CN109032075A - A kind of intelligence steel construction stock method and system - Google Patents

A kind of intelligence steel construction stock method and system Download PDF

Info

Publication number
CN109032075A
CN109032075A CN201810686612.9A CN201810686612A CN109032075A CN 109032075 A CN109032075 A CN 109032075A CN 201810686612 A CN201810686612 A CN 201810686612A CN 109032075 A CN109032075 A CN 109032075A
Authority
CN
China
Prior art keywords
sigma
steel construction
stock
nest
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810686612.9A
Other languages
Chinese (zh)
Inventor
陈敏
胡广瑞
付常谊
乔新旺
刘申
尹春明
梁善国
臧俊贵
庄庆庆
张淼
王校朋
居力杰
李妍
陈婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Shanhaiguan Bridge Group Co Ltd
Original Assignee
China Railway Shanhaiguan Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Shanhaiguan Bridge Group Co Ltd filed Critical China Railway Shanhaiguan Bridge Group Co Ltd
Priority to CN201810686612.9A priority Critical patent/CN109032075A/en
Publication of CN109032075A publication Critical patent/CN109032075A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
    • G05B19/4093Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by part programming, e.g. entry of geometrical information as taken from a technical drawing, combining this with machining and material information to obtain control information, named part programme, for the NC machine
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/37Measurements
    • G05B2219/37079Display probing result on drawing taken from cad data

Abstract

The invention discloses a kind of intelligent steel construction stock method and systems, this feature of artificial treatment is relied on substantially for existing steel construction stock, jump out existing thinking, integration is developed, the multiple function of double optimization BIM system, Sigma NEST system and ERP system, intelligent steel construction stock preparation system is formed, realizes high quality, high efficiency, the stock of low cost;The stock accident for avoiding design data mistake from causing eliminates manual typing bring operation error, saves the Man Graphics time;The operation flow for improving Steel structure manufacturing enterprises, significantly improves the core competitiveness of enterprise.

