CN207582806U - A kind of fire-proof shock-proof cylinder system constructing structure - Google Patents

A kind of fire-proof shock-proof cylinder system constructing structure Download PDF

Info

Publication number
CN207582806U
CN207582806U CN201721563196.0U CN201721563196U CN207582806U CN 207582806 U CN207582806 U CN 207582806U CN 201721563196 U CN201721563196 U CN 201721563196U CN 207582806 U CN207582806 U CN 207582806U
Authority
CN
China
Prior art keywords
steel
column
shaped steel
steel column
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721563196.0U
Other languages
Chinese (zh)
Inventor
王丽梅
郭建东
付国刚
王少杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China Construction Sixth Engineering Bureau Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China Construction Sixth Engineering Bureau Civil Engineering Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201721563196.0U priority Critical patent/CN207582806U/en
Application granted granted Critical
Publication of CN207582806U publication Critical patent/CN207582806U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型公开了一种防火抗震柱体系施工结构,包括按照设定位置沿横向和纵向分别预埋在承台基础上的多组地脚螺栓,在每一个地脚螺栓上螺纹连接有一个调整螺母,在每一组地脚螺栓上均安装有位于最下层的型钢钢柱,在每一根型钢钢柱的柱顶上上、下连接设置有多层上层型钢钢柱,上下相邻的两根型钢钢柱中的上一层型钢钢柱采用螺栓连接固定在下一层型钢钢柱柱顶上,在每一根型钢钢柱的柱头上采用螺栓连接有柱头定型钢模,在每一根柱头定型钢模的四壁上均沿水平方向安装有钢梁安装接头,在同一层左右相邻的两个钢梁安装接头之间依次安装有钢主梁或者钢次梁。本结构大大提高了结构的承载力、刚度、耐火性、抗震性能等。

The utility model discloses a construction structure of a fire-proof and anti-seismic column system, which comprises a plurality of groups of anchor bolts which are respectively pre-buried on the foundation of the platform according to the set position along the horizontal and vertical directions, and each anchor bolt is threaded to be connected with an adjustment bolt. Nuts, each group of anchor bolts are installed with the bottom steel column, and the top and bottom of each steel column are connected with multi-layer upper steel columns, and the upper and lower adjacent two The upper steel column in the root steel column is fixed on the top of the next layer of steel column by bolts, and the column head of each steel column is bolted with a steel mold for the column head. Steel girder installation joints are installed along the horizontal direction on the four walls of the stereotyped steel mold, and steel main beams or steel secondary beams are successively installed between the left and right adjacent steel beam installation joints on the same floor. The structure greatly improves the bearing capacity, rigidity, fire resistance and earthquake resistance of the structure.

Description

一种防火抗震柱体系施工结构Construction structure of a fire-proof and anti-seismic column system

技术领域technical field

本实用新型涉及一种柱头定型结构,尤其涉及一种防火抗震柱体系施工结构。The utility model relates to a shaped structure of a column head, in particular to a construction structure of a fireproof and anti-seismic column system.

背景技术Background technique

随着我国经济的发展和科技的进步,工业与民用建筑层高越来越大、层数越来越多,柱网也越来越密,为了满足承载力要求,结构底部几层柱的截面尺寸势必会加大,这不仅会影响结构的使用功能,还会形成不利于抗震的短柱。型钢混凝土组合结构作为一种新型结构体系,它利用型钢、钢筋与混凝土协同作用的原理,大大提高了结构的承载力、刚度、耐火性、抗震性能等。型钢、钢筋、混凝土、柱头定型钢模四维一体地工作使型钢混凝土结构具备了比传统的钢筋混凝土结构承载力大、刚度大、抗震性能好的优点。柱头的承载力刚度是关键节点。必须保证其结构质量。With the development of my country's economy and the advancement of science and technology, the height of industrial and civil buildings is increasing, the number of floors is increasing, and the column network is becoming denser. In order to meet the requirements of bearing capacity, the cross-section of the columns at the bottom of the structure The size will inevitably increase, which will not only affect the use and function of the structure, but also form short columns that are not conducive to earthquake resistance. As a new type of structural system, the steel-concrete composite structure utilizes the principle of synergy between steel, steel bars and concrete to greatly improve the bearing capacity, stiffness, fire resistance, and seismic performance of the structure. The four-dimensional integrated work of section steel, steel bars, concrete, and post-shaped steel molds makes the section steel concrete structure have the advantages of greater bearing capacity, greater rigidity, and better seismic performance than traditional reinforced concrete structures. The bearing stiffness of the column head is the key node. Its structural quality must be guaranteed.

