CN106948358A - A kind of construction site pile foundation fixing device - Google Patents

A kind of construction site pile foundation fixing device Download PDF

Info

Publication number
CN106948358A
CN106948358A CN201710151181.1A CN201710151181A CN106948358A CN 106948358 A CN106948358 A CN 106948358A CN 201710151181 A CN201710151181 A CN 201710151181A CN 106948358 A CN106948358 A CN 106948358A
Authority
CN
China
Prior art keywords
groove
pile foundation
block
hole
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710151181.1A
Other languages
Chinese (zh)
Other versions
CN106948358B (en
Inventor
朱煜钰
付志豪
康延铭
闫盼盼
石微微
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanghe Science and Technology College
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN201710151181.1A priority Critical patent/CN106948358B/en
Priority to CN201810195573.2A priority patent/CN108360546B/en
Publication of CN106948358A publication Critical patent/CN106948358A/en
Application granted granted Critical
Publication of CN106948358B publication Critical patent/CN106948358B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to the realm of building construction, especially a kind of construction site pile foundation fixing device, for existing pile foundation fixing device reinforcement protection problem can not be carried out to constructed pile foundation, now propose following scheme, it includes multiple clamping groups mutually stacked, each clamping group includes two symmetrically arranged clamping devices, the clamping device includes grip block and two fixed blocks, the both sides of grip block are equipped with fixed block, grip block and fixed block are integral type structure, two first through hole are provided with fixed block, threaded rod is provided with first through hole on two fixed blocks, the two ends of threaded rod are threaded with nut, pad and the first spring are provided between nut and fixed block, pad is located between the first spring and nut.Simple in construction, low cost of the invention, it is easy for installation, it can realize and building pile foundation is consolidated, prevent from, when carrying out other building operations, influence being produced on building pile foundation.

