CN206162531U - Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique - Google Patents
Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique Download PDFInfo
- Publication number
- CN206162531U CN206162531U CN201621015641.5U CN201621015641U CN206162531U CN 206162531 U CN206162531 U CN 206162531U CN 201621015641 U CN201621015641 U CN 201621015641U CN 206162531 U CN206162531 U CN 206162531U
- Authority
- CN
- China
- Prior art keywords
- machine tool
- control machine
- reinforcing bar
- digit control
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model discloses a does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique, including reinforced concrete structure design data memory, BIM processing platform, reinforcing bar module code server, digit control machine tool information identification server, numerical control machine tool controller, digit control machine tool, product collection device and information system management platform server, reinforced concrete structure design data memory, BIM processing platform, reinforcing bar module code server, digit control machine tool information identification server and numerical control machine tool controller respectively through data transmission device with information system management platform server connects. The utility model discloses the method can realize the full life cycle's of reinforcing bar production information flow management, compares the traditional handicraft, saves the time limit for a project greatly, and reduce cost greatly improves production efficiency, reduces the artificial mistake that leads to that intervenes.
Description
Technical field
The utility model belongs to civil engineering structure field, is related to application of the BIM technology in building field, and in particular to Yi Zhongji
In the reinforcement detailing calculating-modularization processing unit (plant) of BIM technology.
Background technology
At present, domestic reinforcement detailing rests on always the stage for construction drawing reinforcement detailing, i.e. technical staff by setting
Meter construction drawing calculates steel bar meter inventory and draws the process of manuscript.
With the development of information technology, " zooming " of the reinforcement detailing from initial " hand computation " by now, reinforcement detailing efficiency
Have been realized in huge leap.There are various construction stage Deepen Design softwares on market, steel is also included among these
Version of tendon and muscle sample software, the common feature of these softwares be due to the blocking data in design and construction stage, be all want artificial overmolded or
Through the process that the mark identification to construction drawing is modeled again.This simply instead of with two-dintension CAD drawing turn over sample by hand in itself,
Go to recognize that lines replace craft pen to go to turn over sample with mouse is clicked on manually, be construction field " head-twitch test ", be not carried out design
To the BIM data exchanges of construction:Digital information is exchanged, management and the seamless smooth of access are docked.
It is well known that the construction stage reinforcement detailing software generally existing problems with based on CAD diagram paper:1)Need basis
Element type recognizes successively the flat method markup information on each component, and workload is big and efficiency is low;2)What each designing institute provided
DWG drawings specification not to the utmost causes construction stage reinforcement detailing personnel early stage to do substantial amounts of drawing joint examination work;3)Current electricity
Count according to one-way data flow process is belonged to, i.e., reinforcing bar data are picked up from CAD and is modeled, deepened;Ultimately generate reinforcing bar material list and
Blanking figure, data can not be reviewed inversely;4)Electron delivery version due to lacking designing institute, it is difficult to realize that reinforcement detailing was deepened
Journey, for the process of reinforcing bar complexity connecting node all meets at Contraction in Site personnel, causes error rate height and waste of material etc.
Problem;5)Many people's work are limited by conventional individual version software architecture, and efficiently the difficulty of collaboration is larger.
In view of the problems that at present reinforcement detailing software is present, market urgently so a software:For any coagulation
The achievement of soil structure design software, the reinforcement detailing software for calculation can read the reinforcing bar information of design expression, form reinforcing bar and turn over
The basic data model of sample, is deepened based on the data model, turns over sample, adjust, go out material list, statistic, group valency etc..Structure sets
Meter software realizes end-to-end data transfer with reinforcement detailing software, reduces artificial intervention, realizes the lossless transmission of information, and then
Greatly improve the whole efficiency of reinforcement detailing.
Another important feature of BIM technology is its powerful three-dimension interaction ability, can in the form of visualization of 3 d model
With vivid, accurate guiding construction process, for reinforcement detailing process has great significance.
Collaborative is an important value of BIM technology, realizes the collaboration of data bottom by information technology and then realizes
The online collaborative work of many people, many people's concurrent workings can increase substantially the efficiency of reinforcement detailing work.
