CN109736437A - A kind of green house of vegetables longitudinal keel installation to joint kit - Google Patents
A kind of green house of vegetables longitudinal keel installation to joint kit Download PDFInfo
- Publication number
- CN109736437A CN109736437A CN201910005900.8A CN201910005900A CN109736437A CN 109736437 A CN109736437 A CN 109736437A CN 201910005900 A CN201910005900 A CN 201910005900A CN 109736437 A CN109736437 A CN 109736437A
- Authority
- CN
- China
- Prior art keywords
- sleeve
- vegetables
- green house
- clamping block
- fastening bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 235000013311 vegetables Nutrition 0.000 title claims abstract description 31
- 238000009434 installation Methods 0.000 title claims abstract description 17
- 238000010276 construction Methods 0.000 claims description 4
- 239000000463 material Substances 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 abstract description 29
- 239000010959 steel Substances 0.000 abstract description 29
- 238000000034 method Methods 0.000 description 7
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 3
- 235000017491 Bambusa tulda Nutrition 0.000 description 3
- 241001330002 Bambuseae Species 0.000 description 3
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 3
- 239000011425 bamboo Substances 0.000 description 3
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910002092 carbon dioxide Inorganic materials 0.000 description 1
- 239000001569 carbon dioxide Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/25—Greenhouse technology, e.g. cooling systems therefor
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The present invention relates to green house of vegetables technical fields, and disclose a kind of green house of vegetables longitudinal keel installation to joint kit, including sleeve, the left and right sides of sleeve is along annular integrally formed with baffle, there are two the first fastening bolts for horizontal thread connection at left side and the position of close baffle at the top of sleeve, two the first fastening bolts extend perpendicularly to the inner cavity of sleeve, the top of the sleeve lining and left and right sides for being located at two the first fastening bolts is vertically fixedly connected with the first loop bar.The green house of vegetables longitudinal keel installation to joint kit, it is designed by sleeve, the first fastening bolt, the second fastening bolt, the first clamping block, the second clamping block and first loop bar etc., the design scheme structure is simple, it is easy to use, before practicability, effectively the steel pipe of green house of vegetables can be attached, can both guarantee to be attached different size of steel pipe, it is also ensured that the stability of steel pipe after connection.
Description
Technical field
The present invention relates to green house of vegetables technical field, specially a kind of green house of vegetables longitudinal keel installation to female connector
Part.
Background technique
Green house of vegetables is a kind of frame structure of film with outstanding thermal insulation property, it occurs that people are had
Vegetables in improper season, general green house of vegetables are covered with one or more layers insulating plastic pipe using bamboo structure or the skeleton of steel construction above
Film, material is thus formed a greenhouse space, outer membrane prevents the loss of carbon dioxide caused by internal vegetable growth well,
Make that there is good heat insulation effect in canopy, green house of vegetables structure is identical as simple bamboo frame greenhouse, and interval steel pipe or bamboo pole do and encircle
Bar has saving steel, reduces cost, the advantages that operating conveniently, there is certain application area.
Existing green house of vegetables when building, require using to steel pipe carry out it is longitudinally connected, to reach to entire vegetables
The length of greenhouse controls, and when the green house of vegetables length that people build is too long, and the length of steel pipe that people possess is inadequate, at this time
With regard to needing to use relevant connectivity kit, and existing connectivity kit is mostly the aperture limited, can not accurately be fitted to not
With the steel pipe of size, it has not been convenient to people carry out using, while existing connectivity kit long-time connect after it is possible that pine
De- situation causes entire green house of vegetables to collapse.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of green house of vegetables longitudinal keel installations to joint kit, has
The advantages of can connect different size of steel pipe and being connected firmly solves the problems, such as that original connectivity kit is inconvenient for use.
(2) technical solution
To realize the above-mentioned purpose that can connect different size steel pipe, the invention provides the following technical scheme: a kind of green house of vegetables
Longitudinal keel installation to joint kit, including sleeve, the left and right sides of sleeve is along annular integrally formed with baffle, sleeve top
There are two the first fastening bolts, two the first fastening bolts to hang down for horizontal thread connection at the left side in portion and the position of close baffle
Directly extend to the inner cavity of sleeve, the top of the sleeve lining and left and right sides for being located at two the first fastening bolts is vertically fixed connects
It is connected to the first loop bar, the top of sleeve lining is laterally fixedly connected with the first clamping block, sleeve bottom by two the first loop bars
Left side and there are two the second fastening bolt, two the second fastening bolts are vertical for horizontal thread connection at the position of baffle
Extend to the inner cavity of sleeve, the bottom of the sleeve lining and left and right sides for being located at two the second fastening bolts is vertically fixedly connected
There is the second loop bar, the bottom of sleeve lining is laterally fixedly connected with the second clamping block by two the second loop bars.
