CN108197376A - A kind of temporary building design and modeling method and system based on BIM - Google Patents
A kind of temporary building design and modeling method and system based on BIM Download PDFInfo
- Publication number
- CN108197376A CN108197376A CN201711466902.4A CN201711466902A CN108197376A CN 108197376 A CN108197376 A CN 108197376A CN 201711466902 A CN201711466902 A CN 201711466902A CN 108197376 A CN108197376 A CN 108197376A
- Authority
- CN
- China
- Prior art keywords
- model
- race
- modular
- uygurs
- library
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711466902.4A CN108197376A (en) | 2017-12-28 | 2017-12-28 | A kind of temporary building design and modeling method and system based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711466902.4A CN108197376A (en) | 2017-12-28 | 2017-12-28 | A kind of temporary building design and modeling method and system based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108197376A true CN108197376A (en) | 2018-06-22 |
Family
ID=62585918
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711466902.4A Pending CN108197376A (en) | 2017-12-28 | 2017-12-28 | A kind of temporary building design and modeling method and system based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108197376A (en) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108871442A (en) * | 2018-06-29 | 2018-11-23 | 宝葫历史建筑科技(上海)有限公司 | A kind of long-range monitoring and warning system based on BIM and Internet of Things |
CN109086552A (en) * | 2018-08-30 | 2018-12-25 | 中铁二局集团有限公司 | A kind of furred ceiling design and construction moulding fast modeling method based on BIM |
CN109165476A (en) * | 2018-10-16 | 2019-01-08 | 广东电网有限责任公司 | A kind of modeling method and simulation of wind method of modularization wind-field model |
CN109344439A (en) * | 2018-09-01 | 2019-02-15 | 鼎宸建设科技有限公司 | A kind of modeling of building block formula and its simulative construction method based on BIM |
CN109710785A (en) * | 2018-12-27 | 2019-05-03 | 中民筑友科技投资有限公司 | A kind of management method, device, system and the storage medium of picture library figure cluster |
CN109934909A (en) * | 2019-03-04 | 2019-06-25 | 深圳市迷你玩科技有限公司 | Reconstruct method, apparatus, electronic equipment and the storage medium of 3D model |
CN110866295A (en) * | 2018-08-10 | 2020-03-06 | 华龙国际核电技术有限公司 | Three-dimensional modeling method and device for building |
CN111783188A (en) * | 2020-05-22 | 2020-10-16 | 杭州嗡嗡科技有限公司 | BIM-based assembly type free design tool and deepened design method thereof |
CN112270034A (en) * | 2020-11-24 | 2021-01-26 | 筑友智造科技投资有限公司 | Wall splitting method, device and system |
CN113111423A (en) * | 2021-04-21 | 2021-07-13 | 重庆华兴工程咨询有限公司 | Steel structure virtual assembly method, system and device based on BIM and storage medium |
CN113158278A (en) * | 2020-01-07 | 2021-07-23 | 北京博超时代软件有限公司 | Temporary building design method and device, equipment and storage medium |
CN113468641A (en) * | 2021-06-30 | 2021-10-01 | 广联达科技股份有限公司 | Method and device for creating geometric model of handrail, electronic equipment and storage medium |
CN114450737A (en) * | 2019-10-08 | 2022-05-06 | M·肖 | Design building model making system |
CN114611179A (en) * | 2022-03-21 | 2022-06-10 | 中建交通建设集团有限公司 | Revit platform-based structural member family type creation method and system |
CN114692270A (en) * | 2022-03-21 | 2022-07-01 | 中建交通建设集团有限公司 | Revit platform-based method and system for creating structural member family instance |
CN115631309A (en) * | 2022-12-21 | 2023-01-20 | 广东电网有限责任公司江门供电局 | Three-dimensional modeling method and device for power distribution network equipment |
CN117078887A (en) * | 2023-10-17 | 2023-11-17 | 成都古河云科技有限公司 | Three-dimensional model visual penetration method, system, electronic equipment and storage medium |
CN117150622A (en) * | 2023-09-08 | 2023-12-01 | 中国建筑第二工程局有限公司 | Archaized roof cornice characteristic optimization method based on GAN algorithm and BIM technology |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101477197A (en) * | 2009-01-24 | 2009-07-08 | 哈尔滨工业大学 | Simulation method used for woodland complex scene high-spectrum remote sensing data |
