CN108360546A - A kind of architectural engineering pile foundation fixing device - Google Patents

A kind of architectural engineering pile foundation fixing device Download PDF

Info

Publication number
CN108360546A
CN108360546A CN201810195573.2A CN201810195573A CN108360546A CN 108360546 A CN108360546 A CN 108360546A CN 201810195573 A CN201810195573 A CN 201810195573A CN 108360546 A CN108360546 A CN 108360546A
Authority
CN
China
Prior art keywords
groove
fixed
pile foundation
block
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810195573.2A
Other languages
Chinese (zh)
Other versions
CN108360546B (en
Inventor
付志豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Seiko Green Building Integrated Technology Co., Ltd.
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN201810195573.2A priority Critical patent/CN108360546B/en
Publication of CN108360546A publication Critical patent/CN108360546A/en
Application granted granted Critical
Publication of CN108360546B publication Critical patent/CN108360546B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to the realm of building construction, especially a kind of architectural engineering pile foundation fixing device, for existing pile foundation fixing device reinforcement protection problem cannot be carried out to constructed pile foundation, now propose following scheme, it includes multiple clamping groups mutually stacked, each clamping group includes two symmetrically arranged clamping devices, the clamping device includes grip block and two fixed blocks, the both sides of grip block are equipped with fixed block, grip block and fixed block are an integral structure, first through hole there are two being opened on fixed block, threaded rod is equipped in first through hole on two fixed blocks, the both ends of threaded rod are threaded with nut, gasket and the first spring are equipped between nut and fixed block, gasket is between the first spring and nut.The configuration of the present invention is simple, it is at low cost, it is easy for installation, it can realize and building pile foundation is consolidated, prevent from, when carrying out other building operations, having an impact building pile foundation.

