CN106948358B - A kind of construction site pile foundation fixing device - Google Patents

A kind of construction site pile foundation fixing device Download PDF

Info

Publication number
CN106948358B
CN106948358B CN201710151181.1A CN201710151181A CN106948358B CN 106948358 B CN106948358 B CN 106948358B CN 201710151181 A CN201710151181 A CN 201710151181A CN 106948358 B CN106948358 B CN 106948358B
Authority
CN
China
Prior art keywords
groove
pile foundation
fixed
block
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710151181.1A
Other languages
Chinese (zh)
Other versions
CN106948358A (en
Inventor
朱煜钰
付志豪
康延铭
闫盼盼
石微微
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanghe Science and Technology College
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN201710151181.1A priority Critical patent/CN106948358B/en
Priority to CN201810195573.2A priority patent/CN108360546B/en
Publication of CN106948358A publication Critical patent/CN106948358A/en
Application granted granted Critical
Publication of CN106948358B publication Critical patent/CN106948358B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to the realm of building construction, especially a kind of construction site pile foundation fixing device, for existing pile foundation fixing device reinforcement protection problem cannot be carried out to constructed pile foundation, now propose following scheme, it includes multiple clamping groups mutually stacked, each clamping group includes two symmetrically arranged clamping devices, the clamping device includes grip block and two fixed blocks, the both sides of grip block are equipped with fixed block, grip block and fixed block are an integral structure, two first through hole are provided with fixed block, threaded rod is equipped with first through hole on two fixed blocks, the both ends of threaded rod are threaded with nut, gasket and the first spring are equipped between nut and fixed block, gasket is between the first spring and nut.The configuration of the present invention is simple, cost is low, easy for installation, can realize and building pile foundation is consolidated, and prevents from, when carrying out other building operations, having an impact building pile foundation.