In short, a kind of reinforcement detailing computational methods based on BIM technology, while and KXG(Such as material
Management and control, progress control, safety management etc.), the docking such as Digit Control Machine Tool, form a set of effective modularization processing method, tool
There is preferable extensibility, it is with the obvious advantage, possess wide application development space.
The content of the invention
Goal of the invention:The utility model purpose is for computational efficiency is low, workload is big present in prior art etc.
Problem, there is provided a kind of standardization, informationalized reinforcement detailing calculating-modularization processing unit (plant) and method based on BIM technology.
Technical scheme:A kind of reinforcement detailing calculating-modularization system of processing based on BIM technology, including structural model number
According to design module, bar construction design data import modul, BIM model management modules, rebar model coding module, modularization add
Work model data export module, Digit Control Machine Tool model information identification module, reinforcing bar modularized production processing module and information-based pipe
Platform;The bar construction design data import modul, BIM model management modules, rebar model coding module, modularization add
Work model data export module, Digit Control Machine Tool model information identification module and reinforcing bar modularized production processing module be capable of achieving with
The end-to-end data transfer of described information management platform;
The structural model design data module designs the basic data of reinforcement detailing, and bar construction design data imports mould
Block is used to gathering and deriving the reinforcing bar information data of design expression;
The BIM model managements module is used to read the reinforcing bar information of design expression, forms the basic data of reinforcement detailing
Model, is deepened based on the data model, turns over sample, adjust, go out material list, statistic, group valency;
Management function of the rebar model coding module based on informatization platform, to rebar model unique encodings are realized,
Enter row label effect to processing model information using RIFD technologies simultaneously, be that identification, processing and the installation of rebar model information is carried
Rise efficiency to prepare;
The modularization processing model data export module is used to collect the data of the rebar model coding module and lead
Go out;
The Digit Control Machine Tool model information identification module is based on information system management platform, by reinforcing bar modularization process data letter
Breath " zero " loss ground imports Digit Control Machine Tool system of processing, loses without information, it is ensured that precision;
The processing model information that the reinforcing bar modularized production processing module is imported according to anterior operation, realizes that automation adds
Work, produces product and preserves.
Further, the structural model design data module includes component level model design data and reinforcing bar rank mould
Two sub-modules of type design data.
Further, the BIM model managements module includes the data management of component level model and reinforcing bar level model number
According to two sub-modules of management.
Further, the component level model data include wall body structure model data, girder construction model data, hardened
Structure model data and rod structure model data;The reinforcing bar level model includes reinforcing bar model data, reinforcing bar length data, reinforcing bar
Location information data.
Further, the Digit Control Machine Tool model information identification module includes data conversion sub-module, will be from reinforcing bar mould
The steel bar meter data message of type coding module is converted to the discernible data message of Digit Control Machine Tool.
Further, Quick Response Code identification technique is set up in described information management platform, by cell-phone customer terminal and two dimension
Feed and blanking figure with regard to reinforcing bar production on information system management platform is operated bag by code identification technique by schedule
Push.
Further, described information system management platform is provided with rebar model Classifying Sum module, recalls and completes coding
Rebar model data Classifying Sum is carried out to it and the form that numerical control device can be recognized is converted into, by operation information pipe
Platform selects Steel Reinforcing Bar Material saddlebag to carry out prefabrication processing.
Carry the device of the system, including design of reinforced concrete structure data storage, BIM processing platforms, reinforcing bar mould
Block encoder server, Digit Control Machine Tool information identification server, controller of digital controlled machine tool, Digit Control Machine Tool, product collecting device and letter
Breathization management platform server;The design of reinforced concrete structure data storage, BIM processing platforms, reinforcing bar module coding
Server, Digit Control Machine Tool information identification server and controller of digital controlled machine tool pass sequentially through data transmission set connection, the number
Control lathe and product collecting device are connected with the Digit Control Machine Tool control device, and by the Digit Control Machine Tool control device numerical control is instructed
The collection of machine and product, the products export of the Digit Control Machine Tool connects the product collecting device;The reinforced concrete
Soil structure design data memory, BIM processing platforms, reinforcing bar module coding server, Digit Control Machine Tool information identification server and
Controller of digital controlled machine tool is connected respectively by data transmission device with described information management platform server;
Further, the BIM processing platforms connect some component level model data storages and reinforcing bar level model
Memory.