Description

A kind of architectural engineering pile foundation fixing device
Present patent application is divisional application, and parent application number is 2017101511811, and parent application day is 03 month 2017 14 Day, female case patent name is:A kind of architectural engineering pile foundation fixing device.
Technical field
The present invention relates to technical field of building construction more particularly to a kind of architectural engineering pile foundation fixing devices.
Background technology
Pile foundation is by foundation pile and is connected to the cushion cap of stake top and collectively constitutes, if pile body is all embedded in soil, cushion cap bottom surface with The soil body contacts, then referred to as embedded footing on piles, low capped pile foundation, if pile body top is basseted, cushion cap bottom is located at ground or more, referred to as high cushion cap Pile foundation, building pile foundation are usually embedded footing on piles, low capped pile foundation plinth, and it is solid that the patent of Patent No. CN 205576958U proposes a kind of high pile foundation Determine structure, by the setting of armoured concrete slab, spring, main piston and auxiliary piston, enhances pile foundation in soft soil foundation and silt The stability of mud layer reduces the pulling capacity and moment of flexure of pile foundation, improves the stability of high pile foundation, this patent structure is too simple, right The stability of pile foundation is not too high, and its be mostly in order to improve the stability of pile foundation and soft soil foundation and mud, cannot Reinforcement protection is carried out to constructed pile foundation, such as after pile foundation construction is good, carry out building upper layer construct or into When row building reconstruction, pile foundation can not be protected, and can not realize that the pile foundation of different height is protected according to the height of pile foundation Shield, thus it is proposed that a kind of architectural engineering pile foundation fixing device.
Invention content
A kind of architectural engineering pile foundation fixing device proposed by the present invention, solving existing pile foundation fixing device cannot be right Constructed pile foundation carries out reinforcement protection problem.
To achieve the goals above, present invention employs following technical solutions:
A kind of architectural engineering pile foundation fixing device, including multiple clamping groups are superposed between adjacent clamping group, each clamping group Including two symmetrically arranged clamping devices, the clamping device includes grip block and two fixed blocks, and the both sides of grip block are equal Equipped with fixed block, grip block and fixed block are an integral structure, and are opened on fixed block there are two first through hole, on two fixed blocks Threaded rod is equipped in first through hole, the both ends of threaded rod are threaded with nut, and gasket and the are equipped between nut and fixed block One spring, for gasket between the first spring and nut, two grip blocks side close to each other is provided with arc fixing groove, arc The inner wall of shape fixing groove is circumferentially distributed the third groove that multiple diameters concave, and slidably connects guide rod in third groove, leads It is welded with arc fixinig plate to one end of bar, the both sides of guide rod are welded with limited block, and the both sides of third groove are provided with limit Position slot, limited block is slidably connected with limiting slot, side of the grip block far from arc fixing groove set there are two it is symmetrically arranged First link block, is rotatably connected to telescopic rod on the first link block, and telescopic rod includes head rod and the second connecting rod, and second The top of connecting rod is provided with the second groove, and one end of head rod is located in the second groove, head rod and the second groove Sidewall thread connection, the bottom end of the second connecting rod is equipped with fixed plate, the second link block, the second connecting rod is welded in fixed plate It is rotatablely connected with the second link block, the both sides of fixed plate are opened there are two the second through-hole, and fixing glue is equipped in the second through-hole, described The top of grip block is opened there are two symmetrically arranged mounting groove and two connecting holes, and mounting groove is located between two connecting holes, peace The bottom end of tankage is provided with threaded hole, and threaded hole internal thread is connected with fixed link, and the bottom end of fixed link extends to the lower section of grip block, The bottom end of fixed link is equipped with tip, and fixed link is an integral structure with tip, and the section of the connecting hole is T shapes, in connecting hole It is connected with fixed part, fixed part includes rectangle fixed part and cylindrical fixing portion, and the bottom end of rectangle fixed part is connected with cylinder Fixed part, by being connected between fixed part between adjacent clamping group, and the bottom end of cylindrical fixing portion extends to the company of bottom end grip block It connects in hole.
Preferably, the both sides of the grip block are equipped with the first groove, and the vertical section of the first groove is cross, and first is recessed Opened at slot there are two pin hole, two pin holes are located at the upper and lower ends of the first groove ", it sets in the first groove on adjacent grip block There is I-shaped connector, is set on I-shaped connector there are two bolt, bolt is plugged on the bolt in adjacent first groove respectively In hole.
Preferably, the gasket is provided with annular groove close to the side of the first spring, and one end of the first spring is located at annular In groove.
Preferably, 3 to 5 third grooves are provided on the side wall of the arc fixing groove, third groove is around arc fixing groove Center circumferential distribution.
Preferably, the guide rod, arc fixinig plate and limited block are an integral structure, and arc fixinig plate is equipped with anti-skidding Line, and guide rod, arc fixinig plate and limited block are steel structure.
