trench is additionally provided with filtering respectively Net.
The filter screen is gauze, and gauze is wound on the outer wall of header or soakaway trench.
The delivery pipe has several, and several delivery pipes are arranged along the length direction of header, and delivery pipe is located at flow concentration hole Lower section.
Bed course is additionally provided between the waterproof layer and soil matrix, the bottom of base, the top of bed course are in be adapted with waterproof layer Roof shape.
The waterproof layer is made of polyethylene waterproof coating;The thickness of waterproof layer is 5cm.
Compared with prior art, the utility model has the advantages that:
The water assembled in base is collected and is drained, can largely reduced by the way that waterproof layer is arranged by the utility model Cross the amount of rainfall that road surface is penetrated into the soil matrix of road lower part, reduce in the soil matrix of road lower part inbuilt pipeline and its auxiliary device by The risk of water damage occurs for water logging and soil matrix, while rainwater on road surface diameter also can be improved and flow down milliosmolarity, is conducive to the covering of underground water, can Accelerate road permeable pavement surface rain water runoff dissipation speed, ensures that road surface pedestrian, vehicle pass-through are smooth.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is A-A schematic diagrames in Fig. 1;
Fig. 3 is the partial schematic diagram of delivery pipe and soakaway trench;
Wherein:1, permeable pavement layer;2, screed-coat;3, base;4, waterproof layer;5, bed course;6, soil matrix;7, underground city Political affairs pipeline and its affiliated facility;8, header;9, delivery pipe;10, water tank;11, soakaway trench;12, flow concentration hole;13, it seeps water Hole.
Specific implementation mode
A kind of porous pavement rain infiltration structure, as shown in Figs. 1-3, including the permeable pavement layer that sets gradually from top to bottom 1, screed-coat 2, base 3, bed course 5 and soil matrix 6 are equipped with the waterproof layer 4 in roof shape between the base 3 and bed course 5, described Waterproof layer 4 is made of polyethylene waterproof coating, and the thickness of waterproof layer 4 is 5cm, and the bottom of the base 3, the top of bed course 5 are in The roof shape being adapted with waterproof layer 4, the both sides of base 3 are also embedded with header 8, and the upper side wall of header 8 is laid with The outer wall of several flow concentration holes 12, header 8 and soakaway trench 11 is additionally provided with filter screen respectively, and the filter screen is gauze, gauze It is wound on the outer wall of header 8 or soakaway trench 11, the side wall of the header 8 is connected with water tank 10, institute by delivery pipe 9 Stating delivery pipe 9 has several, and several delivery pipes 9 are arranged along the length direction of header 8, and delivery pipe 9 is located at the lower section of flow concentration hole, often A delivery pipe 9 is connected with water tank 10, and the bottom of water tank 10 is also associated with soakaway trench 11, several ooze is laid on soakaway trench 11 Water hole 13.
Wherein:Permeable pavement layer 1 is the permeable face layer such as water-permeable brick, pervious asphalt or pervious concrete;Screed-coat 2:It is thoroughly Aqueous to be not less than permeable pavement layer, sand, coarse sand, dry cement mortar are constructed in general use, thickness 2-3cm;Base 3:Its Rigid base, semi-rigid type base, flexbile base three classes are generally included, permeable pellet, permeable may be selected according to regions resources difference The materials such as cement concrete, stabilization gravel are built, it is desirable that this layer has enough intensity, water penetration, water stability, continuous hole Rate is not less than 10%;Bed course 5:Bed course should be generally set when the earth base of road is cohesive soil, mainly use water penetration preferable The granular materials such as sand, gravel or harmless industrial residue are built, and particle accounting of the material particle size less than 0.075mm should not exceed 5%; Soil matrix 6:Natural soils layer below road.
The rainfall runoff that road generates when rainfall under the permeable pavement of road surface by being seeped into up to after base 3, in waterproof layer 4 It comes together under barrier effect in base 3, since the bottom of base 3 is in the ramped shaped of slope aspect both sides of the road, therefore comes together in base 3 Rainwater under the effect of gravity rapidly to the bottom of slope on 3 bottom of base, two slope assemble.The rainwater of bottom of slope is gathered in by Embedment and installation Header 8 in the bottom of base 3 is collected(Gauze plays the role of intercepting sundries), passed through by the rainwater that header 8 is collected defeated It send pipe 9 to be directed to from road on both sides of the road remotely, then flows into water tank 10, spread to surrounding soil by soakaway trench 11.This Utility model can largely reduce the amount of rainfall penetrated into through road surface in road lower part soil matrix 6, reduce road lower part soil matrix 6 In inbuilt underground municipal pipeline and its affiliated facility 7 by the risk of water logging, while rainwater on road surface diameter also can be improved and flow down and ooze Amount, is conducive to the covering of underground water.