申请号为CN201320501404.X的中国专利公开了“型钢柱与框架主梁、框架连系梁的节点连接结构”,该结构提供了一种型钢柱与框架主梁、框架连系梁的节点连接结构,包括型钢柱,与型钢柱垂直相交的框架主梁、框架连系梁,型钢柱内设有H型钢,H型钢具有腹板,框架主梁、框架连系梁均具有各自的主筋,型钢在框架主梁的主筋标高位置设置上下两道连接板,框架主梁与型钢垂直相交的主筋与连接板上表面焊接,框架主梁与型钢垂直但不相交的主筋锚固在型钢柱内;H型钢的腹板上开设孔,框架连系梁与型钢垂直相交的主筋穿过腹板上开设的孔内,框架连系梁与型钢垂直但不相交的主筋锚固在型钢柱内。该专利主要是柱与梁的节点结构。不适用于型钢钢柱及柱头定型钢模.The Chinese patent with the application number CN201320501404.X discloses the "node connection structure of steel columns and frame main beams and frame connecting beams", which provides a node connection structure between steel columns and frame main beams and frame connecting beams , including shaped steel columns, frame main beams and frame connecting beams perpendicular to the shaped steel columns, H-shaped steels are arranged inside the shaped steel columns, H-shaped steels have webs, frame main beams, and frame connecting beams have their own main reinforcements, and the shaped steels are in Two upper and lower connection plates are set at the main reinforcement elevation of the main beam of the frame, the main reinforcement perpendicular to the frame main beam and the section steel is welded to the upper surface of the connection plate, and the main reinforcement perpendicular to the section steel of the frame main beam but not intersecting is anchored in the section steel column; the H-section steel A hole is opened on the web, and the main reinforcement perpendicular to the frame connecting beam and the section steel passes through the hole opened on the web, and the main reinforcement perpendicular to the frame connecting beam and the section steel but not intersecting is anchored in the section steel column. This patent is mainly a joint structure of columns and beams. Not suitable for shaped steel columns and column head shaped steel molds.

发明内容Contents of the invention

本实用新型的目的在于克服现有技术的不足,提供一种施工安装方便、安装牢固、安装精度高、结构承载力和刚度大,耐火性、抗震性能高的防火抗震柱体系施工结构。The purpose of the utility model is to overcome the deficiencies of the prior art, and provide a fire-proof and anti-seismic column system construction structure with convenient construction and installation, firm installation, high installation precision, large structural bearing capacity and rigidity, high fire resistance and anti-seismic performance.