Preferably, the rectangle fixed part and cylindrical fixing portion are connect with the side walls of connecting hole.
Preferably, the junction of the threaded rod and first through hole is equipped with rubber sleeve, and rubber sleeve is flexibly connected with threaded rod, And the outer diameter of rubber sleeve is identical as the aperture of first through hole.
Preferably, the arc fixing groove is located at the centre position of third recess sidewall, and arc fixinig plate is fixed with arc The radian of slot is identical.
Preferably, the side wall bottom end of the fixed link is set there are four the blow tank being mutually parallel with fixed link, and four discharge Slot is symmetrical arranged.
Preferably, the fixed link is slidably connected with threaded hole, and the top of fixed link is equipped with cap, and cap is located at mounting groove It is interior, reinforcing rib is equipped in fixed link.
Compared with prior art, the beneficial effects of the invention are as follows:
1, the present invention can be consolidated the present apparatus and building pile foundation by the setting of grip block, fixed block, threaded rod, nut It is fixed, by the setting of telescopic rod, fixed plate, fixing glue, threaded hole and fixed link, building pile foundation can be made to be fixed with ground and connected It connects, building pile foundation stability higher, prevents from, when carrying out other building operations, having an impact building pile foundation.
2, the present invention setting by connecting hole, fixed part, the first groove, fixed nail hole, fixing glue and I-shaped connector It sets, multigroup clamping group can be fixed together, and use multigroup clamping group, the building pile foundation made more steady according to actual conditions Gu.
3, the setting of the invention by guide rod, arc fixinig plate, limited block, limiting slot, second spring and third groove, Clamping device can be facilitated to be connected and fixed irregular pile foundation, the clamping device made and pile foundation stationarity are more preferable.
4, the present invention, can by the setting of head rod and the second connecting rod, the first link block and the second link block Realize the fixation to different height clamping device, the present apparatus is simple in structure, at low cost, easy for installation, can realize to building stake Base consolidates, and prevents from, when carrying out other building operations, having an impact building pile foundation, and by the setting of the first spring, right Building pile foundation vibrations generate cushioning effect.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of the clamping group of architectural engineering pile foundation fixing device proposed by the present invention.
Fig. 2 is a kind of connection signal of the fixed link and grip block of architectural engineering pile foundation fixing device proposed by the present invention Figure.
Fig. 3 is a kind of side structure schematic view of architectural engineering pile foundation fixing device proposed by the present invention.
Fig. 4 is a kind of partial structural diagram of architectural engineering pile foundation fixing device proposed by the present invention.
Fig. 5 is a kind of stereogram of the fixed part of architectural engineering pile foundation fixing device proposed by the present invention.
Fig. 6 is a kind of schematic cross-sectional view of architectural engineering pile foundation fixing device proposed by the present invention.
Fig. 7 is a kind of structure of the guide rod and arc fixinig plate of architectural engineering pile foundation fixing device proposed by the present invention Schematic diagram.
Fig. 8 is guide rod and arc fixinig plate and the clamping of a kind of architectural engineering pile foundation fixing device proposed by the present invention The connection diagram in portion.
In figure:1 clamping device, 2 guide rods, 3 arc fixinig plates, 4 arc fixing grooves, 5 first grooves, 6 nuts, 7 catch, 8 fixed blocks, 9 first springs, 10 threaded rods, 11 connecting holes, 12 first link blocks, 13 threaded holes, 14 mounting holes, 15 grip blocks, 16 fixed links, 17 tips, 18 I-shaped connectors, 19 fixing glues, 20 fix nail hole, 21 head rods, 22 second connecting rods, 23 second grooves, 24 second link blocks, 25 fixed plates, 26 fixing glues, 27 fixed parts, 271 round fixed parts, 272 rectangles are fixed Portion, 28 limited blocks, 29 limiting slots, 30 third grooves, 31 second springs.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Referring to Fig.1-8, a kind of architectural engineering pile foundation fixing device, including multiple clamping groups are superimposed between adjacent clamping group Setting, each clamping group include two symmetrically arranged clamping devices 1, and clamping device 1 includes grip block 15 and two fixed blocks 8, the both sides of grip block 15 are equipped with fixed block 8, and grip block 15 and fixed block 8 are an integral structure, opened on fixed block 8 there are two First through hole is equipped with threaded rod 10 in the first through hole on two fixed blocks 8, and the both ends of threaded rod 10 are threaded with nut 6, Gasket 7 and the first spring 9 are equipped between nut 6 and fixed block 8, gasket 7 is between the first spring 9 and nut 6, two clampings The side close to each other of block 15 is provided with arc fixing groove 4, and the inner wall of arc fixing groove 4 is circumferentially distributed to have multiple diameters to concave Third groove 30 slidably connects guide rod 2 in third groove 30, and one end of guide rod 2 is welded with arc fixinig plate 3, is oriented to The both sides of bar 2 are welded with limited block 28, and the both sides of third groove 30 are provided with limiting slot 29, and limited block 28 is slided with limiting slot 29 Dynamic connection, side of the grip block 15 far from arc fixing groove 4 set that there are two symmetrically arranged first link block 12, the first link blocks Telescopic rod is rotatably connected on 12, telescopic rod includes head rod 21 and the second connecting rod 22, the top of the second connecting rod 22 It is provided with the second groove 23, one end of head rod 21 is located in the second groove 23, head rod 21 and the second groove 23 Sidewall thread connects, and the bottom end of the second connecting rod 22 is equipped with fixed plate 25, is welded with the second link