CN204000867U - Sill anchor assembling support - Google Patents

Sill anchor assembling support Download PDF

Info

Publication number
CN204000867U
CN204000867U CN201420147379.4U CN201420147379U CN204000867U CN 204000867 U CN204000867 U CN 204000867U CN 201420147379 U CN201420147379 U CN 201420147379U CN 204000867 U CN204000867 U CN 204000867U
Authority
CN
China
Prior art keywords
clamp
bases
connector
bolt
clip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420147379.4U
Other languages
Chinese (zh)
Inventor
李泰鹏
王朝阳
蒋官业
高杰
陈进
朱茂
全玉国
李安雄
刘海龙
李秋耕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201420147379.4U priority Critical patent/CN204000867U/en
Application granted granted Critical
Publication of CN204000867U publication Critical patent/CN204000867U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of sill anchor assembling support, comprises two bases, a plurality of linkage and organizes clip arrangement more; Two bases extend and interval setting in second direction along first direction; Linkage is spaced apart and arranged between two bases and respectively two bases is connected, for regulating the distance of two bases in second direction; Many group clip arrangements are slidably mounted on two bases along first direction; Every group of clip arrangement comprises two clip arrangements, and two clip arrangements in every group of clip arrangement are separately positioned on two bases along second direction.

Description

Sill anchor assembling support
Technical field
The utility model relates to building field, particularly a kind of sill anchor assembling support.
Background technology
Along with scientific and technical progress, construction steel structure has obtained developing rapidly, and particularly super high steel structure development is swifter and more violent.Wherein, sill anchor, as connecting superstructure and basic vitals, is one of the key link in the super highrise building basement construction stage, and its assembled quality affects great on the installation quality of steel superstructure.
Existing sill anchor assembling method is comparatively complicated, conventionally need to adopt fixed bracket the ancillary methods such as scaffold operating platform of arranging in pairs or groups, and the engineering time is long, cost is higher; And a kind of support can only be assembled the built-in fitting of a type conventionally, for different sill anchors, need the different support of configuration, therefore, versatility is poor.
Utility model content
Technical problem to be solved in the utility model is, the sill anchor assembling support that a kind of versatility is good is provided.
The utility model is achieved in that provides a kind of sill anchor assembling support, comprises two bases, a plurality of linkage and organizes clip arrangement more; Described two bases extend and interval setting in second direction along first direction; Described a plurality of linkage is spaced apart and arranged between described two bases and respectively described two bases is connected, for regulating the distance of described two bases in described second direction; Described many group clip arrangements are slidably mounted on described two bases along described first direction; Every group of clip arrangement comprises two clip arrangements, and two clip arrangements in every group of clip arrangement are separately positioned on described two bases along described second direction.
Further, described second direction is vertical with described first direction.
Further, on each base, be formed with chute; Described chute extends along described first direction; Each clip arrangement comprises clamp base, adjusts bolt, the first clamp and the second clamp; Be arranged on corresponding described base described clamp base sliding; Described the first clamp and described the second clamp are spaced apart and arranged on described clamp base, for location-plate is installed; Described adjustment bolt is located in described clamp base and is arranged in described chute.
Further, each clip arrangement also comprises lock bolt; Described lock bolt is fixed on described the first clamp, and extend between described the first clamp and described the second clamp.
Further, each clip arrangement also comprises nut and lock bolt; Described nut-welding is on described the first clamp; Described lock bolt coordinates with described nut and extend between described the first clamp and described the second clamp.
Further, each linkage comprises the first connector, the second connector and adjusting bolt; One end of described the first connector is connected with in described two bases one, and the other end is connected with described the second connector by described adjusting bolt; One end of described the second connector is connected with another in described two bases; On described the first connector and/or described the second connector, form sliding rail; Described adjusting bolt is located in described the first connector and described the second connector and is arranged in described sliding rail.
Further, described sliding rail extends along described second direction.