一种防火抗震柱体系施工结构,包括按照设定位置沿横向和纵向分别预埋在承台基础上的多组地脚螺栓,每组地脚螺栓由多个地脚螺栓构成,在每一个地脚螺栓上螺纹连接有一个调整螺母,在每一组地脚螺栓上均安装有位于最下层的型钢钢柱,位于最下层的型钢钢柱的柱脚底板支撑在对应设置的一组地脚螺栓的调整螺母上,在最下层的型钢钢柱的柱脚底板上方且在每一个地脚螺栓上插有一个垫板并螺纹连接有一个紧固螺母和一个止退螺母,在每一根型钢钢柱的柱顶上上、下连接设置有多层上层型钢钢柱,上下相邻的两根型钢钢柱中的上一层型钢钢柱采用螺栓连接固定在下一层型钢钢柱柱顶上,每一根型钢钢柱的底部和柱脚底板之间固定有柱脚肋板,在每一根所述的型钢钢柱的柱头上采用螺栓连接有柱头定型钢模,在每一根所述的柱头定型钢模的四壁上均沿水平方向安装有钢梁安装接头,在同一层左右相邻的两个钢梁安装接头之间依次安装有钢主梁或者钢次梁,在最下层的柱脚底板底部灌注有混凝土,在全部型钢钢柱四周绑扎有型钢钢柱钢筋并在型钢钢柱钢筋四周安装有柱模,在每个柱模内浇筑有型钢钢柱混凝土,每一根型钢钢柱中心线与基础中心线的误差不大于3.0mm,型钢钢柱的顶标高与设定顶标高偏差不大于2.0mm,所有垫板的标高误差均在1.0mm以内。A construction structure of a fire-proof and anti-seismic column system, including multiple groups of anchor bolts that are pre-embedded on the cap foundation along the horizontal and vertical directions according to the set positions. Each group of anchor bolts is composed of multiple anchor bolts. An adjusting nut is threaded on the foot bolt, and the bottom steel column is installed on each set of anchor bolts, and the base plate of the bottom steel column is supported by the corresponding set of anchor bolts. On the adjusting nut of the bottom steel column, a backing plate is inserted on each anchor bolt and a fastening nut and a stop nut are threaded on the top of the bottom plate of the steel column at the bottom layer. The upper and lower connections of the top of the column are provided with multi-layer upper-layer steel columns, and the upper-layer steel columns of the two adjacent upper-lower steel columns are fixed on the top of the next-layer steel column by bolts. A column foot rib is fixed between the bottom of a section steel column and the base plate of the column foot, and a column head shaped steel mold is connected to the column head of each section steel column by bolts, and each column head Steel girder installation joints are installed on the four walls of the shaped steel form along the horizontal direction, steel main beams or steel secondary beams are installed in turn between the left and right adjacent steel beam installation joints on the same floor, Concrete is poured at the bottom of the slab, steel bars are bound around all the steel columns and column molds are installed around the steel bars of the steel columns, steel column concrete is poured in each column mold, and the center of each steel column is The error between the line and the center line of the foundation is not greater than 3.0mm, the deviation between the top elevation of the steel column and the set top elevation is not greater than 2.0mm, and the elevation error of all backing plates is within 1.0mm.

本实用新型的型钢混凝土组合结构作为一种新型结构体系,利用型钢、钢筋与混凝土协同作用的原理,大大提高了结构的承载力、刚度、耐火性、抗震性能等。型钢、钢筋、混凝土、柱头定型钢模四维一体地工作使型钢混凝土结构具备了比传统的钢筋混凝土结构承载力大、刚度大、抗震性能好的优点。与钢结构相比,具有防火性能好,结构局部和整体稳定性好,节省钢材的优点。为了解决组合结构中的钢柱节点处型钢与钢筋混凝土在空间上的分布关系,实现柱中主筋自下而上连续、贯通,为了方便混凝土柱模板工程及后续混凝土浇筑作业的连续性,保证工期进度要求。柱头定型钢模处结构承载力大,保证了关键节点处的结构质量。As a new structural system, the steel-concrete composite structure of the utility model utilizes the principle of synergy between steel, steel bars and concrete to greatly improve the bearing capacity, rigidity, fire resistance, and earthquake resistance of the structure. The four-dimensional integrated work of section steel, steel bars, concrete, and post-shaped steel molds makes the section steel concrete structure have the advantages of greater bearing capacity, greater rigidity, and better seismic performance than traditional reinforced concrete structures. Compared with the steel structure, it has the advantages of good fire resistance, good local and overall stability of the structure, and saving steel. In order to solve the spatial distribution relationship between section steel and reinforced concrete at the joints of steel columns in the composite structure, realize the continuous and continuous main reinforcement in the column from bottom to top, in order to facilitate the continuity of concrete column formwork engineering and subsequent concrete pouring operations, and ensure the construction period progress requirements. The structural bearing capacity of the shaped steel mold at the column head is large, which ensures the structural quality of the key nodes.

