CN105421468A - Basement support without concrete diagonal brace - Google Patents

Basement support without concrete diagonal brace Download PDF

Info

Publication number
CN105421468A
CN105421468A CN201510915206.1A CN201510915206A CN105421468A CN 105421468 A CN105421468 A CN 105421468A CN 201510915206 A CN201510915206 A CN 201510915206A CN 105421468 A CN105421468 A CN 105421468A
Authority
CN
China
Prior art keywords
basement
bracing members
steel
time
waist rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510915206.1A
Other languages
Chinese (zh)
Other versions
CN105421468B (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG YANGXIN JINYUAN TEXTILE CHEMICAL CO Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510915206.1A priority Critical patent/CN105421468B/en
Priority to CN201710354673.0A priority patent/CN107012875B/en
Priority to CN201710354674.5A priority patent/CN107130608B/en
Priority to CN201710354672.6A priority patent/CN107130607B/en
Priority to CN201710354675.XA priority patent/CN107130609B/en
Publication of CN105421468A publication Critical patent/CN105421468A/en
Application granted granted Critical
Publication of CN105421468B publication Critical patent/CN105421468B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/0021Mortar

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a basement support without a concrete diagonal brace. The basement support without the concrete diagonal brace is characterized in that a first-working-condition basement support structure is as follows: a support pile is a cast-in-site bored pile, a waterproof curtain is a three-axis cement mixing pile, a first pass of steel waist beam is arranged on the upper portion in the inner side direction of the support pile, a pre-stressed anchor cable is anchored on the first pass of steel waist beam, the width of a reinforced zone of a basement passive zone is within one meter in the tangent line of the outer edge of the support pile, and the depth of the reinforced zone is 1.5-2 meters below a basement foundation; a primary steel support is arranged between the first pass of steel waist beam and a steel base plate; a second-working-condition basement support structure is as follows: a second pass of steel waist beam is arranged in the middle in the inner side direction of the support pile, a second pass of pre-stressed anchor cable is anchored on the second pass of steel waist beam, a steel base plate is arranged on an engineering pile, a secondary steel support is arranged between the steel base plate and the first pass of steel waist beam, and a secondary steel support is arranged between the steel base plate and the second pass of steel waist beam.