Description

A kind of construction site pile foundation fixing device
Technical field
The present invention relates to technical field of building construction, more particularly to a kind of construction site pile foundation fixing device.
Background technology
Pile foundation is by foundation pile and is connected to the cushion cap of stake top and collectively constitutes, if pile body is all embedded in soil, cushion cap bottom surface with The soil body is contacted, then referred to as embedded footing on piles, low capped pile foundation, if pile body top is basseted, cushion cap bottom is located at more than ground, referred to as high cushion cap Pile foundation, building pile foundation is usually embedded footing on piles, low capped pile foundation plinth, and Patent No. CN 205576958U patent proposes a kind of high pile foundation and consolidated Fixed structure, it enhances pile foundation in soft soil foundation and silt by the setting of armoured concrete slab, spring, main piston and auxiliary piston The steadiness of mud layer, reduces the pulling capacity and moment of flexure of pile foundation, improves the steadiness of high pile foundation, and this patent structure is excessively simple, right The steadiness of pile foundation is not too high, and it is to improve the steadiness of pile foundation and soft soil foundation and mud mostly, it is impossible to Reinforcement protection is carried out to constructed pile foundation, such as it is well rear, it is necessary to carry out the construction of building upper strata or enter in pile foundation construction During row building reconstruction, it is impossible to which pile foundation is protected, and it can not realize that the pile foundation of different height is protected according to the height of pile foundation Shield, is this it is proposed that a kind of construction site pile foundation fixing device.
The content of the invention
A kind of construction site pile foundation fixing device proposed by the present invention, solving existing pile foundation fixing device can not be right Constructed pile foundation carries out reinforcement protection problem.
To achieve these goals, present invention employs following technical scheme:
A kind of construction site pile foundation fixing device, including multiple clamping groups mutually stacked, each clamping group include two Individual symmetrically arranged clamping device, the clamping device includes grip block and two fixed blocks, and the both sides of grip block are equipped with admittedly Determine block, grip block and fixed block are that first be provided with integral type structure, fixed block on two first through hole, two fixed blocks is led to Threaded rod is provided with hole, the two ends of threaded rod are threaded with nut, pad and the first spring is provided between nut and fixed block, Pad is located between the first spring and nut, and two grip blocks side close to each other is provided with arc fixing groove, and arc is fixed The inwall of groove is circumferentially distributed to be had in the 3rd groove that multiple footpaths concave, the 3rd groove and slidably connects guide post, guide post One end is welded with arc stator, and the both sides of guide post are welded with limited block, and the both sides of the 3rd groove are provided with stopper slot, limit Position block is slidably connected with stopper slot, and side of the grip block away from arc fixing groove is provided with two symmetrically arranged first connections Expansion link is rotatably connected on block, the first contiguous block, expansion link includes head rod and the second connecting rod, the second connecting rod Top is provided with the second groove, and one end of head rod is located in the second groove, the side wall spiral shell of head rod and the second groove Line is connected, and the bottom of the second connecting rod, which is provided with fixed plate, fixed plate, is welded with the second contiguous block, and the second connecting rod connects with second Connect block and rotate connection, the both sides of fixed plate are provided with two the second through holes, the second through hole provided with fixed nail, the grip block Top is provided with two symmetrically arranged mounting grooves and two connecting holes, and mounting groove is located between two connecting holes, the bottom of mounting groove End is provided with screwed hole, and screwed hole internal thread is connected with fix bar, and the bottom of fix bar extends to the lower section of grip block, fix bar Bottom is provided with sophisticated, and fix bar is integral type structure with tip, and the section of the connecting hole is to be connected with T-shaped, connecting hole admittedly Determine portion, fixed part includes rectangle fixed part and cylindrical fixing portion, and the bottom of rectangle fixed part is connected with cylindrical fixing portion, phase By being connected between fixed part between adjacent clamping group, and the bottom of cylindrical fixing portion is extended in the connecting hole of bottom grip block.
It is preferred that, the both sides of the grip block are equipped with the first groove, and the vertical section of the first groove is cross, and first is recessed The bottom of groove, which is provided with, is provided with I-shaped connector, I-shaped connector the first groove on two pin holes, adjacent grip block Nei Provided with two latches, latch is plugged in the pin hole in adjacent first groove respectively.
It is preferred that, the pad is provided with annular groove close to the side of the first spring, and one end of the first spring is located at annular In groove.
It is preferred that, 3 to 5 the 3rd grooves are provided with the side wall of the arc fixing groove, the 3rd groove is around arc fixing groove Center circumferential distribution.
It is preferred that, the guide post, arc stator and limited block are integral type structure, and arc stator is provided with anti-skidding Line, and guide post, arc stator and limited block are steel design.
It is preferred that, the rectangle fixed part and cylindrical fixing portion are connected with the side walls of connecting hole.