Description

A kind of construction site pile foundation fixing device
Technical field
The present invention relates to technical field of building construction, more particularly to a kind of construction site pile foundation fixing device.
Background technology
Pile foundation is by foundation pile and is connected to the cushion cap of stake top and collectively constitutes, if pile body is all embedded in soil, cushion cap bottom surface with The soil body contacts, then referred to as embedded footing on piles, low capped pile foundation, if pile body top is basseted, cushion cap bottom is located at more than ground, referred to as high cushion cap Pile foundation, building pile foundation are usually embedded footing on piles, low capped pile foundation plinth, and the patent of Patent No. CN 205576958U proposes a kind of high pile foundation and consolidates Determine structure, it enhances pile foundation in soft soil foundation and silt by the setting of armoured concrete slab, spring, main piston and auxiliary piston The stability of mud layer, reduces the pulling capacity and moment of flexure of pile foundation, improves the stability of high pile foundation, this patent structure is too simple, right The stability of pile foundation is not too high, and it is to improve pile foundation and soft soil foundation and the stability of mud mostly, it is impossible to Carry out reinforcement protection to constructed pile foundation, for example, after pile foundation construction is good, it is necessary to carry out building upper strata construct or into During row building reconstruction, pile foundation can not be protected, and can not realize that the pile foundation of different height is protected according to the height of pile foundation Shield, for this it is proposed that a kind of construction site pile foundation fixing device.
The content of the invention
A kind of construction site pile foundation fixing device proposed by the present invention, solving existing pile foundation fixing device cannot be right Constructed pile foundation carries out reinforcement protection problem.
To achieve these goals, present invention employs following technical solution:
A kind of construction site pile foundation fixing device, including multiple clamping groups, are superimposed between adjacent clamping group and set, each folder Holding group includes two symmetrically arranged clamping devices, and the clamping device includes grip block and two fixed blocks, and the two of grip block Side is equipped with fixed block, and grip block and fixed block are an integral structure, and two first through hole, two fixed blocks are provided with fixed block On first through hole in be equipped with threaded rod, the both ends of threaded rod are threaded with nut, and gasket is equipped between nut and fixed block With the first spring, between the first spring and nut, two grip blocks side close to each other is provided with arc and fixes gasket Groove, the inner wall of arc fixing groove is circumferentially distributed the 3rd groove that multiple footpaths concave, and guiding is slidably connected in the 3rd groove Bar, one end of guide rod are welded with arc fixinig plate, and the both sides of guide rod are welded with limited block, and the both sides of the 3rd groove are opened There is limiting slot, limited block is slidably connected with limiting slot, and side of the grip block away from arc fixing groove is symmetrically set equipped with two The first contiguous block put, is rotatably connected to telescopic rod on the first contiguous block, and telescopic rod includes head rod and the second connecting rod, The top of second connecting rod is provided with the second groove, and one end of head rod is located in the second groove, head rod and second The sidewall thread connection of groove, the bottom of the second connecting rod are equipped with fixed plate, and the second contiguous block is welded with fixed plate, and second connects Extension bar and the second contiguous block are rotatablely connected, and the both sides of fixed plate are provided with two the second through holes, and fixing glue is equipped with the second through hole, The top of the grip block is provided with two symmetrically arranged mounting grooves and two connecting holes, mounting groove positioned at two connecting holes it Between, the bottom of mounting groove is provided with threaded hole, and threaded hole internal thread is connected with fixed link, and the bottom of fixed link extends to grip block Lower section, the bottom of fixed link are equipped with tip, and fixed link is an integral structure with tip, and the section of the connecting hole is T-shaped, connection Fixed part is connected with hole, fixed part includes rectangle fixed part and cylindrical fixing portion, and the bottom of rectangle fixed part is connected with circle Cylindricality fixed part, by being connected between fixed part between adjacent clamping group, and the bottom of cylindrical fixing portion extends to bottom grip block Connecting hole in.
Preferably, the both sides of the grip block are equipped with the first groove, and the vertical section of the first groove is cross, and first is recessed Two pin holes are provided with groove, two pin holes are located at the upper and lower ends of the first groove ", set in the first groove on adjacent grip block There is I-shaped connector, I-shaped connector is equipped with two latches, and latch is plugged on the latch in adjacent first groove respectively In hole.
Preferably, the gasket is provided with annular groove close to the side of the first spring, and one end of the first spring is positioned at annular In groove.
Preferably, 3 to 5 the 3rd grooves are provided with the side wall of the arc fixing groove, the 3rd groove is around arc fixing groove Center circumferential distribution.
Preferably, the guide rod, arc fixinig plate and limited block are an integral structure, and arc fixinig plate is equipped with anti-skidding Line, and guide rod, arc fixinig plate and limited block are steel structure.
Preferably, the rectangle fixed part and cylindrical fixing portion are connected with the side walls of connecting hole.