Preferably, the left side at the top of the first clamping block is laterally fixedly connected with the first extension block, the second clamping block bottom
Left side is laterally fixedly connected with the second extension block, is a kind of smooth at the top of the bottom of the first extension block and the second extension block
Mirror surface construction.
Preferably, the overall structure on the right side of sleeve is identical as the overall structure on the left of sleeve.
Preferably, it is opened up at the left and right sides at the top of the first clamping block and position corresponding with two the first fastening bolts
There are two the first groove, the recess radian of first groove is adapted with the raised radian of the first fastening bolt bottom.
Preferably, it is opened up at the left and right sides of the second clamping block bottom and position corresponding with two the second fastening bolts
There are two the second groove, the recess radian of second groove is adapted with the raised radian at the top of the second fastening bolt.
Preferably, the side elevation view of sleeve is a kind of hex socket, which has certain thickness, which is one kind
" the pre- hard material of P ".
(3) beneficial effect
Compared with prior art, the present invention provides a kind of green house of vegetables longitudinal keel installations to joint kit, has following
The utility model has the advantages that
The green house of vegetables longitudinal keel installation to joint kit, pass through sleeve, the first fastening bolt, the second fastening bolt,
The design such as one clamping block, the second clamping block and first loop bar, the design scheme structure is simple, easy to use, can be with before practicability
Effectively the steel pipe of green house of vegetables is attached, can both guarantee to be attached different size of steel pipe, it is also ensured that
The stability of steel pipe after connection is not in the case where steel pipe is detached from, greatly embodies the practicability and diversity of the device,
The problem of original connectivity kit of the design scheme effective solution cannot effectively be attached steel pipe of different sizes,
The design for passing through the first extension block and the second extension block simultaneously, can be more convenient people and inject steel pipe in the sleeve, facilitate people
Use.
Detailed description of the invention
Fig. 1 is sleeve positive structure diagram of the present invention;
Fig. 2 is the schematic cross-sectional view of sleeve face view of the present invention;
Fig. 3 is sleeve side structure schematic view of the present invention.
In figure: 1, sleeve;2, the first fastening bolt;3, baffle;4, the second fastening bolt;5, the first extension block;6, second
Extension block;7, the first clamping block;8, the second clamping block;9, the first loop bar;10, the first groove;11, the second groove;12, second set
Bar.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-3, a kind of green house of vegetables longitudinal keel installation to joint kit, including sleeve 1, a left side for sleeve 1
Right two sides are along annular integrally formed with baffle 3, the left side at 1 top of sleeve and the horizontal thread connection at the position of baffle 3
There are two the first fastening bolt 2, two the first fastening bolts 2 extend perpendicularly to the inner cavity of sleeve 1, the top of 1 inner wall of sleeve
And the left and right sides for being located at two the first fastening bolts 2 is vertically fixedly connected with the first loop bar 9, the top of 1 inner wall of sleeve is logical
It crosses two the first loop bars 9 and is laterally fixedly connected with the first clamping block 7, the left side of 1 bottom of sleeve and the cross at the position of baffle 3
To being threadedly coupled there are two the second fastening bolt 4, two the second fastening bolts 4 extend perpendicularly to the inner cavity of sleeve 1, sleeve 1
The bottom of the inner wall and left and right sides for being located at two the second fastening bolts 4 is vertically fixedly connected with the second loop bar 12, in sleeve 1
The bottom of wall is laterally fixedly connected with the second clamping block 8 by two the second loop bars 12.
The left side at 7 top of the first clamping block is laterally fixedly connected with the first extension block 5, the left side of 8 bottom of the second clamping block
Laterally it is fixedly connected with the second extension block 6, the top of the bottom of the first extension block 5 and the second extension block 6 is a kind of smooth
Mirror surface construction, the appearance of the design can be more convenient staff and inject steel pipe in the sleeve 1, while can guarantee to consolidate
Property.
The overall structure on 1 right side of sleeve is identical as the overall structure in 1 left side of sleeve, and the appearance of the design can be effective
Two steel pipes are separately inserted to the left and right sides of the sleeve 1.
Two are offered at the left and right sides and position corresponding with two the first fastening bolts 2 at 7 top of the first clamping block
The recess radian of a first groove 10, first groove 10 is adapted with the raised radian of 2 bottom of the first fastening bolt, the design
Appearance can more effectively make the first fastening bolt 2 squeeze the first clamping block 7.
Two are offered at the left and right sides of second clamping block, 8 bottom and position corresponding with two the second fastening bolts 4
The recess radian of a second groove 11, second groove 11 is adapted with the raised radian at 4 top of the second fastening bolt, the design
Appearance can more effectively make the second fastening bolt 4 squeeze the second clamping block 8.
The side elevation view of sleeve 1 is a kind of hex socket, which has certain thickness, which is one kind " P20
Pre- hard material ", the appearance of the design can make the sleeve 1 is whole to have better robustness, prolong its service life.