Further, the reinforcing bar module coding server connects radio-frequency recognition system, for arranging electricity to rebar model
Subtab.
Further, it is logical that product transmission is set between the products export of the Digit Control Machine Tool and the product collecting device
Road, arranges product coding verifying unit in the transmission channel, for proofreading the uniformity of the coding on product and design coding.
Further, the product collecting device includes product classification device and product automatic packing apparatus.
The utility model also provides a kind of reinforcement detailing calculating-modularization processing method based on BIM technology, including as follows
Step:
(1)Bar construction is designed, and by design data information import information management platform;
(2)Bar construction information is imported by BIM model management modules by described information management platform, to original design
Data model be optimized, turn over sample, adjust, go out material list, statistic, group valency, the model data after being optimized;
(3)Model data after optimization is imported into rebar model coding module based on information system management platform, to reinforcing bar mould
Type carries out unique encodings;
(4)The unique encodings information of rebar model is imported by the identification of Digit Control Machine Tool model information based on information system management platform
Module, realizes being suitable to the data message verification of Digit Control Machine Tool processing, optimization and changes to reinforcing bar module machining information;
(5)Machining information data after verification, optimization and conversion are imported into reinforcing bar modularization based on information system management platform
Production and processing module, realizes that modularized production is processed and assembled in situ.
Further, it is to improve stock utilization, reduces spillage of material, step(2)In model optimization include to reinforcing bar
The optimization of position is calculated and the optimization of reinforcing bar fracture form is calculated, and automatically looks for optimal fracture form, reduce loss.
Beneficial effect:(1)The utility model factor data can interoperability, can be greatly reduced unnecessary, time-consuming, fallibility
Overmolded works, while also reducing artificial intervention, realizes the lossless transmission of information;(2)The utility model is because of the three-dimension interaction of figure
Ability can with it is vivider, more accurately instruct turn over sample operation;On the one hand work is cooperateed with together because online cooperative ability is capable of achieving many people
Industry, greatly improves whole efficiency;On the other hand because all kinds of achievements are by digital expression, the circulation and interaction of information are realized;
(3)Conventional method screwing steel bars, the proportion of goods damageds are about 3%, and the utility model is directly read based on the reinforcement detailing software of BIM technology
Design data is taken, material list is generated, prevents the deviation occurred during flat method knowledge figure, the degree of accuracy is high, while being optimized using cloud computing
Material list, can be down to 0.5%, economic benefits by loss;(4)Reinforcement detailing model data can use from design, a set of model
In budget, material, site operation, it is to avoid bid in prior art, budget, labor service secondary overmolded, the process that repeats overmolded, pole
Big raises labour productivity, and the input of human cost is reduced, with stronger social benefit;(5)Information based on BIM technology
Change management platform, this device realizes reinforcement detailing calculating, and optimization, module coding, the whole process industrial chain of Digital manufacturing is carried
High production efficiency.
Description of the drawings
Fig. 1 is the utility model implementation process diagram;
Fig. 2 is the utility model attachment structure schematic diagram;
Wherein 1, component level model data storage, 2, reinforcing bar level model memory.
Specific embodiment
Technical solutions of the utility model are described in detail below by accompanying drawing, but protection domain of the present utility model
It is not limited to the embodiment.