Description

A kind of intelligence steel construction stock method and system
Technical field
Stock up technical field the present invention relates to steel construction, it is especially a kind of based on BIM system, Sigma NEST system and The intelligent steel construction stock method and system of ERP system.
Background technique
Currently, the stock in steel construction project generallys use the softwares such as manual operation CAD or EXCEL, design elements are pre- Row's stock forms double scale steel plate specifications of fixed width fixed length, then steel mill is submitted to be rolled by this.Although this stock mode Project purchasing cost can be saved to the maximum extent, but manual operation is excessive, seriously constrains project construction progress, influences to give birth to The duration is produced, drawback is a lot of.First, it is easy to appear maloperation, is needed using the artificial stock method of part walkthrough by project whole The figure and data of part carry out manual drawing and are input among the softwares such as CAD or EXCEL, and parts information amount is huge, thus Cause task amount big, data are cumbersome, are easy to operation error occur;Second, stock up low efficiency, stock be one it is cumbersome and The exigent work of accuracy rate, Steel Plate Information needed for needing to manually enter different parts, and draw the row of corresponding steel plate Material figure, for operator it is difficult to ensure that efficient work for a long time, this also results in the people in the case where wishing to ensure that accuracy rate Work must concentrate one's energy and take a significant amount of time completion stock work;Third occupies a large amount of human resources.
Summary of the invention
In view of the above-mentioned problems, the present invention provides a kind of intelligence based on BIM system, Sigma NEST system and ERP system Steel construction stock method and system can be changed.
The present invention protects a kind of intelligent steel construction stock method, integrates BIM system, Sigma NEST system and ERP The multiple function of system realizes intelligentized steel construction stock, specifically includes the following steps:
Step 1: the information-based threedimensional model of project is established using BIM system;
Step 2: establishing unitem data source to each part automatic numbering in threedimensional model, and generating includes each zero The part report inventory of part information, parts information include but is not limited to Part No., section profile, material, specification, weight;
Step 3: using the AutoLink function of Sigma NEST system and BIM system, all information of project being imported into Sigma In NEST system, including the part report inventory in BIM system, all information of project include at least part report inventory, Steel mill's rolling power data, equipment processing ability data, logistics transportation capacity data;
Step 4: with the batch facility of Sigma NEST system, according in design drawing batch editor's part report inventory Attribute of component, attribute of component include but is not limited to order number, priority, whether abnormity, affiliated structure position;
Step 5: with the Auto-matching function of Sigma NEST system, grouped task being carried out with work order, is ordered according to work Single grouping Auto-matching part and its information;
Step 6: according to work order, drawing marker map with the Stock plug-in unit of Sigma NEST system, automatically generate needs Steel plate specification and its information;
Step 7: marker map being inputted into numerically-controlled machine tool, automatically generates cutting NC code, completes the preparation that part blanking generates;
Step 8: the steel plate specification and its information of needs being imported into ERP system with the ERP output function of Sigma NEST system;
Step 9:ERP system automatically generated stock inventory.
Preferably, before step 5, with the batch facility of Sigma NEST system, edit part technique dosage, Cutting mode, blanking priority.
Preferably, ERP system connects steel mill's ERP system, directly transmission purchase order.
The present invention also protects a kind of intelligent steel construction stock preparation system, by BIM system, Sigma NEST system and ERP System composition, using above-mentioned stock method.
Beneficial effects of the present invention: this feature of artificial treatment is relied on substantially for existing steel construction stock, is jumped out existing Thinking, integration are developed, the multiple function of double optimization BIM system, Sigma NEST system and ERP system, are formed intelligent Steel construction stock preparation system realizes high quality, high efficiency, the stock of low cost;The stock accident for avoiding design data mistake from causing, Manual typing bring operation error is eliminated, the Man Graphics time is saved;Improve the operation flow of Steel structure manufacturing enterprises, significantly Improve the core competitiveness of enterprise.
Detailed description of the invention
Fig. 1 is a kind of flow chart of intelligent steel construction stock method.
Specific embodiment
Technical scheme in the embodiment of the invention is clearly and completely described with reference to the accompanying drawing, it is clear that described Embodiment be only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ability Domain those of ordinary skill every other embodiment obtained, shall fall within the protection scope of the present invention.
Embodiment 1
A kind of intelligence steel construction stock preparation system, is made of BIM system, Sigma NEST system and ERP system, use it is standby Material method as shown in Figure 1, specifically includes the following steps:
Step 1: the information-based threedimensional model of project is established using BIM system;
Step 2: establishing unitem data source to each part automatic numbering in threedimensional model, and generating includes each zero The part report inventory of part information realizes Whole Life Cycle of Projects information sharing;Parts information includes but is not limited to Part No., cuts Face profile, material, specification, weight;
Step 3: using the AutoLink function of Sigma NEST system and BIM system, all information of project being imported into Sigma In NEST system, all information of project include at least part report inventory, steel mill's rolling power data, equipment processing ability number According to, logistics transportation capacity data;Part report inventory can be edited according to demand before importing Sigma NEST system;
Step 4: with the batch facility of Sigma NEST system, according in design drawing batch editor's part report inventory Attribute of component, attribute of component include but is not limited to order number, priority, whether abnormity, affiliated structure position;
Step 5: with the Auto-matching function of Sigma NEST system, grouped task being carried out with work order, is ordered according to work Single grouping Auto-matching part and its information;
Step 6: according to work order, drawing marker map with the Stock plug-in unit of Sigma NEST system, automatically generate needs Steel plate specification and its information;
Step 7: marker map being inputted into numerically-controlled machine tool, automatically generates cutting NC code, completes the preparation that part blanking generates;
Step 8: the steel plate specification and its information of needs being imported into ERP system with the ERP output function of Sigma NEST system;
Step 9:ERP system automatically generated stock inventory.
Before step 5, with the batch facility of Sigma NEST system, technique dosage, the cutting side of part are edited Formula, blanking priority;ERP system connects steel mill's ERP system, directly transmission purchase order.
The present invention relies on this feature of artificial treatment for existing steel construction stock substantially, jumps out existing thinking, integrates, opens The multiple function of hair, double optimization BIM system, Sigma NEST system and ERP system forms intelligent steel construction stock system System realizes high quality, high efficiency, the stock of low cost;The stock accident for avoiding design data mistake from causing eliminates manual typing The Man Graphics time is saved in bring operation error;The operation flow for improving Steel structure manufacturing enterprises, significantly improves the core of enterprise Heart competitiveness.
BIM system development, double optimization explanation: before the present patent application, applicant completes the product based on BIM technology The building-up work of lifecycle management service platform (iBIM V1.0), and have been achieved with Copyright in Computer Software.The platform Using BIM technology as carrier, by Design of digital and digital process management, realizes the information sharing of project overall process, push away Wide application develops unique based on BIM technology to realize that the digitlization construction of bridge steel structure project provides data basis Collaborative platform framework is managed, practical engineering BOM coding scheme is established, double optimization threedimensional model lightweight platform imports skill Art and super large model rendering and browser technology realize completely new steel construction model of project management and service mode, pass through foundation Structural steelwork product 3D model and construction relevant information resources integration one are realized the system based on BIM by BIM modeling Make the dynamic integration management and work progress of installation progress, safety, quality, cost, manpower, material, equipment and Ground arrangement etc. Visual Simulation will interconnect for future and lays the foundation.
ERP system exploitation, double optimization explanation: before the present patent application, applicant's Cooperative Design adaptation steel construction The ERP-PS V10.2 system of project management, develops completely new handling of goods and materials program, contract management program, information management journey Sequence, quality management program have carried out double optimization to in-company operation flow and management process, realize and client ERP The network interdynamic of system is directly combined closely between raw material supplier by system, is sent steel purchase order, is increased The ability interacted with market.
Sigma NEST system development, double optimization explanation: before the present patent application, applicant completes Sigma NEST system adapts to secondary the opening of the parts information import modul, report export module, DXF format output module of steel construction project Work is sent out, and develops the completely new process for using for adapting to steel construction project jacking, stock, numerically-controlled machine tool NC and exporting;It completes The interface of Sigma NEST system and iBIM V1.0, ERP-PS V10.2 system are built, and are coupled three systems effectively, are interacted Intercommunication supports steel construction project to shorten the preparatory period of Project Technical and goods and materials, reduce manufacturing cost, calculate bid price again Lattice further increase the core competitiveness of enterprise.
Finally, it should also be noted that listed above is only a specific embodiment of the invention.Obviously, the present invention is unlimited In above embodiments, acceptable there are many deformations.Those skilled in the art can directly lead from present disclosure Out or all deformations for associating, it is considered as protection scope of the present invention.