Description

Without the basement supporting of concrete to support
Technical field
The present invention relates to a kind of basement supporting, particularly without the basement supporting of concrete to support.
Background technology
Tradition basement support technology is that basement supporting is provided with concrete and maintains basement supporting to support and stablize, but concrete can increase basement support cost greatly to support, also causes very large impact to earthwork outward transport in addition, thus delays the construction period.If by the safe and orderly adjustment of stress in basement Bracing Process, transfer and reallocation, make basement supporting when significant economic benefit and duration benefit obviously can be obtained without when inner support.But how to avoid in basement supporting construction process without concrete to support situation under safety problem be the problem that engineering staff faces.
Summary of the invention
The present invention is to provide a kind of without the basement supporting of concrete to support, solves the problem of prior art.
For this reason, the present invention takes certain technical measures progressively to replace the inner supporting structure system playing temporary support effect, thus after ensureing provisional bracing demolition, engineering construction can continue safety and successfully carry out.The present invention is applicable to the basement that cutting depth is 3.5 ~ 5m degree of depth.
First operating mode basement supporting and protection structure adopts as follows:
Soldier pile adopts bored pile, and bored pile diameter is 600 ~ 900mm.Arrange water-stop curtain from soldier pile central point lateral direction 1.5 ~ 2m place, water-stop curtain adopts three axle cement mixing piles, and three axle cement mixing pile stake footpaths are 600mm or 500mm, and adjacent three axle cement mixing piles are engaged mutually, and occlusion distance is 200mm or 150mm.Inside soldier pile, top, direction arranges first steel waist rail, first steel waist rail top mark is high identical with soldier pile top mark height, the embedded bar of first steel waist rail and soldier pile is welded to connect, prestressed cable anchorage is at first steel waist rail, digging depth 1.5 ~ 2.5m places billet in position on engineering pile, and the engineering pile below billet has 2 ~ 4.Billet thickness is 10 ~ 12cm, billet setting position is from basement edge 13 ~ 15m, fluted in the middle of billet, the recessed poor degree of depth is 8 ~ 12mm, length and width are 10 ~ 15cm, the stabilization zone width of basement passive area is 1m scope within soldier pile outward flange tangent line, and the stabilization zone degree of depth is below basement substrate 1.5m ~ 2m.First time bracing members is set between first steel waist rail and billet.
Second operating mode basement supporting and protection structure adopts as follows:
Second steel waist rail is set in the middle part of direction inside soldier pile, second steel waist bottom elevation is the first time soil excavation degree of depth, the embedded bar of second steel waist rail and soldier pile is welded to connect, second prestressed cable anchorage is at second steel waist rail, engineering pile cuts when second time soil excavation, engineering pile top mark is high identical with basement bottom board substrate absolute altitude, above engineering pile, billet is set, second time bracing members is set between billet and first steel waist rail, second time bracing members is set between billet and second steel waist rail.
(9), local excavation is to basement periphery soil to basement substrate;
(10), second time bracing members is set
Second time bracing members arranges two roads; First arrange the bracing members of second steel waist rail, the bracing members of first steel waist rail is formerly dismantled in first time bracing members situation and is arranged, and at once method to set up arranges second time bracing members after removing first time bracing members;
(11) soil in the middle of basement, is excavated;
(12), water and smash basement bottom board and concrete side walls; Concrete side walls and position, bracing members junction arrange embedded hole;
(13), support replacement is set;
Dead slot filling macadam-aggregate mix between concrete side walls and soldier pile;
(14), bracing members and billet is removed;
(15) basement roof concrete, is built;
(16), the pre-buried and billet position underplate concrete of bracing members is closed with waterproof concrete.
According to claim 1 without the basement supporting of concrete to support, it is characterized in that steel waist rail calculates by continuous beam; During the moment of flexure design value of waist rail, the basic combined effect calculated when anchor cable pulling force gets structural analysis is as fulcrum axial-load effect value.
According to claim 1 without the basement supporting of concrete to support, it is characterized in that prestress anchorage cable technical data adopts as follows: when anchor rope grouting adopts cement paste, water/binder ratio should get 0.45 ~ 0.50; When adopting cement mortar, water/binder ratio should get 0.40 ~ 0.45, and cement-sand ratio should get 0.5 ~ 1.0, and mix sand should select middle fine sand, and mud content must not exceed 3% of sand weight; 3%; When adopting secondary pressure grouting process, secondary pressure slip casting should adopt the cement paste of water/binder ratio 0.50 ~ 0.55, secondary grouting pipe answers lashing on the body of rod, before the end grout outlet of Grouting Pipe should take to prevent slip casting, slurries enter the seal approach of Grouting Pipe, during secondary pressure slip casting, grouting pressure should not be less than 1.5MPa; When adopting anchoring section segmentation secondary grouting technique, slip casting should be carried out after the intensity of hole body grouting soil reaches 5MPa, the slurry outlet of fracture grouting pipe should be arranged along anchor rod anchored section of total length, and grouting sequence should from anchor pole end, and segmentation is carried out successively from inside to outside.
According to claim 1 without the basement supporting of concrete to support, it is characterized in that construction prestressed cable adopts as follows:
1) when the intensity of injecting cement paste reaches 75% of design strength and after being not less than 15MPa, can carry out the tensioning fixation of anchor cable;