It is preferred that, the junction of the threaded rod and first through hole is provided with rubber sleeve, and rubber sleeve is flexibly connected with threaded rod, And the external diameter of rubber sleeve is identical with the aperture of first through hole.
It is preferred that, the arc fixing groove is located at the centre position of the 3rd recess sidewall, and arc stator is fixed with arc The radian of groove is identical.
It is preferred that, the side wall bottom of the fix bar is provided with four blow tanks being parallel to each other with fix bar, four dischargings Groove is symmetrical arranged.
It is preferred that, the fix bar is slidably connected with screwed hole, and the top of fix bar is provided with cap, and cap is located at mounting groove It is interior, reinforcement is provided with fix bar.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, the present invention by grip block, fixed block, threaded rod, nut setting, the present apparatus and building pile foundation can be entered Row is fixed, and by the setting of expansion link, fixed plate, fixed nail, screwed hole and fix bar, building pile foundation can be made to be fixed with ground Connection, building pile foundation steadiness is higher, prevents from, when carrying out other building operations, influence being produced on building pile foundation;
2nd, the present invention setting by connecting hole, fixed part, the first groove, fixed nail, fixed nail and I-shaped connector Put, multigroup clamping group can be fixed together, and multigroup clamping group is used according to actual conditions, the building pile foundation made is more steady Gu;
3rd, the setting of the invention by guide post, arc stator, limited block, stopper slot, second spring and the 3rd groove, Clamping device can be facilitated to be connected irregular pile foundation, the clamping device made and pile foundation stationarity are more preferable;
4th, the present invention, can by the setting of head rod and the second connecting rod, the first contiguous block and the second contiguous block The fixation to different height clamping device is realized, the present apparatus is simple in construction, and low cost is easy for installation, can realized to building stake Consolidating for base, prevents that building pile foundation, which is produced, to be influenceed when carrying out other building operations, and by the setting of the first spring, it is right Building pile foundation vibrations produce cushioning effect.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the clamping group of construction site pile foundation fixing device proposed by the present invention;
Fig. 2 is a kind of fix bar of construction site pile foundation fixing device proposed by the present invention and the connection signal of grip block Figure;
Fig. 3 is a kind of side structure schematic view of construction site pile foundation fixing device proposed by the present invention;
Fig. 4 is a kind of partial structural diagram of construction site pile foundation fixing device proposed by the present invention;
Fig. 5 is a kind of stereogram of the fixed part of construction site pile foundation fixing device proposed by the present invention;
Fig. 6 is a kind of cross section structure diagram of construction site pile foundation fixing device proposed by the present invention;
Fig. 7 is a kind of guide post of construction site pile foundation fixing device proposed by the present invention and the structure of arc stator Schematic diagram;
Guide posts and arc stator and clamping of the Fig. 8 for a kind of construction site pile foundation fixing device proposed by the present invention The connection diagram in portion.
In figure:1 clamping device, 2 guide posts, 3 arc stators, 4 arc fixing grooves, 5 first grooves, 6 nuts, 7 catch, 8 fixed blocks, 9 first springs, 10 threaded rods, 11 connecting holes, 12 first contiguous blocks, 13 screwed holes, 14 mounting holes, 15 grip blocks, 16 fix bars, 17 tips, 18 I-shaped connectors, 19 fix nail, 20 fix nail, 21 head rods, 22 second connecting rods, 23 second grooves, 24 second contiguous blocks, 25 fixed plates, 26 fixation nails, 27 fixed parts, 271 circular fixed parts, 272 rectangles are fixed Portion, 28 limited blocks, 29 stopper slots, 30 the 3rd grooves, 31 second springs.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.
Reference picture 1-8, a kind of construction site pile foundation fixing device, including multiple clamping groups mutually stacked, each folder Holding group includes two symmetrically arranged clamping devices 1, and clamping device 1 includes grip block 15 and two fixed blocks 8, grip block 15 Both sides are equipped with fixed block 8, and grip block 15 and fixed block 8 are to be provided with two first through hole, two on integral type structure, fixed block 8 Threaded rod 10 is provided with first through hole on individual fixed block 8, the two ends of threaded rod 10 are threaded with nut 6, and nut 6 is with fixing The spring 9 of pad 7 and first is provided between block 8, pad 7 is located between the first spring 9 and nut 6, and two grip blocks 15 are mutually leaned on Near side is provided with arc fixing groove 4, and the inwall of arc fixing groove 4 is circumferentially distributed the 3rd groove that multiple footpaths concave 30, guide post 2 is slidably connected in the 3rd groove 30, and one end of guide post 2 is welded with arc stator 3, the both sides of guide post 2 Limited block 28 is welded with, the both sides of the 3rd groove 30 are provided with stopper slot 29, and limited block 28 is slidably connected with stopper slot 29, pressed from both sides Hold side of the block 15 away from arc fixing groove 4 and be provided with rotation on two symmetrically arranged first contiguous blocks 12, the first contiguous block 12 Expansion link is connected with, expansion link includes the connecting rod 22 of head rod 21 and second, and the top of the second connecting rod 22 is provided with second Groove 23, one end of head rod 21 is located in the second groove 23, the sidewall thread of the groove 23 of head rod 21 and second Connection, the bottom of the second connecting rod 22, which is provided with fixed plate 25, fixed plate 25, is welded with the second contiguous block 24, the second connecting rod 22 Rotate and be connected with