Claims (7)

1. a kind of intelligence steel construction stock method, which is characterized in that integrate BIM system, Sigma NEST system and ERP system The multiple function of system realizes intelligentized steel construction stock, specifically includes the following steps:
Step 1: the information-based threedimensional model of project is established using BIM system;
Step 2: establishing unitem data source to each part automatic numbering in threedimensional model, and generating includes each zero The part report inventory of part information;
Step 3: using the AutoLink function of Sigma NEST system and BIM system, all information of project being imported into Sigma In NEST system, including the part report inventory in BIM system;
Step 4: with the batch facility of Sigma NEST system, according in design drawing batch editor's part report inventory Attribute of component;
Step 5: with the Auto-matching function of Sigma NEST system, grouped task being carried out with work order, is ordered according to work Single grouping Auto-matching part and its information;
Step 6: according to work order, drawing marker map with the Stock plug-in unit of Sigma NEST system, automatically generate needs Steel plate specification and its information;
Step 7: marker map being inputted into numerically-controlled machine tool, automatically generates cutting NC code, completes the preparation that part blanking generates;
Step 8: the steel plate specification and its information of needs being imported into ERP system with the ERP output function of Sigma NEST system;
Step 9:ERP system automatically generated stock inventory.
2. intelligence steel construction stock method according to claim 1, which is characterized in that the parts information packet in step 2 Include but be not limited to Part No., section profile, material, specification, weight.
3. intelligence steel construction stock method according to claim 1, which is characterized in that all letters of project in step 3 Breath includes at least part report inventory, steel mill's rolling power data, equipment processing ability data, logistics transportation capacity data.
4. intelligence steel construction stock method according to claim 1, which is characterized in that the attribute of component packet in step 4 Include but be not limited to order number, priority, whether abnormity, affiliated structure position.
5. intelligence steel construction stock method according to claim 1, which is characterized in that before step 5, use The batch facility of Sigma NEST system edits the technique dosage, cutting mode, blanking priority of part.
6. intelligence steel construction stock method according to claim 1, which is characterized in that ERP system connects steel mill ERP system System, directly transmission purchase order.
7. a kind of intelligence steel construction stock preparation system, which is characterized in that by BIM system, Sigma NEST system and ERP system Composition, using working method described in claim 1.
CN201810686612.9A 2018-06-28 2018-06-28 A kind of intelligence steel construction stock method and system Pending CN109032075A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810686612.9A CN109032075A (en) 2018-06-28 2018-06-28 A kind of intelligence steel construction stock method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810686612.9A CN109032075A (en) 2018-06-28 2018-06-28 A kind of intelligence steel construction stock method and system