附图说明Description of drawings

图1是本实用新型的一种防火抗震柱体系施工结构的结构示意图;Fig. 1 is a structural schematic diagram of a construction structure of a fireproof and anti-seismic column system of the present invention;

图2是图1所示的结构中的地脚螺栓与型钢钢柱节点结构示意图。Fig. 2 is a schematic diagram of the joint structure of anchor bolts and section steel columns in the structure shown in Fig. 1 .

具体实施方式Detailed ways

下面结合附图,对本实用新型的具体实施方式进行详细说明。Below in conjunction with accompanying drawing, the specific embodiment of the utility model is described in detail.

如附图所示的一种防火抗震柱体系施工结构,包括按照设定位置沿横向和纵向分别预埋在承台基础上的多组地脚螺栓9,每组地脚螺栓9由多个地脚螺栓构成,在每一个地脚螺栓上螺纹连接有一个调整螺母7,在每一组地脚螺栓9上均安装有位于最下层的型钢钢柱,位于最下层的型钢钢柱的柱脚底板5支撑在对应设置的一组地脚螺栓9的调整螺母7上,在最下层的型钢钢柱的柱脚底板5上方且在每一个地脚螺栓上插有一个垫板10并螺纹连接有一个紧固螺母6和一个止退螺母8,在每一根型钢钢柱3的柱顶上上、下连接设置有多层上层型钢钢柱,上下相邻的两根型钢钢柱中的上一层型钢钢柱采用螺栓连接固定在下一层型钢钢柱柱顶上,每一根型钢钢柱3的底部和柱脚底板5之间固定有柱脚肋板11,在每一根所述的型钢钢柱的柱头上采用螺栓连接有柱头定型钢模1,在每一根所述的柱头定型钢模的四壁上均沿水平方向安装有钢梁安装接头2,在同一层左右相邻的两个钢梁安装接头2之间依次安装有钢主梁或者钢次梁,在最下层的柱脚底板5底部灌注有混凝土,在全部型钢钢柱3四周绑扎有型钢钢柱钢筋并在型钢钢柱钢筋四周安装有柱模4。在每个柱模4内浇筑有型钢钢柱混凝土。每一根型钢钢柱中心线与基础中心线的误差不大于3.0mm,型钢钢柱的顶标高与设定顶标高偏差不大于2.0mm,所有垫板的标高误差均在1.0mm以内。As shown in the accompanying drawings, a construction structure of a fire-resistant and anti-seismic column system includes multiple sets of anchor bolts 9 pre-buried on the cap foundation in the horizontal and vertical directions according to the set position, and each set of anchor bolts 9 is composed of a plurality of ground bolts. An adjusting nut 7 is threadedly connected to each anchor bolt, and each group of anchor bolts 9 is equipped with a section steel column at the bottom, and the bottom plate of the section steel column at the bottom 5 is supported on the adjusting nuts 7 of a corresponding set of anchor bolts 9, above the base plate 5 of the bottom steel column and on each anchor bolt is inserted a backing plate 10 and screwed with a The fastening nut 6 and a stop nut 8 are connected to the top and bottom of each steel column 3 with a multi-layer upper steel column, and the upper layer of the two adjacent steel columns up and down The shaped steel column is fixed on the top of the next layer of shaped steel column by bolt connection, and a column foot rib 11 is fixed between the bottom of each shaped steel column 3 and the bottom plate 5 of the column foot. The capital of the column is connected with a steel mold 1 for the shape of the column head by bolts, and steel beam installation joints 2 are installed along the horizontal direction on the four walls of each of the steel molds for the shape of the column head. Steel main beams or steel secondary beams are sequentially installed between the steel beam installation joints 2, concrete is poured at the bottom of the column base plate 5 at the lowest level, and section steel column reinforcements are bound around all section steel columns 3 and reinforced in section steel column reinforcements. Column formwork 4 is installed around. Concrete with steel and steel columns is poured in each column formwork 4 . The error between the center line of each steel column and the center line of the foundation is not more than 3.0mm, the deviation between the top elevation of the steel column and the set top elevation is not more than 2.0mm, and the error of the elevation of all backing plates is within 1.0mm.

