CN111299475A - Mechanized processing equipment for building construction steel bar building materials of bridge pile foundation - Google Patents
Mechanized processing equipment for building construction steel bar building materials of bridge pile foundation Download PDFInfo
- Publication number
- CN111299475A CN111299475A CN201911202511.0A CN201911202511A CN111299475A CN 111299475 A CN111299475 A CN 111299475A CN 201911202511 A CN201911202511 A CN 201911202511A CN 111299475 A CN111299475 A CN 111299475A
- Authority
- CN
- China
- Prior art keywords
- fixed
- telescopic
- plate
- steel bar
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21F—WORKING OR PROCESSING OF METAL WIRE
- B21F27/00—Making wire network, i.e. wire nets
- B21F27/12—Making special types or portions of network by methods or means specially adapted therefor
- B21F27/20—Making special types or portions of network by methods or means specially adapted therefor of plaster-carrying network
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses mechanized processing equipment for reinforcing steel bar building materials in bridge pile foundation construction, which comprises a fixed ring, a movable ring and a telescopic rod, wherein the fixed ring is connected with the movable ring through the telescopic rod, the fixed ring and the movable ring are fixed on the outer wall of a reinforcing steel bar, the telescopic rod is used for telescopic ascending and descending at the same time, the fixed ring is divided into two fixed arcs, bolt fixing plates are arranged between the fixed arcs, fixing bolts penetrate through the bolt fixing plates, the two fixed arcs are fixedly connected with the fixing bolts through the bolt fixing plates, so that a complete fixed ring can be formed, the fixed ring is convenient to disassemble and assemble and fix, the fixed ring is fixedly arranged on the outer wall of a reinforcing steel bar frame, the stability of the fixed rods is kept, fixed telescopic hydraulic rods are arranged on the inner walls of the fixed arcs, and one ends of the fixed telescopic hydraulic rods are connected with the inner walls of, and the other end of the fixed telescopic hydraulic rod is provided with an antiskid plate.
Description
Technical Field
The invention relates to the technical field of bridge correlation, in particular to mechanized processing equipment for construction reinforcing steel bar building materials of bridge pile foundations.
Background
The bridge is generally a structure which is erected on rivers, lakes and seas and allows vehicles, pedestrians and the like to smoothly pass through. In order to adapt to the modern high-speed developed traffic industry, bridges are also extended to be constructed to span mountain stream, unfavorable geology or meet other traffic needs, so that the buildings are convenient to pass. The bridge generally comprises an upper structure, a lower structure, a support and an auxiliary structure, wherein the upper structure is also called a bridge span structure and is a main structure for spanning obstacles; the lower structure comprises a bridge abutment, a bridge pier and a foundation; the support is a force transmission device arranged at the supporting positions of the bridge span structure and the bridge pier or the bridge abutment; the auxiliary structures refer to bridge end butt straps, tapered revetments, diversion works and the like.
The bridge pile foundation is a deep foundation (shown in the figure) consisting of piles and pile bearing platforms (bearing platforms for short) connected with the pile tops or a single pile foundation (pile foundation for short) formed by connecting the piles and the pile foundation. If the pile body is completely buried in the soil and the bottom surface of the bearing platform is contacted with the soil body, the pile body is called a low bearing platform pile foundation; when the upper part of the pile body is exposed out of the ground and the bottom of the pile cap is positioned above the ground, the pile body is called a high pile cap pile foundation. Building pile foundations are typically low cap pile foundations. In high-rise buildings, pile foundations are widely applied.
Bridge pile foundation need use a large amount of reinforcing bars at the in-process of construction, pricks into the reinforcing bar frame with the reinforcing bar, utilizes the manual work to fix in the reinforcing bar frame fixed process among the prior art, but the stability of reinforcing bar frame can not be guaranteed to such fixed mode, emptys the damage that leads to personnel easily.
Disclosure of Invention
The invention aims to provide mechanical processing equipment for building materials of reinforcing steel bars in bridge pile foundation construction, which aims to solve the problems that the bridge pile foundation mentioned in the background art needs to use a large amount of reinforcing steel bars in the construction process to tie the reinforcing steel bars into a reinforcing steel bar frame, and the reinforcing steel bar frame is fixed manually in the fixing process in the prior art, but the fixing mode cannot ensure the stability of the reinforcing steel bar frame, and personnel are easily damaged due to toppling.
