CN108197376A - A kind of temporary building design and modeling method and system based on BIM - Google Patents

A kind of temporary building design and modeling method and system based on BIM Download PDF

Info

Publication number
CN108197376A
CN108197376A CN201711466902.4A CN201711466902A CN108197376A CN 108197376 A CN108197376 A CN 108197376A CN 201711466902 A CN201711466902 A CN 201711466902A CN 108197376 A CN108197376 A CN 108197376A
Authority
CN
China
Prior art keywords
model
race
modular
uygurs
library
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711466902.4A
Other languages
Chinese (zh)
Inventor
吴泽平
刘杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
China Railway Erju 4th Engineering Co Ltd
Original Assignee
China Railway Erju Co Ltd
China Railway No 2 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd, China Railway No 2 Engineering Group Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN201711466902.4A priority Critical patent/CN108197376A/en
Publication of CN108197376A publication Critical patent/CN108197376A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • General Physics & Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of temporary building design based on BIM and modeling methods and system, can reduce the operation difficulty of temporary building design and modeling, modeling efficiency be greatly improved, and can make Unified Model, improve modeling accuracy.The method includes:Modular decomposition is carried out to temporary building yet to be built on BIM software platforms, establishes modular 3 d graphic library;Based on modular 3 d graphic library, modular three Uygurs model library is established;The constructing variable of each race's model, material and decoration parameter, structural parameters and model attributes parameter in three Uygurs's model libraries of setup module;The logic association parameter of each race's model and each part submodel in three Uygurs's model libraries of setup module;Multiple race's models is selected to be combined from modular three Uygurs model library, obtain the quantity of the threedimensional model and corresponding various part submodels of temporary building yet to be built on BIM software platforms.