本结构的施工包括以下步骤:The construction of this structure includes the following steps:

(1)在承台基础上按照设定位置沿横向和纵向分别预埋多组地脚螺栓9,每组地脚螺栓9由多个地脚螺栓构成,在每一个地脚螺栓上拧进一个调整螺母7;(1) Multiple sets of anchor bolts 9 are pre-embedded along the horizontal and vertical directions according to the set position on the cap foundation. Each set of anchor bolts 9 is composed of multiple anchor bolts. Adjusting nut 7;

(2)采用塔吊吊装型钢钢柱并且使型钢钢柱的柱脚底板5支撑在对应设置的一组地脚螺栓9的调整螺母7上,再在每一个地脚螺栓上插入一个垫板10并依次拧进一个紧固螺母6和一个止退螺母8,然后调节每组地脚螺栓上的调整螺母的标高以使型钢钢柱的的垂直度达到规范标准,所述的型钢钢柱3的底部和柱脚底板5之间固定有柱脚肋板11,在所述的型钢钢柱的柱头上采用螺栓连接有柱头定型钢模1,在所述的柱头定型钢模的四壁上均沿水平方向安装有钢梁安装接头2;(2) Use a tower crane to hoist the shaped steel column and make the base plate 5 of the shaped steel column supported on the adjusting nuts 7 of a set of anchor bolts 9 correspondingly arranged, then insert a backing plate 10 on each anchor bolt and Screw in a fastening nut 6 and a stop nut 8 in turn, and then adjust the elevation of the adjustment nuts on each group of anchor bolts so that the verticality of the steel column reaches the specification standard. The bottom of the steel column 3 is A column foot rib 11 is fixed between the column foot bottom plate 5, and a column head shaped steel mold 1 is connected with a bolt on the column head of the section steel steel column, and the four walls of the column head shaped steel mold are all along the horizontal The direction is installed with steel beam installation joint 2;

(3)用两台经纬仪同时观察,采用缆风绳对安装的最下层型钢钢柱的尺寸校正,具体步骤为:(a)调整型钢钢柱平面位置:先将型钢钢柱的中心线与基础中心线对齐,确定型钢钢柱的平面位置,调整地脚螺栓将型钢钢柱中心线与基础中心线的误差控制在3.0mm以内,然后将紧固螺母6微微拧紧;(b)调节柱脚底板5下的调整螺母7的高低控制型钢钢柱3的垂直度,使得型钢钢柱在自由状态下,水平和垂直两个正交方向的垂直度偏差校正到零,然后拧紧紧固螺母6并且控制型钢钢柱的顶标高与设定顶标高偏差不超过2.0mm,保证型钢钢柱位移和垂直度偏差符合验收规范标准。(c)拧紧各个紧固螺母6、止退螺母8和调整螺母7。(3) Use two theodolites to observe at the same time, and use the cable wind rope to correct the size of the installed steel column on the bottom layer. The specific steps are: (a) Adjust the plane position of the steel column: first align the centerline of the steel column with the foundation Align the center line, determine the plane position of the shaped steel column, adjust the anchor bolts to control the error between the center line of the shaped steel column and the center line of the foundation within 3.0mm, and then tighten the fastening nut 6 slightly; (b) adjust the bottom plate of the column foot The height of the adjustment nut 7 under 5 controls the verticality of the profiled steel column 3, so that the verticality deviation of the horizontal and vertical two orthogonal directions is corrected to zero when the profiled steel column is in a free state, then tighten the fastening nut 6 and control The deviation between the top elevation of the shaped steel column and the set top elevation shall not exceed 2.0mm to ensure that the displacement and verticality deviation of the shaped steel column meet the acceptance criteria. (c) Tighten each fastening nut 6, stop nut 8 and adjustment nut 7.

(4)采用比基础混凝土强度等级高一个等级的细石混凝土,在柱脚底板5底部进行二次灌浆,使得最下层的型钢钢柱固定。(4) Use fine stone concrete one grade higher than the strength grade of the foundation concrete, and perform secondary grouting at the bottom of the column base plate 5, so that the bottom steel column is fixed.