block 24 in fixed plate 25, and second Connecting rod 22 and the second link block 24 are rotatablely connected, and the both sides of fixed plate 25 are opened there are two the second through-hole, are set in the second through-hole There is a fixing glue 26, the top of grip block 15 opens that there are two symmetrically arranged mounting groove 14 and two connecting holes 11, mounting grooves 14 Between two connecting holes 11, the bottom end of mounting groove 14 is provided with threaded hole 13, and 13 internal thread of threaded hole is connected with fixed link 16, Gu The bottom end of fixed pole 16 extends to the lower section of grip block 15, and the bottom end of fixed link 16 is equipped with tip 17, and fixed link 16 is with tip 17 The section of integral structure, connecting hole 11 is T shapes, is connected with fixed part 27 in connecting hole 11, fixed part 27 is fixed including rectangle Portion 272 and cylindrical fixing portion 271, the bottom end of rectangle fixed part 272 are connected with cylindrical fixing portion 271, between adjacent clamping group By being connected between fixed part 27, and the bottom end of cylindrical fixing portion 271 extends in the connecting hole 11 of bottom end grip block 15, clamping The both sides of block 15 are equipped with the first groove 5, and the vertical section of the first groove 5 is cross, open that there are two pin holes at the first groove 5 20, two pin holes are located at the upper and lower ends of the first groove 5 ", I-shaped connection is equipped in the first groove 5 on adjacent grip block 15 Part 18 is set on I-shaped connector 18 there are two bolt 19, and bolt 19 is plugged on the pin hole 20 in adjacent first groove 5 respectively Interior, gasket 7 is provided with annular groove close to the side of the first spring 9, and one end of the first spring 9 is located in annular groove, and arc is solid Determine to be provided with 3 to 5 third grooves 30 on the side wall of slot 4, third groove 30 is distributed around the center circumferential of arc fixing groove 4, is oriented to Bar 2, arc fixinig plate 3 and limited block 28 are an integral structure, and arc fixinig plate 3 is equipped with anti-skid chequer, and guide rod 2, arc Fixinig plate 3 and limited block 28 are steel structure, the side of rectangle fixed part 272 and cylindrical fixing portion 271 with connecting hole 11 Wall is slidably connected, and threaded rod 10 and the junction of first through hole are equipped with rubber sleeve, and rubber sleeve is flexibly connected with threaded rod, and rubber The outer diameter of set is identical as the aperture of first through hole, and arc fixing groove 4 is located at the centre position of 30 side wall of third groove, and arc is fixed Piece 3 is identical as the radian of arc fixing groove 4, and the side wall bottom end of fixed link 16 sets that there are four the dischargings being mutually parallel with fixed link 16 Slot, four blow tanks are symmetrical arranged, and fixed link 16 is slidably connected with threaded hole 13, and the top of fixed link 16 is equipped with cap, cap In mounting groove 14, reinforcing rib is equipped in fixed link 16.
Embodiment:The clamping group that different number is chosen according to the height of building pile foundation and actual demand, by two grip blocks 15 are individually positioned in the bottom end both sides of building pile foundation, and two grip blocks 15 are symmetrical arranged, the arc fixinig plate 3 on grip block 15 Be in contact with the side wall of round pile foundation, in the first through hole on fixed block 8 be inserted into threaded rod 10, the both ends of threaded rod 10 according to It is secondary to load onto the first spring 9, gasket 7 and nut 6, two nuts 6 are rotated, nut 6 rotates on threaded rod 10, and nut 6 passes through pad Piece 7 drives the compression of the first spring 9, the present apparatus and building pile foundation can be fixed, while arc fixinig plate 3 is in the work of pile foundation Under, guide rod 2 is driven to be moved into third groove 30, guide rod 2 drives 31 compressive deformation of second spring, limited block 28 leading It is slided in limiting slot 29 under the action of to bar 2, clamping device can be facilitated to be connected and fixed irregular pile foundation, the folder made It holds device and pile foundation stationarity is more preferable, until grip block 15 by pile foundation fixed column, is packed into solid in the threaded hole 13 of grip block 15 Fixed pole 16, fixed link 16 are threadedly coupled with threaded hole 13, and the setting of mounting groove 14 facilitates the installation of fixed link 16, passes through rotation Fixed link 16 is inserted into underground by device under the action of tip 17, and building pile foundation is made to be fixedly connected with the ground, adjustable telescopic rod Length, rotates the second connecting rod 22, and the rotation in the second groove 23 of head rod 21 is realized and stretches, passes through the first link block 12 and second link block 24 adjust its obtain angle with ground, after regulating, by fixed plate 25 place on the ground, pass through fixing glue 26 fix fixed plate 25 on the ground, further enhance building pile foundation and the stability on ground, prevent from carrying out other buildings When operation, building pile foundation is had an impact, when needing multiple clamping group cooperations, will each clamping group be carried out in the manner described above It installs, contacts with each other between adjacent clamping group, fixed part 27 is put into connecting hole 11, the bottom end insertion bottom end of fixed part 27 is adjacent In connecting hole 11 in clamping group, the top of fixed part 27 is located at the inside of connecting hole 11, the bottom end of a upper fixed part 27 with The top of the adjacent fixed part in bottom end 27 is in contact, and the first groove of cross 5 is provided on the side wall of grip block 15, by I-shaped company Fitting 18 is put into the first groove 5, is connect I-shaped connector 18 with grip block 15 by bolt 19 so that adjacent clamping group On two grip blocks 15 be connected, the building pile foundation made is more firm, the setting of the first spring 9, shakes and produces to building pile foundation Raw cushioning effect.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (8)