Working principle: it in use, then the steel pipe transverse of hexagon to be injected to the left and right sides of the casing 1 first, injects
When, due to having the first extension block 5 and the second extension block 6 to the guiding and limit of hexagon steel pipe, it can more convenient people insert
Enter steel pipe, after insertion, four second fastening spiral shells of people successively four first fastening bolts 2 at the top of casing 1 and 1 bottom of casing
Bolt 4 squeezes the first fastening bolt 2 to the first groove 10, and the second fastening bolt 4 squeezes the second groove 11, squeezes
When pressure, it can effective that the first clamping block 7 and the second clamping block 8 is pushed to carry out extruding fastening to hexagon steel pipe.
In conclusion the green house of vegetables longitudinal keel installation to joint kit, by sleeve 1, the first fastening bolt 2,
The design such as the second fastening bolt 4, the first clamping block 7, the second clamping block 8 and first loop bar 9, the design scheme structure is simple, makes
With conveniently, before practicability, effectively the steel pipe of green house of vegetables can be attached, can both have been guaranteed to different size of steel pipe
It is attached, it is also ensured that the stability of steel pipe after connection is not in the case where steel pipe is detached from, greatly embodies the dress
The practicability and diversity set, the original connectivity kit of the design scheme effective solution cannot effectively to of different sizes
The problem of steel pipe is attached, while passing through the design of the first extension block 5 and the second extension block 6, people can be more convenient by steel
Pipe injects in the sleeve 1, is convenient for people to use.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of green house of vegetables longitudinal keel installation to joint kit, including sleeve (1), it is characterised in that: the sleeve
(1), the left and right sides of the sleeve (1) is along annular integrally formed with baffle (3), the left side at the top of the sleeve (1) and leans on
There are two the first fastening bolt (2), two the first fastening bolts (2) are vertical for horizontal thread connection at the position of nearly baffle (3)
Extend to the inner cavity of the sleeve (1), the top of sleeve (1) inner wall and the left and right for being located at two the first fastening bolts (2)
Two sides are vertically fixedly connected with the first loop bar (9), and the top of sleeve (1) inner wall passes through two first loop bars (9)
It is laterally fixedly connected with the first clamping block (7), the left side of sleeve (1) bottom and the transverse direction spiral shell at the position of baffle (3)
There are two the second fastening bolt (4), two second fastening bolts (4) extend perpendicularly to the sleeve (1) for line connection
Inner cavity, the bottom of sleeve (1) inner wall and the left and right sides for being located at two the second fastening bolts (4) are vertically fixedly connected with
The bottom of second loop bar (12), sleeve (1) inner wall is laterally fixedly connected with second by two second loop bars (12)
Clamping block (8).
2. a kind of green house of vegetables longitudinal keel installation according to claim 1 to joint kit, it is characterised in that: it is described
Left side at the top of first clamping block (7) is laterally fixedly connected with the first extension block (5), a left side for the second clamping block (8) bottom
Side is laterally fixedly connected with the second extension block (6), and the bottom of first extension block (5) and the top of the second extension block (6) are equal
For a kind of smooth mirror surface construction.
3. a kind of green house of vegetables longitudinal keel installation according to claim 1 to joint kit, it is characterised in that: it is described
Overall structure on the right side of sleeve (1) is identical as the overall structure on the left of the sleeve (1).
4. a kind of green house of vegetables longitudinal keel installation according to claim 1 to joint kit, it is characterised in that: it is described
Open up that there are two the at the left and right sides and position corresponding with two the first fastening bolt (2) at the top of first clamping block (7)
One groove (10), the recess radian of first groove (10) are adapted with the raised radian of the first fastening bolt (2) bottom.
5. a kind of green house of vegetables longitudinal keel installation according to claim 1 to joint kit, it is characterised in that: it is described
Open up that there are two the at the left and right sides of the second clamping block (8) bottom and position corresponding with two the second fastening bolt (4)
Two grooves (11), the recess radian of second groove (11) are adapted with the raised radian at the top of second fastening bolt (4).
6. a kind of green house of vegetables longitudinal keel installation according to claim 1 to joint kit, it is characterised in that: it is described
The side elevation view of sleeve (1) is a kind of hex socket, which has certain thickness, which is that " P20 is pre- for one kind
Hard material ".