Description

A kind of temporary building design and modeling method and system based on BIM
Technical field
The present invention relates to electronics architectural design and modeling technique fields more particularly to a kind of temporary building based on BIM to set Meter and modeling method and system.
Background technology
BIM (Building Information Model, Building Information Model) technology is being faced as Building Trade in China A kind of the features such as important technology in transition and upgrade, the visualization having, parametrization, simulation, building can be effectively improved Design, the particularly working efficiency of construction production, the mathematical model under BIM technology can carry a large amount of engineering component number letter It ceases (geological information and non-geometry information), this is irreplaceable under the conditions of current cad technique.
But when enterprise comes into effect BIM technology in application, will be a very long mistake to the universal of BIM software applications in enterprise Journey, this constrains the opportunity of enterprise fast onset BIM values again.It is advised using construction enterprises' temporary building initial stage of BIM technology It draws in arrangement, is also often the standard modeling side provided according to BIM platform softwares particularly in the design of one off houses Formula carries out one off houses model buildings one by one with components such as wall, column, beam, door and window, roofs, when model and texturing etc. according to After the completion of scheme requirement, and the continuous modification adjustment of model can be faced.In the process, the error probability promotion of modeling, model Optimization degree and operability reduce, this can so that technical staff's modeling work amount increases, enthusiasm subtracts greatly, while can also influence Face to build and plan the problems such as formation time of arrangement or even scheme lag behind construction site.
Invention content
An object of the present invention at least that, for how to overcome the above-mentioned problems of the prior art, provide one kind Temporary building design and modeling method and system based on BIM can reduce operation difficulty, the pole of temporary building design and modeling It is big to improve modeling efficiency, and Unified Model can be made, improve modeling accuracy.
To achieve these goals, the technical solution adopted by the present invention includes following aspects.
A kind of temporary building design and modeling method based on BIM, including:
Modular decomposition is carried out to temporary building yet to be built on BIM software platforms, establishes modular 3 d graphic library; Based on modular 3 d graphic library, modular three Uygurs model library is established;It is every in three Uygurs's model libraries of setup module The constructing variable of one race's model, material and decoration parameter, structural parameters and model attributes parameter;The three of setup module The logic association parameter of each race's model and each part submodel in Uygurs's model library;From modular three Uygurs model library The multiple race's models of middle selection are combined, and obtain threedimensional model of the temporary building yet to be built on BIM software platforms and corresponding The quantity of various part submodels.
Preferably, the method includes:Part submodel is established based on modular 3 d graphic library, by part Model carries out nesting to form modular three Uygurs model.
Preferably, the part submodel includes:It is ground beam basis, floor, window, door, curtain wall, double stair, single stair, open Submodel in the middle part of formula board house stair, wall, roof end and roof;
Race's model includes:Open type, closed and curtain wall type corridor board house first floor end, first floor middle part, top Layer end, top layer middle part, staircase and entrance hall race model.
Preferably, the constructing variable is used to controlling the appearance geometric dimension of race's model, the standard width of a room in an old-style house length including board house, Net deep length, story height, width of corridor and longitudinal standard wall quantity.
Preferably, the logic association parameter include stair step quantity, object of reference range difference away from, trigonometric function, number Learn formula and conditional function.
Preferably, the BIM software platforms are the Revit platforms of autodesk, inc..
Preferably, the method further includes after logic association parameter is set, first setting the ground beam base in room Plinth, ground paving, wall, the length and width of top surface furred ceiling submodel and height sizing;Further pass through race's editing machine Array functional generate several identical submodels, to control the appearance scale of construction size of race's model.
Preferably, the method further includes:Selected from modular three Uygurs model library multiple race's models into Before row combination, the standard width of a room in an old-style house for selecting board house successively is chosen in the parameter of each race's model from modular three Uygurs model library Length, width, the quantity of board house on-gauge plate and room height be configured.
Preferably, the method further includes:Selected from modular three Uygurs model library multiple race's models into Before row combination, control test is carried out to the parameter of each race's model in modular three Uygurs model library, inputs BIM softwares Race's editing machine of platform allows the arbitrary parameter value in input range to generate corresponding race's model and part submodel, according to bullet The prompting that reports an error gone out carrys out the logic association parameter to adjustment race's model and each part submodel, is carried until no longer popping up to report an error Show.
A kind of temporary building design and modeling based on BIM, including at least electronics by network connection Equipment and a database server;
Wherein, the electronic equipment includes at least one processor and is connect at least one processor communication Memory;The memory is stored with the instruction that can be performed by least one processor, described instruction by it is described at least One processor performs, so that at least one processor is able to carry out aforementioned either method;
The database server is used for the 3 d graphic library of memory module and modular three Uygurs model library.
In conclusion by adopting the above-described technical solution, the present invention at least has the advantages that:
