CN209227547U - A kind of deep foundation pit support structure - Google Patents

A kind of deep foundation pit support structure Download PDF

Info

Publication number
CN209227547U
CN209227547U CN201821805597.7U CN201821805597U CN209227547U CN 209227547 U CN209227547 U CN 209227547U CN 201821805597 U CN201821805597 U CN 201821805597U CN 209227547 U CN209227547 U CN 209227547U
Authority
CN
China
Prior art keywords
foundation pit
piling bar
earth
support structure
inner sidewall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821805597.7U
Other languages
Chinese (zh)
Inventor
祝森强
黄军
程吉强
任丽彬
毛宝鑫
虞丹凤
董峰
丁丽钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xiehe Construction Co Ltd
Original Assignee
Zhejiang Xiehe Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xiehe Construction Co Ltd filed Critical Zhejiang Xiehe Construction Co Ltd
Priority to CN201821805597.7U priority Critical patent/CN209227547U/en
Application granted granted Critical
Publication of CN209227547U publication Critical patent/CN209227547U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a kind of deep foundation pit support structures, belong to construction engineering technical field, it include the circumferential earth-retaining component for being set to foundation pit inner sidewall and it is circumferential be set to earth-retaining component and go along with sb. to guard him component far from foundation pit inner sidewall one end, be characterized in that: the component of going along with sb. to guard him includes the piling bar being circumferentially arranged and steel plate, the multilayer horizontal support piece for being set to the bottom nozzle mounts on foundation pit ground and being set to piling bar upper end along foundation pit length direction.The utility model proposes a kind of deep foundation pit support structure, guaranteeing Underground Construction and while safe foundation pit surrounding environment, facilitating the disassembly and recycling of support construction.