2) method of the overall tensioning fixation of steel strand is adopted;
3) anchorage cable stretching should load gently, and loading classification should not be greater than 0.3, and the interval time of every grade of load is not less than 3min; Before anchor cable locking, should keep stable a period of time under maximum stretching force, to sandy soil stratum, stabilization time should be greater than 5min ~ 10min, and to cohesive soil stratum, stabilization time should be greater than 15min;
4) anchor cable rope timing, stretch-draw is worth (1.1 ~ 1.15) of desirable design tensioning lock definite value doubly;
Length should not be less than 50mm, when adopting thermal cutting, should not be less than 80mm.
(6), local excavation's basement periphery soil is to second steel waist rail top.
(7), first time bracing members is set.
Place billet above after the leveling of engineering pile top, bracing members is propped up by bracing members and withstands in billet groove and fix with bolt for the first time.
Because bracing members spacing is most important to basement excavation safety.Adopt simulation analysis of computer, under base area, the maximum native deep soil movement in outside 0.5m place is as reference point, and maximum native deep soil movement controls as 2mm.Bracing members arranges the degree of depth is for the first time digging depth 1.5 ~ 2.5m position.Table 1 is first time bracing members spacing and depth relationship, according to simulation analysis of computer result, first time bracing members setting space be 1.35 ~ 3.75m.
Table 1 first time bracing members spacing and depth relationship
(8) soil in the middle of basement, is excavated.
(9), local excavation is to basement periphery soil to basement substrate.
(10), second time bracing members is set
Second time bracing members arranges two roads.First arrange the bracing members of second steel waist rail, the bracing members of first steel waist rail is formerly dismantled in first time bracing members situation and is arranged, and at once method to set up arranges second time bracing members after removing first time bracing members.
It is digging depth 2 ~ 3m position that second time bracing members arranges the degree of depth.Table 2 is second time bracing members spacing and depth relationship, and according to simulation analysis of computer result, second time bracing members setting space is 1.70 ~ 3.83m.
Table 2 second time bracing members spacing and depth relationship
(11) soil in the middle of basement, is excavated.
(12), water and smash basement bottom board and concrete side walls.Concrete side walls and position, bracing members junction arrange embedded hole.In the middle part of the basement bottom board of billet position, embedded water stop rubber strip blocks infiltration path.
(13), support replacement is set.
Dead slot filling macadam-aggregate mix between concrete side walls and soldier pile.It is make the point load of bracing members be converted to the evenly distributed load acting on soldier pile that macadam-aggregate mix to be packed between concrete side walls and soldier pile object in dead slot, and for lower step, to remove bracing members ready.
Lack sand packing process between particle after reasonable macadam-aggregate mix grating both can avoid compacting and the aerial construction formed, also ensure that has enough bulky grains to form skeleton between sand powder particulate, meets requirement of strength.
Macadam-aggregate mix adopts rubble, sand grains, powder compound, and ballast grain sizes is 15 ~ 2mm, and quality volume is 30% ~ 40%; Sand grains particle diameter is 2 ~ 0.1mm, and quality volume is 40% ~ 50%; Powder particle diameter is less than 0.1mm, and quality volume is 20% ~ 30%.
(14), bracing members and billet is removed.
(15) basement roof concrete, is built.
(16), the pre-buried and billet position underplate concrete of bracing members is closed with waterproof concrete.
Construction cost of the present invention is low, and the construction period is short.
Accompanying drawing explanation
Fig. 1 is the first operating mode basement supporting schematic diagram, and Fig. 2 is the second operating mode basement supporting schematic diagram.
In each accompanying drawing: 1, soldier pile, 2, first steel waist rail, 3, prestress anchorage cable, 4, water-stop curtain, 5, basement passive area, 6, first bracing members, 7, billet, 8, engineering pile, 9, second steel waist rail, 10, second time bracing members.
Detailed description of the invention
Embodiment one
First operating mode basement supporting and protection structure adopts as follows:
Soldier pile 1 adopts bored pile, and bored pile diameter is 600 ~ 900mm.From soldier pile 1 central point lateral direction 1.5 ~ 2m place, water-stop curtain 4 is set, water-stop curtain 4 adopts three axle cement mixing piles, three axle cement mixing pile stake footpaths are 600mm or 500mm, and adjacent three axle cement mixing piles are engaged mutually, and occlusion distance is 200mm or 150mm.Inside soldier pile 1, top, direction arranges first steel waist rail 2, first steel waist rail 2 top mark is high identical with soldier pile 1 top mark height, first steel waist rail 2 is welded to connect with the embedded bar of soldier pile 1, prestress anchorage cable 3 is anchored at first steel waist rail 2, billet 7 is placed in digging depth 1.5 ~ 2.5m position on engineering pile 8, and the engineering pile 8 below billet 7 has 2 ~ 4.Billet 7 thickness is 10 ~ 12cm, billet 7 setting position is from basement edge 13 ~ 15m, fluted in the middle of billet 7, the recessed poor degree of depth is 8 ~ 12mm, length and width are 10 ~ 15cm, the stabilization zone width of basement passive area 5 is 1m scope within soldier pile 1 outward flange tangent line, and the stabilization zone degree of depth is below basement substrate 1.5m ~ 2m.First time bracing members 6 is set between first steel waist rail 2 and billet 7.
Second operating mode basement supporting and protection structure adopts as follows:
Inside soldier pile 1, second steel waist rail 9 is set in the middle part of direction, second steel waist rail 9 end absolute altitude is the first time soil excavation degree of depth, second steel waist rail 9 is welded to connect with the embedded bar of soldier pile 1, second prestress anchorage cable 3 is anchored at second steel waist rail 9, engineering pile 8 cuts when second time soil excavation, engineering pile 8 top mark is high identical with basement bottom board substrate absolute altitude, engineering pile 8 arranges billet 7 above, second time bracing members 10 is set between billet 7 and first steel waist rail 2, second time bracing members 10 is set between billet 7 and second steel waist rail 9.