Embodiment:A kind of reinforcement detailing calculating-modularization system of processing based on BIM technology, including structural model data
Design module, bar construction design data import modul, BIM model management modules, rebar model coding module, modularization processing
Model data export module, Digit Control Machine Tool model information identification module, reinforcing bar modularized production processing module and information system management
Platform;The bar construction design data import modul, BIM model management modules, rebar model coding module, modularization processing
Model data export module, Digit Control Machine Tool model information identification module and reinforcing bar modularized production processing module are capable of achieving and institute
State the end-to-end data transfer of information system management platform;
The structural model design data module includes that component level model design data and reinforcing bar level model data set
Two sub-modules of meter, for designing the basic data of reinforcement detailing, bar construction design data import modul is used to gather and lead
Go out the reinforcing bar information data of design expression;Component level model data include wall body structure model data, girder construction model data,
Hardened structure model data and rod structure model data;The reinforcing bar level model include reinforcing bar model data, reinforcing bar length data,
Reinforcement location information data;
The BIM model managements module is used to read the reinforcing bar information of design expression, forms the basic data of reinforcement detailing
Model, is deepened based on the data model, turns over sample, adjust, go out material list, statistic, group valency;
Management function of the rebar model coding module based on informatization platform, to rebar model unique encodings are realized,
Enter row label effect to processing model information using RIFD technologies simultaneously, be that identification, processing and the installation of rebar model information is carried
Rise efficiency to prepare;
The modularization processing model data export module is used to collect the data of the rebar model coding module and lead
Go out;
The Digit Control Machine Tool model information identification module includes data conversion sub-module, based on information system management platform, will
Reinforcing bar modularization process data information " zero " loss ground imports Digit Control Machine Tool system of processing, is converted to the discernible number of Digit Control Machine Tool
It is believed that breath, loses, it is ensured that precision without information;
The processing model information that the reinforcing bar modularized production processing module is imported according to anterior operation, realizes that automation adds
Work, produces product and preserves.
In the utility model scheme, Quick Response Code identification technique is set up on information system management platform, by cell-phone customer terminal and
Feed and blanking figure with regard to reinforcing bar production on information system management platform is carried out work by Quick Response Code identification technique by schedule
Make bag to push;Rebar model Classifying Sum module is additionally provided with information system management platform, the rebar model number for completing to encode is recalled
According to carrying out Classifying Sum to it and being converted into the form that numerical control device can be recognized, steel is selected by operation information management platform
Muscle blanking saddlebag carries out prefabrication processing.
Carrying the entity apparatus of the system includes design of reinforced concrete structure data storage, BIM processing platforms, reinforcing bar
Module coding server, Digit Control Machine Tool information identification server, controller of digital controlled machine tool, Digit Control Machine Tool, product collecting device and
Information system management Platform Server;The design of reinforced concrete structure data storage, BIM processing platforms, reinforcing bar module are compiled
Code server, Digit Control Machine Tool information identification server and controller of digital controlled machine tool pass sequentially through data transmission set connection, described
Digit Control Machine Tool and product collecting device are connected with the Digit Control Machine Tool control device, and by the Digit Control Machine Tool control device number is instructed
The collection of control machine and product, the products export of the Digit Control Machine Tool connects the product collecting device;The reinforcing bar is mixed
Xtah Crude Clay structure design data memory, BIM processing platforms, reinforcing bar module coding server, Digit Control Machine Tool information identification server
It is connected with described information management platform server by data transmission device respectively with controller of digital controlled machine tool;At the BIM
Platform connects some component level model data storages 1 and reinforcing bar level model memory 2;Reinforcing bar module coding server
Connection radio-frequency recognition system, for arranging electronic tag to rebar model, has product on the product of Digit Control Machine Tool processing
Coding, arranges product transmission channel between the products export of the Digit Control Machine Tool and the product collecting device, the transmission is led to
Product coding verifying unit is set on road, for proofreading the uniformity of the coding on product and design coding;Product collecting device
Including product classification device and product automatic packing apparatus, classification automatically and automatically packaging are carried out to the product of numerical control machine tooling
Warehouse-in.