Description

A kind of deep foundation pit support structure
Technical field
The utility model relates to construction engineering technical fields, more particularly, to a kind of deep foundation pit support structure.
Background technique
Foundation pit is the heatable adobe sleeping platform excavated in basic engineering position by base absolute altitude and basic plane size, and base pit engineering is main It is a comprehensive very strong system engineering including foundation pit supporting system design and construction and earth excavation.Base pit engineering be by Ground excavates a underground space downwards, due to forming new excavation end face after excavating, destroys the stabilization of rock mass original structure Property, it is easy to happen the safe constructions such as landslide, collapsing in the construction process;For the stability for protecting base pit engineering, inner sidewall is cheated It is usually provided with support construction;Foundation pit support construction is the safety for protection Underground Construction and foundation pit surrounding environment, to base It cheats side wall and surrounding enviroment uses supporting and retaining system, reinforcing and safeguard measure.
When the depth of foundation pit is deeper or area is narrower, the requirement to foundation pit support construction is higher, and traditional reply is deep When foundation pit or the lesser foundation pit of basic plane size, support construction needs ready-mixed concrete, utilizes the high intensity of concrete externally Side soil layer is protected.Simultaneously because the intensity of concrete is high, the construction period is caused to extend for dismounting inconvenience and much material can not It reuses.
Utility model content
The purpose of the utility model is to provide a kind of deep foundation pit support structures, are guaranteeing Underground Construction and foundation pit periphery While Environmental security, facilitate the disassembly and recycling of support construction.
The above-mentioned purpose of utility model of the utility model has the technical scheme that
A kind of deep foundation pit support structure is set to earth-retaining with circumferential including the circumferential earth-retaining component for being set to foundation pit inner sidewall Go along with sb. to guard him component of the component far from foundation pit inner sidewall one end, the component of going along with sb. to guard him include the piling bar being circumferentially arranged and steel plate, are set to The bottom nozzle mounts on foundation pit ground and the multilayer horizontal support piece that piling bar upper end is set to along foundation pit length direction.
By using above-mentioned technical proposal, earth-retaining component carries out the soil layer of foundation pit inner sidewall after excavation of foundation pit completion It is preliminary to stop, it goes along with sb. to guard him component and foundation pit further progress is protected, to guarantee the safety of the surrounding enviroment of foundation pit in the construction process With the safety of work progress;The soil layer of foundation pit inner sidewall is protected by the piling bar and steel plate that are circumferentially arranged, passes through setting Piling bar and steel plate are fixed in the bottom nozzle mounts of bottom of foundation ditch, so that the installation of piling bar and steel plate is more stable;Due to The depth of foundation pit is deeper, and bottom nozzle mounts only play stronger fixed function to the lower end of piling bar and steel plate, to piling bar and steel plate Upper end fixed function it is weaker, by be arranged lateral support member make piling bar upper end more stable, secured.
The utility model is further arranged to: the bottom nozzle mounts include fixed bottom plate and fixed insertion bottom of foundation ditch soil The anchor stud of earth, the bottom nozzle mounts offer the slot of grafting piling bar vertically, and the lower end of the piling bar is equipped with connecting plate, institute Connecting plate is stated to be fixedly connected with fixed bottom plate.
By using above-mentioned technical proposal, bottom nozzle mounts make bottom by the soil that anchor stud is inserted into bottom of foundation ditch Fixing piece is fixed on bottom of foundation ditch, and bottom nozzle mounts open up slot vertically and one end of piling bar is inserted into bottom nozzle mounts, lead to Fixed bottom plate is crossed to be fixedly connected with connecting plate so that one end of piling bar is fixedly connected with bottom nozzle mounts, so that piling bar is fixed In bottom of foundation ditch.
The utility model is further arranged to: the horizontal support piece include with the fixed support leg contradicted of two sides piling bar and The support rod of two support legs is connected, the both ends lateral wall of the support rod is threaded with sleeve.