Publications (1)

Publication Number Publication Date
CN109032075A true CN109032075A (en) 2018-12-18

Family

ID=65520641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810686612.9A Pending CN109032075A (en) 2018-06-28 2018-06-28 A kind of intelligence steel construction stock method and system

Country Status (1)

Country Link
CN (1) CN109032075A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110490523A (en) * 2019-08-20 2019-11-22 Oppo(重庆)智能科技有限公司 Generation method, device and the electronic equipment of stock inventory

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130339078A1 (en) * 2012-06-18 2013-12-19 Coaxis, Inc. System and method linking building information modeling and enterprise resource planning
CN105303308A (en) * 2015-10-22 2016-02-03 张玉英 Management system and method for whole steel bar engineering process based on 3D figure information platform
CN105868502A (en) * 2016-04-22 2016-08-17 广州硕品物联网科技有限公司 BIM (building information modeling) based material management system and control method thereof
CN206162531U (en) * 2016-08-31 2017-05-10 中建安装工程有限公司 Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130339078A1 (en) * 2012-06-18 2013-12-19 Coaxis, Inc. System and method linking building information modeling and enterprise resource planning
CN105303308A (en) * 2015-10-22 2016-02-03 张玉英 Management system and method for whole steel bar engineering process based on 3D figure information platform
CN105868502A (en) * 2016-04-22 2016-08-17 广州硕品物联网科技有限公司 BIM (building information modeling) based material management system and control method thereof
CN206162531U (en) * 2016-08-31 2017-05-10 中建安装工程有限公司 Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
唐建华: "《Tekla Structures在钢结构工程中的应用》", 《安装》 *
岳长勇: "《基于BIM技术的钢桥制造应用》", 《铁路技术创新》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110490523A (en) * 2019-08-20 2019-11-22 Oppo(重庆)智能科技有限公司 Generation method, device and the electronic equipment of stock inventory

Similar Documents

Publication Publication Date Title
CN113033001B (en) Three-dimensional digital factory modeling method and system for digital twin application
CN101763068B (en) Preparation system of quick numerical control machining of complex parts of airplane and method
CN102411333B (en) Fast numerical control machining process system for complex parts of airplane
CN107256005A (en) A kind of reinforcing steel bar numerical control processing method and equipment based on BIM technology
CN109325736B (en) Three-dimensional digital manufacturing system with full life cycle for industrial manufacturing and implementation method thereof
CN101329747A (en) Die enterprise informatization management system
CN104680320A (en) BIM-based project management system and method
CN106295078A (en) A kind of reinforcement detailing computing module system of processing based on BIM technology and method
CN104679954A (en) Method and system for lightening BIM (Building Information Modeling) model
CN112036953A (en) Power transmission and transformation project cost calculation system and cost calculation method based on three-dimensional model
CN111651818A (en) BIM model rapid change method
CN113673104A (en) Manufacturing workshop process planning system based on digital twin
CN207216403U (en) A kind of reinforcing steel bar numerical control process equipment based on BIM technology
CN111459116A (en) High-efficiency digital management system for intelligent production line of pipes
CN107292473A (en) The online estimating and examining system of planning feasibility study business and method based on process optimization
CN109032075A (en) A kind of intelligence steel construction stock method and system
CN108121874A (en) A kind of bus parameter bill of materials and process route automatic generation method
CN103870633B (en) A kind of large scale structure rapid modeling system
Xiao et al. Study on Construction Engineering Management Based on BIM from the perspective of big data
Mon et al. Evaluation of technological development for the definition of Industries 4.0
CN113610484A (en) Intelligent manufacturing production execution system L-MES and manufacturing method thereof
CN110689263A (en) River channel quality management and control system based on BIM technology
CN113536422A (en) BIM platform based on multiple selection sets and use method
CN113031556A (en) Multisource industrial data acquisition system based on network collaborative manufacturing
Gabriel et al. Analysis of environmental potential by implementing industry 4.0

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218