CN103942388A (en) * | 2014-04-18 | 2014-07-23 | 重庆市勘测院 | Large-scale building information model and three-dimensional digital city integration method |
CN206162531U (en) * | 2016-08-31 | 2017-05-10 | 中建安装工程有限公司 | Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique |
CN107515991A (en) * | 2017-09-06 | 2017-12-26 | 北京市金龙腾装饰股份有限公司 | A kind of house type full trim simulation shows method and display systems based on BIM technology |
-
2017
- 2017-12-28 CN CN201711466902.4A patent/CN108197376A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101477197A (en) * | 2009-01-24 | 2009-07-08 | 哈尔滨工业大学 | Simulation method used for woodland complex scene high-spectrum remote sensing data |
CN103942388A (en) * | 2014-04-18 | 2014-07-23 | 重庆市勘测院 | Large-scale building information model and three-dimensional digital city integration method |
CN206162531U (en) * | 2016-08-31 | 2017-05-10 | 中建安装工程有限公司 | Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique |
CN107515991A (en) * | 2017-09-06 | 2017-12-26 | 北京市金龙腾装饰股份有限公司 | A kind of house type full trim simulation shows method and display systems based on BIM technology |
Non-Patent Citations (2)
Title |
---|
刘杰 等: "BIM技术在上海国际舞蹈中心项目中的应用", 《建设监理》 * |
广东省建设执业资格注册中心: "《二级建造师继续教育必修教材之三(下册)》", 31 October 2016, 中国环境出版社 * |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108871442A (en) * | 2018-06-29 | 2018-11-23 | 宝葫历史建筑科技(上海)有限公司 | A kind of long-range monitoring and warning system based on BIM and Internet of Things |
CN110866295A (en) * | 2018-08-10 | 2020-03-06 | 华龙国际核电技术有限公司 | Three-dimensional modeling method and device for building |
CN109086552A (en) * | 2018-08-30 | 2018-12-25 | 中铁二局集团有限公司 | A kind of furred ceiling design and construction moulding fast modeling method based on BIM |
CN109344439A (en) * | 2018-09-01 | 2019-02-15 | 鼎宸建设科技有限公司 | A kind of modeling of building block formula and its simulative construction method based on BIM |
CN109165476A (en) * | 2018-10-16 | 2019-01-08 | 广东电网有限责任公司 | A kind of modeling method and simulation of wind method of modularization wind-field model |
CN109710785A (en) * | 2018-12-27 | 2019-05-03 | 中民筑友科技投资有限公司 | A kind of management method, device, system and the storage medium of picture library figure cluster |
CN109934909A (en) * | 2019-03-04 | 2019-06-25 | 深圳市迷你玩科技有限公司 | Reconstruct method, apparatus, electronic equipment and the storage medium of 3D model |
CN114450737A (en) * | 2019-10-08 | 2022-05-06 | M·肖 | Design building model making system |
CN113158278A (en) * | 2020-01-07 | 2021-07-23 | 北京博超时代软件有限公司 | Temporary building design method and device, equipment and storage medium |
CN113158278B (en) * | 2020-01-07 | 2024-02-06 | 北京博超时代软件有限公司 | Temporary building design method, device, equipment and storage medium |
CN111783188A (en) * | 2020-05-22 | 2020-10-16 | 杭州嗡嗡科技有限公司 | BIM-based assembly type free design tool and deepened design method thereof |
CN112270034A (en) * | 2020-11-24 | 2021-01-26 | 筑友智造科技投资有限公司 | Wall splitting method, device and system |
CN113111423A (en) * | 2021-04-21 | 2021-07-13 | 重庆华兴工程咨询有限公司 | Steel structure virtual assembly method, system and device based on BIM and storage medium |
CN113468641B (en) * | 2021-06-30 | 2024-01-30 | 广联达科技股份有限公司 | Method, device, electronic equipment and storage medium for creating geometric model of railing |
CN113468641A (en) * | 2021-06-30 | 2021-10-01 | 广联达科技股份有限公司 | Method and device for creating geometric model of handrail, electronic equipment and storage medium |
CN114611179A (en) * | 2022-03-21 | 2022-06-10 | 中建交通建设集团有限公司 | Revit platform-based structural member family type creation method and system |
CN114692270A (en) * | 2022-03-21 | 2022-07-01 | 中建交通建设集团有限公司 | Revit platform-based method and system for creating structural member family instance |
CN115631309A (en) * | 2022-12-21 | 2023-01-20 | 广东电网有限责任公司江门供电局 | Three-dimensional modeling method and device for power distribution network equipment |