1. a kind of architectural engineering pile foundation fixing device, including multiple clamping groups, it is superposed between adjacent clamping group, it is each to be clamped Group includes two symmetrically arranged clamping devices (1), which is characterized in that the clamping device (1) includes grip block (15) and two The both sides of a fixed block (8), grip block (15) are equipped with fixed block (8), and grip block (15) and fixed block (8) are integral type knot Structure is opened on fixed block (8) there are two first through hole, and threaded rod (10), screw thread are equipped in the first through hole on two fixed blocks (8) The both ends of bar (10) are threaded with nut (6), and gasket (7) and the first spring (9) are equipped between nut (6) and fixed block (8), For gasket (7) between the first spring (9) and nut (6), it is solid that two grip block (15) sides close to each other are provided with arc Determine slot (4), the inner wall of arc fixing groove (4) is circumferentially distributed the third groove (30) that multiple diameters concave, third groove (30) Guide rod (2) is inside slidably connected, one end of guide rod (2) is welded with arc fixinig plate (3), and the both sides of guide rod (2) are welded It is connected to limited block (28), the both sides of third groove (30) are provided with limiting slot (29), and limited block (28) is slided with limiting slot (29) Connection, side of the grip block (15) far from arc fixing groove (4) are set there are two symmetrically arranged first link block (12), the It is rotatably connected to telescopic rod on one link block (12), telescopic rod includes head rod (21) and the second connecting rod (22), and second The top of connecting rod (22) is provided with the second groove (23), and one end of head rod (21) is located in the second groove (23), and first Connecting rod (21) is connect with the sidewall thread of the second groove (23), and the bottom end of the second connecting rod (22) is equipped with fixed plate (25), Gu The second link block (24) is welded on fixed board (25), the second connecting rod (22) is rotatablely connected with the second link block (24), fixed plate (25) both sides are opened there are two the second through-hole, and the second through-hole is interior to be equipped with fixing glue (26), and the top of the grip block (15) is opened There are two symmetrically arranged mounting groove (14) and two connecting holes (11), mounting groove (14) is located between two connecting holes (11), The bottom end of mounting groove (14) is provided with threaded hole (13), and threaded hole (13) internal thread is connected with fixed link (16), fixed link (16) Bottom end extends to the lower section of grip block (15), and the bottom end of fixed link (16) is equipped with tip (17), fixed link (16) and tip (17) It is an integral structure, the section of the connecting hole (11) is T shapes, and fixed part (27), fixed part are connected in connecting hole (11) (27) include rectangle fixed part (272) and cylindrical fixing portion (271), the bottom end of rectangle fixed part (272) is connected with cylinder Fixed part (271), by being connected between fixed part (27) between adjacent clamping group, and the bottom end of cylindrical fixing portion (271) extends to In the connecting hole (11) of bottom end grip block (15);
The both sides of the grip block (15) are equipped with the first groove (5), and the vertical section of the first groove (5) is cross, and first is recessed It is opened at slot (5) there are two pin hole (20), two pin holes are located at the upper and lower ends of the first groove (5), on adjacent grip block (15) The first groove (5) in be equipped with I-shaped connector (18), set that there are two bolt (19), bolts on I-shaped connector (18) (19) it is plugged on respectively the pin hole (20) in adjacent first groove (5) Nei;
The gasket (7) is provided with annular groove close to the side of the first spring (9), and one end of the first spring (9) is recessed positioned at annular In slot.
2. a kind of architectural engineering pile foundation fixing device according to claim 1, which is characterized in that the arc fixing groove (4) 3 to 5 third grooves (30) are provided on side wall, third groove (30) is distributed around the center circumferential of arc fixing groove (4).
3. a kind of architectural engineering pile foundation fixing device according to claim 1, which is characterized in that the guide rod (2), Arc fixinig plate (3) and limited block (28) are an integral structure, arc fixinig plate (3) be equipped with anti-skid chequer, and guide rod (2), Arc fixinig plate (3) and limited block (28) are steel structure.
4. a kind of architectural engineering pile foundation fixing device according to claim 1, which is characterized in that the rectangle fixed part (272) it is connect with the side walls of connecting hole (11) with cylindrical fixing portion (271).
5. a kind of architectural engineering pile foundation fixing device according to claim 1, which is characterized in that the threaded rod (10) It is equipped with rubber sleeve with the junction of first through hole, rubber sleeve is flexibly connected with threaded rod, and the outer diameter and first through hole of rubber sleeve Aperture it is identical.
6. a kind of architectural engineering pile foundation fixing device according to claim 1, which is characterized in that the arc fixing groove (4) it is located at the centre position of third groove (30) side wall, arc fixinig plate (3) is identical as the radian of arc fixing groove (4).
7. a kind of architectural engineering pile foundation fixing device according to claim 1, which is characterized in that the fixed link (16) Side wall bottom end set there are four the blow tank that is mutually parallel with fixed link (16), four blow tanks are symmetrical arranged.
8. a kind of architectural engineering pile foundation fixing device according to claim 1, which is characterized in that the fixed link (16) It is slidably connected with threaded hole (13), the top of fixed link (16) is equipped with cap, and cap is located in mounting groove (14), fixed link (16) It is interior to be equipped with reinforcing rib.
CN201810195573.2A 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation Active CN108360546B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810195573.2A CN108360546B (en) 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710151181.1A CN106948358B (en) 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device
CN201810195573.2A CN108360546B (en) 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201710151181.1A Division CN106948358B (en) 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device