Preferably, the junction of the threaded rod and first through hole is equipped with rubber sleeve, and rubber sleeve is flexibly connected with threaded rod, And the outside diameter of rubber sleeve is identical with the aperture of first through hole.
Preferably, the arc fixing groove is located at the centre position of the 3rd recess sidewall, and arc fixinig plate is fixed with arc The radian of groove is identical.
Preferably, the side wall bottom of the fixed link is equipped with four blow tanks being parallel to each other with fixed link, four dischargings Groove is symmetrical arranged.
Preferably, the fixed link is slidably connected with threaded hole, and the top of fixed link is equipped with cap, and cap is located at mounting groove It is interior, it is equipped with reinforcing rib in fixed link.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, the present invention is by the setting of grip block, fixed block, threaded rod, nut, can by the present apparatus and building pile foundation into Row is fixed, and by the setting of telescopic rod, fixed plate, fixing glue, threaded hole and fixed link, building pile foundation can be made to be fixed with ground Connection, building pile foundation stability higher, prevents from, when carrying out other building operations, having an impact building pile foundation.
2nd, the present invention setting by connecting hole, fixed part, the first groove, fixed nail, fixing glue and I-shaped connector Put, multigroup clamping group can be fixed together, and multigroup clamping group is used according to actual conditions, the building pile foundation made is more steady Gu.
3rd, the setting of the invention by guide rod, arc fixinig plate, limited block, limiting slot, second spring and the 3rd groove, Connection of the clamping device to irregular pile foundation can be facilitated to fix, the clamping device made and pile foundation stationarity are more preferable.
4th, the present invention, can by the setting of head rod and the second connecting rod, the first contiguous block and the second contiguous block Realize the fixation to different height clamping device, the present apparatus is simple in structure, and cost is low, easy for installation, can realize to building stake Base consolidates, and prevents from, when carrying out other building operations, having an impact building pile foundation, and by the setting of the first spring, it is right Building pile foundation vibrations produce cushioning effect.
Brief description of the drawings
Fig. 1 is a kind of structure diagram of the clamping group of construction site pile foundation fixing device proposed by the present invention.
Fig. 2 is a kind of fixed link of construction site pile foundation fixing device proposed by the present invention and the connection signal of grip block Figure.
Fig. 3 is a kind of side structure schematic view of construction site pile foundation fixing device proposed by the present invention.
Fig. 4 is a kind of partial structural diagram of construction site pile foundation fixing device proposed by the present invention.
Fig. 5 is a kind of stereogram of the fixed part of construction site pile foundation fixing device proposed by the present invention.
Fig. 6 is a kind of schematic cross-sectional view of construction site pile foundation fixing device proposed by the present invention.
Fig. 7 is a kind of guide rod of construction site pile foundation fixing device proposed by the present invention and the structure of arc fixinig plate Schematic diagram.
Fig. 8 is guide rod and arc fixinig plate and the clamping of a kind of construction site pile foundation fixing device proposed by the present invention The connection diagram in portion.
In figure:1 clamping device, 2 guide rods, 3 arc fixinig plates, 4 arc fixing grooves, 5 first grooves, 6 nuts, 7 catch, 8 fixed blocks, 9 first springs, 10 threaded rods, 11 connecting holes, 12 first contiguous blocks, 13 threaded holes, 14 mounting holes, 15 grip blocks, 16 fixed links, 17 tips, 18 I-shaped connectors, 19 fixing glues, 20 fix nail, 21 head rods, 22 second connecting rods, 23 second grooves, 24 second contiguous blocks, 25 fixed plates, 26 fixing glues, 27 fixed parts, 271 circular fixed parts, 272 rectangles are fixed Portion, 28 limited blocks, 29 limiting slots, 30 the 3rd grooves, 31 second springs.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.
With reference to Fig. 1-8, a kind of construction site pile foundation fixing device, including multiple clamping groups, is superimposed between adjacent clamping group Set, each clamping group includes two symmetrically arranged clamping devices 1, and clamping device 1 includes grip block 15 and two fixed blocks 8, the both sides of grip block 15 are equipped with fixed block 8, and grip block 15 and fixed block 8 are an integral structure, and two are provided with fixed block 8 First through hole, is equipped with threaded rod 10 in the first through hole on two fixed blocks 8, and the both ends of threaded rod 10 are threaded with nut 6, 7 and first spring 9 of gasket is equipped between nut 6 and fixed block 8, gasket 7 is between the first spring 9 and nut 6, two clampings The side close to each other of block 15 is provided with arc fixing groove 4, and the inner wall of arc fixing groove 4 is circumferentially distributed to have multiple footpaths to concave The 3rd groove 30, slidably connect guide rod 2 in the 3rd groove 30, one end of guide rod 2 is welded with arc fixinig plate 3, leads Limited block 28 is welded with to the both sides of bar 2, the both sides of the 3rd groove 30 are provided with limiting slot 29, limited block 28 and limiting slot 29 It is slidably connected, side of the grip block 15 away from arc fixing groove 4 is equipped with two symmetrically arranged first contiguous blocks 12, the first connection Telescopic rod is rotatably connected on block 12, telescopic rod includes 21 and second connecting rod 22 of head rod, the top of the second connecting rod 22 End is provided with the second groove 23, and one end of head rod 21 is located in the second groove 23,21 and second groove 23 of head rod Sidewall thread connection, the bottom of the second connecting rod 22 is equipped with fixed plate 25, the second contiguous block 24 is welded with fixed plate 25, the Two connecting rods 