CN117150622A (en) * | 2023-09-08 | 2023-12-01 | 中国建筑第二工程局有限公司 | Archaized roof cornice characteristic optimization method based on GAN algorithm and BIM technology |
CN117150622B (en) * | 2023-09-08 | 2024-05-07 | 中国建筑第二工程局有限公司 | Archaized roof cornice characteristic optimization method based on GAN algorithm and BIM technology |
CN117078887B (en) * | 2023-10-17 | 2024-01-02 | 成都古河云科技有限公司 | Three-dimensional model visual penetration method, system, electronic equipment and storage medium |
CN117078887A (en) * | 2023-10-17 | 2023-11-17 | 成都古河云科技有限公司 | Three-dimensional model visual penetration method, system, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108197376A (en) | A kind of temporary building design and modeling method and system based on BIM | |
Wu et al. | A critical review of the use of 3-D printing in the construction industry | |
CN109684662A (en) | A kind of construction method of intellectual assembled architecture | |
Cang et al. | A new method for calculating the embodied carbon emissions from buildings in schematic design: Taking “building element” as basic unit | |
KR20160010245A (en) | Automatic quantity calculation method for calculating rough estimate using BIM in construction design stage and information classification system | |
CN111950052A (en) | BIM technology-based exterior cladding construction method for integrally-assembled building | |
CN112016148B (en) | Calculation method and system for stair engineering quantity | |
CN108427819A (en) | A kind of generation method and device of complete assembled BIM buildings models | |
US20220374557A1 (en) | Design and construction of fence panels and fence panel components | |
CN109033558A (en) | External scaffolding model modelling approach based on Revit platform | |
CN108416076B (en) | BIM technology-based assembly type building design method | |
CN107292060A (en) | Basement roadway applications method based on BIM technology | |
US20210165922A1 (en) | Design and construction of fence panels and fence panel components | |
CN113158320B (en) | Three-dimensional modeling system based on building plane design | |
CN107423523B (en) | BIM-based complex shared space assembly building decoration construction method | |
Gleń et al. | Comparative analysis of the inventory process using manual measurements and laser scanning | |
Visintini et al. | Advanced 3d modeling versus building information modeling: The case study of palazzo ettoreo in sacile (Italy) | |
KR102438103B1 (en) | Method of manufacturing 3D drawing using 2D drawing for construction | |
Glymph | Evolution of the digital design process | |
CN110379012A (en) | A kind of buildings model generation processing method based on BIM | |
CN105844016B (en) | A method of the proposed building quantity of acquisition based on buildings model cutting | |
CN106840117A (en) | A kind of method for measuring the side's of returning unwrapping wire | |
Dore et al. | Semi-automatic techniques for as-built BIM façade modeling of historic buildings | |
Thaller et al. | Developing parametric building models–the gandis use case | |
Diez et al. | Autmod3: an automatic 3D modularization system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Applicant after: China Railway Second Bureau Construction Co.,Ltd. Applicant after: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd. Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Applicant before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. Applicant before: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd. |
|
CB02 | Change of applicant information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190823 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Applicant after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. Applicant after: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd. Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Applicant before: China Railway Second Bureau Construction Co.,Ltd. Applicant before: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180622 |
|
RJ01 | Rejection of invention patent application after publication |