Sill anchor assembling support tool in the utility model one embodiment has the following advantages: the position capable of regulating of clip arrangement in first direction and second direction, such as can and adjusting the adjustment such as bolt by adjusting bolt, applicable to different location-plates and crab-bolt etc., assembledly go out different sill anchor groups, therefore, there is good versatility, and escapable cost; Adopt the sleeping technique of spelling, installation on ground crab-bolt group, without by operating platforms such as scaffolds, also without using the loop wheel machines such as tower crane, easy to operate, safety, can control crab-bolt group's assembled quality and precision better.
Accompanying drawing explanation
Fig. 1 is the top view of sill anchor assembling support in the utility model one embodiment;
Fig. 2 is the front view of pin crab-bolt assembling support as shown in Figure 1;
Fig. 3 is the lateral view of pin crab-bolt assembling support as shown in Figure 1;
Fig. 4 a is for installing the schematic diagram of the first location-plate;
Fig. 4 b-c is respectively Fig. 4 a along the sectional view of B-B, A-A hatching line;
Fig. 5 a is for installing the schematic diagram of the second location-plate;
Fig. 5 b-c is respectively Fig. 5 a along the sectional view of B-B, A-A hatching line;
Fig. 6 a is for installing and weld the schematic diagram of crab-bolt;
Fig. 6 b-c is respectively Fig. 6 a along the sectional view of B-B, A-A hatching line;
Fig. 7 a is the schematic diagram of reinforced structure for installation;
Fig. 7 b-c is respectively Fig. 7 a along the sectional view of B-B, A-A hatching line;
Fig. 8 is crab-bolt group integral hoisting schematic diagram;
Fig. 9 is that crab-bolt group hangs schematic diagram;
Figure 10 is that crab-bolt group rights and is positioned over ground schematic diagram;
Figure 11 is crab-bolt group integral hoisting schematic diagram in place.
The specific embodiment
In order to make technical problem to be solved in the utility model, technical scheme and beneficial effect clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1, be a preferred embodiment of the utility model sill anchor assembling support 100.This sill anchor assembling support 100 comprises two bases 110, a plurality of linkage 120 and organizes clip arrangement 130 more.Wherein, linkage 120 is spaced apart and arranged between two bases 110 and by two bases 110 and connects; Clip arrangement 130 is distributed on two bases 110 and base 110 slips relatively.
Wherein, two bases 110 are roughly strip, roughly along first direction D1, extend, and interval arrange on second direction D2.First direction D1 is approximately perpendicular to second direction D2.Each base 110 comprises substrate 112 and is formed on the chute 113 on substrate 112.Chute 113 is roughly strip, roughly along first direction D1, extends.In the embodiment shown in fig. 1, two chutes 113 are formed on symmetrically on substrate 112 on second direction D2, can be called one group; And, organize chute 113 more and arrange along first direction D1 interval.In one embodiment, base 110 can be made by HW125*125 shaped steel.
A plurality of linkages 120 arrange along first direction D1 interval, and each linkage 120 is connected by bolt etc. with two bases 110 respectively on second direction D2.Each linkage 120 can comprise the first connector 121, the second connector 123 and adjusting bolt 125.One end of the first connector 121 can be connected with a base 110 by bolt etc. as top (when sill anchor assembling support 100 is as shown in Fig. 1 during position), and the other end can be connected with the second connector 123 by adjusting bolt 125 as bottom; And the bottom of the second connector 123 can be connected with another base by bolt etc.As shown in Figure 3, on the first connector 121 and/or the second connector 123, can form sliding rail 126.Sliding rail 126 roughly extends along second direction D2.Adjusting bolt 125 is located in the first connector 121 and the second connector 123 and is arranged in sliding rail 126; When adjusting bolt 125 is not tightened, adjusting bolt 125 can be slided in sliding rail 126, also the first connector 121 and the second connector 123 can be on second direction D2 relative sliding, thereby regulate the distance of two bases 110 on second direction D2.When by two bases 110, the distance on second direction D2 is adjusted to suitable distance, tightening adjusting bolt 125 can be relative fixing with the second connector 123 by the first connector 121.
Every group of clip arrangement 130 comprises two clip arrangements 130, and two clip arrangements 130 in every group are separately positioned on two bases 110 along second direction D2.Many group clip arrangements 130 are spaced apart and arranged on base 110 along first direction D1.As depicted in figs. 1 and 2, each clip arrangement 130 comprises clamp base 131, adjusts bolt 132, the first clamp 133, the second clamp 134 and lock bolt 135.Wherein, clamp base 131 is slidably arranged on the substrate 112 of base 110.Adjusting bolt 132 is located in clamp base 131 and is arranged in the chute 113 on substrate 112.When adjustment bolt 132 is not tightened, adjust bolt 132 and can slide along chute 113, thus the distance of adjustable two adjacent groups clip arrangement 130 on first direction D1.The first clamp 133 and the second clamp 134 are generally perpendicularly arranged on clamp base 131 and keep certain distance, so that the location-plate (hereinafter will be described further) that is used to form stone bolt group is installed between the first clamp 133 and the second clamp 134.Lock bolt 135 can be fixed as being welded on the first clamp 133.For example, can be by nut-welding on the first clamp 133, and make the double-screw bolt of lock bolt 135 coordinate with the nut being welded on the first clamp 133, thereby can make lock bolt 135 extend between the first clamp 133 and the second clamp 134 to the location-plate being arranged between the first clamp 133 and the second clamp 134 is locked.