22 are rotatablely connected with the second contiguous block 24, and the both sides of fixed plate 25 are provided with two the second through holes, in the second through hole Equipped with fixing glue 26, the top of grip block 15 is provided with two symmetrically arranged mounting grooves 14 and two connecting holes 11, installation Groove 14 is between two connecting holes 11, and the bottom of mounting groove 14 is provided with threaded hole 13, and 13 internal thread of threaded hole is connected with fixation Bar 16, the bottom of fixed link 16 extend to the lower section of grip block 15, and the bottom of fixed link 16 is equipped with tip 17, fixed link 16 and point End 17 is an integral structure, and the section of connecting hole 11 is T-shaped, and fixed part 27 is connected with connecting hole 11, and fixed part 27 includes square Shape fixed part 272 and cylindrical fixing portion 271, the bottom of rectangle fixed part 272 are connected with cylindrical fixing portion 271, adjacent folder Hold between group by being connected between fixed part 27, and the bottom of cylindrical fixing portion 271 extends to the connecting hole 11 of bottom grip block 15 Interior, the both sides of grip block 15 are equipped with the first groove 5, and the vertical section of the first groove 5 is cross, and two are provided with the first groove 5 A pin hole 20, two pin holes are located at the upper and lower ends of the first groove 5 ", work is equipped with the first groove 5 on adjacent grip block 15 Shaped connecting piece 18, I-shaped connector 18 are equipped with two latches 19, and latch 19 is plugged in adjacent first groove 5 respectively In pin hole 20, gasket 7 is provided with annular groove close to the side of the first spring 9, and one end of the first spring 9 is located at annular groove It is interior, 3 to 5 the 3rd grooves 30, center circumferential of the 3rd groove 30 around arc fixing groove 4 are provided with the side wall of arc fixing groove 4 Distribution, guide rod 2, arc fixinig plate 3 and limited block 28 are an integral structure, and arc fixinig plate 3 is equipped with anti-skid chequer, and is oriented to Bar 2, arc fixinig plate 3 and limited block 28 are steel structure, and rectangle fixed part 272 and cylindrical fixing portion 271 are with being connected The junction of the side walls connection in hole 11, threaded rod 10 and first through hole is equipped with rubber sleeve, and rubber sleeve connects with threaded rod activity Connect, and the outside diameter of rubber sleeve is identical with the aperture of first through hole, arc fixing groove 4 is located at the interposition of 30 side wall of the 3rd groove Put, arc fixinig plate 3 is identical with the radian of arc fixing groove 4, and the side wall bottom of fixed link 16 is equipped with four and 16 phase of fixed link Mutually parallel blow tank, four blow tanks are symmetrical arranged, and fixed link 16 is slidably connected with threaded hole 13, and the top of fixed link 16 is set There is cap, cap is located in mounting groove 14, and reinforcing rib is equipped with fixed link 16.
Embodiment:The clamping group of varying number is chosen according to the height of building pile foundation and actual demand, by two grip blocks 15 are individually positioned in the bottom both sides of building pile foundation, and two grip blocks 15 are symmetrical arranged, the arc fixinig plate 3 on grip block 15 Be in contact with the side wall of circular pile foundation, in the first through hole on fixed block 8 be inserted into threaded rod 10, the both ends of threaded rod 10 according to It is secondary to load onto the first spring 9, gasket 7 and nut 6, two nuts 6 are rotated, nut 6 rotates on threaded rod 10, and nut 6 passes through pad Piece 7 drives the first spring 9 to compress, and the present apparatus and building pile foundation can be fixed, while arc fixinig plate 3 is in the work of pile foundation Under, guide rod 2 is driven to be moved into the 3rd groove 30, guide rod 2 drives 31 compression of second spring, and limited block 28 is being led Slided under the action of to bar 2 in limiting slot 29, connection of the clamping device to irregular pile foundation can be facilitated to fix, the folder made Hold device and pile foundation stationarity is more preferable, until grip block 15 by pile foundation fixed column, loads solid in the threaded hole 13 of grip block 15 Fixed pole 16, fixed link 16 are threadedly coupled with threaded hole 13, and the setting of mounting groove 14, facilitates the installation of fixed link 16, pass through rotation Fixed link 16 is inserted into underground by device under the action of tip 17, is fixedly connected with the ground building pile foundation, adjustable telescopic rod Length, rotates the second connecting rod 22, and head rod 21 rotates in the second groove 23, realizes and stretch, pass through the first contiguous block 12 and second contiguous block 24 adjust its obtain angle with ground, after regulating, fixed plate 25 is placed on the ground, passes through fixing glue 26 fix fixed plate 25 on the ground, further enhance building pile foundation and the stability on ground, prevent from carrying out other buildings During operation, building pile foundation is had an impact, when needing multiple clampings to assemble conjunction, will each clamping group be carried out in the manner described above Install, contact with each other between adjacent clamping group, fixed part 27, the bottom insertion bottom of fixed part 27 are put into connecting hole 11 Hold in the connecting hole 11 in adjacent clamping group, the top of fixed part 27 is located at the inside of connecting hole 11, a upper fixed part The top of 27 bottom fixed part 27 adjacent with bottom is in contact, and it is recessed that cross first is provided with the side wall of grip block 15 Groove 5, I-shaped connector 18 is put into the first groove 5, is connected I-shaped connector 18 with grip block 15 by latch 19, So that two grip blocks 15 in adjacent clamping group are connected, the building pile foundation made is more firm, and the setting of the first spring 9 is right Building pile foundation vibrations produce cushioning effect.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (10)