Publications (2)

Publication Number Publication Date
CN108360546A true CN108360546A (en) 2018-08-03
CN108360546B CN108360546B (en) 2019-09-27

Family

ID=59467439

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201810195573.2A Active CN108360546B (en) 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation
CN201710151181.1A Expired - Fee Related CN106948358B (en) 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201710151181.1A Expired - Fee Related CN106948358B (en) 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device

Country Status (1)

Country Link
CN (2) CN108360546B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842801A (en) * 2018-08-08 2018-11-20 河南沪江电缆有限公司 The fixed device of pile foundation for civil engineering
CN109736437A (en) * 2019-01-03 2019-05-10 上海建森农业温室工程有限公司 A kind of green house of vegetables longitudinal keel installation to joint kit
CN111299475A (en) * 2019-11-29 2020-06-19 盐城市朱庄城市开发建设有限公司 Mechanized processing equipment for building construction steel bar building materials of bridge pile foundation
CN112894692A (en) * 2020-01-21 2021-06-04 铠镁企业有限公司 Magnetizing device for providing magnetism to hand tool
CN112922315A (en) * 2021-01-29 2021-06-08 中建七局第二建筑有限公司 Firmly-connected wall connecting piece and construction process
CN114197515A (en) * 2021-11-29 2022-03-18 华能(庄河)风力发电有限责任公司 High stability deep sea waters single pile bottom stable structure
CN114351687A (en) * 2021-07-09 2022-04-15 山东国建工程集团有限公司 Building pile body fixing device
CN116464049A (en) * 2023-04-28 2023-07-21 浙江秦鼎科技建设有限公司 Pile foundation fixing device for building engineering