By " race " editing machine of Revit platforms, early period is being modeled by the function to construction site one off houses with applying The analysis of work characteristic deconstructs project content, one off houses engineering is decomposed several units, establishing each unit race model (structure Part), and relevant parameter is set to it, it is made to have the characteristics such as modular, parametrization, standardization, by race's model of each unit (component) is assembled into the construction site one off houses model of an entirety.Due to by the wall of one off houses, column, beam, door and window, roof Components is waited just to be integrated at modeling initial stage, are formed one by one such as the module of " building blocks ", and each module can either be by " big " requirement is controlled, and can carry out independent change according to " small " requirement, in the design of one off houses, it will be able to use Each one off houses module quickly is quickly erected, when encountering scheme modifying by the mode of " playing with building blocks " according to demand When, need to only be controlled by several simple commands with regard to the variation of one off houses can be completed, it will be able to play reduce software operation difficulty, Modeling efficiency is greatly improved, can also make Unified Model, meets enterprise's correlation model standard.
Description of the drawings
Fig. 1 is the flow diagram of according to embodiments of the present invention temporary building design and modeling method.
Fig. 2 is ground beam basis according to embodiments of the present invention, floor, window, door and curtain wall submodel schematic diagram.
Fig. 3 is double stair according to embodiments of the present invention, single stair, open type board house stair and wall submodel Schematic diagram.
Fig. 4 is roof end according to embodiments of the present invention and middle part submodel schematic diagram.
Fig. 5 is open type corridor board house first floor end according to embodiments of the present invention and middle tribe's model schematic.
Fig. 6 is closed corridor board house first floor end according to embodiments of the present invention and middle tribe's model schematic.
Fig. 7 is curtain wall type corridor board house first floor end according to embodiments of the present invention and middle tribe's model schematic.
Fig. 8 is first floor staircase according to embodiments of the present invention and entrance hall race model schematic.
Fig. 9 is open type corridor board house cover layer ends according to embodiments of the present invention and middle tribe's model schematic.
Figure 10 is curtain wall type corridor board house cover layer ends according to embodiments of the present invention and middle tribe's model schematic.
Figure 11 is that curtain wall type corridor according to embodiments of the present invention and closed corridor board house top layer staircase race model show It is intended to.
Figure 12 is the front schematic view of curtain wall type corridor board house model according to embodiments of the present invention.
Figure 13 is the front schematic view of closed corridor board house model according to embodiments of the present invention.
Figure 14 is the front schematic view of open type corridor board house model according to embodiments of the present invention.
Figure 15 is the structure diagram of temporary building design according to embodiments of the present invention and modeling.
Specific embodiment
With reference to the accompanying drawings and embodiments, the present invention will be described in further detail, so that the purpose of the present invention, technology Scheme and advantage are more clearly understood.It should be appreciated that specific embodiment described herein is only to explain the present invention, and do not have to It is of the invention in limiting.
The embodiment of the present invention is by modeling early period to the function of construction site one off houses and the analysis of construction property Project content is deconstructed, one off houses engineering is decomposed into several units, establishing each unit race model (component), and it is set Relevant parameter is put, it is made to have the characteristics such as modular, parametrization, standardization, race's model (component) of each unit is assembled into The construction site one off houses model of one entirety.The BIM modeling softwares of mainstream include the Revit of autodesk, inc. in the market Platform, hereafter based on the editable parameter of this platform, the repeatable race's model (or block) utilized, to the embodiment of the present invention One off houses quickly designs at the construction field (site) and each step of modeling is described in detail for the method application of offer.As shown in Figure 1, This method comprises the following steps:
Step 101:Modular decomposition is carried out to temporary building yet to be built on BIM software platforms, establishes modular three Tie up shape library
For example, all kinds of one off houses that can be built to plan at the construction field (site) carry out modular decomposition, make each mould Block become a kind of form is single, recycling degree height, can modularization 3-D graphic, avoid the mistake for causing to combine in later stage model Locally occurs coincidence situation in journey.
Step 102:Based on modular 3 d graphic library, modular three Uygurs model library is established
For example, the shape editting function that race's editing machine of Revit platforms provides can be utilized, according to modular graphics 3-D graphic in shape library establishes modular three Uygurs model or three Uygurs's blocks.
Wherein, the physical components that three Uygurs's models represent include different types of part, therefore for ease of to three-dimensional All kinds of parts that race's model includes carry out effective state modulator, can be wrapped before modular three Uygurs model is established Each part contained establishes part submodel by race's editing machine, then nested modular to be formed by being carried out to part submodel Three Uygurs's models.For example, based on Fig. 2 to part submodel shown in Fig. 4 (for example, ground beam is basic, floor, window, door, curtain wall, double The submodels such as stair, single stair, open type board house stair, wall, roof end, roof middle part) and other parts submodule Type can obtain three Uygurs's models as shown in Fig. 5 to Figure 11 (for example, open type, closed, Yi Jimu by nested combination The first floor end of wall corridor board house, first floor middle part, cover layer ends, top layer middle part, staircase, entrance hall isofamily model).
Step 103:The constructing variable of each race's model, material and decoration ginseng in three Uygurs's model libraries of setup module Number, structural parameters and model attributes parameter