Claims (6)

1. a kind of porous pavement rain infiltration structure, including set gradually from top to bottom permeable pavement layer, screed-coat, base and Soil matrix, which is characterized in that the waterproof layer in roof shape is equipped between the base and soil matrix, the both sides of base are also embedded with Header is laid with several flow concentration holes on header, and the side wall of the header is connected with water tank, water tank by delivery pipe Bottom be also associated with soakaway trench, several water seepage holes are laid on soakaway trench.
2. porous pavement rain infiltration structure as described in claim 1, which is characterized in that the flow concentration hole is distributed in header Upper side wall;The outer wall of header and soakaway trench is additionally provided with filter screen respectively.
3. porous pavement rain infiltration structure as claimed in claim 2, which is characterized in that the filter screen is gauze, gauze It is wound on the outer wall of header or soakaway trench.
4. porous pavement rain infiltration structure as claimed in claim 3, which is characterized in that the delivery pipe have it is several, it is several Delivery pipe is arranged along the length direction of header, and delivery pipe is located at the lower section of flow concentration hole.
5. porous pavement rain infiltration structure as claimed in claim 4, which is characterized in that between the waterproof layer and soil matrix also Equipped with bed course, the bottom of the base, the top of bed course are in the roof shape being adapted with waterproof layer.
6. porous pavement rain infiltration structure according to any one of claims 1 to 5, which is characterized in that the waterproof layer is by poly- second Alkene water-repellent paint is made;The thickness of waterproof layer is 5cm.
CN201820075899.7U 2018-01-17 2018-01-17 Permeable pavement rainwater infiltration structure Expired - Fee Related CN207793788U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820075899.7U CN207793788U (en) 2018-01-17 2018-01-17 Permeable pavement rainwater infiltration structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820075899.7U CN207793788U (en) 2018-01-17 2018-01-17 Permeable pavement rainwater infiltration structure

Publications (1)

Publication Number Publication Date
CN207793788U true CN207793788U (en) 2018-08-31

Family

ID=63271048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820075899.7U Expired - Fee Related CN207793788U (en) 2018-01-17 2018-01-17 Permeable pavement rainwater infiltration structure

Country Status (1)

Country Link
CN (1) CN207793788U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208426A (en) * 2018-09-21 2019-01-15 深圳市鹏升建设有限公司 A kind of municipal road construction structure and its construction method
CN109469181A (en) * 2018-11-08 2019-03-15 江苏永通市政园林建设有限公司 A kind of sponge urban rainwater collection system
CN109879458A (en) * 2019-03-07 2019-06-14 北京建筑大学 A placement type rainwater runoff filtration and purification system and purification body
CN110158404A (en) * 2019-06-11 2019-08-23 北京向阳水木城市规划设计研究院 A kind of urban express way pervious ecological road surface
CN110735450A (en) * 2019-11-19 2020-01-31 沈阳促晋科技有限公司 Underground pipe gallery waterproof structure
CN111560813A (en) * 2020-05-29 2020-08-21 中北大学 Concrete pavement slab system and pavement slab rainwater collection system permeate water
CN111593627A (en) * 2020-05-29 2020-08-28 中北大学 Permeable concrete brick pavement system based on solid waste material and paving method thereof
CN111764219A (en) * 2020-05-27 2020-10-13 北京建筑大学 Permeable paving structure and permeable paving method
CN113737594A (en) * 2021-09-04 2021-12-03 广东正升建筑有限公司 Permeable pavement assembly and drainage system for sidewalk
CN114016351A (en) * 2021-11-16 2022-02-08 佛山市阳辰建设有限公司 Quick infiltration road bed road surface of rainwater
CN114624162A (en) * 2022-02-15 2022-06-14 中国一冶集团有限公司 Permeable pavement permeability coefficient monitoring device, burying method and monitoring method