In order to achieve the purpose, the invention provides the following technical scheme: a mechanized processing device for reinforcing steel bar building materials in bridge pile foundation construction comprises a fixed ring, a movable ring and a telescopic rod, wherein the fixed ring is connected with the movable ring through the telescopic rod, the fixed ring and the movable ring are fixed on the outer wall of a reinforcing steel bar, and simultaneously, the telescopic rod is utilized to perform telescopic ascending and descending, the fixed ring is divided into two fixed arcs, a bolt fixing plate is arranged between the fixed arcs, a fixing bolt is arranged between the bolt fixing plates in a penetrating way, the two fixed arcs are fixedly connected with the fixing bolt through the bolt fixing plate, a complete fixed ring can be formed, the fixed ring is convenient to disassemble and mount and fix, the fixed ring is fixedly mounted on the outer wall of a reinforcing steel bar frame, the stability of the fixed rod is kept, a fixed telescopic hydraulic rod is mounted on the inner wall of the fixed arc, one end of the fixed telescopic hydraulic rod is connected, the other end of the fixed telescopic hydraulic rod is provided with an anti-slip plate, the fixed telescopic hydraulic rod is fixed in a telescopic way and can be fixed according to the size of an actual reinforcing frame, the installation stability is kept, the reinforcing frame can be prevented from falling apart during construction, advanced fixation can be carried out, the bottom can be fixed conveniently, the construction safety is improved, the movable ring is divided into two movable connecting arcs, a first connecting plate and a second connecting plate are arranged between the two movable connecting arcs, the movable ring is fixed on the outer wall of the reinforcing frame, the movable connecting arcs are fixed and are fixedly installed through the first connecting plate and the second connecting plate, the installation and the fixation are convenient, the dismounting and the installation effects are improved, movable bolts are arranged between the first connecting plate and the second connecting plate in a penetrating way, the inner wall of the movable ring is provided with a lifting fixed hydraulic rod, and one end of the lifting fixed hydraulic rod is connected with the inner wall of the movable ring, the sliding tray is installed to the other end of the fixed hydraulic stem of lift, the inside position cavity form of sliding tray, install rotatory lifting wheel between the sliding tray, run through in the rotatory lifting wheel and install the rotation axis, elevator motor is installed to the one end of rotation axis, elevator motor arranges in the inside of sliding tray, the fixed hydraulic stem of lift support that stretches out and draws back, be convenient for stretch out and draw back fixedly, and utilize the sliding tray to be connected with one of them reinforcing bar, fix under the support of the fixed hydraulic stem of lift simultaneously, and the sliding tray card is on the reinforcing bar, rotatory lifting wheel carries out rotatory lifting control simultaneously, can carry out lifting control, and the building height of root play reality carries out lifting control, has improved the stability of use.
Preferably, a fixed support plate is installed in the lifting fixed hydraulic rod, a supporting spring rod is installed on one side of the fixed support plate, the supporting spring rod is far away from one end of the fixed support plate, a movable plate is installed on one side of the movable plate, which is far away from the supporting spring rod, a pressure rod is installed on one side of the movable plate, one end of the pressure rod penetrates through the outer wall of the lifting fixed hydraulic rod, one end of the pressure rod is connected with the sliding groove, pressure control is performed by utilizing an external hydraulic pump, the stretching of the pressure rod can be controlled, and stretching control is facilitated.
Preferably, the fixed hydraulic stem that goes up and down with fixed flexible hydraulic stem is same model, just the fixed hydraulic stem that goes up and down with the connector is all installed to the one end of fixed flexible hydraulic stem, the fixed hydraulic stem that goes up and down with fixed flexible hydraulic stem is external hydraulic pump, and the equipment model is unified to be convenient for carry on external hydraulic pump.
Preferably, the retainer plate with the movable ring all adopts the resistant steel that supports of high strength, has improved the stability of supporting, and has improved the effect of installation.
Preferably, the telescopic link includes flexible lifter and telescope tube, flexible lifter is arranged in the telescope tube, the hydraulic pressure connecting hole has been seted up to the outer wall of telescope tube, and the telescopic link is flexible control, is convenient for utilize the hydraulic pressure connecting hole to carry out lift connection control.