By using above-mentioned technical proposal, two fixed feets are fixed by support rod and are connected by support leg and the fixed conflict of piling bar It connects, support is formed by piling bar of the support rod to two sides and is contradicted so that the piling bar of two sides is more stable, the both ends of support rod are arranged Sleeve is connect with support leg so that enhancing the connective stability of support rod and support leg by sleeve.
The utility model is further arranged to: the earth-retaining component includes arc-shaped angle steel and the edge for being set to foundation pit four corners The more steel columns and earth-retaining net that foundation pit inner sidewall is circumferentially arranged, the both ends of the earth-retaining net are fixedly connected with arc-shaped angle steel, described Steel column is set to earth-retaining net away from foundation pit inner sidewall side and contradicts with earth-retaining net.
By using above-mentioned technical proposal, earth-retaining component forms preliminary protection to foundation pit inner wall, avoids going along with sb. to guard him group in installation Foundation pit inner wall soil avalanche when part, the both ends of earth-retaining net, which are fixedly connected on arc-shaped angle steel, stretches earth-retaining net, and steel column is arranged When avoiding soil slide to the reinforcing of earth-retaining net further progress, earth-retaining net stress is excessive and arc-shaped angle steel stress is loosened.
The utility model is further arranged to: the arc-shaped angle steel is equipped with clamping plate away from the side of foundation pit inner sidewall, described The two sides of clamping plate along its length offer multiple waist-shaped holes, and the arc-shaped angle steel is correspondingly provided with the screw thread being connected to waist-shaped hole Hole, the threaded hole are threaded with bolt.
By using above-mentioned technical proposal, since earth-retaining net is in netted, earth-retaining net is carried out by arc-shaped angle steel and clamping plate Fixed, for convenience of the connection of arc-shaped angle steel and clamping plate, the two sides of clamping plate open up waist-shaped hole, make bolt and screw thread by waist-shaped hole It hole being capable of rapid alignment.
The utility model is further arranged to: the size of the slot is greater than the size of piling bar, and the slot is towards foundation pit The side of side wall offers jack, and the piling bar bottom end corresponds to jack equipped with holdfast.
By using above-mentioned technical proposal, the size that the size of slot is greater than piling bar enables piling bar to move in slot Dynamic, to guarantee the stability in piling bar insertion slot, the bottom end of piling bar, which is equipped with when holdfast is inserted into piling bar in slot, to be passed through Holdfast, which is inserted into jack, makes piling bar be not susceptible to skew.
The utility model is further arranged to: the support leg is in Y-shaped, one end that the support leg is connect with support rod Equipped with external screw thread, the sleeve is threadedly coupled with external screw thread, and the thread rotary orientation at the sleeve both ends is opposite.
By using above-mentioned technical proposal, support leg makes support leg increase the contact area with piling bar in Y-shaped, simultaneously Improve the stability that support leg is connect with piling bar;It is fixedly connected by setting external screw thread with sleeve, while sleeve two is set The thread rotary orientation at end is reversely support leg when turnbarrel relatively or contrarily to be moved with support rod, thus to support leg and branch Spacing between strut is adjusted.
The utility model is further arranged to: the two sides of the piling bar offer card slot vertically, the two sides of the steel plate with Card slot clamping, the steel plate are U-shaped.
By using above-mentioned technical proposal, the two sides setting card slot of piling bar makes the two sides of steel plate be clamped to make with card slot It obtains steel plate to be fixedly connected with piling bar, the U-shaped pressure that when soil avalanche steel plate will be subject to of setting steel plate is passed to two sides It passs, avoids single or plurality of steel plates stress excessive and the stability for going along with sb. to guard him component is reduced.
The utility model is further arranged to: the fixed bottom plate is rotatablely hinged with tiltedly away from one end of foundation pit inner sidewall Support, one end that the diagonal brace deviates from fixed bottom plate are equipped with fixed feet, and the fixed feet is fixedly connected with piling bar.