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989400B (en) * 2018-01-15 2023-04-25 上海建工四建集团有限公司 Supporting device and supporting method for column foot pier connection repair
CN107989402B (en) * 2018-01-15 2023-05-05 上海建工四建集团有限公司 Supporting device and supporting method for column body during building displacement
CN108166481A (en) * 2018-01-23 2018-06-15 许昌学院 Civil engineering pile foundation fixing device
CN109551426A (en) * 2018-12-18 2019-04-02 江阴爱尔姆真空设备有限公司 A kind of split type screw pump stator dismantling device
CN109826195B (en) * 2019-01-03 2020-08-28 中交二航局第四工程有限公司 Pile clamping and cutting integrated tool for offshore steel inclined piles
CN111135325B (en) * 2020-02-14 2021-02-05 青岛大学附属医院 Environmental disinfection equipment for multilayer stairs
CN111906709B (en) * 2020-07-19 2022-01-25 河北卓思通信器材有限公司 Communication base station stake fixing device with locating component
CN112523246B (en) * 2020-11-12 2022-04-15 阳春市第四建筑工程公司 Combined pile foundation structure for engineering construction
CN112814007B (en) * 2021-01-05 2022-03-29 浙江沧海建设有限公司 Pile foundation
CN113047273B (en) * 2021-04-06 2022-04-22 广州市胜特建筑科技开发有限公司 Foundation pile hole reinforcing device with dual reinforcing effects for building construction
CN114232669A (en) * 2022-01-06 2022-03-25 徐霞 Supporting pile foundation for building

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2078765U (en) * 1990-09-25 1991-06-12 武汉市建筑工程机械厂 Holder of cylindrical concrete pile
JP5954679B2 (en) * 2015-08-19 2016-07-20 日本ヒューム株式会社 Pile-free welded joint
CN205576958U (en) * 2016-03-14 2016-09-14 大成科创基础建设股份有限公司 High pile foundation fixed knot constructs

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2977363B2 (en) * 1992-02-12 1999-11-15 株式会社ハッコー Manhole cover height adjustment device
JPH09323068A (en) * 1996-06-07 1997-12-16 Chowa Kogyo Kk Method for controlling phase difference of eccentric weight for excitation and mechanism for controlling the same phase
DE102010020995B4 (en) * 2010-05-11 2014-12-04 Werner Möbius Engineering GmbH Foundation system for the foundation of an offshore wind energy plant
CN203530960U (en) * 2013-10-29 2014-04-09 林清辉 Fixing structure of pine pile installing device
CN203625920U (en) * 2013-11-16 2014-06-04 国家电网公司 Pile foundation of power transmission line
CN204570694U (en) * 2015-03-11 2015-08-19 王云花 Building pile body fixture
CN104895102A (en) * 2015-05-12 2015-09-09 成都迅德科技有限公司 Single-pile foundation structure
CN105002890B (en) * 2015-07-15 2017-03-08 杭州江润科技有限公司 A kind of profundal zone cast-in-situ bored pile is lossless to assemble and disassemble double-deck steel pile casting group structure and construction method
CN205591266U (en) * 2016-05-11 2016-09-21 浙江海洋大学 Bridge pile foundation's detection device under water

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2078765U (en) * 1990-09-25 1991-06-12 武汉市建筑工程机械厂 Holder of cylindrical concrete pile
JP5954679B2 (en) * 2015-08-19 2016-07-20 日本ヒューム株式会社 Pile-free welded joint
CN205576958U (en) * 2016-03-14 2016-09-14 大成科创基础建设股份有限公司 High pile foundation fixed knot constructs