The method that reinforcing bar production is carried out using the above-mentioned reinforcement detailing calculating-modularization system of processing based on BIM technology, bag
Include following steps:
(1)Bar construction is designed, including to component ranks such as wall body structure, girder construction, hardened structure and rod structures
The reinforcing bar level model data of the design of model data and the reinforcing bar model, reinforcing bar length and reinforcement location information set
Meter;And by design data information import information management platform;
(2)Bar construction information is imported by BIM model management modules, the number to original design by information system management platform
It is optimized according to model, turns over sample, adjust, go out material list, statistic, group valency;Optimization therein includes the optimization meter to reinforcement location
Calculate and the optimization of reinforcing bar fracture form is calculated, automatically look for optimal fracture form, reduce loss, the pattern number after being optimized
According to;
(3)Model data after optimization is imported into rebar model coding module based on information system management platform, to reinforcing bar mould
Type carries out unique encodings;
(4)The unique encodings information of rebar model is imported by the identification of Digit Control Machine Tool model information based on information system management platform
Module, realizes being suitable to the data message verification of Digit Control Machine Tool processing, optimization and changes to reinforcing bar module machining information;
(5)Machining information data after verification, optimization and conversion are imported into reinforcing bar modularization based on information system management platform
Production and processing module, realizes that modularized production is processed and assembled in situ.
As described above, although the utility model has been represented and described with reference to specific preferred embodiment, it must not
It is construed to the restriction to the utility model itself.In the spirit and scope of the present utility model defined without departing from claims
Under the premise of, can in the form and details various changes can be made to it.
Claims (5)
1. a kind of reinforcement detailing calculating-modularization processing unit (plant) based on BIM technology, it is characterised in that:Including armored concrete
Structure design data storage, BIM processing platforms, reinforcing bar module coding server, Digit Control Machine Tool information identification server, numerical control
Machine tool controller, Digit Control Machine Tool, product collecting device and information system management Platform Server;The design of reinforced concrete structure
Data storage, BIM processing platforms, reinforcing bar module coding server, Digit Control Machine Tool information identification server and Digit Control Machine Tool control
Device processed passes sequentially through data transmission set connection, the Digit Control Machine Tool and product collecting device and the Digit Control Machine Tool control device
It is connected, instructs Digit Control Machine Tool operation and the collection of product, the product of the Digit Control Machine Tool to go out by the Digit Control Machine Tool control device
The mouth connection product collecting device;The design of reinforced concrete structure data storage, BIM processing platforms, reinforcing bar module
Encoder server, Digit Control Machine Tool information identification server and controller of digital controlled machine tool are respectively by data transmission device and the letter
Breathization management platform server connects.
2. the reinforcement detailing calculating-modularization processing unit (plant) based on BIM technology according to claim 1, it is characterised in that:
The BIM processing platforms connect some component level model data storages and reinforcing bar level model memory.
3. the reinforcement detailing calculating-modularization processing unit (plant) based on BIM technology according to claim 1, it is characterised in that:
The reinforcing bar module coding server connects radio-frequency recognition system.
4. the reinforcement detailing calculating-modularization processing unit (plant) based on BIM technology according to claim 1, it is characterised in that:
Product transmission channel is set between the products export of the Digit Control Machine Tool and the product collecting device, is set in the transmission channel
Product coding verifying unit is put, for proofreading the uniformity of the coding on product and design coding.
5. the reinforcement detailing calculating-modularization processing unit (plant) based on BIM technology according to claim 1, it is characterised in that:
The product collecting device includes product classification device and product automatic packing apparatus.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621015641.5U CN206162531U (en) | 2016-08-31 | 2016-08-31 | Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621015641.5U CN206162531U (en) | 2016-08-31 | 2016-08-31 | Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206162531U true CN206162531U (en) | 2017-05-10 |