In addition, as shown in Figures 2 and 3, on the first clamp 133 and the second clamp 134, a plurality of gussets 137,138 can be set respectively, to strengthen structural strength.
As mentioned above, the distance by adjustable two bases 110 of adjusting bolt 125 on second direction D2, is also two clip arrangements 130 distance on second direction D2 in same group of clip arrangement 130; Meanwhile, by adjusting the distance of the adjustable two adjacent groups clip arrangement 130 of bolt 132 on first direction D1; So, can be according to the particular location of the adjustment clip arrangements 130 such as the size and dimension of different location-plates, crab-bolt etc. on first direction D2 and second direction D2, thereby applicable to different location-plates and crab-bolt etc., assembledly go out different sill anchor groups, therefore, sill anchor assembling support 100 of the present utility model has good versatility, and escapable cost.
Brief description is applied above-mentioned sill anchor assembling support 100 and is carried out the assembled method of sill anchor, and the method comprises:
Step S1: as shown in Fig. 4 a-c, the first location-plate 210 is arranged between first clamp 133 and the second clamp 134 of two clip arrangements 130 in same group of clip arrangement 130, and utilizes lock bolt 135 by the first location-plate 210 lockings;
Step S2: as shown in Fig. 5 a-c, regulate the distance of two adjacent groups clip arrangement 130 on first direction D1, then the second location-plate 220 is arranged between first clamp 133 and the second clamp 134 of two clip arrangements 130 in adjacent one group of clip arrangement 130, and utilizes lock bolt 135 by the first location-plate 210 lockings;
Step S3: as shown in Fig. 6 a-c, crab-bolt 230 is arranged in the first location-plate 210 and the second clamp 134 and welding;
Step S4: as shown in Fig. 7 a-c, reinforced structure for installation 240 between the first location-plate 210 and the second clamp 134, as channel-section steel or angle steel;
Step S5: as shown in Figure 8, unscrew lock bolt 135, and by crab-bolt group integral hoisting;
Step S6: as shown in Figure 9, crab-bolt group is hung from sill anchor assembling support 100;
Step S7: as shown in figure 10, crab-bolt group is righted and is positioned over ground;
Step S8: as shown in figure 11, crab-bolt group integral hoisting is in place.
In step S1, can be first according to the particular location of the adjustment clip arrangements 130 such as the size and dimension of different location-plates, crab-bolt etc. on second direction D2.Particularly, before the first location-plate 210 being arranged between the first clamp 133 and the second clamp 134, step S1 can further comprise: unscrew adjusting bolt 125, the distance by two bases 110 on second direction D2 is adjusted to suitable distance, then tightens adjusting bolt 125.
In step S2, regulate the distance of two adjacent groups clip arrangement 130 on first direction D1 to comprise: unscrew and adjust bolt 132, the distance by two adjacent groups clip arrangement 130 on first direction D1 is adjusted to suitable distance, then tighten and adjust bolt 132.
In step S3, crab-bolt 230 is roughly installed in the first location-plate 210 and the second clamp 134 along horizontal direction, the ground integral body that realizes crab-bolt 230 is assembled (also claiming sleeping spelling) laterally, can effectively improve the assembled work efficiency of crab-bolt 230, optimize working procedure, promoted the assembled quality of crab-bolt 230 integral body.
As mentioned above, the sill anchor assembling support 100 in the utility model one embodiment and sill anchor assembling method tool have the following advantages:
1, each parts of sill anchor assembling support 100 all connect with bolt, install and convenient disassembly;
2, the position on first direction D1 and second direction D2 by adjusting bolt 125 and adjustment bolt 132 adjustable clamp panel assemblies 130, applicable to different location-plates and crab-bolt etc., assembledly go out different sill anchor groups, therefore, there is good versatility, and escapable cost;
3, adopt the sleeping technique of spelling, installation on ground crab-bolt group, without by operating platforms such as scaffolds, also without using the loop wheel machines such as tower crane, easy to operate, safety, can control crab-bolt group's assembled quality and precision better.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in protection domain of the present utility model.