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208426A (en) * 2018-09-21 2019-01-15 深圳市鹏升建设有限公司 A kind of municipal road construction structure and its construction method
CN109208426B (en) * 2018-09-21 2020-12-08 深圳市鹏升建设有限公司 Municipal road construction structure and construction method thereof
CN109469181A (en) * 2018-11-08 2019-03-15 江苏永通市政园林建设有限公司 A kind of sponge urban rainwater collection system
CN109879458B (en) * 2019-03-07 2020-02-11 北京建筑大学 Placement type rainwater runoff filtering and purifying system and purifying body
CN109879458A (en) * 2019-03-07 2019-06-14 北京建筑大学 A placement type rainwater runoff filtration and purification system and purification body
CN110158404A (en) * 2019-06-11 2019-08-23 北京向阳水木城市规划设计研究院 A kind of urban express way pervious ecological road surface
CN110735450A (en) * 2019-11-19 2020-01-31 沈阳促晋科技有限公司 Underground pipe gallery waterproof structure
CN111764219A (en) * 2020-05-27 2020-10-13 北京建筑大学 Permeable paving structure and permeable paving method
CN111560813A (en) * 2020-05-29 2020-08-21 中北大学 Concrete pavement slab system and pavement slab rainwater collection system permeate water
CN111593627A (en) * 2020-05-29 2020-08-28 中北大学 Permeable concrete brick pavement system based on solid waste material and paving method thereof
CN113737594A (en) * 2021-09-04 2021-12-03 广东正升建筑有限公司 Permeable pavement assembly and drainage system for sidewalk
CN114016351A (en) * 2021-11-16 2022-02-08 佛山市阳辰建设有限公司 Quick infiltration road bed road surface of rainwater
CN114016351B (en) * 2021-11-16 2022-07-19 佛山市阳辰建设有限公司 Quick infiltration road bed road surface of rainwater
CN114624162A (en) * 2022-02-15 2022-06-14 中国一冶集团有限公司 Permeable pavement permeability coefficient monitoring device, burying method and monitoring method
CN114624162B (en) * 2022-02-15 2024-08-13 中国一冶集团有限公司 Permeable pavement permeability coefficient monitoring device, embedding method and monitoring method

Similar Documents

Publication Publication Date Title
CN207793788U (en) Permeable pavement rainwater infiltration structure
CN106759825B (en) Construction method of sponge urban green land water storage system
CN104831599B (en) Composite water storage and drainage environment-friendly ground
CN209024909U (en) A Sponge City Multifunctional Pavement Structure
CN207793792U (en) A kind of road surface permeable pavement structure
CN110965420A (en) A construction structure and construction method for road reconstruction and upgrading sponge city
CN207062672U (en) A kind of permeable pavement structure
DE10000025A1 (en) Water system, especially for rain water for collection and intermediate storage, and for reducing and extended time-throttled delivery of water introduced in water system; has at least one drainage pipe
CN104343177B (en) underground drainage channel
CN209338948U (en) A kind of water-permeable pavement structure
CN207700330U (en) A kind of concave herbaceous field grass-planting ecological ditch
CN208685390U (en) Sponge city paved road structure
CN207244389U (en) A kind of shallow-layer water storage road surface water-permeable brick
DE20002066U1 (en) Infiltration system
CN210658632U (en) Infiltration ditch structure
CN208362838U (en) A kind of porous pavement
CN204780521U (en) Composite water storage and drainage environment-friendly ground
CN106978845A (en) Plough groove type rainwater collection pool and rainwater on road surface collection method
CN111305482A (en) Building roof sponge playground capable of recovering rainwater and construction method thereof
CN105484125A (en) Step capable of collecting and utilizing rainwater
CN206971040U (en) A kind of special discharge structure in walking road surface
CN109056897A (en) Radial pattern rain-water accumulating releases seepage well system
CN213358855U (en) Can collect interception ditch of permeable material basic unit rainwater
CN211848696U (en) Type bituminous paving structure permeates water
CN201770925U (en) Highway leaching well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831

Termination date: 20220117

CF01 Termination of patent right due to non-payment of annual fee