Preferably, the fixed telescopic hydraulic rod and the antiskid plate are provided with connecting bolt plates, the fixed telescopic hydraulic rod and the antiskid plate are connected through the connecting bolt plates, the antiskid plate can be conveniently replaced, the shape of the antiskid plate can be replaced according to the fact that the reinforcing steel bar frame is square or cylindrical, and the mounting stability effect is improved.
Preferably, the lifting fixing groove is formed in the rotating lifting wheel, and the anti-slip lines are formed in the outer wall of the rotating lifting wheel, so that the anti-slip effect is achieved, and the lifting stability is improved.
Preferably, a plurality of groups of installation cavities are formed in the upper surface of the fixing ring, the bottom of the telescopic rod is matched with the installation cavities, the telescopic rod is convenient to install, and the installation stability is improved.
Preferably, the outer wall of antiskid ribbed tile installs anti-skidding backing plate, anti-skidding backing plate adopts wear-resisting plastic material, anti-skidding line has been seted up to the outer wall of anti-skidding backing plate, is convenient for with the skid-proof effect of reinforcing bar contact.
The invention provides mechanical treatment equipment for a reinforcing steel bar building material for bridge pile foundation construction, which has the following beneficial effects:
(1) the fixing ring is fixed on the outer wall of a steel bar through the fixing ring and the movable ring, and meanwhile, the telescopic rod is used for stretching, ascending and descending, the fixing ring is divided into two fixing arcs, a bolt fixing plate is arranged between the fixing arcs, a fixing bolt penetrates through the bolt fixing plate, the two fixing arcs are fixedly connected with the fixing bolt through the bolt fixing plate, a complete fixing ring can be formed, meanwhile, the dismounting is convenient, the mounting and the fixing are convenient, the fixing ring is fixed on the outer wall of a steel bar frame for fixing, and the stability of the fixing rod is kept.
(2) The fixed telescopic hydraulic rod is used for telescopic fixation, the fixed telescopic hydraulic rod can be fixed according to the size of an actual reinforcing steel bar frame, the installation stability is kept, the reinforcing steel bar frame can be prevented from being scattered during construction, advanced fixation can be carried out, bottom fixation is facilitated, the construction safety is improved, the movable ring is divided into two movable connecting arcs, a first connecting plate and a second connecting plate are arranged between the two movable connecting arcs, the movable ring is fixed on the outer wall of the reinforcing steel bar frame, the movable connecting arcs are fixed, the first connecting plate and the second connecting plate are fixedly installed, installation and fixation are facilitated, and the dismounting and installation effects are improved.
(3) The telescopic fixing is convenient, the sliding groove is connected with one of the steel bars and is fixed under the support of the lifting fixing hydraulic rod, the sliding groove is clamped on the steel bar, and the lifting wheel is rotated to perform rotary lifting control, so that the lifting control can be performed, the actual building height is controlled, and the use stability is improved.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the movable ring of the present invention;
FIG. 3 is a schematic view of the lift fixed hydraulic ram of the present invention;
FIG. 4 is a schematic view of a sliding channel of the present invention;
FIG. 5 is an enlarged view taken at A in FIG. 2 according to the present invention;
fig. 6 is a schematic view of a retainer ring of the present invention.