(5)重复所述的步骤(2)-(4)完成全部组的地脚螺栓9上的最下层的型钢钢柱的安装;(5) repeat described steps (2)-(4) to complete the installation of the bottommost section steel column on the anchor bolts 9 of all groups;

(6)在相邻的两个钢梁安装接头2之间依次安装钢主梁或者钢次梁;(6) Install steel main beams or steel secondary beams sequentially between two adjacent steel beam installation joints 2;

(7)在每一根型钢钢柱3四周绑扎型钢钢柱钢筋并在型钢钢柱钢筋四周安装柱模4。(7) Bind the steel bars of the steel columns around each steel column 3 and install the column formwork 4 around the steel bars of the steel columns.

(8)在每一根型钢钢柱顶上采用螺栓连接固定上一层型钢钢柱;(8) Use bolts to fix the upper layer of steel columns on the top of each steel column;

(9)在上一层型钢钢柱的相邻的两个钢梁安装接头2之间依次安装钢主梁或者钢次梁;(9) Install steel main beams or steel secondary beams sequentially between two adjacent steel beam installation joints 2 of the steel column on the last floor;

(10)在每一根上一层型钢钢柱3四周绑扎型钢钢柱钢筋,然后在该层型钢钢柱钢筋四周安装该层柱模4,同时将该层柱模4与对应设置的下层柱模4固定连接;(10) Bind the profiled steel column reinforcing bars around the profiled steel column 3 of each upper layer, then install the layer column formwork 4 around the profiled steel column reinforcement bar of this layer, and simultaneously the layer column formwork 4 and the corresponding lower floor column formwork 4 fixed connections;

(11)重复所述的步骤(8)-(10)完成全部层的型钢钢柱的施工;(11) repeat described steps (8)-(10) to complete the construction of the section steel column of all layers;

(12)在柱模4内浇筑全部层的型钢钢柱混凝土。(12) Concrete the section steel column concrete of all layers in the column formwork 4.

Claims (1)

1. a kind of fire-proof shock-proof cylinder system constructing structure, it is characterised in that:Including according to setting position transversely with longitudinal difference The multigroup foundation bolt being embedded on cushion cap foundation, to each group foot bolt be made of multiple foundation bolts, in each lower margin spiral shell It is threadedly coupled on bolt there are one adjusting nut, is mounted on being located at undermost shaped steel steel column, position on each group of foundation bolt It is supported on the adjusting nut of one group of foundation bolt being correspondingly arranged in the column root-plate of undermost shaped steel steel column, in lowest level Shaped steel steel column column root-plate above and on each foundation bolt insert there are one backing plate and be threadedly coupled there are one fasten Nut and an anti-return nut, are connected with multilayer upper strata shaped steel steel column above and below on the capital of each shaped steel steel column, on Under last layer shaped steel steel column in adjacent two shaped steel steel columns be fixed with bolts on next stratotype steel steel column capital, Suspension column floor is fixed between the bottom of each shaped steel steel column and column root-plate, in the column cap of the shaped steel steel column described in each On be connected by screw bolts column cap sizing punching block, described in each column cap sizing punching block four walls on pacify in the horizontal direction Equipped with steel girder erection connector, steel girder or steel are sequentially installed between two adjacent steel girder erection connectors of same layer or so Secondary beam, concrete is perfused in undermost column root-plate bottom, and shaped steel steel column reinforcing bar is banded in whole shaped steel steel column surroundings And column mould is installed in shaped steel steel column reinforcing bar surrounding, shaped steel steel column concrete, each shaped steel steel have been poured in each column mould The error of column center line and base center line is not more than 3.0mm, and the top mark height and the setting high deviation of top mark of shaped steel steel column are not more than 2.0mm, the absolute altitude error of all backing plates is within 1.0mm.
CN201721563196.0U 2017-11-21 2017-11-21 A kind of fire-proof shock-proof cylinder system constructing structure Active CN207582806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721563196.0U CN207582806U (en) 2017-11-21 2017-11-21 A kind of fire-proof shock-proof cylinder system constructing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721563196.0U CN207582806U (en) 2017-11-21 2017-11-21 A kind of fire-proof shock-proof cylinder system constructing structure