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910005900.8A CN109736437A (en) | 2019-01-03 | 2019-01-03 | A kind of green house of vegetables longitudinal keel installation to joint kit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910005900.8A CN109736437A (en) | 2019-01-03 | 2019-01-03 | A kind of green house of vegetables longitudinal keel installation to joint kit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109736437A true CN109736437A (en) | 2019-05-10 |
Family
ID=66363375
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910005900.8A Pending CN109736437A (en) | 2019-01-03 | 2019-01-03 | A kind of green house of vegetables longitudinal keel installation to joint kit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109736437A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113668876A (en) * | 2021-07-16 | 2021-11-19 | 齐珊珊 | Steel construction with pre-installation butt-joint structural |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10252720A (en) * | 1997-03-17 | 1998-09-22 | Showa Alum Corp | Connecting method for members together |
JP2000295926A (en) * | 1999-04-13 | 2000-10-24 | Sadao Motooka | Pipe fixing fitment of plastic greenhouse end part |
CN103790235A (en) * | 2012-10-30 | 2014-05-14 | 杨华龙 | Integrated house main frame structure assembly |
CN108360546A (en) * | 2017-03-14 | 2018-08-03 | 黄河科技学院 | A kind of architectural engineering pile foundation fixing device |
CN207714518U (en) * | 2018-01-13 | 2018-08-10 | 王宗瑜 | A kind of architectural engineering sleeve couple |
CN108442538A (en) * | 2018-03-28 | 2018-08-24 | 白杰 | A kind of pipe node transformational structure |
CN208128993U (en) * | 2018-04-03 | 2018-11-23 | 厦门市黑土农业科技有限公司 | A kind of attachment device for greenhouse arch tube and crossbeam |
CN209556129U (en) * | 2019-01-03 | 2019-10-29 | 上海建森农业温室工程有限公司 | A kind of green house of vegetables longitudinal keel installation to joint kit |
-
2019
- 2019-01-03 CN CN201910005900.8A patent/CN109736437A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10252720A (en) * | 1997-03-17 | 1998-09-22 | Showa Alum Corp | Connecting method for members together |
JP2000295926A (en) * | 1999-04-13 | 2000-10-24 | Sadao Motooka | Pipe fixing fitment of plastic greenhouse end part |
CN103790235A (en) * | 2012-10-30 | 2014-05-14 | 杨华龙 | Integrated house main frame structure assembly |
CN108360546A (en) * | 2017-03-14 | 2018-08-03 | 黄河科技学院 | A kind of architectural engineering pile foundation fixing device |
CN207714518U (en) * | 2018-01-13 | 2018-08-10 | 王宗瑜 | A kind of architectural engineering sleeve couple |
CN108442538A (en) * | 2018-03-28 | 2018-08-24 | 白杰 | A kind of pipe node transformational structure |
CN208128993U (en) * | 2018-04-03 | 2018-11-23 | 厦门市黑土农业科技有限公司 | A kind of attachment device for greenhouse arch tube and crossbeam |
CN209556129U (en) * | 2019-01-03 | 2019-10-29 | 上海建森农业温室工程有限公司 | A kind of green house of vegetables longitudinal keel installation to joint kit |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113668876A (en) * | 2021-07-16 | 2021-11-19 | 齐珊珊 | Steel construction with pre-installation butt-joint structural |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209556129U (en) | A kind of green house of vegetables longitudinal keel installation to joint kit | |
CN109736437A (en) | A kind of green house of vegetables longitudinal keel installation to joint kit | |
CN210737842U (en) | Novel building energy-saving wall | |
CN205101336U (en) | Embedded tubular product connecting piece | |
CN205399974U (en) | Can pull open formula baseboard | |
CN208504286U (en) | A kind of lamp connecting structure | |
CN207761132U (en) | A kind of Steel Structure being used to support connection curtain wall | |
CN204995049U (en) | Double track way mosquito net frame | |
CN204140572U (en) | For the three-dimensional joint that agricultural greenhouse booth is built | |
CN210550587U (en) | Integrative bracket of heat preservation nail | |
CN205046707U (en) | Section bar of adjustable width of factory building wall body disjunction gate body and function | |
CN206529930U (en) | A kind of heat-insulation layer sandwich wall connector | |
CN202081316U (en) | Wardrobe rack of multilayer clothes dryer | |
CN206157863U (en) | Novel drain pipe and drainage system who constitutes thereof | |
CN207568007U (en) | A kind of curtain wall installing structure of stone material | |
CN206958470U (en) | Multidirectional multiple-pass joint | |
CN206310132U (en) | A kind of composite pipe junction device of fast and easy docking | |
CN204703368U (en) | Sandwich type insulation blocks | |
CN215762637U (en) | Plastic buckle for connecting metal pipe | |
CN209818013U (en) | High-temperature high-pressure gas injection wellhead device convenient for depth adjustment | |
CN204091485U (en) | Extension support for mosquito net | |
CN208858305U (en) | One kind is for oil well construction China and foreign countries' variable buckle connector | |
CN208480371U (en) | A kind of metal framework green house of vegetables facilitating installation | |
CN204456941U (en) | A kind of New-type heat insulating walling | |
CN203230134U (en) | Right-angle piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190510 |
|
WD01 | Invention patent application deemed withdrawn after publication |