Construction sequence comprises:
(1), construction works stake 8.The engineering pile 8 top construction elevation arranging billet 7 flushes with second waist rail elevation of top, and Other Engineering stake 8 top construction elevation is below absolute altitude at the bottom of basement bottom board 10cm.
(2), construction supporting stake 1.
(3), construction water-stop curtain 4.
(4), basement passive area 5 is reinforced.
Basement passive area 5 reinforces and adopts churning concrete stake.
(5), construction first steel waist rail 2 and prestress anchorage cable 3.
First steel waist rail 2 is welded with the embedded bar of soldier pile 1.
Steel waist rail is pressed continuous beam and is calculated.During the moment of flexure design value of waist rail, the basic combined effect calculated when anchor cable pulling force gets structural analysis is as fulcrum axial-load effect value.
Steel waist rail selects single channel-section steel or double flute steel or two i iron, and when selecting double flute steel or two i iron, steel wale should be welded as entirety, is welded to connect employing fillet weld, and weld bead height should not be less than 8mm.
To construct prestress anchorage cable 3 after the construction of first steel waist rail 2.
Prestress anchorage cable 3 technical data adopts as follows: when anchor rope grouting adopts cement paste, water/binder ratio should get 0.45 ~ 0.50; When adopting cement mortar, water/binder ratio should get 0.40 ~ 0.45, and cement-sand ratio should get 0.5 ~ 1.0, and mix sand should select middle fine sand, and mud content must not exceed 3% of sand weight.3%。When adopting secondary pressure grouting process, secondary pressure slip casting should adopt the cement paste of water/binder ratio 0.50 ~ 0.55, secondary grouting pipe answers lashing on the body of rod, before the end grout outlet of Grouting Pipe should take to prevent slip casting, slurries enter the seal approach of Grouting Pipe, during secondary pressure slip casting, grouting pressure should not be less than 1.5MPa; When adopting anchoring section segmentation secondary grouting technique, slip casting should be carried out after the intensity of hole body grouting soil reaches 5MPa, the slurry outlet of fracture grouting pipe should be arranged along anchor rod anchored section of total length, and grouting sequence should from anchor pole end, and segmentation is carried out successively from inside to outside.
Anchor cable construction adopts as follows:
1) when the intensity of injecting cement paste reaches 75% of design strength and after being not less than 15MPa, can carry out the tensioning fixation of anchor cable.
2) method of the overall tensioning fixation of steel strand is adopted.
3) anchorage cable stretching should load gently, and loading classification should not be greater than 0.3, and the interval time of every grade of load is not less than 3min; Before anchor cable locking, should keep stable a period of time under maximum stretching force, to sandy soil stratum, stabilization time should be greater than 5min ~ 10min, and to cohesive soil stratum, stabilization time should be greater than 15min.
4) anchor cable rope timing, stretch-draw is worth (1.1 ~ 1.15) of desirable design tensioning lock definite value doubly.
5) anchor cable locking after 48h in, anchor cable pulling force lower than design lock value 90% time, should again lock; Anchor cable locking still should consider that adjacent anchor cable stretching lock the loss of prestress caused, when anchor cable pulling force lower than design lock value 90% time, should again lock.
6) after locking, anchor cable outer end should adopt cold cut segmentation method to excise; Steel strand after ground tackle cuts outward retain length should not be less than 50mm, when adopting thermal cutting, should not be less than 80mm.
(6), local excavation's basement periphery soil is to second steel waist rail 9 top.
(7), first time bracing members is set.
Place billet 7 above after the leveling of engineering pile 8 top, bracing members is propped up by bracing members and withstands in billet 7 groove and fix with bolt for the first time.
Bracing members arranges the degree of depth is for the first time digging depth 1.5 ~ 2.5m position, and bracing members setting space is 1.35 ~ 3.75m for the first time.
(8) soil in the middle of basement, is excavated.
(9), local excavation is to basement periphery soil to basement substrate.
(10), second time bracing members 10 is set
Second time bracing members 10 arranges two roads.First arrange the bracing members of second steel waist rail 9, the bracing members of first steel waist rail 2 is formerly dismantled in first time bracing members situation and is arranged, and at once method to set up arranges second time bracing members 10 after removing first time bracing members.
It is digging depth 2 ~ 3m position that second time bracing members 10 arranges the degree of depth, and second time bracing members 10 setting space is 1.70 ~ 3.83m.
(11) soil in the middle of basement, is excavated.
(12), water and smash basement bottom board and concrete side walls.Concrete side walls and position, bracing members junction arrange embedded hole.In the middle part of the basement bottom board of billet 7 position, embedded water stop rubber strip blocks infiltration path.
(13), support replacement is set.
Between concrete side walls and soldier pile 1, dead slot clogs macadam-aggregate mix.It is make the point load of bracing members be converted to the evenly distributed load acting on soldier pile 1 that macadam-aggregate mix to be packed between concrete side walls and soldier pile 1 object in dead slot, and for lower step, to remove bracing members ready.
Macadam-aggregate mix adopts rubble, sand grains, powder compound, and ballast grain sizes is 15 ~ 2mm, and quality volume is 30% ~ 40%; Sand grains particle diameter is 2 ~ 0.1mm, and quality volume is 40% ~ 50%; Powder particle diameter is less than 0.1mm, and quality volume is 20% ~ 30%.
(14), bracing members and billet 7 is removed.
(15) basement roof concrete, is built.
(16), the pre-buried and billet 7 position underplate concrete of bracing members is closed with waterproof concrete.
From the overall process of basement excavation, maximum soil body deep soil movement is 9mm, and the soil excavation of this engineering is safe and reliable.