Wherein, constructing variable is used to control the appearance geometric dimension of race's model, for example, the standard width of a room in an old-style house length of board house is 3640mm, net deep length are 7280mm, story height 3600mm, width of corridor 2200mm and longitudinal standard wall quantity It is 4.
Material and decoration parameter are used to control the appearance material of race's model, and each part submodule can be set in race's editing machine Type material (such as basis, floor, wall, column, furred ceiling, frame, window-glass, cladding glass, curtain wall erect very, door leaf, The material of door handle, doorframe etc. is for concrete, floor tile, zinc-plated, stainless steel etc.), color and textures, to race's model in coloring, true In fact, the appearance of different fine degrees is shown under render mode;By setting the visibility of part submodel, race's mould can be controlled Type matches the design requirement under different scenes when Digital Assembly.
Structural parameters are used to control the component visibility of race's model, such as can be including furred ceiling, side wall, middle part partition wall It is no as it can be seen that and partition wall, corridor wall, exterior wall pattern (for example, door by left/right, window by left/right etc.).Model attributes parameter.
Model attributes parameter includes cutting for the basic sectional dimension of ground beam, the thickness of plate, the sectional dimension of column, beam and lintel Face size, the size dimension of door and window and terrain clearance, thickness of wall body, the size dimension of standard wall (board house wallboard), roof and The slope of stairs, stair mark time and riser size, the size of balustrade guardrail, roof eaves width etc. are a series of with control The related parameter of system model, to need under special circumstances adjustment when into edlin use.
Step 104:The logic of each race's model and each part submodel in three Uygurs's model libraries of setup module Relevant parameter
Logic association parameter include stair step quantity, object of reference range difference away from, trigonometric function, mathematical formulae, condition Function etc..For example, for cover layer ends race model and corresponding part submodel, can the two be set by trigonometric function Between restriction relation, such as the gradient=atan (roof height/(width/2)).For stair submodel, stair length is equal to stair The product of tread run and lower part stairway step number, top stairway step number is equal to top stair height divided by stair riser is high Degree, room width add 200mm etc. equal to stairway width.For board house standard wall submodel, being automatically controlled by conditional function is No display, as when door is when right, being shown as door in board house standard wall submodel on the right side, window is on a left side.
Specifically, can by logic association parameter in race's editing machine of Revit platforms by multiple part submodels with Corresponding race model carries out logic association and locking, so as to which the setting by part submodule shape parameter is realized to race's model Space geometry form, appearance and pattern etc. control.After logic association, ground beam basis, the ground in room can be first set The length degree of the parts submodels such as paving, wall, top surface furred ceiling is isocratic to take measurements;Further pass through race's editing machine " array " function generates several identical submodels, to control the appearance scale of construction size of race's model.
Step 105:Multiple race's models is selected to be combined from modular three Uygurs model library, are obtained yet to be built interim Build the quantity of the threedimensional model and corresponding various part submodels on BIM software platforms
In practical applications, modular three Uygurs model library can be loaded into the project yet to be built in Revit platforms, By selecting several race's models, you can complete the Digital Assembly of one set of construction scene one off houses, obtain the three-dimensional of temporary building Model (as shown in Figure 12,13,14), while by the quantity of the corresponding part submodel of output, realize to the accurate of required material It calculates.Also, to the usage scenario for having different demands, then it can change one off houses by changing the parameter of related race model The related shape and feature of BIM models, to meet the design requirement of different construction site one off houses.
It in a preferred embodiment, can also be in modular three Uygurs model library before above-mentioned steps 105 are carried out The parameter of each race's model optimizes and sorts, and excessively causes modeling process complicated so as to avoid the need for the parameter of setting The problems such as degree raising realized only by the setting of part major parameter, the variation of automatic traction other parameter, so as to by setting compared with Few parameter reaches purpose of design.For example, the quantity of the standard width of a room in an old-style house length of board house, width and board house on-gauge plate is selected successively, So as to control the net depth in room and standard width of a room in an old-style house planar dimension, the planar dimension on basis, ground pavement and furred ceiling planar dimension, The width of corridor and staircase, stair runway width, roof planar dimension etc.;The height in reselection room, so as to control Door and window height processed, ceiling height, curtain wall height, entrance hall height, stair height, the number of steps of stair, stair angle, roofing slope The vertical dimensions such as degree, eaves height.
It in a preferred embodiment, can also be in modular three Uygurs model library before above-mentioned steps 105 are carried out The parameter of each race's model carries out control test, to improve the accuracy of modeling and lower error rate.For example, it can input Race's editing machine of Revit platforms allows the arbitrary parameter value in input range to generate corresponding race's model and part submodel, According to the prompting that reports an error of pop-up come the logic association parameter to adjustment race's model and each part submodel, until no longer popping up report Mistake prompting, so as to fulfill the accurate logic association of race's model to part submodel.
Figure 15 shows temporary building design according to embodiments of the present invention and modeling, including passing through network 320 An at least electronic equipment 310 and a database server 330 for connection.
Wherein, the electronic equipment 310 includes at least one processor 311 and leads to at least one processor Believe the memory 312 of connection;The memory 312 is stored with the instruction that can be performed by least one processor 311, described Instruction is performed by least one processor 311, so that at least one processor 311 is able to carry out aforementioned any implementation Method disclosed in example.3 d graphic library 331 and modular three-dimensional of the database server 330 for memory module Race's model library 332.