1. it is superimposed and sets a kind of construction site pile foundation fixing device, including multiple clamping groups, between adjacent clamping group, each clamping Group includes two symmetrically arranged clamping devices(1), it is characterised in that the clamping device(1)Including grip block(15)With two A fixed block(8), grip block(15)Both sides be equipped with fixed block(8), grip block(15)And fixed block(8)For integral type knot Structure, fixed block(8)On be provided with two first through hole, two fixed blocks(8)On first through hole in be equipped with threaded rod(10), screw thread Bar(10)Both ends be threaded with nut(6), nut(6)With fixed block(8)Between be equipped with gasket(7)With the first spring(9), Gasket(7)Positioned at the first spring(9)And nut(6)Between, two grip blocks(15)Side close to each other is provided with arc and consolidates Determine groove(4), arc fixing groove(4)Inner wall circumferentially distributed have the 3rd groove that multiple footpaths concave(30), the 3rd groove(30) Inside slidably connect guide rod(2), guide rod(2)One end be welded with arc fixinig plate(3), guide rod(2)Both sides weld It is connected to limited block(28), the 3rd groove(30)Both sides be provided with limiting slot(29), limited block(28)With limiting slot(29)Slide Connection, the grip block(15)Away from arc fixing groove(4)Side be equipped with two symmetrically arranged first contiguous blocks(12), the One contiguous block(12)On be rotatably connected to telescopic rod, telescopic rod includes head rod(21)With the second connecting rod(22), second Connecting rod(22)Top be provided with the second groove(23), head rod(21)One end be located at the second groove(23)It is interior, first Connecting rod(21)With the second groove(23)Sidewall thread connection, the second connecting rod(22)Bottom be equipped with fixed plate(25)Gu Fixed board(25)On be welded with the second contiguous block(24), the second connecting rod(22)With the second contiguous block(24)Rotation connection, fixed plate (25)Both sides be provided with two the second through holes, is equipped with fixing glue in the second through hole(26), the grip block(15)Top open There are two symmetrically arranged mounting grooves(14)With two connecting holes(11), mounting groove(14)Positioned at two connecting holes(11)Between, Mounting groove(14)Bottom be provided with threaded hole(13), threaded hole(13)Internal thread is connected with fixed link(16), fixed link(16)'s Bottom extends to grip block(15)Lower section, fixed link(16)Bottom be equipped with tip(17), fixed link(16)With tip(17) It is an integral structure, the connecting hole(11)Section be T-shaped, connecting hole(11)Inside it is connected with fixed part(27), fixed part (27)Including rectangle fixed part(272)And cylindrical fixing portion(271), rectangle fixed part(272)Bottom be connected with cylinder Fixed part(271), pass through fixed part between adjacent clamping group(27)Between connect, and cylindrical fixing portion(271)Bottom extend to Bottom grip block(15)Connecting hole(11)It is interior.
A kind of 2. construction site pile foundation fixing device according to claim 1, it is characterised in that the grip block(15) Both sides be equipped with the first groove(5), the first groove(5)Vertical section be cross, the first groove(5)Place is provided with two latches Hole(20), two pin holes are located at the first groove(5)Upper and lower ends, adjacent grip block(15)On the first groove(5)Inside it is equipped with I-shaped connector(18), I-shaped connector(18)It is equipped with two latches(19), latch(19)Adjacent is plugged on respectively One groove(5)Interior pin hole(20)It is interior.
A kind of 3. construction site pile foundation fixing device according to claim 1, it is characterised in that the gasket(7)Lean on Nearly first spring(9)Side be provided with annular groove, the first spring(9)One end be located in annular groove.
A kind of 4. construction site pile foundation fixing device according to claim 1, it is characterised in that the arc fixing groove (4)Side wall on be provided with 3 to 5 the 3rd grooves(30), the 3rd groove(30)Around arc fixing groove(4)Center circumferential distribution.
A kind of 5. construction site pile foundation fixing device according to claim 1, it is characterised in that the guide rod(2)、 Arc fixinig plate(3)And limited block(28)It is an integral structure, arc fixinig plate(3)It is equipped with anti-skid chequer, and guide rod(2)、 Arc fixinig plate(3)And limited block(28)It is steel structure.
A kind of 6. construction site pile foundation fixing device according to claim 1, it is characterised in that the rectangle fixed part (272)And cylindrical fixing portion(271)And connecting hole(11)Side walls connection.
A kind of 7. construction site pile foundation fixing device according to claim 1, it is characterised in that the threaded rod(10) Rubber sleeve is equipped with the junction of first through hole, rubber sleeve is flexibly connected with threaded rod, and the outside diameter and first through hole of rubber sleeve Aperture it is identical.
A kind of 8. construction site pile foundation fixing device according to claim 1, it is characterised in that the arc fixing groove (4)Positioned at the 3rd groove(30)The centre position of side wall, arc fixinig plate(3)With arc fixing groove(4)Radian it is identical.
A kind of 9. construction site pile foundation fixing device according to claim 1, it is characterised in that the fixed link(16) Side wall bottom be equipped with four and fixed link(16)The blow tank being parallel to each other, four blow tanks are symmetrical arranged.
A kind of 10. construction site pile foundation fixing device according to claim 1, it is characterised in that the fixed link (16)With threaded hole(13)It is slidably connected, fixed link(16)Top be equipped with cap, cap is located at mounting groove(14)It is interior, fixed link (16)It is interior to be equipped with reinforcing rib.
CN201710151181.1A 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device Expired - Fee Related CN106948358B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710151181.1A CN106948358B (en) 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device
CN201810195573.2A CN108360546B (en) 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710151181.1A CN106948358B (en) 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201810195573.2A Division CN108360546B (en) 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation

Publications (2)

Publication Number Publication Date
CN106948358A CN106948358A (en) 2017-07-14
CN106948358B true CN106948358B (en) 2018-04-17

Family

ID=59467439

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201710151181.1A Expired - Fee Related CN106948358B (en) 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device
CN201810195573.2A Active CN108360546B (en) 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201810195573.2A Active CN108360546B (en) 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation

Country Status (1)

Country Link
CN (2) CN106948358B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989400B (en) * 2018-01-15 2023-04-25 上海建工四建集团有限公司 Supporting device and supporting method for column foot pier connection repair
CN107989402B (en) * 2018-01-15 2023-05-05 上海建工四建集团有限公司 Supporting device and supporting method for column body during building displacement
CN108166481A (en) * 2018-01-23 2018-06-15 许昌学院 Civil engineering pile foundation fixing device
CN108842801B (en) * 2018-08-08 2020-09-22 东阳市琰安建筑工程有限公司 Pile foundation fixing device for civil engineering
CN109551426A (en) * 2018-12-18 2019-04-02 江阴爱尔姆真空设备有限公司 A kind of split type screw pump stator dismantling device
CN109826195B (en) * 2019-01-03 2020-08-28 中交二航局第四工程有限公司 Pile clamping and cutting integrated tool for offshore steel inclined piles
CN109736437A (en) * 2019-01-03 2019-05-10 上海建森农业温室工程有限公司 A kind of green house of vegetables longitudinal keel installation to joint kit
CN111299475B (en) * 2019-11-29 2022-03-29 盐城市朱庄城市开发建设有限公司 Mechanized processing equipment for building construction steel bar building materials of bridge pile foundation
TWI721761B (en) * 2020-01-21 2021-03-11 鎧鎂企業有限公司 Magnetizer sorority that provides magnetic hand tools
CN111135325B (en) * 2020-02-14 2021-02-05 青岛大学附属医院 Environmental disinfection equipment for multilayer stairs
CN111906709B (en) * 2020-07-19 2022-01-25 河北卓思通信器材有限公司 Communication base station stake fixing device with locating component
CN112523246B (en) * 2020-11-12 2022-04-15 阳春市第四建筑工程公司 Combined pile foundation structure for engineering construction
CN112814007B (en) * 2021-01-05 2022-03-29 浙江沧海建设有限公司 Pile foundation
CN112922315A (en) * 2021-01-29 2021-06-08 中建七局第二建筑有限公司 Firmly-connected wall connecting piece and construction process
CN113047273B (en) * 2021-04-06 2022-04-22 广州市胜特建筑科技开发有限公司 Foundation pile hole reinforcing device with dual reinforcing effects for building construction
CN114351687B (en) * 2021-07-09 2024-03-22 山东国建工程集团有限公司 Building pile fixing device
CN114232669A (en) * 2022-01-06 2022-03-25 徐霞 Supporting pile foundation for building
CN116464049B (en) * 2023-04-28 2023-10-03 浙江秦鼎科技建设有限公司 Pile foundation fixing device for building engineering