In the figure: 1. a movable ring; 2. a stationary ring; 3. a telescopic rod; 4. lifting and fixing the hydraulic rod; 5. a sliding groove; 6. a connector; 7. a support spring rod; 8. fixing the support plate; 9. a movable plate; 10. a pressure lever; 11. a lifting motor; 12. rotating the lifting wheel; 13. a second connecting plate; 14. a first connecting plate; 15. a movable bolt; 16. fixing a telescopic hydraulic rod; 17. an anti-skid plate; 18. and fixing the plate by bolts.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1 to 6, the present invention provides a technical solution: a mechanized processing device for reinforcing steel bar building materials in bridge pile foundation construction comprises a fixed ring 2, a movable ring 1 and a telescopic rod 3, wherein the fixed ring 2 is connected with the movable ring 1 through the telescopic rod 3, the fixed ring 2 is divided into two fixed arcs, bolt fixing plates 18 are arranged between the fixed arcs, fixing bolts are arranged between the bolt fixing plates 18 in a penetrating manner, fixed telescopic hydraulic rods 16 are arranged on the inner walls of the fixed arcs, one ends of the fixed telescopic hydraulic rods 16 are connected with the inner walls of the fixed arcs, anti-skid plates 17 are arranged at the other ends of the fixed telescopic hydraulic rods 16, the movable ring 1 is divided into two movable connecting arcs, a first connecting plate 14 and a second connecting plate 13 are arranged between the movable connecting arcs, movable bolts 15 are arranged between the first connecting plate 14 and the second connecting plate 13 in a penetrating manner, and a lifting fixed hydraulic rod 4 is arranged on the inner wall of the movable ring 1, the one end of the fixed hydraulic stem 4 that goes up and down with 1 inner wall connection of movable ring, sliding tray 5 is installed to the other end of the fixed hydraulic stem 4 that goes up and down, the inside position cavity form of sliding tray 5, install rotatory lifting wheel 12 between the sliding tray 5, run through in the rotatory lifting wheel 12 and install the rotation axis, elevator motor 11 is installed to the one end of rotation axis, elevator motor 11 arranges in the inside of sliding tray 5.
Further, install rigid support board 8 in the fixed hydraulic stem 4 that goes up and down, supporting spring pole 7 is installed to one side of rigid support board 8, supporting spring pole 7 is kept away from the one end of rigid support board 8 is installed fly leaf 9, fly leaf 9 is kept away from one side of supporting spring pole 7 is installed pressure pole 10, the one end of pressure pole 10 runs through the outer wall of the fixed hydraulic stem 4 that goes up and down, just the one end of pressure pole 10 with sliding tray 5 is connected, utilizes external hydraulic pump to carry out pressure control, can control the flexible of pressure pole 10, is convenient for carry out flexible control.
Further, the fixed hydraulic stem 4 that goes up and down with fixed flexible hydraulic stem 16 is same model, just the fixed hydraulic stem 4 that goes up and down with connector 6 is all installed to the one end of fixed flexible hydraulic stem 16, the fixed hydraulic stem 4 that goes up and down with fixed flexible hydraulic stem 16 is external hydraulic pump, and the equipment model is unified to be convenient for carry on external hydraulic pump.
Further, the retainer plate 2 with the movable ring 1 all adopts the resistant steel that supports of high strength, has improved the stability of supporting, and has improved the effect of installation.
Further, telescopic link 3 includes flexible lifter and telescope tube, flexible lifter is arranged in the telescope tube, the hydraulic pressure connecting hole has been seted up to telescope tube's outer wall, and telescopic link 3 carries out flexible control, is convenient for utilize the hydraulic pressure connecting hole to carry out lift connection control.
Furthermore, a connecting bolt plate is arranged between the fixed telescopic hydraulic rod 16 and the anti-skid plate 17, the fixed telescopic hydraulic rod 16 and the anti-skid plate 17 are connected through the connecting bolt plate, the anti-skid plate 17 is convenient to replace, the shape of the anti-skid plate 17 can be replaced according to the fact that the steel bar frame is square or cylindrical, and the mounting stability effect is improved.
Furthermore, a lifting fixing groove is formed in the rotating lifting wheel 12, and anti-slip lines are formed in the outer wall of the rotating lifting wheel 12, so that anti-slip is facilitated, and the lifting stability is improved.
Further, a plurality of groups of installation cavities have been seted up to the upper surface of retainer plate 2, 3 bottoms of telescopic link with the installation cavity matches the setting, is convenient for install telescopic link 3, has improved the stability of installation.
Further, the outer wall of antiskid ribbed tile 17 installs anti-skidding backing plate, anti-skidding backing plate adopts wear-resisting plastic material, anti-skidding line has been seted up to the outer wall of anti-skidding backing plate, is convenient for with the skid-proof effect of reinforcing bar contact.