By using above-mentioned technical proposal, by the way that diagonal brace is arranged, piling bar be plugged into slot and by fixed bottom plate with Connecting plate is supported fixed bottom plate with piling bar by diagonal brace after being fixedly connected, when avoiding soil avalanche piling bar and steel plate by Pressure it is excessive so that form shearing force between piling bar and bottom nozzle mounts, improve the stabilization that piling bar is connect with bottom nozzle mounts Property.
In conclusion the advantageous effects of the utility model are as follows:
1. going along with sb. to guard him component by setting avoids soil avalanche in the case where the piling bar and steel plate being circumferentially arranged are gone along with sb. to guard him, pass through bottom Fixing piece and horizontal support piece reinforce steel plate and piling bar, so that steel plate and piling bar are more stable and secured;
2. tentatively being protected before going along with sb. to guard him component installation the soil of foundation pit side-wall by setting earth-retaining component, avoid Make the soil avalanche of foundation pit side-wall due to construction intensity increase when component is gone along with sb. to guard him in installation.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the partial structure diagram of the utility model, mainly shows that the connection for going along with sb. to guard him component and earth-retaining component is closed System;
Fig. 3 is the part explosive view of the utility model, mainly shows the connection relationship of arc-shaped angle steel and clamping plate;
Fig. 4 is the part explosive view of the utility model, mainly shows the connection relationship of horizontal support piece;
Fig. 5 is the portion A enlarged drawing in Fig. 4;
Fig. 6 is the partial structure diagram of the utility model, mainly shows the connection relationship of piling bar and fixing piece.
In figure, 1, earth-retaining component;11, arc-shaped angle steel;111, threaded hole;112, bolt;12, steel column;13, earth-retaining net;14, Clamping plate;141, waist-shaped hole;15, plug division;2, component is gone along with sb. to guard him;21, piling bar;211, holdfast;212, card slot;213, the second clamping Hole;22, steel plate;221, the first blocked hole;23, bottom nozzle mounts;231, fixed bottom plate;232, anchor stud;233, slot;234, Fixation hole;235, jack;236, fixing bolt;24, connecting plate;241, square hole;25, diagonal brace;251, fixed feet;252, run through Hole;253, screw rod;26, horizontal support piece;261, support leg;2611, external screw thread;262, support rod;263, sleeve;2631, Hand.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment:
Referring to Fig.1, it is a kind of deep foundation pit support structure disclosed by the utility model, including is circumferentially set to foundation pit inner sidewall Earth-retaining component 1 and it is circumferential be set to earth-retaining component 1 and go along with sb. to guard him component 2 far from foundation pit inner sidewall one end, wherein going along with sb. to guard him the packet of component 2 The piling bar 21 being circumferentially arranged and steel plate 22 are included, the bottom nozzle mounts 23 on foundation pit ground is set to and is arranged along foundation pit length direction It is shown as two layers) with the multilayer horizontal support piece 26(figure of 21 upper end of piling bar.Foundation pit inner sidewall soil is in the piling bar being circumferentially arranged 21 and steel plate 22 go along with sb. to guard him down and avoid soil avalanche, by bottom nozzle mounts 23 and horizontal support piece 26 to steel plate 22 and piling bar 21 It is reinforced, so that steel plate 22 and piling bar 21 are more stable and secured.
Referring to Figures 1 and 2, it after the completion of excavation of foundation pit, is carried out by soil of the setting earth-retaining component 1 to foundation pit inner sidewall Preliminary protection, earth-retaining component 1 include the gear for being set to the arc-shaped angle steel 11 of foundation pit four corners and being circumferentially arranged along foundation pit inner sidewall The both ends of native net 13, earth-retaining net 13 are fixedly connected with arc-shaped angle steel 11.To avoid the foundation pit inner wall soil when component 2 is gone along with sb. to guard him in installation Avalanche and make 13 stress of earth-retaining net excessive, earth-retaining net 13 is to foundation pit internal protrusion, so as to cause the both ends due to earth-retaining net 13 The pulling force of arc-shaped angle steel 11 is increased and arc-shaped angle steel 11 is loosened, earth-retaining net 13 is equipped with more away from foundation pit inner sidewall side One end fixation of the steel column 12 contradicted with earth-retaining net 13, steel column 12 is plugged into the soil of bottom of foundation ditch.