Claims (7)

1. a sill anchor assembling support, is characterized in that, comprises two bases, a plurality of linkage and organizes clip arrangement more;
Described two bases extend and interval setting in second direction along first direction;
Described a plurality of linkage is spaced apart and arranged between described two bases and respectively described two bases is connected, for regulating the distance of described two bases in described second direction;
Described many group clip arrangements are slidably mounted on described two bases along described first direction; Every group of clip arrangement comprises two clip arrangements, and two clip arrangements in every group of clip arrangement are separately positioned on described two bases along described second direction.
2. sill anchor assembling support according to claim 1, is characterized in that, described second direction is vertical with described first direction.
3. sill anchor assembling support according to claim 1, is characterized in that, on each base, is formed with chute; Described chute extends along described first direction;
Each clip arrangement comprises clamp base, adjusts bolt, the first clamp and the second clamp;
Be arranged on corresponding described base described clamp base sliding;
Described the first clamp and described the second clamp are spaced apart and arranged on described clamp base, for location-plate is installed;
Described adjustment bolt is located in described clamp base and is arranged in described chute.
4. sill anchor assembling support according to claim 3, is characterized in that, each clip arrangement also comprises lock bolt; Described lock bolt is fixed on described the first clamp, and extend between described the first clamp and described the second clamp.
5. sill anchor assembling support according to claim 3, is characterized in that, each clip arrangement also comprises nut and lock bolt; Described nut-welding is on described the first clamp; Described lock bolt coordinates with described nut and extend between described the first clamp and described the second clamp.
6. sill anchor assembling support according to claim 1, is characterized in that, each linkage comprises the first connector, the second connector and adjusting bolt; One end of described the first connector is connected with in described two bases one, and the other end is connected with described the second connector by described adjusting bolt; One end of described the second connector is connected with another in described two bases;
On described the first connector and/or described the second connector, form sliding rail; Described adjusting bolt is located in described the first connector and described the second connector and is arranged in described sliding rail.
7. sill anchor assembling support according to claim 6, is characterized in that, described sliding rail extends along described second direction.
CN201420147379.4U 2014-03-28 2014-03-28 Sill anchor assembling support Withdrawn - After Issue CN204000867U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420147379.4U CN204000867U (en) 2014-03-28 2014-03-28 Sill anchor assembling support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420147379.4U CN204000867U (en) 2014-03-28 2014-03-28 Sill anchor assembling support

Publications (1)

Publication Number Publication Date
CN204000867U true CN204000867U (en) 2014-12-10

Family

ID=52040892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420147379.4U Withdrawn - After Issue CN204000867U (en) 2014-03-28 2014-03-28 Sill anchor assembling support

Country Status (1)

Country Link
CN (1) CN204000867U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953040A (en) * 2014-03-28 2014-07-30 中建钢构有限公司 Sill anchor assembling support and sill anchor assembling method
CN105750798A (en) * 2016-03-28 2016-07-13 国网浙江省电力公司金华供电公司 Foundation bolt pre-burying auxiliary welding device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953040A (en) * 2014-03-28 2014-07-30 中建钢构有限公司 Sill anchor assembling support and sill anchor assembling method
CN103953040B (en) * 2014-03-28 2016-02-03 中建钢构有限公司 Sill anchor assembling support and sill anchor assembling method
CN105750798A (en) * 2016-03-28 2016-07-13 国网浙江省电力公司金华供电公司 Foundation bolt pre-burying auxiliary welding device
CN105750798B (en) * 2016-03-28 2017-07-21 国网浙江省电力公司金华供电公司 Embedding anchor bolts auxiliary welding equipment

Similar Documents

Publication Publication Date Title
CN207079735U (en) A kind of beam-column node structure
CN107419870A (en) A kind of construction method for decorating panel cladding system and decoration panel cladding system
CN103397701A (en) Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method
CN203963252U (en) A kind of petroleum pipeline bracket
CN107869195A (en) A kind of shaped steel steel column and column cap sizing punching block construction method
CN105064670A (en) Exterior wall suspension board pouring form board erecting support
CN106192776A (en) A kind of big Span Continuous Flexible arch bridge with steel truss beam free cantilever erection construction technology
CN104895082B (en) Precise large-diameter steel casing deviation rectifying device and method
CN204059799U (en) A kind of installation constitution of railing angular adjustment
CN204000867U (en) Sill anchor assembling support
CN115305833B (en) Cap beam construction system and method
CN104790567A (en) Flexible connecting system, external wall panel and external wall plate installing node
CN207582806U (en) A kind of fire-proof shock-proof cylinder system constructing structure
CN203247601U (en) Tower crane assembled base
CN205743048U (en) Correction positioner installed by a kind of curtain wall large-size column
CN203383332U (en) Adjustable positioning structure with two positioning plates for embedded bolts
CN103953040B (en) Sill anchor assembling support and sill anchor assembling method
CN204455862U (en) A kind of steel box-girder seam angle rackwork
CN105113536A (en) Movable sidewall formwork erecting system for underground structure and construction method of system
CN103303789B (en) Adjustable buttress for supporting running rail of tunnel track laying gantry crane
CN207523478U (en) A kind of contact net support device being installed in tunnel built-in groove
CN105781056B (en) Special-shaped metope moulding can adjust gusseted point hang device
CN206602485U (en) It is a kind of to be used for the quick levelling adjustable photovoltaic support in out-of-flatness roof
CN205976405U (en) A scaffold frame that slides for face of cylinder double -layer steel nets shell
CN203822340U (en) Gate-type support frame equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141210

Effective date of abandoning: 20160203

C25 Abandonment of patent right or utility model to avoid double patenting