the second contiguous block 24, the both sides of fixed plate 25 are provided with two the second through holes, the second through hole provided with fixed nail 26, the top of grip block 15 is provided with two symmetrically arranged mounting grooves 14 and two connecting holes 11, and mounting groove 14 is located at two companies Connect between hole 11, the bottom of mounting groove 14 is provided with screwed hole 13, and the internal thread of screwed hole 13 is connected with fix bar 16, fix bar 16 Bottom extends to the lower section of grip block 15, and the bottom of fix bar 16 is provided with tip 17, and fix bar 16 is integral type knot with tip 17 Structure, the section of connecting hole 11 is that fixed part 27 is connected with T-shaped, connecting hole 11, and fixed part 27 includes rectangle fixed part 272 and circle Cylindricality fixed part 271, the bottom of rectangle fixed part 272, which is connected between cylindrical fixing portion 271, adjacent clamping group, passes through fixed part Connected between 27, and the bottom of cylindrical fixing portion 271 is extended in the connecting hole 11 of bottom grip block 15, the both sides of grip block 15 The first groove 5 is equipped with, the vertical section of the first groove 5 is cross, and the bottom of the first groove 5 is provided with two pin holes 20, phase I-shaped connector 18 is provided with the first groove 5 on adjacent grip block 15, I-shaped connector 18 is inserted provided with two latches 19 Pin 19 is plugged in the pin hole 20 in adjacent first groove 5 respectively, and it is recessed that pad 7 is provided with annular close to the side of the first spring 9 Groove, one end of the first spring 9 is located in annular groove, and 3 to 5 the 3rd grooves 30, the 3rd are provided with the side wall of arc fixing groove 4 Groove 30 is distributed around the center circumferential of arc fixing groove 4, and guide post 2, arc stator 3 and limited block 28 are integral type structure, Arc stator 3 is provided with anti-slip veins, and guide post 2, arc stator 3 and limited block 28 are steel design, and rectangle is fixed The side walls of portion 272 and cylindrical fixing portion 271 with connecting hole 11 are connected, and threaded rod 10 and the junction of first through hole are set Rubber sleeve, rubber sleeve is flexibly connected with threaded rod, and the external diameter of rubber sleeve and the aperture of first through hole are identical, arc fixing groove 4 are located at the centre position of the side wall of the 3rd groove 30, and arc stator 3 is identical with the radian of arc fixing groove 4, the side of fix bar 16 Wall bottom is provided with four blow tanks being parallel to each other with fix bar 16, and four blow tanks are symmetrical arranged, fix bar 16 and screwed hole 13 are slidably connected, and the top of fix bar 16 is provided with cap, and cap is located in mounting groove 14, and reinforcement is provided with fix bar 16.
Embodiment:The clamping group of varying number is chosen according to the height of building pile foundation and actual demand, by two grip blocks 15 are individually positioned in the bottom both sides of building pile foundation, and two grip blocks 15 are symmetrical arranged, the arc stator 3 on grip block 15 Be in contact with the side wall of circular pile foundation, in the first through hole on fixed block 8 insert threaded rod 10, the two ends of threaded rod 10 according to It is secondary to load onto the first spring 9, pad 7 and nut 6, two nuts 6 are rotated, nut 6 is rotated on threaded rod 10, nut 6 passes through pad Piece 7 drives the first spring 9 to compress, and the present apparatus and building pile foundation can be fixed, while work of the arc stator 3 in pile foundation Under, guide post 2 is driven to be moved into the 3rd groove 30, guide post 2 drives the compression of second spring 31, limited block 28 is being led Slided in the presence of to bar 2 in stopper slot 29, clamping device can be facilitated to be connected irregular pile foundation, the folder made Hold device more preferable with pile foundation stationarity, until grip block 15 is by pile foundation fixed column, load solid in the screwed hole 13 of grip block 15 Fixed pole 16, fix bar 16 is threadedly coupled with screwed hole 13, the setting of mounting groove 14, facilitates the installation of fix bar 16, passes through rotation Fix bar 16 is inserted underground by device in the presence of tip 17, is fixedly connected with the ground building pile foundation, adjustable telescopic rod Length, rotates the second connecting rod 22, and head rod 21 rotates in the second groove 23, realizes and stretch, pass through the first contiguous block 12 and second the regulation of contiguous block 24 its obtain angle with ground, after regulating, fixed plate 25 is placed on the ground, passes through fixed nail 26 fix fixed plate 25 on the ground, further enhance building pile foundation and the steadiness on ground, prevent from carrying out other buildings During operation, influence is produced on building pile foundation, when needing multiple clampings to assemble conjunction, each clamping group will be carried out in the manner described above Install, contacted with each other between adjacent clamping group, fixed part 27 is put into connecting hole 11, the bottom insertion bottom of fixed part 27 is adjacent In connecting hole 11 in clamping group, the top of fixed part 27 is located at the inside of connecting hole 11, the bottom of a upper fixed part 27 with The top of the adjacent fixed part 27 in bottom is in contact, and the first groove of cross 5 is provided with the side wall of grip block 15, by I-shaped company Fitting 18 is put into the first groove 5, is connected I-shaped connector 18 with grip block 15 by latch 19 so that adjacent clamping group On two grip blocks 15 be connected, the building pile foundation made more consolidate, the setting of the first spring 9, to building pile foundation shake produce Raw cushioning effect.
The foregoing is intended to be a preferred embodiment of the present invention, but protection scope of the present invention is not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent or change, should all be included within the scope of the present invention.