Referring to Fig. 2 and Fig. 3, since earth-retaining net 13 is in netted, for convenience of the connection of earth-retaining net 13 and arc-shaped angle steel 11, arc Angle steel 11 is equipped with clamping plate 14 away from the side of foundation pit inner sidewall, and the two sides of clamping plate 14 along its length offer multiple waist-shaped holes 141, arc-shaped angle steel 11 is correspondingly provided with the threaded hole 111 being connected with waist-shaped hole 141, and threaded hole 111 is threaded with bolt 112.Bolt 112 is threadedly coupled after sequentially passing through waist-shaped hole 141 and earth-retaining net 13 with threaded hole 111, to press from both sides by bolt 112 Plate 14 and arc-shaped angle steel 11 are fixed to each other so that earth-retaining net 13 is fixed is clamped between arc-shaped angle steel 11 and clamping plate 14;By setting Setting waist-shaped hole 141 facilitates bolt 112 and threaded hole 111 being capable of rapid alignment.One end of arc-shaped angle steel 11 is fixedly welded with and base The plug division 15 of bottom soil fixing grafting is cheated, plug division 15 is tapered away from one end end of arc-shaped angle steel 11, facilitates grafting Portion 15 is inserted into soil.
Referring to figure 5 and figure 6, bottom nozzle mounts 23 include fixed bottom plate 231 and the fixed anchor for being inserted into bottom of foundation ditch soil Gu column 232,23 inner vertical of bottom nozzle mounts offers the slot 233 of grafting piling bar 21, and the size of slot 233 is greater than piling bar 21 sizes enable piling bar 21 to slide in slot 233.Unstable, slot 233 when to avoid piling bar 21 with 233 grafting of slot Jack 235 is offered towards the side of foundation pit side-wall, 21 bottom end of piling bar corresponds to jack 235 equipped with holdfast 211;When 21 grafting of piling bar After in slot 233, piling bar 21 is pushed to make holdfast 211 and 235 grafting of jack towards foundation pit inner sidewall one end, so that steel Connection is more stable when stake 21 is plugged into slot 233.
Referring to Fig. 4 and Fig. 5, for the stability for guaranteeing piling bar 21, the lower end of piling bar 21 is fixedly connected with connecting plate 24, to protect Card bottom nozzle mounts 23 can play the role of supporting & stablizing to piling bar 21, and connecting plate 24 is fixedly connected with fixed bottom plate 231, fixed Bottom plate 231 is equipped with fixation hole 234 vertically, and fixation hole 234 is threaded with fixing bolt 236;For convenience of fixing bolt 236 and fixation hole 234 alignments, the corresponding fixation hole 234 of connecting plate 24 offer the square hole 241 being connected with fixation hole 234, and fixing bolt 236 passes through Square hole 241 is threadedly coupled with fixation hole 234 so that piling bar 21 is fixedly connected with bottom nozzle mounts 23.Fixed bottom plate 231 deviates from One end of foundation pit side-wall is rotatablely hinged with diagonal brace 25, and one end rotation that diagonal brace 25 deviates from fixed bottom plate 231 is equipped with fixed feet 251, Fixed feet 251 is fixedly connected with piling bar 21;Enhance the bonding strength of piling bar 21 and bottom nozzle mounts 23 by diagonal brace 25.Fixed feet 251 are circumferentially with multiple through holes 252 for being axially parallel to 251 axis of fixed feet along it, are equipped with screw rod in through hole 252 253, fixed feet 251 is fixedly connected by screw rod 253 with piling bar 21.
Referring to Fig. 4 and Fig. 6, horizontal support piece 26 includes and the fixed support leg 261 contradicted of two sides piling bar 21 and connect two The support rod 262 of a support leg 261, support leg 261 are fixedly connected in Y-shaped and both ends with adjacent two piling bars 21, increase branch Support foot 261 improves the stability that support leg 261 is connect with piling bar 21 with the contact area of piling bar 21 simultaneously.The two of support rod 262 End outside screw is connected with sleeve 263, and support leg 261 is equipped with external screw thread 2611, sleeve 263 and outer spiral shell away from one end of piling bar 21 Line 2611 is threadedly coupled and the thread rotary orientation at the both ends of sleeve 263 is opposite;For convenience of the rotation of sleeve 263,263 lateral wall of sleeve It is opposite to be equipped with handle 2631.By the threaded connection of external screw thread 2611 and sleeve 263 so that support leg 261 and support rod 262 it Between connection it is more stable, simultaneously because the thread rotary orientation at 263 both ends of sleeve is suitable, rotating handles 2631 make support rod 262 It is relatively or contrarily moved with support leg 261, to be adjusted to the spacing between support leg 261 and support rod 262.