Above-described embodiment has broken conventional modeling method, by " race " editing machines of Revit platforms by the wall of one off houses, The components such as column, beam, door and window, roof can just be integrated in modeling primary, be formed one by one such as the module of " building blocks ", and Each module can either be controlled by " big " requirement, and can carry out independent change according to " small " requirement, and technical staff is interim In the design in house, it will be able to quickly that each one off houses module is quick according to demand by the way of " playing with building blocks " It erects and, when encountering scheme modifying, need to only be controlled by several simple commands with regard to the variation of one off houses can be completed, with regard to energy Enough playing reduces software operation difficulty, modeling efficiency is greatly improved, and can also make Unified Model, meet enterprise's correlation model mark It is accurate.
The detailed description of the above, the only specific embodiment of the invention rather than limitation of the present invention.The relevant technologies The technical staff in field is in the case of the principle and range for not departing from the present invention, various replacements, modification and the improvement made It should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of temporary building design and modeling method based on BIM, which is characterized in that the method includes:
Modular decomposition is carried out to temporary building yet to be built on BIM software platforms, establishes modular 3 d graphic library;It is based on Modular 3 d graphic library establishes modular three Uygurs model library;Each in three Uygurs's model libraries of setup module The constructing variable of race's model, material and decoration parameter, structural parameters and model attributes parameter;Three Uygurs of setup module The logic association parameter of each race's model and each part submodel in model library;It is selected from modular three Uygurs model library It selects multiple race's models to be combined, obtains threedimensional model of the temporary building yet to be built on BIM software platforms and corresponding various The quantity of part submodel.
2. according to the method described in claim 1, it is characterized in that, the method includes:Based on modular 3 d graphic library Part submodel is established, by forming modular three Uygurs model to part submodel progress nesting.
3. according to the method described in claim 2, it is characterized in that, the part submodel includes:Ground beam basis, floor, window, Submodel in the middle part of door, curtain wall, double stair, single stair, open type board house stair, wall, roof end and roof;
Race's model includes:Open type, closed and curtain wall type corridor board house first floor end, first floor middle part, top layer end Portion, top layer middle part, staircase and entrance hall race model.
4. according to the method described in claim 1, it is characterized in that, the constructing variable is used to control the appearance geometry of race's model Size, standard width of a room in an old-style house length, net deep length, story height, width of corridor and longitudinal standard wall quantity including board house.
5. according to the method described in claim 1, it is characterized in that, the logic association parameter includes stair step quantity, ginseng According to object range difference away from, trigonometric function, mathematical formulae and conditional function.
6. according to the method described in claim 1, it is characterized in that, the BIM software platforms are the Revit of autodesk, inc. Platform.
7. according to the method described in claim 1, it is characterized in that, the method further includes joining in setting logic association After number, ground beam basis, ground paving, wall, the length and width of top surface furred ceiling submodel and the height degree in room are first set It takes measurements;Several identical submodels are further generated by the array functional of race's editing machine, to control the appearance body of race's model Measure size.
8. according to the method described in claim 1, it is characterized in that, the method further includes:From modular three-dimensional It is selected in race's model library before multiple race's models are combined, the ginseng of each race's model from modular three Uygurs model library The height that the standard width of a room in an old-style house length of selection board house, width, the quantity of board house on-gauge plate and room successively are chosen in number is configured.
9. according to the method described in claim 1, it is characterized in that, the method further includes:From modular three-dimensional It is selected in race's model library before multiple race's models are combined, to the ginseng of each race's model in modular three Uygurs model library Number carries out control test, and inputting race's editing machine of BIM software platforms allows the arbitrary parameter value in input range to generate accordingly Race's model and part submodel, closed according to the prompting that reports an error of pop-up come the logic to adjustment race's model and each part submodel Join parameter, until no longer popping up the prompting that reports an error.
10. a kind of temporary building design and modeling based on BIM, which is characterized in that the system comprises connected by network At least electronic equipment connect and a database server;
Wherein, the electronic equipment includes at least one processor and is deposited with what at least one processor communication was connect Reservoir;The memory is stored with the instruction that can be performed by least one processor, and described instruction is by described at least one Processor performs, so that at least one processor is able to carry out the side described in any one of aforementioned any claim 1 to 9 Method;
The database server is used for the 3 d graphic library of memory module and modular three Uygurs model library.
CN201711466902.4A 2017-12-28 2017-12-28 A kind of temporary building design and modeling method and system based on BIM Pending CN108197376A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711466902.4A CN108197376A (en) 2017-12-28 2017-12-28 A kind of temporary building design and modeling method and system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711466902.4A CN108197376A (en) 2017-12-28 2017-12-28 A kind of temporary building design and modeling method and system based on BIM