Claims (10)

1. a kind of construction site pile foundation fixing device, including multiple clamping groups mutually stacked, each clamping group include two Symmetrically arranged clamping device (1), it is characterised in that the clamping device (1) includes grip block (15) and two fixed blocks (8), the both sides of grip block (15) are equipped with fixed block (8), and grip block (15) and fixed block (8) are integral type structure, fixed block (8) it is provided with and threaded rod (10) is provided with the first through hole on two first through hole, two fixed blocks (8) Nei, threaded rod (10) Two ends are threaded with nut (6), and pad (7) and the first spring (9), pad (7) are provided between nut (6) and fixed block (8) Between the first spring (9) and nut (6), two grip block (15) sides close to each other are provided with arc fixing groove (4), The inwall of arc fixing groove (4) is circumferentially distributed the company of slip in the 3rd groove (30) that multiple footpaths concave, the 3rd groove (30) Guide post (2) is connected to, one end of guide post (2) is welded with arc stator (3), and limited location is welded in the both sides of guide post (2) Block (28), the both sides of the 3rd groove (30) are provided with stopper slot (29), and limited block (28) is slidably connected with stopper slot (29), described Side of the grip block (15) away from arc fixing groove (4) is provided with two symmetrically arranged first contiguous blocks (12), the first contiguous block (12) expansion link is rotatably connected on, expansion link includes head rod (21) and the second connecting rod (22), the second connecting rod (22) top is provided with the second groove (23), and one end of head rod (21) is located in the second groove (23), head rod (21) sidewall thread with the second groove (23) is connected, and the bottom of the second connecting rod (22) is provided with fixed plate (25), fixed plate (25) the second contiguous block (24) is welded with, the second connecting rod (22) is rotated with the second contiguous block (24) and is connected, fixed plate (25) Both sides be provided with two the second through holes, provided with fixed nail (26) in the second through hole, the top of the grip block (15) is provided with two Individual symmetrically arranged mounting groove (14) and two connecting holes (11), mounting groove (14) are located between two connecting holes (11), install The bottom of groove (14) is provided with screwed hole (13), and screwed hole (13) internal thread is connected with fix bar (16), the bottom of fix bar (16) The lower section of grip block (15) is extended to, the bottom of fix bar (16) is provided with sophisticated (17), and fix bar (16) is one with sophisticated (17) Body formula structure, the section of the connecting hole (11) is that fixed part (27) is connected with T-shaped, connecting hole (11), fixed part (27) bag Rectangle fixed part (272) and cylindrical fixing portion (271) are included, the bottom of rectangle fixed part (272) is connected with cylindrical fixing portion (271), by being connected between fixed part (27) between adjacent clamping group, and the bottom of cylindrical fixing portion (271) extends to bottom folder In the connecting hole (11) for holding block (15).
2. a kind of construction site pile foundation fixing device according to claim 1, it is characterised in that the grip block (15) Both sides be equipped with the first groove (5), the vertical section of the first groove (5) is cross, and the bottom of the first groove (5) is provided with two I-shaped connector (18), I-shaped connector are provided with the first groove (5) on pin hole (20), adjacent grip block (15) (18) provided with two latches (19), latch (19) is plugged on the pin hole (20) in adjacent first groove (5) Nei respectively.
3. a kind of construction site pile foundation fixing device according to claim 1, it is characterised in that the pad (7) is leaned on The side of nearly first spring (9) is provided with annular groove, and one end of the first spring (9) is located in annular groove.
4. a kind of construction site pile foundation fixing device according to claim 1, it is characterised in that the arc fixing groove (4) 3 to 5 the 3rd grooves (30) are provided with side wall, the 3rd groove (30) is distributed around the center circumferential of arc fixing groove (4).
5. a kind of construction site pile foundation fixing device according to claim 1, it is characterised in that the guide post (2), Arc stator (3) and limited block (28) are integral type structure, and arc stator (3) is provided with anti-slip veins, and guide post (2), Arc stator (3) and limited block (28) are steel design.
6. a kind of construction site pile foundation fixing device according to claim 1, it is characterised in that the rectangle fixed part (272) it is connected with side walls of the cylindrical fixing portion (271) with connecting hole (11).
7. a kind of construction site pile foundation fixing device according to claim 1, it is characterised in that the threaded rod (10) Rubber sleeve is provided with the junction of first through hole, rubber sleeve is flexibly connected with threaded rod, and the external diameter and first through hole of rubber sleeve Aperture it is identical.
8. a kind of construction site pile foundation fixing device according to claim 1, it is characterised in that the arc fixing groove (4) it is located at the centre position of the 3rd groove (30) side wall, arc stator (3) is identical with the radian of arc fixing groove (4).
9. a kind of construction site pile foundation fixing device according to claim 1, it is characterised in that the fix bar (16) Side wall bottom be provided with four blow tanks for being parallel to each other with fix bar (16), four blow tanks are symmetrical arranged.
10. a kind of construction site pile foundation fixing device according to claim 1, it is characterised in that the fix bar (16) it is slidably connected with screwed hole (13), the top of fix bar (16) is provided with cap, and cap is located in mounting groove (14), fix bar (16) reinforcement is provided with.
CN201710151181.1A 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device Expired - Fee Related CN106948358B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710151181.1A CN106948358B (en) 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device
CN201810195573.2A CN108360546B (en) 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710151181.1A CN106948358B (en) 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201810195573.2A Division CN108360546B (en) 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation

Publications (2)

Publication Number Publication Date
CN106948358A true CN106948358A (en) 2017-07-14
CN106948358B CN106948358B (en) 2018-04-17

Family

ID=59467439

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201810195573.2A Active CN108360546B (en) 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation
CN201710151181.1A Expired - Fee Related CN106948358B (en) 2017-03-14 2017-03-14 A kind of construction site pile foundation fixing device

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201810195573.2A Active CN108360546B (en) 2017-03-14 2017-03-14 A kind of architectural engineering fixes device with pile foundation

Country Status (1)

Country Link
CN (2) CN108360546B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989400A (en) * 2018-01-15 2018-05-04 上海建工四建集团有限公司 Bracket assembly, suspension column pier connect the rest method of repairerment
CN107989402A (en) * 2018-01-15 2018-05-04 上海建工四建集团有限公司 The rest method of cylinder when bracket assembly, building displacement
CN108166481A (en) * 2018-01-23 2018-06-15 许昌学院 Civil engineering pile foundation fixing device
CN108842801A (en) * 2018-08-08 2018-11-20 河南沪江电缆有限公司 The fixed device of pile foundation for civil engineering
CN109551426A (en) * 2018-12-18 2019-04-02 江阴爱尔姆真空设备有限公司 A kind of split type screw pump stator dismantling device
CN109826195A (en) * 2019-01-03 2019-05-31 中交二航局第四工程有限公司 A kind of offshore steel taper pile clip pile cuts stake integration tooling
CN111135325A (en) * 2020-02-14 2020-05-12 新昌暮云自动化设备有限公司 Environmental disinfection equipment for multilayer stairs
CN111906709A (en) * 2020-07-19 2020-11-10 杭州盛通科技有限公司 Communication base station stake fixing device with locating component
CN112523246A (en) * 2020-11-12 2021-03-19 温州竺陌机械科技有限公司 Combined pile foundation structure for engineering construction
CN112814007A (en) * 2021-01-05 2021-05-18 浙江沧海建设有限公司 Pile foundation
CN113047273A (en) * 2021-04-06 2021-06-29 广州市胜特建筑科技开发有限公司 Foundation pile hole reinforcing device with dual reinforcing effects for building construction
CN114232669A (en) * 2022-01-06 2022-03-25 徐霞 Supporting pile foundation for building

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736437A (en) * 2019-01-03 2019-05-10 上海建森农业温室工程有限公司 A kind of green house of vegetables longitudinal keel installation to joint kit
CN111299475B (en) * 2019-11-29 2022-03-29 盐城市朱庄城市开发建设有限公司 Mechanized processing equipment for building construction steel bar building materials of bridge pile foundation
TWI721761B (en) * 2020-01-21 2021-03-11 鎧鎂企業有限公司 Magnetizer sorority that provides magnetic hand tools
CN112922315A (en) * 2021-01-29 2021-06-08 中建七局第二建筑有限公司 Firmly-connected wall connecting piece and construction process
CN113373927B (en) * 2021-07-09 2022-03-29 山东国建工程集团有限公司 Building pile body fixing device
CN114197515A (en) * 2021-11-29 2022-03-18 华能(庄河)风力发电有限责任公司 High stability deep sea waters single pile bottom stable structure
CN116464049B (en) * 2023-04-28 2023-10-03 浙江秦鼎科技建设有限公司 Pile foundation fixing device for building engineering