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2078765U (en) * 1990-09-25 1991-06-12 武汉市建筑工程机械厂 Holder of cylindrical concrete pile
JP2977363B2 (en) * 1992-02-12 1999-11-15 株式会社ハッコー Manhole cover height adjustment device
JPH09323068A (en) * 1996-06-07 1997-12-16 Chowa Kogyo Kk Method for controlling phase difference of eccentric weight for excitation and mechanism for controlling the same phase
DE102010020995B4 (en) * 2010-05-11 2014-12-04 Werner Möbius Engineering GmbH Foundation system for the foundation of an offshore wind energy plant
CN203530960U (en) * 2013-10-29 2014-04-09 林清辉 Fixing structure of pine pile installing device
CN203625920U (en) * 2013-11-16 2014-06-04 国家电网公司 Pile foundation of power transmission line
CN204570694U (en) * 2015-03-11 2015-08-19 王云花 Building pile body fixture
CN104895102A (en) * 2015-05-12 2015-09-09 成都迅德科技有限公司 Single-pile foundation structure
CN105002890B (en) * 2015-07-15 2017-03-08 杭州江润科技有限公司 A kind of profundal zone cast-in-situ bored pile is lossless to assemble and disassemble double-deck steel pile casting group structure and construction method
JP5954679B2 (en) * 2015-08-19 2016-07-20 日本ヒューム株式会社 Pile-free welded joint
CN205576958U (en) * 2016-03-14 2016-09-14 大成科创基础建设股份有限公司 High pile foundation fixed knot constructs
CN205591266U (en) * 2016-05-11 2016-09-21 浙江海洋大学 Bridge pile foundation's detection device under water

Also Published As

Publication number Publication date
CN108360546A (en) 2018-08-03
CN108360546B (en) 2019-09-27
CN106948358A (en) 2017-07-14

Similar Documents

Publication Publication Date Title
CN106948358B (en) A kind of construction site pile foundation fixing device
US7744316B2 (en) Apparatus for lifting building foundations
CN105863362A (en) Deviation rectifying device for inclined transmission tower
CN109162306B (en) Uneven settlement correcting device for communication iron tower and using method thereof
CN209114476U (en) A kind of deep foundation pit fender post
CN106284396B (en) A kind of shock-proof type reinforced concrete structure column
CN206157792U (en) Complementary rectification reinforced structure of stake raft
CN112726394A (en) Pin-connected panel public road bridge roof beam shock absorber support
CN207143956U (en) More pile-type interconnection system pile covers
CN110173538A (en) A kind of shock-damping structure of energy saving and environment friendly oil exploitation drilling platforms
CN211006686U (en) Deep foundation pit supporting structure
CN203891022U (en) Tensioning and anchoring device based on unbonded prestressing reinforced soil technology
CN213953074U (en) Wood column and column foundation reinforcing structure for repairing wooden ancient architecture
CN212866016U (en) Leveling structure suitable for offshore wind power pile foundation construction platform
CN112376600A (en) Safe anti-seismic building pile
CN216836798U (en) Tower crane track mounting structure that slides
CN103195079A (en) Installation type templates, installation type template group and set of installation type template devices
CN106320343A (en) Automatic positioning device for building concrete pouring
CN202187338U (en) Prestressed pipe pile
CN202347528U (en) Steel tube inserted foundation
CN215369021U (en) Concrete wire pole reinforcing apparatus
CN114411793B (en) Antique building is with antidetonation ground
CN210766714U (en) Rammer of convenient transportation
CN215671067U (en) Closed stair plastic formwork
CN210263120U (en) Line tower base embedded screw fixing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhu Yuyu

Inventor after: Tang Hu

Inventor after: Zhao Yongsheng

Inventor after: Fu Zhihao

Inventor after: Kang Yanming

Inventor after: Yan Panpan

Inventor after: Shi Weiwei

Inventor before: Zhu Yuyu

Inventor before: Fu Zhihao

Inventor before: Kang Yanming

Inventor before: Yan Panpan

Inventor before: Shi Weiwei

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180417

Termination date: 20200314