Publications (1)

Publication Number Publication Date
CN108197376A true CN108197376A (en) 2018-06-22

Family

ID=62585918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711466902.4A Pending CN108197376A (en) 2017-12-28 2017-12-28 A kind of temporary building design and modeling method and system based on BIM

Country Status (1)

Country Link
CN (1) CN108197376A (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108871442A (en) * 2018-06-29 2018-11-23 宝葫历史建筑科技(上海)有限公司 A kind of long-range monitoring and warning system based on BIM and Internet of Things
CN109086552A (en) * 2018-08-30 2018-12-25 中铁二局集团有限公司 A kind of furred ceiling design and construction moulding fast modeling method based on BIM
CN109165476A (en) * 2018-10-16 2019-01-08 广东电网有限责任公司 A kind of modeling method and simulation of wind method of modularization wind-field model
CN109344439A (en) * 2018-09-01 2019-02-15 鼎宸建设科技有限公司 A kind of modeling of building block formula and its simulative construction method based on BIM
CN109710785A (en) * 2018-12-27 2019-05-03 中民筑友科技投资有限公司 A kind of management method, device, system and the storage medium of picture library figure cluster
CN109934909A (en) * 2019-03-04 2019-06-25 深圳市迷你玩科技有限公司 Reconstruct method, apparatus, electronic equipment and the storage medium of 3D model
CN110866295A (en) * 2018-08-10 2020-03-06 华龙国际核电技术有限公司 Three-dimensional modeling method and device for building
CN111783188A (en) * 2020-05-22 2020-10-16 杭州嗡嗡科技有限公司 BIM-based assembly type free design tool and deepened design method thereof
CN112270034A (en) * 2020-11-24 2021-01-26 筑友智造科技投资有限公司 Wall splitting method, device and system
CN113111423A (en) * 2021-04-21 2021-07-13 重庆华兴工程咨询有限公司 Steel structure virtual assembly method, system and device based on BIM and storage medium
CN113158278A (en) * 2020-01-07 2021-07-23 北京博超时代软件有限公司 Temporary building design method and device, equipment and storage medium
CN113468641A (en) * 2021-06-30 2021-10-01 广联达科技股份有限公司 Method and device for creating geometric model of handrail, electronic equipment and storage medium
CN114450737A (en) * 2019-10-08 2022-05-06 M·肖 Design building model making system
CN114611179A (en) * 2022-03-21 2022-06-10 中建交通建设集团有限公司 Revit platform-based structural member family type creation method and system
CN114692270A (en) * 2022-03-21 2022-07-01 中建交通建设集团有限公司 Revit platform-based method and system for creating structural member family instance
CN115631309A (en) * 2022-12-21 2023-01-20 广东电网有限责任公司江门供电局 Three-dimensional modeling method and device for power distribution network equipment
CN117078887A (en) * 2023-10-17 2023-11-17 成都古河云科技有限公司 Three-dimensional model visual penetration method, system, electronic equipment and storage medium
CN117150622A (en) * 2023-09-08 2023-12-01 中国建筑第二工程局有限公司 Archaized roof cornice characteristic optimization method based on GAN algorithm and BIM technology