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05222739A (en) * 1992-02-12 1993-08-31 Hakko Co Ltd Cover level controller of manhole
JPH09323068A (en) * 1996-06-07 1997-12-16 Chowa Kogyo Kk Method for controlling phase difference of eccentric weight for excitation and mechanism for controlling the same phase
DE102010020995A1 (en) * 2010-05-11 2011-11-17 Werner Möbius Engineering GmbH off-shore wind energy plant establishment system, has supporting structure connected to foundation piles embedded in seabed, and protection plate attached to foundation piles at seabed
CN203530960U (en) * 2013-10-29 2014-04-09 林清辉 Fixing structure of pine pile installing device
CN203625920U (en) * 2013-11-16 2014-06-04 国家电网公司 Pile foundation of power transmission line
CN204570694U (en) * 2015-03-11 2015-08-19 王云花 Building pile body fixture
CN104895102A (en) * 2015-05-12 2015-09-09 成都迅德科技有限公司 Single-pile foundation structure
CN105002890A (en) * 2015-07-15 2015-10-28 杭州江润科技有限公司 Abyssal region cast-in-situ bored pile nondestructive assembly and disassembly double-layer steel casing group structure and construction method
CN205591266U (en) * 2016-05-11 2016-09-21 浙江海洋大学 Bridge pile foundation's detection device under water

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2078765U (en) * 1990-09-25 1991-06-12 武汉市建筑工程机械厂 Holder of cylindrical concrete pile
JP5954679B2 (en) * 2015-08-19 2016-07-20 日本ヒューム株式会社 Pile-free welded joint
CN205576958U (en) * 2016-03-14 2016-09-14 大成科创基础建设股份有限公司 High pile foundation fixed knot constructs

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05222739A (en) * 1992-02-12 1993-08-31 Hakko Co Ltd Cover level controller of manhole
JPH09323068A (en) * 1996-06-07 1997-12-16 Chowa Kogyo Kk Method for controlling phase difference of eccentric weight for excitation and mechanism for controlling the same phase
DE102010020995A1 (en) * 2010-05-11 2011-11-17 Werner Möbius Engineering GmbH off-shore wind energy plant establishment system, has supporting structure connected to foundation piles embedded in seabed, and protection plate attached to foundation piles at seabed
CN203530960U (en) * 2013-10-29 2014-04-09 林清辉 Fixing structure of pine pile installing device
CN203625920U (en) * 2013-11-16 2014-06-04 国家电网公司 Pile foundation of power transmission line
CN204570694U (en) * 2015-03-11 2015-08-19 王云花 Building pile body fixture
CN104895102A (en) * 2015-05-12 2015-09-09 成都迅德科技有限公司 Single-pile foundation structure
CN105002890A (en) * 2015-07-15 2015-10-28 杭州江润科技有限公司 Abyssal region cast-in-situ bored pile nondestructive assembly and disassembly double-layer steel casing group structure and construction method
CN205591266U (en) * 2016-05-11 2016-09-21 浙江海洋大学 Bridge pile foundation's detection device under water