Claims (9)

1., without the basement supporting of concrete to support, it is characterized in that the first operating mode basement supporting and protection structure adopts as follows: soldier pile adopts bored pile, and bored pile diameter is 600 ~ 900mm, arrange water-stop curtain from soldier pile central point lateral direction 1.5 ~ 2m place, water-stop curtain adopts three axle cement mixing piles, and three axle cement mixing pile stake footpaths are 600mm or 500mm, and adjacent three axle cement mixing piles are engaged mutually, and occlusion distance is 200mm or 150mm, inside soldier pile, top, direction arranges first steel waist rail, first steel waist rail top mark is high identical with soldier pile top mark height, the embedded bar of first steel waist rail and soldier pile is welded to connect, prestressed cable anchorage is at first steel waist rail, digging depth 1.5 ~ 2.5m places billet in position on engineering pile, and the engineering pile below billet has 2 ~ 4, billet thickness is 10 ~ 12cm, billet setting position is from basement edge 13 ~ 15m, fluted in the middle of billet, the recessed poor degree of depth is 8 ~ 12mm, length and width are 10 ~ 15cm, the stabilization zone width of basement passive area is 1m scope within soldier pile outward flange tangent line, and the stabilization zone degree of depth is below basement substrate 1.5m ~ 2m, first time bracing members is set between first steel waist rail and billet, second operating mode basement supporting and protection structure adopts as follows: arrange second steel waist rail inside soldier pile in the middle part of direction, second steel waist bottom elevation is the first time soil excavation degree of depth, the embedded bar of second steel waist rail and soldier pile is welded to connect, second prestressed cable anchorage is at second steel waist rail, engineering pile cuts when second time soil excavation, engineering pile top mark is high identical with basement bottom board substrate absolute altitude, above engineering pile, billet is set, second time bracing members is set between billet and first steel waist rail, second time bracing members is set between billet and second steel waist rail.
2. according to claim 1 without the basement supporting of concrete to support, it is characterized in that construction sequence adopts as follows:
(1), construction works stake; The engineering pile top construction elevation arranging billet flushes with second waist rail elevation of top, and Other Engineering stake top construction elevation is below absolute altitude at the bottom of basement bottom board 10cm;
(2), construction supporting stake;
(3), construction water-stop curtain;
(4), basement passive area is reinforced;
Basement passive area reinforces and adopts churning concrete stake;
(5), construction first steel waist rail and prestress anchorage cable;
First steel waist rail is welded with the embedded bar of soldier pile;
Steel waist rail selects single channel-section steel or double flute steel or two i iron, and when selecting double flute steel or two i iron, steel wale should be welded as entirety, is welded to connect employing fillet weld, and weld bead height should not be less than 8mm;
To construct prestress anchorage cable after the construction of first steel waist rail;
(6), local excavation's basement periphery soil is to second steel waist rail top;
(7), first time bracing members is set;
Place billet above after the leveling of engineering pile top, bracing members is propped up by bracing members and withstands in billet groove and fix with bolt for the first time;
(8) soil in the middle of basement, is excavated;
(9), local excavation is to basement periphery soil to basement substrate;
(10), second time bracing members is set
Second time bracing members arranges two roads; First arrange the bracing members of second steel waist rail, the bracing members of first steel waist rail is formerly dismantled in first time bracing members situation and is arranged, and at once method to set up arranges second time bracing members after removing first time bracing members;
(11) soil in the middle of basement, is excavated;
(12), water and smash basement bottom board and concrete side walls; Concrete side walls and position, bracing members junction arrange embedded hole;
(13), support replacement is set;
Dead slot filling macadam-aggregate mix between concrete side walls and soldier pile;
(14), bracing members and billet is removed;
(15) basement roof concrete, is built;
(16), the pre-buried and billet position underplate concrete of bracing members is closed with waterproof concrete.
3. according to claim 1 without the basement supporting of concrete to support, it is characterized in that steel waist rail calculates by continuous beam; During the moment of flexure design value of waist rail, the basic combined effect calculated when anchor cable pulling force gets structural analysis is as fulcrum axial-load effect value.