In the using process, the fixed ring 2 is connected with the movable ring 1 through the telescopic rod 3, the fixed ring 2 and the movable ring 1 are fixed on the outer wall of a steel bar, the telescopic rod 3 is used for stretching and descending, the fixed ring 2 is divided into two fixed arcs, a bolt fixing plate 18 is installed between the fixed arcs, a fixing bolt is installed between the bolt fixing plates 18 in a penetrating mode, the two fixed arcs are fixedly connected with the fixing bolt through the bolt fixing plate 18, a complete fixed ring can be formed, the fixed ring is convenient to disassemble and assemble and fix, the fixed ring is fixedly installed on the outer wall of a steel bar frame, the stability of the fixing rod is kept, a fixed telescopic hydraulic rod 16 is installed on the inner wall of the fixed arc, one end of the fixed telescopic hydraulic rod 16 is connected with the inner wall of the fixed arc, an anti-skid plate 17 is installed on the other end of the, can be fixed according to the size of an actual reinforcing steel bar frame, the installation stability is kept, the reinforcing steel bar frame can be prevented from being scattered during construction, advanced fixation can be carried out, the bottom fixation is convenient, the construction safety is improved, the movable ring 1 is divided into two movable connecting arcs, a first connecting plate 14 and a second connecting plate 13 are arranged between the movable connecting arcs, the movable ring 1 is fixed on the outer wall of the reinforcing steel bar frame, the movable connecting arcs are fixed, the movable ring is fixedly installed through the first connecting plate 14 and the second connecting plate 13, the installation and the fixation are convenient, the disassembly and installation effects are improved, a movable bolt 15 is arranged between the first connecting plate 14 and the second connecting plate 13 in a penetrating way, a lifting fixed hydraulic rod 4 is arranged on the inner wall of the movable ring 1, one end of the lifting fixed hydraulic rod 4 is connected with the inner wall of the movable ring 1, and a sliding groove 5 is arranged at the other end of, 5 inside position cavitys of sliding tray are described, install rotatory lifting wheel 12 between the sliding tray 5, run through in the rotatory lifting wheel 12 and install the rotation axis, elevator motor 11 is installed to the one end of rotation axis, elevator motor 11 arranges the inside of sliding tray 5 in, the fixed hydraulic stem 4 that goes up and down is stretched out and drawn back and is supported, be convenient for stretch out and draw back fixedly, and utilize sliding tray 5 to be connected with one of them reinforcing bar, fix under the support of the fixed hydraulic stem 4 that goes up and down simultaneously, and sliding tray 5 card is on the reinforcing bar, rotatory lifting wheel 12 rotates the lift control simultaneously, can go up the lift control, the building height of radical drama reality carries out lift control, the stability of using has been improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (9)
1. The utility model provides a mechanized processing equipment of bridge pile foundation construction reinforcing bar building materials, includes retainer plate (2) and movable ring (1) and telescopic link (3), its characterized in that: the fixing ring (2) is connected with the movable ring (1) through the telescopic rod (3), the fixing ring (2) is divided into two fixed arcs, a bolt fixing plate (18) is installed between the fixed arcs, a fixing bolt is installed between the bolt fixing plate (18) in a penetrating manner, a fixed telescopic hydraulic rod (16) is installed on the inner wall of the fixed arc, one end of the fixed telescopic hydraulic rod (16) is connected with the inner wall of the fixed arc, an anti-slip plate (17) is installed at the other end of the fixed telescopic hydraulic rod (16), the movable ring (1) is divided into two movable connecting arcs, a first connecting plate (14) and a second connecting plate (13) are installed between the movable connecting arcs, a movable bolt (15) is installed between the first connecting plate (14) and the second connecting plate (13) in a penetrating manner, a lifting fixed hydraulic rod (4) is installed on the inner wall of the movable ring (1), the one end of the fixed hydraulic stem (4) that goes up and down with the connection of movable ring (1) inner wall, sliding tray (5) are installed to the other end of the fixed hydraulic stem (4) that goes up and down, the inside position cavity form of sliding tray (5), install rotatory lifting wheel (12) between sliding tray (5), run through in the rotatory lifting wheel (12) and install the rotation axis, elevator motor (11) are installed to the one end of rotation axis, elevator motor (11) are arranged in the inside of sliding tray (5).