Publications (1)

Publication Number Publication Date
CN207582806U true CN207582806U (en) 2018-07-06

Family

ID=62732386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721563196.0U Active CN207582806U (en) 2017-11-21 2017-11-21 A kind of fire-proof shock-proof cylinder system constructing structure

Country Status (1)

Country Link
CN (1) CN207582806U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853849A (en) * 2019-04-09 2019-06-07 哈尔滨工业大学 An embedded column foot joint equipped with a short beam of profiled steel and a construction method thereof
CN111305470A (en) * 2020-02-24 2020-06-19 中国建筑第二工程局有限公司 Construction method of super high-rise first-section open-web type geometric steel concrete column
CN114753559A (en) * 2021-01-08 2022-07-15 北京城建集团有限责任公司 Height-adjustable mounting structure of stiff structural steel column

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853849A (en) * 2019-04-09 2019-06-07 哈尔滨工业大学 An embedded column foot joint equipped with a short beam of profiled steel and a construction method thereof
CN109853849B (en) * 2019-04-09 2021-03-30 哈尔滨工业大学 Embedded column base joint with profile steel short beam and construction method thereof
CN111305470A (en) * 2020-02-24 2020-06-19 中国建筑第二工程局有限公司 Construction method of super high-rise first-section open-web type geometric steel concrete column
CN114753559A (en) * 2021-01-08 2022-07-15 北京城建集团有限责任公司 Height-adjustable mounting structure of stiff structural steel column

Similar Documents

Publication Publication Date Title
CN110331668B (en) Construction method of bidirectional inclined V-shaped bridge tower of cable-stayed bridge without back cables
CN112900692B (en) Large-span special-shaped steel structure building, supporting device thereof and construction method
CN107869195A (en) A kind of shaped steel steel column and column cap sizing punching block construction method
CN211517947U (en) Bridge case roof beam is prefabricated with shaped steel pedestal
CN105649360A (en) Integral assembling type building system and installing method
CN105839846A (en) Prefabricated reinforced concrete composite beam
CN110886227B (en) Main tower cast-in-place lower cross beam support system and construction method
CN106522419B (en) Adjacent beam-supporting column conversion beam that strides and set up steel sheet concrete shear force wall
CN105625566B (en) Assembly concrete orthogonal-diagonal lattice space lattice box structure tube-in-tube structure
CN105350458A (en) Construction method of composite structure platform for construction of Y-shaped pier of bridge
CN104818772A (en) Large-span long-cantilever connection structure and construction technique
CN207944590U (en) A kind of assembled steel frame-prefabricated steel reinforced concrete shear wall structure system
CN110792028A (en) Construction method of cable-stayed bridge without back cables
CN113718753B (en) Anchor underground continuous wall foundation assembled type intermediate wall and construction method
CN108222480A (en) A kind of high-altitude overhanging main truss posture steel mould base construction platform
CN102140850B (en) Frame with floors of composite grid structure and construction method thereof
CN206902913U (en) A kind of high-altitude long-span overhung structure
CN109339436B (en) Assembled formwork support device for special-shaped concrete cave
CN105442737A (en) Novel composite heat insulation floor board and construction method thereof
CN104775363A (en) Assembling method of steel bar segments of upper tower column
CN108755938B (en) Steel core area node of assembled concrete frame
CN106869403B (en) Multilayer prefabricated square steel pipe concrete connecting beam
CN215907234U (en) Prefabricated filling plate type stair
CN212295256U (en) Self-stabilizing gradient-variable high-performance assembled roof
CN203475599U (en) Shock-proof prefabricated building of steel tube shearing wall composite structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20180914

Granted publication date: 20180706

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20190618

Granted publication date: 20180706

PD01 Discharge of preservation of patent
PP01 Preservation of patent right

Effective date of registration: 20210415

Granted publication date: 20180706

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20240109

Granted publication date: 20180706

PD01 Discharge of preservation of patent