4. according to claim 1 without the basement supporting of concrete to support, it is characterized in that prestress anchorage cable technical data adopts as follows: when anchor rope grouting adopts cement paste, water/binder ratio should get 0.45 ~ 0.50; When adopting cement mortar, water/binder ratio should get 0.40 ~ 0.45, and cement-sand ratio should get 0.5 ~ 1.0, and mix sand should select middle fine sand, and mud content must not exceed 3% of sand weight; 3%; When adopting secondary pressure grouting process, secondary pressure slip casting should adopt the cement paste of water/binder ratio 0.50 ~ 0.55, secondary grouting pipe answers lashing on the body of rod, before the end grout outlet of Grouting Pipe should take to prevent slip casting, slurries enter the seal approach of Grouting Pipe, during secondary pressure slip casting, grouting pressure should not be less than 1.5MPa; When adopting anchoring section segmentation secondary grouting technique, slip casting should be carried out after the intensity of hole body grouting soil reaches 5MPa, the slurry outlet of fracture grouting pipe should be arranged along anchor rod anchored section of total length, and grouting sequence should from anchor pole end, and segmentation is carried out successively from inside to outside.
5. according to claim 1 without the basement supporting of concrete to support, it is characterized in that construction prestressed cable adopts as follows:
1) when the intensity of injecting cement paste reaches 75% of design strength and after being not less than 15MPa, can carry out the tensioning fixation of anchor cable;
2) method of the overall tensioning fixation of steel strand is adopted;
3) anchorage cable stretching should load gently, and loading classification should not be greater than 0.3, and the interval time of every grade of load is not less than 3min; Before anchor cable locking, should keep stable a period of time under maximum stretching force, to sandy soil stratum, stabilization time should be greater than 5min ~ 10min, and to cohesive soil stratum, stabilization time should be greater than 15min;
4) anchor cable rope timing, stretch-draw is worth (1.1 ~ 1.15) of desirable design tensioning lock definite value doubly;
5) anchor cable locking after 48h in, anchor cable pulling force lower than design lock value 90% time, should again lock; Anchor cable locking still should consider that adjacent anchor cable stretching lock the loss of prestress caused, when anchor cable pulling force lower than design lock value 90% time, should again lock;
6) after locking, anchor cable outer end should adopt cold cut segmentation method to excise; Steel strand after ground tackle cuts outward retain length should not be less than 50mm, when adopting thermal cutting, should not be less than 80mm.
6. according to claim 1 without the basement supporting of concrete to support, it is characterized in that bracing members arranges the degree of depth is for the first time digging depth 1.5 ~ 2.5m position, and bracing members setting space is 1.35 ~ 3.75m for the first time.
7. according to claim 1 without the basement supporting of concrete to support, it is characterized in that second time bracing members arranges the degree of depth is digging depth 2 ~ 3m position, and second time bracing members setting space is 1.70 ~ 3.83m.
8. according to claim 1 without the basement supporting of concrete to support, it is characterized in that in the middle part of the basement bottom board of billet position, embedded water stop rubber strip blocks infiltration path.
9. according to claim 2 without the basement supporting of concrete to support, it is characterized in that macadam-aggregate mix adopts rubble, sand grains, powder compound, ballast grain sizes is 15 ~ 2mm, and quality volume is 30% ~ 40%; Sand grains particle diameter is 2 ~ 0.1mm, and quality volume is 40% ~ 50%; Powder particle diameter is less than 0.1mm, and quality volume is 20% ~ 30%.
CN201510915206.1A 2015-11-24 2015-11-24 Basement supporting without concrete to support Active CN105421468B (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201510915206.1A CN105421468B (en) 2015-11-24 2015-11-24 Basement supporting without concrete to support
CN201710354673.0A CN107012875B (en) 2015-11-24 2015-11-24 Basement supporting
CN201710354674.5A CN107130608B (en) 2015-11-24 2015-11-24 Without concrete to the basement construction method for supporting of support
CN201710354672.6A CN107130607B (en) 2015-11-24 2015-11-24 Building basement supporting
CN201710354675.XA CN107130609B (en) 2015-11-24 2015-11-24 Without the basement supporting to support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510915206.1A CN105421468B (en) 2015-11-24 2015-11-24 Basement supporting without concrete to support

Related Child Applications (4)

Application Number Title Priority Date Filing Date
CN201710354675.XA Division CN107130609B (en) 2015-11-24 2015-11-24 Without the basement supporting to support
CN201710354672.6A Division CN107130607B (en) 2015-11-24 2015-11-24 Building basement supporting
CN201710354673.0A Division CN107012875B (en) 2015-11-24 2015-11-24 Basement supporting
CN201710354674.5A Division CN107130608B (en) 2015-11-24 2015-11-24 Without concrete to the basement construction method for supporting of support

Publications (2)

Publication Number Publication Date
CN105421468A true CN105421468A (en) 2016-03-23
CN105421468B CN105421468B (en) 2017-10-10

Family

ID=55499979

Family Applications (5)

Application Number Title Priority Date Filing Date
CN201710354672.6A Active CN107130607B (en) 2015-11-24 2015-11-24 Building basement supporting
CN201710354674.5A Active CN107130608B (en) 2015-11-24 2015-11-24 Without concrete to the basement construction method for supporting of support
CN201710354673.0A Active CN107012875B (en) 2015-11-24 2015-11-24 Basement supporting
CN201710354675.XA Active CN107130609B (en) 2015-11-24 2015-11-24 Without the basement supporting to support
CN201510915206.1A Active CN105421468B (en) 2015-11-24 2015-11-24 Basement supporting without concrete to support

Family Applications Before (4)

Application Number Title Priority Date Filing Date
CN201710354672.6A Active CN107130607B (en) 2015-11-24 2015-11-24 Building basement supporting
CN201710354674.5A Active CN107130608B (en) 2015-11-24 2015-11-24 Without concrete to the basement construction method for supporting of support
CN201710354673.0A Active CN107012875B (en) 2015-11-24 2015-11-24 Basement supporting
CN201710354675.XA Active CN107130609B (en) 2015-11-24 2015-11-24 Without the basement supporting to support

Country Status (1)

Country Link
CN (5) CN107130607B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227741A (en) * 2017-07-30 2017-10-03 叶长青 Basement supporting construction
CN108385692A (en) * 2018-01-18 2018-08-10 武汉中力岩土工程有限公司 Deep basal pit shear connector support system
CN110130357A (en) * 2019-04-01 2019-08-16 南京市第九建筑安装工程有限公司 Fashioned iron combination stirring pile pit support system construction method is plugged at the top of bored concrete pile
CN111810202A (en) * 2020-07-20 2020-10-23 武汉市市政建设集团有限公司 Underground connecting channel interface construction method
CN113565102A (en) * 2021-07-07 2021-10-29 深圳市中地建设工程有限公司 Construction method for connecting concrete-saving waist beam with support pile

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503355B (en) * 2017-07-20 2023-10-13 广东省建筑工程集团有限公司 Externally-arranged rear-inserted steel type double-row pile foundation pit supporting system and construction method thereof
CN108643190A (en) * 2018-04-12 2018-10-12 中铁上海工程局集团有限公司 A kind of construction method suitable for the larger deep foundation pit supporting structure of excavation area
CN112942371B (en) * 2021-02-05 2022-09-06 中冶成都勘察研究总院有限公司 Support method for controlling deformation of subway tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010248780A (en) * 2009-04-15 2010-11-04 Nippon Steel Corp Water area structure using sea bed ground driving member
KR101181619B1 (en) * 2011-10-06 2012-09-13 쌍용건설 주식회사 Building method of high wall block for large scale underground structure using earth anchor represtressing
CN203307824U (en) * 2013-06-14 2013-11-27 李琳 Supporting structure of high-rise building foundation pit
CN204163085U (en) * 2014-08-28 2015-02-18 浙江大学城市学院 The supporting of bored pile foundation ditch
CN102839672B (en) * 2012-09-19 2015-08-12 广州机施建设集团有限公司 A kind of foundation pit supporting method preventing the displacement of soft base cement mixing pile from transfiniting
CN104947686A (en) * 2015-06-11 2015-09-30 叶长青 Basement supporting structure in soft soil area

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001317054A (en) * 2000-05-09 2001-11-16 Tokyu Constr Co Ltd Horizontal member for preventing deformation of l- shaped cage for reinforcing embankment slope and reinforced embankment method using the same
CN201671108U (en) * 2010-04-27 2010-12-15 中国科学院武汉岩土力学研究所 Riverside shoulder prestressing anchor cable sheet-pile wall
CN102330431A (en) * 2011-06-16 2012-01-25 兰州理工大学 Flexible support structure of pre-stress anchor rod for lattice type frame and construction method of flexible support structure
CN103726495B (en) * 2014-01-10 2016-01-13 上海建工五建集团有限公司 Coastal waters deep foundation pit supporting structure and construction method thereof
CN104264688B (en) * 2014-10-22 2016-06-08 广州市城市规划勘测设计研究院 Manually digging hole non-uniform pile support construction process
CN204919573U (en) * 2015-08-27 2015-12-30 山东科技大学 Combined type side slope supporting construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010248780A (en) * 2009-04-15 2010-11-04 Nippon Steel Corp Water area structure using sea bed ground driving member
KR101181619B1 (en) * 2011-10-06 2012-09-13 쌍용건설 주식회사 Building method of high wall block for large scale underground structure using earth anchor represtressing
CN102839672B (en) * 2012-09-19 2015-08-12 广州机施建设集团有限公司 A kind of foundation pit supporting method preventing the displacement of soft base cement mixing pile from transfiniting
CN203307824U (en) * 2013-06-14 2013-11-27 李琳 Supporting structure of high-rise building foundation pit
CN204163085U (en) * 2014-08-28 2015-02-18 浙江大学城市学院 The supporting of bored pile foundation ditch
CN104947686A (en) * 2015-06-11 2015-09-30 叶长青 Basement supporting structure in soft soil area

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227741A (en) * 2017-07-30 2017-10-03 叶长青 Basement supporting construction
CN108385692A (en) * 2018-01-18 2018-08-10 武汉中力岩土工程有限公司 Deep basal pit shear connector support system
CN110130357A (en) * 2019-04-01 2019-08-16 南京市第九建筑安装工程有限公司 Fashioned iron combination stirring pile pit support system construction method is plugged at the top of bored concrete pile
CN110130357B (en) * 2019-04-01 2021-05-04 南京市第九建筑安装工程有限公司 Construction method of cast-in-place pile top inserting type steel combined stirring pile foundation pit supporting system
CN111810202A (en) * 2020-07-20 2020-10-23 武汉市市政建设集团有限公司 Underground connecting channel interface construction method
CN111810202B (en) * 2020-07-20 2022-04-15 武汉市市政建设集团有限公司 Underground connecting channel interface construction method
CN113565102A (en) * 2021-07-07 2021-10-29 深圳市中地建设工程有限公司 Construction method for connecting concrete-saving waist beam with support pile
CN113565102B (en) * 2021-07-07 2022-07-29 深圳市中地建设工程有限公司 Construction method for connecting waist beam and support pile for saving concrete

Also Published As

Publication number Publication date
CN107012875B (en) 2018-11-09
CN107130608A (en) 2017-09-05
CN107130609B (en) 2018-10-12
CN107130609A (en) 2017-09-05
CN107130607A (en) 2017-09-05
CN105421468B (en) 2017-10-10
CN107012875A (en) 2017-08-04
CN107130608B (en) 2018-11-09
CN107130607B (en) 2018-11-09

Similar Documents

Publication Publication Date Title
CN105421468A (en) Basement support without concrete diagonal brace
CN106400813B (en) A kind of foundation pit support system and its construction method
CN105155558A (en) Combined retaining structure and construction method thereof
CN106930271A (en) It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground and its construction method without fertile groove
CN105525627A (en) Two-way anchorage plate retaining wall and construction method thereof
CN106968260A (en) The device and method come down for Strengthening Tunnel mountain body entrance
CN112252342B (en) Steel wire grid net protection and construction method for rock slope broken rock mass
CN103306289A (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN106968690A (en) The method for tunnel construction for soil property of caving in
CN102505704A (en) Large open caisson construction method in soft geological shaft
CN103696784A (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN103352477A (en) Vertical prestressed anchor rod gravity type composite retaining wall and design and construction method thereof
CN208748665U (en) Wide ecological slope protection structure is spelled suitable for long and narrow space
CN102926400A (en) Combined earth retaining wall structure and construction method thereof
CN104294769A (en) Built abutment structure reinforced through combination of pile supplementing and abutment cap enlarging and construction method
CN112982431A (en) Construction method of foundation pit supporting structure
CN206800370U (en) It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground without fertile groove
CN113417300A (en) Slope support system and construction method thereof
CN111706366A (en) Tunnel lining structure penetrating through large full-filling karst cave and construction method
CN208534486U (en) A kind of Large Diameter Pipeline divides storehouse to excavate artificial push pipe
CN111042161A (en) Slope collapse high slope flexible processing structure and construction method thereof
CN205977233U (en) Tunnel lock foot spouts pilework soon
CN105951874B (en) A kind of retaining wall reinforcement structure and its construction method
CN106703815B (en) Abutment construction method in excavation
CN108505547A (en) A kind of structural system and method for the antiseismic liquefaction uplifting in subway station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 236000 room 1306, unit 3, building 21, gongyuantianxia, Shunhe Road, Yingshang County, Fuyang City, Anhui Province

Patentee after: Ye Changqing

Address before: 325000 No. 4, Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, China

Patentee before: Ye Changqing

CP02 Change in the address of a patent holder

Address after: 325000 No. 4, Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, China

Patentee after: Ye Changqing

Address before: 236000 room 1306, unit 3, building 21, gongyuantianxia, Shunhe Road, Yingshang County, Fuyang City, Anhui Province

Patentee before: Ye Changqing

CP02 Change in the address of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20201221

Address after: 251800 Wendian Town, Yangxin County, Binzhou City, Shandong Province

Patentee after: SHANDONG YANGXIN JINYUAN TEXTILE CHEMICAL Co.,Ltd.

Address before: 325000 Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, 4

Patentee before: Ye Changqing

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Basement support without concrete support

Effective date of registration: 20211230

Granted publication date: 20171010

Pledgee: Industrial and Commercial Bank of China Limited Yangxin sub branch

Pledgor: Shandong Yangxin Jinyuan Textile Chemical Co.,Ltd.

Registration number: Y2021980017022

PE01 Entry into force of the registration of the contract for pledge of patent right