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842801A (en) * 2018-08-08 2018-11-20 河南沪江电缆有限公司 The fixed device of pile foundation for civil engineering
CN108842801B (en) * 2018-08-08 2020-09-22 东阳市琰安建筑工程有限公司 Pile foundation fixing device for civil engineering
CN109736437A (en) * 2019-01-03 2019-05-10 上海建森农业温室工程有限公司 A kind of green house of vegetables longitudinal keel installation to joint kit
CN111299475A (en) * 2019-11-29 2020-06-19 盐城市朱庄城市开发建设有限公司 Mechanized processing equipment for building construction steel bar building materials of bridge pile foundation
CN112894692A (en) * 2020-01-21 2021-06-04 铠镁企业有限公司 Magnetizing device for providing magnetism to hand tool
CN112922315A (en) * 2021-01-29 2021-06-08 中建七局第二建筑有限公司 Firmly-connected wall connecting piece and construction process
CN114351687A (en) * 2021-07-09 2022-04-15 山东国建工程集团有限公司 Building pile body fixing device
CN114351687B (en) * 2021-07-09 2024-03-22 山东国建工程集团有限公司 Building pile fixing device
CN114197515A (en) * 2021-11-29 2022-03-18 华能(庄河)风力发电有限责任公司 High stability deep sea waters single pile bottom stable structure
CN116464049A (en) * 2023-04-28 2023-07-21 浙江秦鼎科技建设有限公司 Pile foundation fixing device for building engineering
CN116464049B (en) * 2023-04-28 2023-10-03 浙江秦鼎科技建设有限公司 Pile foundation fixing device for building engineering

Also Published As

Publication number Publication date
CN106948358A (en) 2017-07-14
CN108360546B (en) 2019-09-27
CN106948358B (en) 2018-04-17

Similar Documents

Publication Publication Date Title
CN108360546B (en) A kind of architectural engineering fixes device with pile foundation
CN105863362A (en) Deviation rectifying device for inclined transmission tower
CN110295669B (en) Reinforced concrete structure and reinforcing method
CN107858919A (en) A kind of novel fabricated bridge extension joint
CN206174487U (en) Pre -cast screw fixing device
CN204715225U (en) A kind of bridge jacking platform based on steel hoop
CN206157792U (en) Complementary rectification reinforced structure of stake raft
DE2708664A1 (en) Overhead cable support pylon - has assembled repairable free part and ground sunken plinth component
CN207143956U (en) More pile-type interconnection system pile covers
CN209585016U (en) A kind of basis hollow square column
CN210714728U (en) Tunnel steel bow member hunch foot prevents subsiding device
CN102191851A (en) Novel support system
CN207582806U (en) A kind of fire-proof shock-proof cylinder system constructing structure
CN216197054U (en) Ground pile structure of electric power steel pipe tower
CN214497154U (en) Bridge bent cap
CN114808973A (en) Foundation pit construction method for improving centering property of reinforcement cage based on foundation pit cover piece
CN210195457U (en) Safety protective guard is used in civil engineering
CN209891235U (en) Integral pre-buried structure of steel structure column lower margin bolt
CN208831029U (en) A kind of mining anchorage device protective device
CN209011116U (en) A kind of explosion-proof stake device of precast square pile
CN207862951U (en) A kind of concrete side slope afforestation fixing net construction member unit
CN112376600A (en) Safe anti-seismic building pile
CN205976692U (en) Base of communication tower
CN209458669U (en) Protection device of unsettled super large diameter high pressure gas pipeline of large-span
CN216195520U (en) Steel column base node

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190903

Address after: 066300 2nd Floor, Business Center, Eastern Section of Guanbei Commercial Street, Funing District, Qinhuangdao City, Hebei Province

Applicant after: Qinhuangdao Seiko Green Building Integrated Technology Co., Ltd.

Address before: 450000 Lianyun Road 123, Erqi District, Zhengzhou City, Henan Province

Applicant before: Huanghe S & T College

GR01 Patent grant
GR01 Patent grant