2. The mechanical processing equipment for the construction steel bar building materials for the bridge pile foundation construction according to claim 1, characterized in that: install fixed support plate (8) in lift fixed hydraulic stem (4), supporting spring pole (7) are installed to one side of fixed support plate (8), supporting spring pole (7) are kept away from the one end of fixed support plate (8) is installed fly leaf (9), fly leaf (9) are kept away from one side of supporting spring pole (7) is installed pressure pole (10), the one end of pressure pole (10) is run through the outer wall of lift fixed hydraulic stem (4), just the one end of pressure pole (10) with sliding tray (5) are connected.
3. The mechanical processing equipment for the construction steel bar building materials for the bridge pile foundation construction according to claim 1, characterized in that: the fixed hydraulic stem of going up and down (4) with fixed flexible hydraulic stem (16) are same model, just go up and down fixed hydraulic stem (4) with connector (6) are all installed to the one end of fixed flexible hydraulic stem (16), go up and down fixed hydraulic stem (4) with fixed flexible hydraulic stem (16) are external hydraulic pump.
4. The mechanical processing equipment for the construction steel bar building materials for the bridge pile foundation construction according to claim 1, characterized in that: the fixed ring (2) and the movable ring (1) are made of high-strength support-resistant steel.
5. The mechanical processing equipment for the construction steel bar building materials for the bridge pile foundation construction according to claim 1, characterized in that: the telescopic rod (3) comprises a telescopic lifting rod and a telescopic sleeve, the telescopic lifting rod is arranged in the telescopic sleeve, and the outer wall of the telescopic sleeve is provided with a hydraulic connecting hole.
6. The mechanical processing equipment for the construction steel bar building materials for the bridge pile foundation construction according to claim 1, characterized in that: and a connecting bolt plate is arranged between the fixed telescopic hydraulic rod (16) and the antiskid plate (17), and the fixed telescopic hydraulic rod (16) is connected with the antiskid plate (17) through the connecting bolt plate.
7. The mechanical processing equipment for the construction steel bar building materials for the bridge pile foundation construction according to claim 1, characterized in that: the lifting fixing groove is formed in the rotating lifting wheel (12), and anti-skid grains are formed in the outer wall of the rotating lifting wheel (12).
8. The mechanical processing equipment for the construction steel bar building materials for the bridge pile foundation construction according to claim 1, characterized in that: a plurality of groups of installation cavities are formed in the upper surface of the fixing ring (2), and the bottom of the telescopic rod (3) is matched with the installation cavities.
9. The mechanical processing equipment for the construction steel bar building materials for the bridge pile foundation construction according to claim 1, characterized in that: the anti-skidding backing plate is installed to the outer wall of antiskid ribbed tile (17), the anti-skidding backing plate adopts wear-resisting plastic material, anti-skidding line has been seted up to the outer wall of anti-skidding backing plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911202511.0A CN111299475B (en) | 2019-11-29 | 2019-11-29 | Mechanized processing equipment for building construction steel bar building materials of bridge pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911202511.0A CN111299475B (en) | 2019-11-29 | 2019-11-29 | Mechanized processing equipment for building construction steel bar building materials of bridge pile foundation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111299475A true CN111299475A (en) | 2020-06-19 |
CN111299475B CN111299475B (en) | 2022-03-29 |
Family
ID=71150610
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911202511.0A Active CN111299475B (en) | 2019-11-29 | 2019-11-29 | Mechanized processing equipment for building construction steel bar building materials of bridge pile foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111299475B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES224663U (en) * | 1975-11-13 | 1977-04-01 | Stakub-Stahl-Kunststoff-Beton Ag | Device for the unión of points of crossing of rods in armor for concrete. (Machine-translation by Google Translate, not legally binding) |