Family
ID=58650082
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621015641.5U Active CN206162531U (en) | 2016-08-31 | 2016-08-31 | Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206162531U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107366224A (en) * | 2017-07-26 | 2017-11-21 | 中交公局第二工程有限公司 | One kind is based on BIM modeling technique space three-dimensional abnormity bridge pier Joint Re-bar Constructions |
CN108197376A (en) * | 2017-12-28 | 2018-06-22 | 中铁二局集团有限公司 | A kind of temporary building design and modeling method and system based on BIM |
CN109032075A (en) * | 2018-06-28 | 2018-12-18 | 中铁山桥集团有限公司 | A kind of intelligence steel construction stock method and system |
CN109785436A (en) * | 2019-01-21 | 2019-05-21 | 广东星层建筑科技股份有限公司 | A kind of management method of the reinforcing bar information Life cycle based on BIM technology |
CN113378268A (en) * | 2021-06-07 | 2021-09-10 | 中国二十冶集团有限公司 | Underground pipe gallery deformation joint reinforcing steel bar refined electric calculation method and system based on BIM |
-
2016
- 2016-08-31 CN CN201621015641.5U patent/CN206162531U/en active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107366224A (en) * | 2017-07-26 | 2017-11-21 | 中交公局第二工程有限公司 | One kind is based on BIM modeling technique space three-dimensional abnormity bridge pier Joint Re-bar Constructions |
CN108197376A (en) * | 2017-12-28 | 2018-06-22 | 中铁二局集团有限公司 | A kind of temporary building design and modeling method and system based on BIM |
CN109032075A (en) * | 2018-06-28 | 2018-12-18 | 中铁山桥集团有限公司 | A kind of intelligence steel construction stock method and system |
CN109785436A (en) * | 2019-01-21 | 2019-05-21 | 广东星层建筑科技股份有限公司 | A kind of management method of the reinforcing bar information Life cycle based on BIM technology |
CN109785436B (en) * | 2019-01-21 | 2020-09-22 | 广东星层建筑科技股份有限公司 | BIM technology-based reinforcing steel bar information full life cycle management method |
CN113378268A (en) * | 2021-06-07 | 2021-09-10 | 中国二十冶集团有限公司 | Underground pipe gallery deformation joint reinforcing steel bar refined electric calculation method and system based on BIM |
CN113378268B (en) * | 2021-06-07 | 2022-11-11 | 中国二十冶集团有限公司 | Underground pipe gallery deformation joint reinforcing steel bar refined electric calculation method and system based on BIM |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106295078A (en) | A kind of reinforcement detailing computing module system of processing based on BIM technology and method | |
CN206162531U (en) | Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique | |
CN107256005B (en) | BIM technology-based steel bar numerical control machining method and equipment | |
CN105302096B (en) | Intelligent factory scheduling method | |
CN107542161A (en) | BIDA engineering of integrating technical systems | |
CN109146118B (en) | Prefabricated part storage yard optimization system based on optimization algorithm and optimization method thereof | |
CN103955754A (en) | Mold workshop scheduling method based on real-time production data collection | |
CN105160462A (en) | Reinforcement raw material information automatic integration apparatus and method for prefabricated concrete member | |
CN106354106A (en) | Data processing system based on MES | |
CN109544084A (en) | A kind of assembled architecture systematic difference method, system and terminal device | |
CN103337041A (en) | System for intelligent decision-making of concrete dam pouring construction based on knowledge engineering and method thereof | |
CN116993532B (en) | Method and system for improving preparation efficiency of battery parts | |
CN107368972A (en) | It is a kind of that work platform and its application method are sent based on BIM technology | |
Yue et al. | Multi-layered coding-based study on optimization algorithms for automobile production logistics scheduling | |
CN105718616A (en) | Reinforcement detailing production computation management method based on BIM (Building Information Modeling) | |
CN112288384A (en) | Application of P-BIAS-based fabricated building full-life-cycle management | |
CN103049551A (en) | Method for automatic association of data points of database in configuration software | |
CN106951621A (en) | A kind of simulation optimization method that Plan rescheduling is carried for ship | |
CN107832951A (en) | Application processes and system of the BIM in precast concrete supply chain | |
CN117371752A (en) | Building construction manpower scheduling method, medium and system | |
CN112765711A (en) | BIM modeling method for green building simulation calculation | |
CN113128041A (en) | Digital factory MES system development method based on digital twin virtual technology | |
CN104778564A (en) | Prefabricated part construction management method based on information coding | |
CN112613849A (en) | BIM-based project supervision information management method | |
CN111810144A (en) | Shale gas well engineering intelligent scheduling method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 210046 Yaojia Road, Qixia District, Nanjing, Jiangsu Province Patentee after: China Construction Installation Group Co., Ltd. Address before: 210046 Yaojia Road, Qixia District, Nanjing, Jiangsu Province Patentee before: China Construction Industrial Equipment Installation Co., Ltd. |