Referring to Fig. 6, for the bonding strength for guaranteeing piling bar 21 and steel plate 22, the two sides of piling bar 21 offer card slot 212 vertically And the section of card slot 212 is L-shaped, the two sides of steel plate 22 and card slot 212 are clamped.The section of steel plate 22 is U-shaped, when soil avalanche When steel plate 22 pressure being subject to can be transmitted to two sides, the pressure being subject to steel plate 22 disperses, and avoids single or muti-piece 22 stress of steel plate is excessive and the stability for going along with sb. to guard him component 2 is reduced.The disassembly of component 2 is gone along with sb. to guard him for convenience of the later period, steel plate 22 Both ends are equipped with the first blocked hole 221, and piling bar 21 offers the second blocked hole 213 away from one end of connecting plate 24, when needing to dismantle Steel plate 22 and piling bar 21 are extracted out of foundation pit with the second blocked hole 213 by the first blocked hole 221.
Specific implementation process: after excavation of foundation pit is completed, by successively striking the interconnecting piece of steel column 12 and arc-shaped angle steel 11 Enter the soil of bottom of foundation ditch, then stretches earth-retaining net 13 along foundation pit inner sidewall, and the both ends of earth-retaining net 13 are passed through into clamping plate 14 It is fixed with arc-shaped angle steel 11.After earth-retaining component 1 is installed, the soil of foundation pit side-wall is tentatively protected, then successively will Bottom nozzle mounts 23 knock in the soil of bottom of foundation ditch, then piling bar 21 is successively plugged into slot 233 and piling bar 21 is pushed to make Holdfast 211 and 235 grafting of jack avoid piling bar 21 from shifting in slot 233 inclination.
Then horizontal support piece 26 is installed, it is first that the both ends of one of support leg 261 and two neighboring piling bar 21 are fixed, Yet another support leg 261 is fixedly connected by sleeve 263 with support rod 262, then makes support rod 262 by sleeve 263 The other end be fixedly connected with support leg 261, last swing handle 2631 increases the spacing of support rod 262 and support leg 261 Greatly, so that fixed 21 side wall of piling bar contradicted of horizontal support piece 26, the upper end for piling bar 21 provides support force.
Since the size of slot 233 is greater than the size of piling bar 21, piling bar 21 is in slot under the conflict of horizontal support piece 26 It is moved in 233, so that fixation hole 234 is connected with square hole 241, pushes the piling bar not connecting with horizontal support piece 26 21, but also fixation hole 234 is connected with square hole 241, fixed bottom plate 231 and connecting plate are then made by fixing bolt 236 24 are fixedly connected.Rotation diagonal brace 25 is fixedly connected with fixed feet 251 with piling bar 21 by screw rod 253, enhances piling bar 21 and bottom The stability that portion's fixing piece 23 connects, avoid piling bar 21 and steel plate 22 are subject to when soil avalanche pressure excessive so that piling bar 21 with Shearing force is formed between bottom nozzle mounts 23.Finally 22 two sides of steel plate are corresponded to card slot 212 and are inserted downwardly into card slot 212 and are made Steel plate 22 and card slot 212 are clamped, and make the protrusion of steel plate 22 towards foundation pit inside, are passed so that decomposing power when 22 stress of steel plate It is delivered to two sides.
In the construction process, when the building of construction constantly builds rising, according to the process of construction to horizontal support piece 26 are dismantled.After the completion of construction, when needing to dismantle support construction, steel plate 22 is pulled up by the first blocked hole 221, is made Steel plate 22 is obtained to be detached from out of card slot 212;Since the bottom of piling bar 21 is fixedly connected with bottom nozzle mounts 23, pass through the second blocked hole 213 pull up piling bar 21, so that piling bar 21 and bottom nozzle mounts 23 are detached from inside foundation pit.It is completed when going along with sb. to guard him the disassembly of component 2 Afterwards, the gap between building and earth-retaining component 1 increases, and makes clamping plate 14 and arc-shaped angle steel 11 by manually unscrewing bolt 112 It separates and earth-retaining net 13 is detached from out of arc-shaped angle steel 11, after the winding of earth-retaining net 13 is taken out, by arc-shaped angle steel 11 and steel column 12 extract from foundation pit;To realize the dismounting of support construction and be recycled.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (9)