ATE107729T1 (en) * | 1989-03-17 | 1994-07-15 | Adolf Runkel | METHOD AND DEVICE FOR CONNECTING TWO CROSSING RODS. |
CN207377151U (en) * | 2017-10-16 | 2018-05-18 | 山东电力建设第一工程公司 | Steel structural upright column installation adjustable fixed support |
CN108237192A (en) * | 2016-12-26 | 2018-07-03 | 左红 | Steel reinforcement cage forming machine structure |
CN108237191A (en) * | 2016-12-26 | 2018-07-03 | 左红 | Reinforcing cage stirrup molding machine |
CN108360546A (en) * | 2017-03-14 | 2018-08-03 | 黄河科技学院 | A kind of architectural engineering pile foundation fixing device |
CN208702179U (en) * | 2018-08-13 | 2019-04-05 | 内蒙古蒙匠建筑工程有限责任公司 | A kind of assembled architecture foundation pole rib precise positioning tool |
CN208763205U (en) * | 2018-08-23 | 2019-04-19 | 甘肃建投建设有限公司 | A kind of pre-embedded steel slab positioning correcting bracket |
-
2019
- 2019-11-29 CN CN201911202511.0A patent/CN111299475B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES224663U (en) * | 1975-11-13 | 1977-04-01 | Stakub-Stahl-Kunststoff-Beton Ag | Device for the unión of points of crossing of rods in armor for concrete. (Machine-translation by Google Translate, not legally binding) |
DE2648405A1 (en) * | 1975-11-13 | 1977-05-26 | Stakub Stahl Kunststoff Und Be | DEVICE FOR CONNECTING NODES IN CONCRETE BARS OR CONCRETE STEEL MATS |
ATE107729T1 (en) * | 1989-03-17 | 1994-07-15 | Adolf Runkel | METHOD AND DEVICE FOR CONNECTING TWO CROSSING RODS. |
CN108237192A (en) * | 2016-12-26 | 2018-07-03 | 左红 | Steel reinforcement cage forming machine structure |
CN108237191A (en) * | 2016-12-26 | 2018-07-03 | 左红 | Reinforcing cage stirrup molding machine |
CN108360546A (en) * | 2017-03-14 | 2018-08-03 | 黄河科技学院 | A kind of architectural engineering pile foundation fixing device |
CN207377151U (en) * | 2017-10-16 | 2018-05-18 | 山东电力建设第一工程公司 | Steel structural upright column installation adjustable fixed support |
CN208702179U (en) * | 2018-08-13 | 2019-04-05 | 内蒙古蒙匠建筑工程有限责任公司 | A kind of assembled architecture foundation pole rib precise positioning tool |
CN208763205U (en) * | 2018-08-23 | 2019-04-19 | 甘肃建投建设有限公司 | A kind of pre-embedded steel slab positioning correcting bracket |
Also Published As
Publication number | Publication date |
---|---|
CN111299475B (en) | 2022-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105464117B (en) | Rotary marine piling saddle and multi-column pier foundation piling technique waterborne | |
CN207811202U (en) | A kind of self-propelled aloft working platform | |
CN108867647B (en) | Multifunctional steel pipe column verticality adjusting machine for pile and column integrated construction | |
CN106522112A (en) | Cable-stayed bridge side span beam section erecting system and method thereof | |
CN204024470U (en) | The all-hydraulic anchor shaft anchor cable drill carriage of a kind of narrow fuselage six arm | |
CN111776950A (en) | Gantry device with telescopic cantilever hoisting frame | |
CN109441361A (en) | A kind of pile frame and its vertical mast method | |
CN110939069B (en) | Construction method of suspension bridge catwalk | |
CN111299475B (en) | Mechanized processing equipment for building construction steel bar building materials of bridge pile foundation | |
CN206538687U (en) | Cable-stayed bridge end bay beam section construction system | |
CN218145304U (en) | Adjustable lifting appliance | |
CN107663859A (en) | Piling machine | |
CN111335172A (en) | Movable pier column cross beam prestress tensioning hanging frame construction platform and construction method | |
CN209163736U (en) | A kind of pile frame | |
CN204060023U (en) | A kind of bootstrap type of chimney class structure removes equipment | |
CN112144401A (en) | Bridge girder erection machine over-span method based on curve track and large longitudinal slope environment | |
CN203755173U (en) | Formwork device used for hydraulic climbing of bridge high pier | |
CN107587853B (en) | Full-rotation full-casing drilling machine | |
CN212612488U (en) | Movable underwater concrete pouring guide pipe trolley | |
CN210177919U (en) | Civil engineering construction support | |
CN202829498U (en) | Hydraulic jacking device | |
CN210507165U (en) | Scaffold device and bridge fitment operation structure for bridge fitment | |
CN2811394Y (en) | Soil-cement pile and spile integrated pile driver | |
CN221027332U (en) | Complex interactive boulder stratum rotary digging pore-forming cast-in-place pile | |
CN217352084U (en) | Municipal construction is with crossing integral passway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |