CN104947686A - Basement supporting structure in soft soil area - Google Patents

Basement supporting structure in soft soil area Download PDF

Info

Publication number
CN104947686A
CN104947686A CN201510351059.XA CN201510351059A CN104947686A CN 104947686 A CN104947686 A CN 104947686A CN 201510351059 A CN201510351059 A CN 201510351059A CN 104947686 A CN104947686 A CN 104947686A
Authority
CN
China
Prior art keywords
slope
concrete
diagonal brace
pile
puts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510351059.XA
Other languages
Chinese (zh)
Other versions
CN104947686B (en
Inventor
叶长青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Wantai Building Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510351059.XA priority Critical patent/CN104947686B/en
Priority to CN201610716769.2A priority patent/CN106351229B/en
Priority to CN201610716770.5A priority patent/CN106351230B/en
Publication of CN104947686A publication Critical patent/CN104947686A/en
Application granted granted Critical
Publication of CN104947686B publication Critical patent/CN104947686B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a basement supporting structure in a soft soil area. The basement supporting structure is characterized by being provided with two side slopes; concrete slabs are laid at the top of the first side slope and the top of the second side slope, a water stop curtain is arranged at the end of the outer side of the first side slope, a U-steel weir is arranged at the corner of the first side slope, a concrete tube is arranged on the outer side of the U-steel weir, a drainage pipe is arranged in the middle of the concrete tube, the gap between the drainage pipe and the concrete tube is filled with pebbles, a negative pressure well is arranged in the middle of the horizontal segment of the second side slope, a coping beam is arranged at the top of a slope protection pile, a first anchor rod is fixed to the coping beam through an anchor device, an embedded steel plate is buried in the coping beam, an upper inclined strut is welded to the embedded steel plate and fixed to angle steel after being tensioned by a jack, the angle steel is welded to a steel plate embedded in a concrete buttress, a second anchor rod is fixed to an intermediate beam through an anchor device, and a passive soil reinforcement area is arranged on the inner side of the slope protection pile. The basement supporting structure is low in construction cost and short in construction period.

Description

Soft clay area basement supporting and protection structure
Technical field
The present invention relates to a kind of supporting and protection structure, particularly soft clay area basement supporting and protection structure.
Background technology
Along with the propelled at high velocity that Chinese Urbanization's is built, there has been great development in basement engineering field.The factors such as foundation depth and scale strengthen, surrounding enviroment are tending towards complexity, the construction period is more urgent bring opportunity to the renewal of basement support technology, also bring engineering safety problem simultaneously.Particularly soft clay area, special geological conditions makes these engineering safety problems more complicated.How can ensure basement construction safety can reduce costs again be engineers and technicians will faced by problem.
Summary of the invention
The present invention is to provide a kind of soft clay area basement supporting and protection structure, solves the problem of prior art.
For this reason, basement supporting arranges twice and puts slope, first puts slope and second puts top, slope laying mixed concrete board, and concrete slab thickness is 12mm, and it is 35 ° ~ 45 ° that first puts the slope gradient, it is 1.5m ~ 2m that first puts slope height, first is put slope outboard end and is arranged water-stop curtain, and water-stop curtain adopts double deep-mixed pile, and deep-mixed pile lap length is 200mm, the deep-mixed pile degree of depth is 15m, and cement mixing content is 15%.First is put slope angle position, slope and is arranged channel-section steel gear weir, channel-section steel gear weir thickness is 12mm, channel-section steel gear height of weir degree is 1.2 ~ 1.3 times that first puts slope height, channel-section steel gear weir arranged outside concrete tube, the internal diameter of concrete tube is 400 ~ 500mm, paving geotextiles inside concrete tube, in the middle of concrete tube, gutter is set, gutter diameter is 50mm, bottom gutter, gauze wire cloth is set, geotextiles is wrapped up below gauze wire cloth, filling cobble in space between gutter and concrete tube, it is 30 ° ~ 40 ° that second puts the slope gradient, it is 1.5 ~ 2m that second puts slope height, second is put in the middle of the horizontal segment of slope and is arranged negative pressure well, second is put slope slope angle and is arranged gutter, depth of drainage ditch is 30 ~ 35mm, slope protection pile adopts bored pile, bored pile diameter is 800 ~ 1000mm, the slope protection pile degree of depth is the basement degree of depth 1.5 ~ 2.5 times, slope protection pile top arranges capping beam, first anchor pole is fixed on capping beam by ground tackle, the anchor pole gradient is 25 ° ~ 30 °, free lengthes of bolt is 6m, anchorage length is 10m, capping beam buries pre-embedded steel slab underground, pre-embedded steel slab thickness is 20mm, upper diagonal brace welds with pre-embedded steel slab, upper diagonal brace level interval is 5 ~ 7m, upper diagonal brace adopts seamless steel pipe, upper diagonal brace is by being fixed on above angle steel after jack tension, angle steel and the Plate Welding being embedded in concrete buttress.Capping beam arranges and hangs muscle, arranges middle girder inside slope protection pile, and middle girder is connected with slope protection pile by embedded bar on the one hand, connects on the other hand by hanging muscle with capping beam.Middle girder is bearing in above concrete buttress by lower diagonal brace.Second anchor pole is fixed on middle girder by ground tackle, and the anchor pole gradient is 25 ° ~ 30 °, and free lengthes of bolt is 6m, and anchorage length is 10m.Arrange inside slope protection pile by stabilization zone of breaking ground, stabilization zone of being broken ground adopts rotary churning pile, and stabilization zone width of being broken ground is 1.2 ~ 1.5m, and the degree of depth is 1.1 ~ 1.2 times of basement cutting depths.
Construction sequence comprises:
(1) construction water-stop curtain.
(2) construction slope protection pile.
(3) construction is by stabilization zone of breaking ground.
(4) earth excavation, does first and puts slope, often excavates one section of earthwork and synchronously inserts channel-section steel gear weir.
(5) install concrete tube, centre arranges gutter, filling cobble in space between gutter and concrete tube.After this concreting plate, then discharges water by gutter, dewatering.
(6) negative pressure precipitation.
Negative pressure well adopts separate filter, and separate filter is double-decker.Outer filter device is that tunneling boring is permeable, can guarantee the same with common negative pressure well the water in soil layer to be entered in dewatering well fast; Internal layer strainer is only provided with water inlet in bottom, guarantees that the water and air in soil layer can only enter internal layer strainer in bottom.During precipitation, sealing internal layer strainer well head adopts negative pressure pump to deflate formation negative pressure, make to form head difference outside interior pipe and pipe, simultaneously in internal layer strainer, installing submersible pump draws water and reduces this head difference, and the water between such ectonexine strainer and in soil layer is entered internal layer strainer from internal layer filter bottom water inlet and discharged by submersible pump constantly under differential pressure action.Gas leakage can not be caused under water because internal layer filter bottom water inlet is embedded in all the time.In pump process, common negative pressure well is usually when groundwater table drops to lower than top treatment hole, and in soil layer, air is entered in well by top treatment hole, thus makes vacuum degree in well produce decay, affects negative pressure vacuum effect.And negative pressure well internal layer filter bottom water inlet can remain under water in the technical program, thus the air completely cut off in soil layer enters internal layer strainer by bottom water inlet, and then avoids the vacuum degree decay of internal layer strainer.How groundwater level no matter outside negative pressure drop well declines, as long as internal layer filter bottom water inlet keeps water seal, can remain a larger negative pressure in internal layer strainer.
(7) earth excavation, does second and puts slope, puts concreting plate after slope, arranges gutter and carries out draining.
(8) earth excavation supports to the 3rd road and arranges position.
(9) build capping beam, and bury pre-embedded steel slab underground and hang muscle.
(10) first anchor pole is installed.
Anchor bolt construction improves conventional art by the following technical programs: the sand of the weight such as the low-alkali concrete expansion agent replacement with 14%, two Grouting Pipe are entered at present together what cast anchor, article one, Grouting Pipe is the foraminate pre-buried floral tube of band, and with friction tape, aperture is closed, another Grouting Pipe is pulled out after having carried out a normal pressure grouting.Reach after 5.0MPa intensity until slurry, then carry out fracture grouting by the pre-buried floral tube high pressure being greater than 2.5MPa, make slurries to hole wall surrounding soil diffusion extruding, the corresponding expansion of anchoring body.Use waste cement paper bag by aperture fast sealing after slip casting at once.
(11) earth excavation is to middle girder position, cuts open the surface concrete from slope protection pile, is welded by middle beam main tendon with the main muscle of slope protection pile, welds the main muscle of slope protection pile simultaneously and hangs muscle.
(12) second anchor pole is installed.
(13) the excavation local earthwork is to base plate position, arranges concrete buttress, and concrete buttress periphery reserves earthen platform as back-pressure soil, and it is 40 ° ~ 45 ° that the slope gradient is put in earthen platform.
(14) diagonal brace is installed.Upper diagonal brace upper end is welded with the pre-embedded steel slab being embedded in capping beam, and prestressed stretch-draw is carried out in upper diagonal brace lower end, is fixed on the angle steel connected with concrete buttress after prestressed stretch-draw.Prestressing force pull-up values adjusts in real time according to maximum soil body deep soil movement value.When maximum soil body deep soil movement value is greater than 10mm, prestressing force pull-up values adopts 800kN, when maximum soil body deep soil movement value is more than or equal to 10mm and is greater than 6mm, prestressing force pull-up values adopts 600kN, when maximum soil body deep soil movement value is less than or equal to 6mm, prestressing force pull-up values adopts 400kN.
(15) lower diagonal brace is installed.Upper diagonal brace upper end is welded with the pre-embedded steel slab being embedded in capping beam, and upper diagonal brace lower end is fixed on concrete buttress.
(16) surplus earth is excavated to base plate position, concreting base plate.
(17) concreting sidewall.
(18) lower diagonal brace and upper diagonal brace is removed.Lower diagonal brace and upper diagonal brace adopt the disposable dismounting of autogenous cutting.
Construction cost of the present invention is low, and the construction period is short.
Accompanying drawing explanation
Fig. 1 is soft clay area basement supporting and protection structure schematic diagram.
In each accompanying drawing: 1, water-stop curtain, 2, concrete slab, 3, concrete tube, 4, channel-section steel gear weir, 5, geotextiles, 6, gutter, 7, cobble, 8, negative pressure well, 9, anchor pole, 10, slope protection pile, 11, gutter, 12, capping beam, 13, upper diagonal brace, 14, middle girder, 15, muscle is hung, 16, lower diagonal brace, 17, pre-embedded steel slab, 18, concrete buttress, 19, angle steel, 20, by stabilization zone of breaking ground.
Detailed description of the invention
In the present embodiment, basement supporting arranges twice and puts slope, first puts slope and second puts top, slope laying mixed concrete board 2, concrete slab 2 thickness is 12mm, it is 40 ° that first puts the slope gradient, and it is 1.8m that first puts slope height, and first is put slope outboard end and arranged water-stop curtain 1, water-stop curtain 1 adopts double deep-mixed pile, deep-mixed pile lap length is 200mm, and the deep-mixed pile degree of depth is 15m, and cement mixing content is 15%.First is put slope angle position, slope and is arranged channel-section steel gear weir 4, channel-section steel gear weir 4 thickness is 12mm, channel-section steel gear weir 4 is highly for first puts 1.25 times of slope height, channel-section steel gear weir 4 arranged outside concrete tube 3, the internal diameter of concrete tube 3 is 450mm, paving geotextiles 5 inside concrete tube 3, in the middle of concrete tube 3, gutter 6 is set, gutter 6 diameter is 50mm, bottom gutter 6, gauze wire cloth is set, geotextiles 5 is wrapped up below gauze wire cloth, between gutter 6 and concrete tube 3, cobble 7 is clogged in space, it is 35 ° that second puts the slope gradient, it is 1.8m that second puts slope height, second is put in the middle of the horizontal segment of slope and is arranged negative pressure well 8, second is put slope slope angle and is arranged gutter 11, gutter 11 degree of depth is 30mm, slope protection pile 10 adopts bored pile, bored pile diameter is 900mm, slope protection pile 10 degree of depth is the basement degree of depth 2 times, slope protection pile 10 top arranges capping beam 12, first anchor pole 9 is fixed on capping beam 12 by ground tackle, anchor pole 9 gradient is 25 °, anchor pole 9 drift is 6m, anchorage length is 10m, capping beam 12 buries pre-embedded steel slab 17 underground, pre-embedded steel slab 17 thickness is 20mm, upper diagonal brace 13 welds with pre-embedded steel slab 17, upper diagonal brace 13 level interval is 5 ~ 7m, upper diagonal brace 13 adopts seamless steel pipe, upper diagonal brace 13 is by being fixed on above angle steel 19 after jack tension, angle steel 19 and the Plate Welding being embedded in concrete buttress 18.Capping beam 12 arranges and hangs muscle 15, and arrange middle girder 14 inside slope protection pile 10, middle girder 14 1 aspect is connected with slope protection pile 10 by embedded bar, connects on the other hand by hanging muscle 15 with capping beam 12.Middle girder 14 is bearing in above concrete buttress 18 by lower diagonal brace 16.Second anchor pole 9 is fixed on middle girder 14 by ground tackle, and anchor pole 9 gradient is 25 °, and anchor pole 9 drift is 6m, and anchorage length is 10m.Arrange stabilization zone 20 of being broken ground inside slope protection pile 10, stabilization zone 20 of being broken ground adopts rotary churning pile, and stabilization zone 20 width of being broken ground is 1.3m, and the degree of depth is 7m.
Construction sequence comprises:
(1) construction water-stop curtain 1.
(2) construction slope protection pile 10.
(3) construction is broken ground stabilization zone 20.
(4) earth excavation, does first and puts slope, often excavates one section of earthwork and synchronously inserts channel-section steel gear weir 4.
(5) install concrete tube 3, centre arranges gutter 6, and between gutter 6 and concrete tube 3, cobble 7 is clogged in space.After this concreting plate 2, then discharges water by gutter 6, dewatering.
(6) negative pressure precipitation.
Negative pressure well 8 adopts separate filter, and separate filter is double-decker.Outer filter device is that tunneling boring is permeable, and internal layer strainer is only provided with water inlet in bottom.During precipitation, sealing internal layer strainer well head adopts negative pressure pump to deflate formation negative pressure, make to form head difference outside interior pipe and pipe, simultaneously in internal layer strainer, installing submersible pump draws water and reduces this head difference, and the water between such ectonexine strainer and in soil layer is entered internal layer strainer from internal layer filter bottom water inlet and discharged by submersible pump constantly under differential pressure action.
(7) earth excavation, does second and puts slope, puts concreting plate 2 after slope, arranges gutter 11 and carries out draining.
(8) earth excavation supports to the 3rd road and arranges position.
(9) build capping beam 12, and bury pre-embedded steel slab 17 underground and hang muscle 15.
(10) first anchor pole 9 is installed.
The sand of the weight such as the low-alkali concrete expansion agent replacement with 14%, two Grouting Pipe are entered at present together what cast anchor, article one, Grouting Pipe is the foraminate pre-buried floral tube of band, and is closed by aperture with friction tape, and another Grouting Pipe is pulled out after having carried out a normal pressure grouting.Reach after 5.0MPa intensity until slurry, then carry out fracture grouting by the pre-buried floral tube high pressure being greater than 2.5MPa, make slurries to hole wall surrounding soil diffusion extruding, the corresponding expansion of anchoring body.Use waste cement paper bag by aperture fast sealing after slip casting at once.
(11) earth excavation is to middle girder 14 position, cuts open the surface concrete from slope protection pile 10, is welded by main for middle girder 14 muscle with the main muscle of slope protection pile 10, welds the main muscle of slope protection pile 10 simultaneously and hangs muscle 15.
(12) second anchor pole 9 is installed.
(13) the excavation local earthwork is to base plate position, arranges concrete buttress 18, and concrete buttress 18 periphery reserves earthen platform as back-pressure soil, and it is 40 ° ~ 45 ° that the slope gradient is put in earthen platform.
(14) diagonal brace 13 is installed.Upper diagonal brace 13 upper end is welded with the pre-embedded steel slab 17 being embedded in capping beam 12, and prestressed stretch-draw is carried out in upper diagonal brace 13 lower end, is fixed on the angle steel 19 connected with concrete buttress 18 after prestressed stretch-draw.Prestressing force pull-up values adjusts in real time according to maximum soil body deep soil movement value.When maximum soil body deep soil movement value is greater than 10mm, prestressing force pull-up values adopts 800kN, when maximum soil body deep soil movement value is more than or equal to 10mm and is greater than 6mm, prestressing force pull-up values adopts 600kN, when maximum soil body deep soil movement value is less than or equal to 6mm, prestressing force pull-up values adopts 400kN.
(15) lower diagonal brace 16 is installed.Upper diagonal brace 13 upper end is welded with the pre-embedded steel slab 17 being embedded in capping beam 12, and upper diagonal brace 13 lower end is fixed on concrete buttress 18.
(16) surplus earth is excavated to base plate position, concreting base plate.
(17) concreting sidewall.
(18) lower diagonal brace 16 and upper diagonal brace 13 is removed.Lower diagonal brace 16 and upper diagonal brace 13 adopt the disposable dismounting of autogenous cutting.
From the overall process of basement excavation, maximum soil body deep soil movement is 10mm, and the soil excavation of this engineering is safe and reliable.Meanwhile, the requirement that construction cost is low and the construction period is short is also met.

Claims (4)

1. a soft clay area basement supporting and protection structure, it is characterized in that basement supporting arranges twice and puts slope, first puts slope and second puts top, slope laying mixed concrete board, and concrete slab thickness is 12mm, and it is 35 ° ~ 45 ° that first puts the slope gradient, it is 1.5m ~ 2m that first puts slope height, first is put slope outboard end and is arranged water-stop curtain, and water-stop curtain adopts double deep-mixed pile, and deep-mixed pile lap length is 200mm, the deep-mixed pile degree of depth is 15m, and cement mixing content is 15%, first is put slope angle position, slope and is arranged channel-section steel gear weir, channel-section steel gear weir thickness is 12mm, channel-section steel gear height of weir degree is 1.2 ~ 1.3 times that first puts slope height, channel-section steel gear weir arranged outside concrete tube, the internal diameter of concrete tube is 400 ~ 500mm, paving geotextiles inside concrete tube, in the middle of concrete tube, gutter is set, gutter diameter is 50mm, bottom gutter, gauze wire cloth is set, geotextiles is wrapped up below gauze wire cloth, filling cobble in space between gutter and concrete tube, it is 30 ° ~ 40 ° that second puts the slope gradient, it is 1.5 ~ 2m that second puts slope height, second is put in the middle of the horizontal segment of slope and is arranged negative pressure well, second is put slope slope angle and is arranged gutter, depth of drainage ditch is 30 ~ 35mm, slope protection pile adopts bored pile, bored pile diameter is 800 ~ 1000mm, the slope protection pile degree of depth is the basement degree of depth 1.5 ~ 2.5 times, slope protection pile top arranges capping beam, first anchor pole is fixed on capping beam by ground tackle, the anchor pole gradient is 25 ° ~ 30 °, free lengthes of bolt is 6m, anchorage length is 10m, capping beam buries pre-embedded steel slab underground, pre-embedded steel slab thickness is 20mm, upper diagonal brace welds with pre-embedded steel slab, upper diagonal brace level interval is 5 ~ 7m, upper diagonal brace adopts seamless steel pipe, upper diagonal brace is by being fixed on above angle steel after jack tension, angle steel and the Plate Welding being embedded in concrete buttress, capping beam arranges and hangs muscle, arranges middle girder inside slope protection pile, and middle girder is connected with slope protection pile by embedded bar on the one hand, connects on the other hand by hanging muscle with capping beam, middle girder is bearing in above concrete buttress by lower diagonal brace, second anchor pole is fixed on middle girder by ground tackle, and the anchor pole gradient is 25 ° ~ 30 °, and free lengthes of bolt is 6m, and anchorage length is 10m, arrange inside slope protection pile by stabilization zone of breaking ground, stabilization zone of being broken ground adopts rotary churning pile, and stabilization zone width of being broken ground is 1.2 ~ 1.5m, and the degree of depth is 1.1 ~ 1.2 times of basement cutting depths.
2. soft clay area according to claim 1 basement supporting and protection structure, is characterized in that construction sequence comprises:
(1) construction water-stop curtain;
(2) construction slope protection pile;
(3) construction is by stabilization zone of breaking ground;
(4) earth excavation, does first and puts slope, often excavates one section of earthwork and synchronously inserts channel-section steel gear weir;
(5) install concrete tube, centre arranges gutter, filling cobble in space between gutter and concrete tube; After this concreting plate, then discharges water by gutter, dewatering;
(6) negative pressure precipitation;
(7) earth excavation, does second and puts slope, puts concreting plate after slope, arranges gutter and carries out draining;
(8) earth excavation supports to the 3rd road and arranges position;
(9) build capping beam, and bury pre-embedded steel slab underground and hang muscle;
(10) first anchor pole is installed;
The sand of the weight such as the low-alkali concrete expansion agent replacement with 14%, two Grouting Pipe are entered at present together what cast anchor, article one, Grouting Pipe is the foraminate pre-buried floral tube of band, and is closed by aperture with friction tape, and another Grouting Pipe is pulled out after having carried out a normal pressure grouting; Reach after 5.0MPa intensity until slurry, then carry out fracture grouting by the pre-buried floral tube high pressure being greater than 2.5MPa, make slurries to hole wall surrounding soil diffusion extruding, the corresponding expansion of anchoring body; Use waste cement paper bag by aperture fast sealing after slip casting at once;
(11) earth excavation is to middle girder position, cuts open the surface concrete from slope protection pile, is welded by middle beam main tendon with the main muscle of slope protection pile, welds the main muscle of slope protection pile simultaneously and hangs muscle;
(12) second anchor pole is installed;
(13) the excavation local earthwork is to base plate position, arranges concrete buttress, and concrete buttress periphery reserves earthen platform as back-pressure soil, and it is 40 ° ~ 45 ° that the slope gradient is put in earthen platform;
(14) diagonal brace is installed; Upper diagonal brace upper end is welded with the pre-embedded steel slab being embedded in capping beam, and prestressed stretch-draw is carried out in upper diagonal brace lower end, is fixed on the angle steel connected with concrete buttress after prestressed stretch-draw;
(15) lower diagonal brace is installed; Upper diagonal brace upper end is welded with the pre-embedded steel slab being embedded in capping beam, and upper diagonal brace lower end is fixed on concrete buttress;
(16) surplus earth is excavated to base plate position, concreting base plate;
(17) concreting sidewall;
(18) lower diagonal brace and upper diagonal brace is removed; Lower diagonal brace and upper diagonal brace adopt the disposable dismounting of autogenous cutting.
3. soft clay area according to claim 1 basement supporting and protection structure, it is characterized in that negative pressure well adopts separate filter, separate filter is double-decker; Outer filter device is that tunneling boring is permeable, and internal layer strainer is only provided with water inlet in bottom; During precipitation, sealing internal layer strainer well head adopts negative pressure pump to deflate formation negative pressure, make to form head difference outside interior pipe and pipe, simultaneously in internal layer strainer, installing submersible pump draws water and reduces this head difference, and the water between such ectonexine strainer and in soil layer is entered internal layer strainer from internal layer filter bottom water inlet and discharged by submersible pump constantly under differential pressure action.
4. soft clay area according to claim 2 basement supporting and protection structure, is characterized in that prestressing force pull-up values adjusts in real time according to maximum soil body deep soil movement value.When maximum soil body deep soil movement value is greater than 10mm, prestressing force pull-up values adopts 800kN, when maximum soil body deep soil movement value is more than or equal to 10mm and is greater than 6mm, prestressing force pull-up values adopts 600kN, when maximum soil body deep soil movement value is less than or equal to 6mm, prestressing force pull-up values adopts 400kN.
CN201510351059.XA 2015-06-11 2015-06-11 Soft clay area basement supporting construction Active CN104947686B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201510351059.XA CN104947686B (en) 2015-06-11 2015-06-11 Soft clay area basement supporting construction
CN201610716769.2A CN106351229B (en) 2015-06-11 2015-06-11 Soft clay area basement support structure
CN201610716770.5A CN106351230B (en) 2015-06-11 2015-06-11 Soft clay area basement construction method for supporting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510351059.XA CN104947686B (en) 2015-06-11 2015-06-11 Soft clay area basement supporting construction

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201610716769.2A Division CN106351229B (en) 2015-06-11 2015-06-11 Soft clay area basement support structure
CN201610716770.5A Division CN106351230B (en) 2015-06-11 2015-06-11 Soft clay area basement construction method for supporting

Publications (2)

Publication Number Publication Date
CN104947686A true CN104947686A (en) 2015-09-30
CN104947686B CN104947686B (en) 2016-11-30

Family

ID=54162704

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201610716770.5A Expired - Fee Related CN106351230B (en) 2015-06-11 2015-06-11 Soft clay area basement construction method for supporting
CN201510351059.XA Active CN104947686B (en) 2015-06-11 2015-06-11 Soft clay area basement supporting construction
CN201610716769.2A Active CN106351229B (en) 2015-06-11 2015-06-11 Soft clay area basement support structure

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610716770.5A Expired - Fee Related CN106351230B (en) 2015-06-11 2015-06-11 Soft clay area basement construction method for supporting

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610716769.2A Active CN106351229B (en) 2015-06-11 2015-06-11 Soft clay area basement support structure

Country Status (1)

Country Link
CN (3) CN106351230B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421468A (en) * 2015-11-24 2016-03-23 叶长青 Basement support without concrete diagonal brace
CN106703044A (en) * 2017-01-11 2017-05-24 北京建工土木工程有限公司 Flow-plastic-shaped flushing and filling soil weak stratum sloping combination support method
CN110644497A (en) * 2019-09-18 2020-01-03 长安大学 Soft soil foundation deep foundation pit supporting device
CN113279416A (en) * 2021-04-23 2021-08-20 游永华 Highway side slope reinforcing apparatus

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106676992B (en) * 2017-02-14 2018-11-09 湖南大学 A kind of pull-type pile Reinforced Embankment design method of anchor that punishment bank is soft soil roadbed
CN108385692A (en) * 2018-01-18 2018-08-10 武汉中力岩土工程有限公司 Deep basal pit shear connector support system
CN109356169B (en) * 2018-12-03 2024-04-19 中国建筑一局(集团)有限公司 Foundation pit row pile supporting system and construction method thereof
CN110080248A (en) * 2019-06-03 2019-08-02 河南城建学院 Nearly depth of water foundation pit supporting construction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000160559A (en) * 1998-11-24 2000-06-13 Shimizu Corp Landslide protection wall and construction method therefor
CN102561362A (en) * 2011-12-31 2012-07-11 青建集团股份公司 Construction method for foundation pit supporting by dynamic compaction replacement of muddy soil
CN104131566A (en) * 2014-05-27 2014-11-05 中国建筑第四工程局有限公司 Method for constructing basement foundation pit without horizontal braces
CN203924073U (en) * 2014-05-30 2014-11-05 深圳市君鹏建筑工程有限公司 The foundation pit supporting construction of the vertical anchor cable rotary churning pile water stopping of a kind of taper pile

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100997727B1 (en) * 2008-04-11 2010-12-01 최승희 Construction structure of breast wall in groundcutted area and construction method thereof
JP5541788B2 (en) * 2010-05-14 2014-07-09 ジェコス株式会社 Yamadome structure
CN202323957U (en) * 2011-11-17 2012-07-11 中国水电顾问集团华东勘测设计研究院 Stiff composite soil nail supporting structure for soft soil area
CN103074898B (en) * 2013-01-18 2015-09-23 江苏鸿基科技有限公司 Multi-row pile foundation pit support structure and construction method thereof
CN203498841U (en) * 2013-09-30 2014-03-26 中国建筑股份有限公司 Inclined pile vertical anchor rod supporting structure used for foundation pit supporting
CN104196036B (en) * 2014-09-01 2016-04-13 中建一局集团第三建筑有限公司 Based on foundation pit supporting construction and the supporting method of old outer wall of basement structure
CN104264688B (en) * 2014-10-22 2016-06-08 广州市城市规划勘测设计研究院 Manually digging hole non-uniform pile support construction process