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101477197A (en) * 2009-01-24 2009-07-08 哈尔滨工业大学 Simulation method used for woodland complex scene high-spectrum remote sensing data
CN103942388A (en) * 2014-04-18 2014-07-23 重庆市勘测院 Large-scale building information model and three-dimensional digital city integration method
CN206162531U (en) * 2016-08-31 2017-05-10 中建安装工程有限公司 Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique
CN107515991A (en) * 2017-09-06 2017-12-26 北京市金龙腾装饰股份有限公司 A kind of house type full trim simulation shows method and display systems based on BIM technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101477197A (en) * 2009-01-24 2009-07-08 哈尔滨工业大学 Simulation method used for woodland complex scene high-spectrum remote sensing data
CN103942388A (en) * 2014-04-18 2014-07-23 重庆市勘测院 Large-scale building information model and three-dimensional digital city integration method
CN206162531U (en) * 2016-08-31 2017-05-10 中建安装工程有限公司 Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique
CN107515991A (en) * 2017-09-06 2017-12-26 北京市金龙腾装饰股份有限公司 A kind of house type full trim simulation shows method and display systems based on BIM technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘杰 等: "BIM技术在上海国际舞蹈中心项目中的应用", 《建设监理》 *
广东省建设执业资格注册中心: "《二级建造师继续教育必修教材之三(下册)》", 31 October 2016, 中国环境出版社 *