1. a kind of deep foundation pit support structure is set to the earth-retaining component (1) of foundation pit inner sidewall including circumferential direction and circumferential direction is set to gear Local soil type's part (1) goes along with sb. to guard him component (2) far from foundation pit inner sidewall one end, it is characterised in that: described go along with sb. to guard him component (2) include circumferential set The piling bar (21) and steel plate (22) set are set to the bottom nozzle mounts (23) on foundation pit ground and are set to along foundation pit length direction The multilayer horizontal support piece (26) of piling bar (21) upper end.
2. a kind of deep foundation pit support structure according to claim 1, it is characterised in that: the bottom nozzle mounts (23) include The anchor stud (232) of fixed bottom plate (231) and fixed insertion bottom of foundation ditch soil, the bottom nozzle mounts (23) offer vertically The lower end of the slot (233) of grafting piling bar (21), the piling bar (21) is equipped with connecting plate (24), the connecting plate (24) and fixation Bottom plate (231) is fixedly connected.
3. a kind of deep foundation pit support structure according to claim 1, it is characterised in that: the horizontal support piece (26) includes With two sides piling bar (21) fixed support leg (261) contradicted and the support rod (262) for connecting two support legs (261), the branch The both ends lateral wall of strut (262) is threaded with sleeve (263).
4. a kind of deep foundation pit support structure according to claim 1, it is characterised in that: the earth-retaining component (1) includes setting It is placed in the arc-shaped angle steel (11) of foundation pit four corners and more steel columns (12) being circumferentially arranged along foundation pit inner sidewall and earth-retaining net (13), The both ends of the earth-retaining net (13) are fixedly connected with arc-shaped angle steel (11), and the steel column (12) is set to earth-retaining net (13) away from base It cheats inner sidewall side and is contradicted with earth-retaining net (13).
5. a kind of deep foundation pit support structure according to claim 4, it is characterised in that: the arc-shaped angle steel (11) deviates from base The side for cheating inner sidewall is equipped with clamping plate (14), and the two sides of the clamping plate (14) along its length offer multiple waist-shaped holes (141), the arc-shaped angle steel (11) is correspondingly provided with the threaded hole (111) being connected to waist-shaped hole (141), the threaded hole (111) It is threaded with bolt (112).
6. a kind of deep foundation pit support structure according to claim 2, it is characterised in that: the size of the slot (233) is big The side of size in piling bar (21), slot (233) towards the foundation pit side-wall offers jack (235), the piling bar (21) Bottom end corresponds to jack (235) equipped with holdfast (211).
7. a kind of deep foundation pit support structure according to claim 3, it is characterised in that: the support leg (261) is in Y word Type, one end that the support leg (261) connect with support rod (262) are equipped with external screw thread (2611), the sleeve (263) and outer spiral shell Line (2611) is threadedly coupled, and the thread rotary orientation at sleeve (263) both ends is opposite.
8. a kind of deep foundation pit support structure according to claim 1, it is characterised in that: the two sides of the piling bar (21) are vertical It offers card slot (212), the two sides and card slot (212) of the steel plate (22) are clamped, and the steel plate (22) is U-shaped.
9. a kind of deep foundation pit support structure according to claim 2, it is characterised in that: the fixed bottom plate (231) is deviated from One end of foundation pit inner sidewall is rotatablely hinged with diagonal brace (25), and one end that the diagonal brace (25) deviates from fixed bottom plate (231) is equipped with solid Determine foot (251), the fixed feet (251) is fixedly connected with piling bar (21).
CN201821805597.7U 2018-11-02 2018-11-02 A kind of deep foundation pit support structure Expired - Fee Related CN209227547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821805597.7U CN209227547U (en) 2018-11-02 2018-11-02 A kind of deep foundation pit support structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821805597.7U CN209227547U (en) 2018-11-02 2018-11-02 A kind of deep foundation pit support structure