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989402A (en) * 2018-01-15 2018-05-04 上海建工四建集团有限公司 The rest method of cylinder when bracket assembly, building displacement
CN107989400A (en) * 2018-01-15 2018-05-04 上海建工四建集团有限公司 Bracket assembly, suspension column pier connect the rest method of repairerment
CN107989402B (en) * 2018-01-15 2023-05-05 上海建工四建集团有限公司 Supporting device and supporting method for column body during building displacement
CN108166481A (en) * 2018-01-23 2018-06-15 许昌学院 Civil engineering pile foundation fixing device
CN111945769B (en) * 2018-08-08 2022-08-09 河南沪江电缆有限公司 Pile foundation fixing device for civil construction
CN108842801A (en) * 2018-08-08 2018-11-20 河南沪江电缆有限公司 The fixed device of pile foundation for civil engineering
CN108842801B (en) * 2018-08-08 2020-09-22 东阳市琰安建筑工程有限公司 Pile foundation fixing device for civil engineering
CN111945768B (en) * 2018-08-08 2022-08-19 河南沪江电缆有限公司 Civil engineering pile foundation fixed knot constructs
CN111945769A (en) * 2018-08-08 2020-11-17 河南沪江电缆有限公司 Pile foundation fixing device for civil construction
CN111945768A (en) * 2018-08-08 2020-11-17 河南沪江电缆有限公司 Civil engineering pile foundation fixed knot constructs
CN109551426A (en) * 2018-12-18 2019-04-02 江阴爱尔姆真空设备有限公司 A kind of split type screw pump stator dismantling device
CN109826195A (en) * 2019-01-03 2019-05-31 中交二航局第四工程有限公司 A kind of offshore steel taper pile clip pile cuts stake integration tooling
CN111135325A (en) * 2020-02-14 2020-05-12 新昌暮云自动化设备有限公司 Environmental disinfection equipment for multilayer stairs
CN111906709B (en) * 2020-07-19 2022-01-25 河北卓思通信器材有限公司 Communication base station stake fixing device with locating component
CN111906709A (en) * 2020-07-19 2020-11-10 杭州盛通科技有限公司 Communication base station stake fixing device with locating component
CN112523246A (en) * 2020-11-12 2021-03-19 温州竺陌机械科技有限公司 Combined pile foundation structure for engineering construction
CN112814007A (en) * 2021-01-05 2021-05-18 浙江沧海建设有限公司 Pile foundation
CN112814007B (en) * 2021-01-05 2022-03-29 浙江沧海建设有限公司 Pile foundation
CN113047273A (en) * 2021-04-06 2021-06-29 广州市胜特建筑科技开发有限公司 Foundation pile hole reinforcing device with dual reinforcing effects for building construction
CN114232669A (en) * 2022-01-06 2022-03-25 徐霞 Supporting pile foundation for building

Also Published As

Publication number Publication date
CN108360546B (en) 2019-09-27
CN108360546A (en) 2018-08-03
CN106948358B (en) 2018-04-17

Similar Documents

Publication Publication Date Title
CN106948358A (en) A kind of construction site pile foundation fixing device
CN209227547U (en) A kind of deep foundation pit support structure
US20140190093A1 (en) Methods and apparatuses of supporting and bracing a pole
BR112016028356B1 (en) FOUNDATION SYSTEM FOR TOWERS, WIND TURBINE AND/OR WIND TOWER, AND METHOD OF INSTALLATION OF A FOUNDATION SYSTEM FOR TOWERS
CN110295669B (en) Reinforced concrete structure and reinforcing method
CN209114476U (en) A kind of deep foundation pit fender post
CN202543966U (en) Pile-supported cantilever retaining wall
CN208219718U (en) A kind of pile foundation intensity detecting device
CN207300764U (en) A kind of prestressed anchor shear stress on interface measuring device
CN207143956U (en) More pile-type interconnection system pile covers
CN112726394A (en) Pin-connected panel public road bridge roof beam shock absorber support
CN211006686U (en) Deep foundation pit supporting structure
CN212154180U (en) Civil engineering is with prepositioning pay-off
CN209162880U (en) A kind of photovoltaic bracket basis for heavy grade landform
CN203977986U (en) A kind of adjustable protective screening fence upright
US9458592B2 (en) Method for anchoring a structure in a bed of a body of water and underwater foundation
CN110847175A (en) Foundation pile cuts off guide bracket
CN216586561U (en) Steel pipe inclined pile support for foundation pit support
JPS63223218A (en) Driving work of pile
CN216920082U (en) Protection mechanism for tunnel backslope
CN213233392U (en) House foundation with stable structure
CN215562776U (en) Easily build formula tower crane foundation structure with prevent falling
CN114856662B (en) High-ground-stress interbedded soft rock tunnel anchor rod supporting structure
CN213329086U (en) Pile foundation structure for building engineering that stability is strong
CN215759145U (en) Novel transmission line tower foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhu Yuyu

Inventor after: Tang Hu

Inventor after: Zhao Yongsheng

Inventor after: Fu Zhihao

Inventor after: Kang Yanming

Inventor after: Yan Panpan

Inventor after: Shi Weiwei

Inventor before: Zhu Yuyu

Inventor before: Fu Zhihao

Inventor before: Kang Yanming

Inventor before: Yan Panpan

Inventor before: Shi Weiwei

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180417

Termination date: 20200314