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000160559A (en) * 1998-11-24 2000-06-13 Shimizu Corp Landslide protection wall and construction method therefor
CN102561362A (en) * 2011-12-31 2012-07-11 青建集团股份公司 Construction method for foundation pit supporting by dynamic compaction replacement of muddy soil
CN104131566A (en) * 2014-05-27 2014-11-05 中国建筑第四工程局有限公司 Method for constructing basement foundation pit without horizontal braces
CN203924073U (en) * 2014-05-30 2014-11-05 深圳市君鹏建筑工程有限公司 The foundation pit supporting construction of the vertical anchor cable rotary churning pile water stopping of a kind of taper pile

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421468A (en) * 2015-11-24 2016-03-23 叶长青 Basement support without concrete diagonal brace
CN107012875A (en) * 2015-11-24 2017-08-04 叶长青 Basement supporting
CN107130609A (en) * 2015-11-24 2017-09-05 叶长青 Without the basement supporting to support
CN107130607A (en) * 2015-11-24 2017-09-05 叶长青 Building basement supporting
CN107130608A (en) * 2015-11-24 2017-09-05 叶长青 Without basement construction method for supporting of the concrete to support
CN107130608B (en) * 2015-11-24 2018-11-09 叶长青 Without concrete to the basement construction method for supporting of support
CN106703044A (en) * 2017-01-11 2017-05-24 北京建工土木工程有限公司 Flow-plastic-shaped flushing and filling soil weak stratum sloping combination support method
CN110644497A (en) * 2019-09-18 2020-01-03 长安大学 Soft soil foundation deep foundation pit supporting device
CN110644497B (en) * 2019-09-18 2021-05-04 长安大学 Soft soil foundation deep foundation pit supporting device
CN113279416A (en) * 2021-04-23 2021-08-20 游永华 Highway side slope reinforcing apparatus

Also Published As

Publication number Publication date
CN106351230B (en) 2018-08-07
CN106351229B (en) 2018-06-26
CN106351229A (en) 2017-01-25
CN106351230A (en) 2017-01-25
CN104947686B (en) 2016-11-30

Similar Documents

Publication Publication Date Title
CN104947686B (en) Soft clay area basement supporting construction
CN105715296B (en) Sand blowing, backfilling and grouting construction method for tunnel to penetrate through coal mine goaf
CN111733828A (en) Large-section deep foundation pit fender pile and prestressed anchor cable supporting construction technology
CN207512745U (en) A kind of caisson device and its foundation pit structure
CN108678000A (en) A kind of U-shaped retaining structure of roadbed Xia Chuan highways and its construction method
CN110469332B (en) Advanced support consolidation method for tunnel penetrating through debris flow accumulation body
CN109778869A (en) Foundation ditch construction method
CN106869151A (en) A kind of bridge construction method of deep foundation ditch
CN113174958A (en) Construction method for foundation pit of adjacent road under poor ground condition
CN110042842A (en) A kind of open cut construction method of deep foundation ditch for wearing river
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN110397050A (en) A kind of light-duty draining barricade of novel beam anchor formula and its construction method
CN109914445A (en) A kind of level of ground water alternately changes the construction method of location expensive soil cutting
CN109989407B (en) Roadbed pile tube curtain supporting structure behind newly-added two-line platform of railway
CN211144503U (en) High steep topography bridge tunnel meets section open cut tunnel and connects long structure
CN103572764A (en) Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN110762286B (en) Drainage pipe network artificial pipe jacking construction process
CN110821512B (en) Loess tunnel entrance opening section pre-reinforcing and excavating construction method passing through landslide body
CN102995647A (en) Underground water control method used for grouting and seepage insulation of pile hole
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN108316237B (en) Revetment retaining wall
CN212153420U (en) Flexible protection system for treating side slope seepage
CN113266362B (en) Top pipe cover excavation construction method for penetrating through existing dense anchor cable area
CN112523272B (en) Anti-floating blind ditch for strongly weathered rock stratum and construction method thereof
CN204898681U (en) Structure is strutted to soft soil area basement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Ye Changqing

Inventor after: Wu Kunfang

Inventor before: Ye Changqing

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20201105

Address after: Room c3009, third floor, new Bund Fuxing City, No.32 Binhai Avenue, Binhai street, Longhua District, Haikou City, Hainan Province 570105

Patentee after: HAINAN WANTAI BUILDING ENGINEERING Co.,Ltd.

Address before: 325000 No. 4, Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, China

Patentee before: Ye Changqing

TR01 Transfer of patent right