Publications (1)

Publication Number Publication Date
CN209227547U true CN209227547U (en) 2019-08-09

Family

ID=67501887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821805597.7U Expired - Fee Related CN209227547U (en) 2018-11-02 2018-11-02 A kind of deep foundation pit support structure

Country Status (1)

Country Link
CN (1) CN209227547U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110777810A (en) * 2019-11-19 2020-02-11 中国三冶集团有限公司 Foundation pit bored pile steel bearing structure
CN112195930A (en) * 2020-10-11 2021-01-08 北京市政建设集团有限责任公司 Sludge silty clay layer long slope supporting structure and construction method thereof
CN113047307A (en) * 2021-04-06 2021-06-29 新力建设集团有限公司 Large-span deep foundation pit combined supporting structure
CN113356231A (en) * 2021-06-25 2021-09-07 银广厦集团有限公司 Steel truss type foundation pit supporting structure
CN113445514A (en) * 2021-07-17 2021-09-28 浙江可久建筑工程有限公司 House building's foundation ditch retaining structure
CN114032922A (en) * 2021-12-13 2022-02-11 杭州森竹建设工程有限公司 Rigid rib wall type pile wall foundation pit supporting structure and construction method
CN114351724A (en) * 2022-01-24 2022-04-15 山西二建集团有限公司 Protective device for foundation pit excavation
CN114541410A (en) * 2022-01-27 2022-05-27 山西二建集团有限公司 A protector for foundation ditch excavation
CN115467337A (en) * 2022-08-11 2022-12-13 李涛 Civil engineering foundation pit construction reinforcing device and method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110777810A (en) * 2019-11-19 2020-02-11 中国三冶集团有限公司 Foundation pit bored pile steel bearing structure
CN112195930A (en) * 2020-10-11 2021-01-08 北京市政建设集团有限责任公司 Sludge silty clay layer long slope supporting structure and construction method thereof
CN113047307A (en) * 2021-04-06 2021-06-29 新力建设集团有限公司 Large-span deep foundation pit combined supporting structure
CN113356231A (en) * 2021-06-25 2021-09-07 银广厦集团有限公司 Steel truss type foundation pit supporting structure
CN113445514A (en) * 2021-07-17 2021-09-28 浙江可久建筑工程有限公司 House building's foundation ditch retaining structure
CN114032922A (en) * 2021-12-13 2022-02-11 杭州森竹建设工程有限公司 Rigid rib wall type pile wall foundation pit supporting structure and construction method
CN114351724A (en) * 2022-01-24 2022-04-15 山西二建集团有限公司 Protective device for foundation pit excavation
CN114541410A (en) * 2022-01-27 2022-05-27 山西二建集团有限公司 A protector for foundation ditch excavation
CN115467337A (en) * 2022-08-11 2022-12-13 李涛 Civil engineering foundation pit construction reinforcing device and method
CN115467337B (en) * 2022-08-11 2023-08-25 苏州二建建筑集团有限公司 Civil engineering foundation pit construction reinforcing device and reinforcing method

Similar Documents

Publication Publication Date Title
CN209227547U (en) A kind of deep foundation pit support structure
CN102162258B (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
KR101614129B1 (en) Assembling-type basis box for fence
CN209114476U (en) A kind of deep foundation pit fender post
CN105421468A (en) Basement support without concrete diagonal brace
CN205778903U (en) A kind of soft-rock tunnel pucking preventing and treating device
CN110409525B (en) Soft soil and unfavorable geology composite foundation reinforcing method
CN204000932U (en) Lower channel in safety in a kind of deep foundation pit construction operation
CN106065668B (en) A kind of construction techniques
KR101217233B1 (en) Green fence and construction method thereof
KR101262357B1 (en) Inclined Earth Retaining Structure Method
CN212294696U (en) Building underground works slope support reinforced structure
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
KR200492883Y1 (en) Braced wall
KR20210053497A (en) Fileless-up wall demolition method
CN208718686U (en) A kind of precast assembly steel loop borehole wall
CN215053063U (en) Foundation pit supporting structure
KR101221118B1 (en) Equipment of earth protection for building works
CN205134364U (en) Basement uprises poor section slant bottom plate formwork system that links up
CN203846517U (en) Vertical anchor bolt supporting structure
TWI579432B (en) Protection equipment and construction method of pit foundation pit
JP5856333B1 (en) Standing method for supporting fence and its supporting pillar
CN204282371U (en) A kind of pre-loaded support struts for foundation ditch
CN210530848U (en) Large-span small-clear-distance asymmetric section tunnel supporting structure in loess region
JP2011157719A (en) Earth retaining method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhu Senqiang

Inventor after: Huang Jun

Inventor after: Cheng Jiqiang

Inventor after: Ren Libin

Inventor after: Mao Baoxin

Inventor after: Yu Danfeng

Inventor after: Dong Feng

Inventor after: Ding Lijue

Inventor before: Zhu Senqiang

Inventor before: Huang Jun

Inventor before: Cheng Jiqiang

Inventor before: Ren Libin

Inventor before: Mao Baoxin

Inventor before: Yu Danfeng

Inventor before: Dong Feng

Inventor before: Ding Liyu

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190809

Termination date: 20211102