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108871442A (en) * 2018-06-29 2018-11-23 宝葫历史建筑科技(上海)有限公司 A kind of long-range monitoring and warning system based on BIM and Internet of Things
CN110866295A (en) * 2018-08-10 2020-03-06 华龙国际核电技术有限公司 Three-dimensional modeling method and device for building
CN109086552A (en) * 2018-08-30 2018-12-25 中铁二局集团有限公司 A kind of furred ceiling design and construction moulding fast modeling method based on BIM
CN109344439A (en) * 2018-09-01 2019-02-15 鼎宸建设科技有限公司 A kind of modeling of building block formula and its simulative construction method based on BIM
CN109165476A (en) * 2018-10-16 2019-01-08 广东电网有限责任公司 A kind of modeling method and simulation of wind method of modularization wind-field model
CN109710785A (en) * 2018-12-27 2019-05-03 中民筑友科技投资有限公司 A kind of management method, device, system and the storage medium of picture library figure cluster
CN109934909A (en) * 2019-03-04 2019-06-25 深圳市迷你玩科技有限公司 Reconstruct method, apparatus, electronic equipment and the storage medium of 3D model
CN114450737A (en) * 2019-10-08 2022-05-06 M·肖 Design building model making system
CN113158278A (en) * 2020-01-07 2021-07-23 北京博超时代软件有限公司 Temporary building design method and device, equipment and storage medium
CN113158278B (en) * 2020-01-07 2024-02-06 北京博超时代软件有限公司 Temporary building design method, device, equipment and storage medium
CN111783188A (en) * 2020-05-22 2020-10-16 杭州嗡嗡科技有限公司 BIM-based assembly type free design tool and deepened design method thereof
CN112270034A (en) * 2020-11-24 2021-01-26 筑友智造科技投资有限公司 Wall splitting method, device and system
CN113111423A (en) * 2021-04-21 2021-07-13 重庆华兴工程咨询有限公司 Steel structure virtual assembly method, system and device based on BIM and storage medium
CN113468641B (en) * 2021-06-30 2024-01-30 广联达科技股份有限公司 Method, device, electronic equipment and storage medium for creating geometric model of railing
CN113468641A (en) * 2021-06-30 2021-10-01 广联达科技股份有限公司 Method and device for creating geometric model of handrail, electronic equipment and storage medium
CN114611179A (en) * 2022-03-21 2022-06-10 中建交通建设集团有限公司 Revit platform-based structural member family type creation method and system
CN114692270A (en) * 2022-03-21 2022-07-01 中建交通建设集团有限公司 Revit platform-based method and system for creating structural member family instance
CN115631309A (en) * 2022-12-21 2023-01-20 广东电网有限责任公司江门供电局 Three-dimensional modeling method and device for power distribution network equipment
CN117150622A (en) * 2023-09-08 2023-12-01 中国建筑第二工程局有限公司 Archaized roof cornice characteristic optimization method based on GAN algorithm and BIM technology
CN117150622B (en) * 2023-09-08 2024-05-07 中国建筑第二工程局有限公司 Archaized roof cornice characteristic optimization method based on GAN algorithm and BIM technology
CN117078887B (en) * 2023-10-17 2024-01-02 成都古河云科技有限公司 Three-dimensional model visual penetration method, system, electronic equipment and storage medium
CN117078887A (en) * 2023-10-17 2023-11-17 成都古河云科技有限公司 Three-dimensional model visual penetration method, system, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN108197376A (en) A kind of temporary building design and modeling method and system based on BIM
Wu et al. A critical review of the use of 3-D printing in the construction industry
CN109684662A (en) A kind of construction method of intellectual assembled architecture
Cang et al. A new method for calculating the embodied carbon emissions from buildings in schematic design: Taking “building element” as basic unit
KR20160010245A (en) Automatic quantity calculation method for calculating rough estimate using BIM in construction design stage and information classification system
CN111950052A (en) BIM technology-based exterior cladding construction method for integrally-assembled building
CN112016148B (en) Calculation method and system for stair engineering quantity
CN108427819A (en) A kind of generation method and device of complete assembled BIM buildings models
US20220374557A1 (en) Design and construction of fence panels and fence panel components
CN109033558A (en) External scaffolding model modelling approach based on Revit platform
CN108416076B (en) BIM technology-based assembly type building design method
CN107292060A (en) Basement roadway applications method based on BIM technology
US20210165922A1 (en) Design and construction of fence panels and fence panel components
CN113158320B (en) Three-dimensional modeling system based on building plane design
CN107423523B (en) BIM-based complex shared space assembly building decoration construction method
Gleń et al. Comparative analysis of the inventory process using manual measurements and laser scanning
Visintini et al. Advanced 3d modeling versus building information modeling: The case study of palazzo ettoreo in sacile (Italy)
KR102438103B1 (en) Method of manufacturing 3D drawing using 2D drawing for construction
Glymph Evolution of the digital design process
CN110379012A (en) A kind of buildings model generation processing method based on BIM
CN105844016B (en) A method of the proposed building quantity of acquisition based on buildings model cutting
CN106840117A (en) A kind of method for measuring the side's of returning unwrapping wire
Dore et al. Semi-automatic techniques for as-built BIM façade modeling of historic buildings
Thaller et al. Developing parametric building models–the gandis use case
Diez et al. Autmod3: an automatic 3D modularization system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant after: China Railway Second Bureau Construction Co.,Ltd.

Applicant after: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Applicant before: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20190823

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant before: China Railway Second Bureau Construction Co.,Ltd.

Applicant before: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20180622

RJ01 Rejection of invention patent application after publication