CN109032075A - A kind of intelligence steel construction stock method and system - Google Patents
A kind of intelligence steel construction stock method and system Download PDFInfo
- Publication number
- CN109032075A CN109032075A CN201810686612.9A CN201810686612A CN109032075A CN 109032075 A CN109032075 A CN 109032075A CN 201810686612 A CN201810686612 A CN 201810686612A CN 109032075 A CN109032075 A CN 109032075A
- Authority
- CN
- China
- Prior art keywords
- sigma
- steel construction
- stock
- nest
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/18—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
- G05B19/4093—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by part programming, e.g. entry of geometrical information as taken from a technical drawing, combining this with machining and material information to obtain control information, named part programme, for the NC machine
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/37—Measurements
- G05B2219/37079—Display probing result on drawing taken from cad data
Abstract
The invention discloses a kind of intelligent steel construction stock method and systems, this feature of artificial treatment is relied on substantially for existing steel construction stock, jump out existing thinking, integration is developed, the multiple function of double optimization BIM system, Sigma NEST system and ERP system, intelligent steel construction stock preparation system is formed, realizes high quality, high efficiency, the stock of low cost;The stock accident for avoiding design data mistake from causing eliminates manual typing bring operation error, saves the Man Graphics time;The operation flow for improving Steel structure manufacturing enterprises, significantly improves the core competitiveness of enterprise.
Description
Technical field
Stock up technical field the present invention relates to steel construction, it is especially a kind of based on BIM system, Sigma NEST system and
The intelligent steel construction stock method and system of ERP system.
Background technique
Currently, the stock in steel construction project generallys use the softwares such as manual operation CAD or EXCEL, design elements are pre-
Row's stock forms double scale steel plate specifications of fixed width fixed length, then steel mill is submitted to be rolled by this.Although this stock mode
Project purchasing cost can be saved to the maximum extent, but manual operation is excessive, seriously constrains project construction progress, influences to give birth to
The duration is produced, drawback is a lot of.First, it is easy to appear maloperation, is needed using the artificial stock method of part walkthrough by project whole
The figure and data of part carry out manual drawing and are input among the softwares such as CAD or EXCEL, and parts information amount is huge, thus
Cause task amount big, data are cumbersome, are easy to operation error occur;Second, stock up low efficiency, stock be one it is cumbersome and
The exigent work of accuracy rate, Steel Plate Information needed for needing to manually enter different parts, and draw the row of corresponding steel plate
Material figure, for operator it is difficult to ensure that efficient work for a long time, this also results in the people in the case where wishing to ensure that accuracy rate
Work must concentrate one's energy and take a significant amount of time completion stock work;Third occupies a large amount of human resources.
Summary of the invention
In view of the above-mentioned problems, the present invention provides a kind of intelligence based on BIM system, Sigma NEST system and ERP system
Steel construction stock method and system can be changed.
The present invention protects a kind of intelligent steel construction stock method, integrates BIM system, Sigma NEST system and ERP
The multiple function of system realizes intelligentized steel construction stock, specifically includes the following steps:
Step 1: the information-based threedimensional model of project is established using BIM system;
Step 2: establishing unitem data source to each part automatic numbering in threedimensional model, and generating includes each zero
The part report inventory of part information, parts information include but is not limited to Part No., section profile, material, specification, weight;
Step 3: using the AutoLink function of Sigma NEST system and BIM system, all information of project being imported into Sigma
In NEST system, including the part report inventory in BIM system, all information of project include at least part report inventory,
Steel mill's rolling power data, equipment processing ability data, logistics transportation capacity data;
Step 4: with the batch facility of Sigma NEST system, according in design drawing batch editor's part report inventory
Attribute of component, attribute of component include but is not limited to order number, priority, whether abnormity, affiliated structure position;
Step 5: with the Auto-matching function of Sigma NEST system, grouped task being carried out with work order, is ordered according to work
Single grouping Auto-matching part and its information;
Step 6: according to work order, drawing marker map with the Stock plug-in unit of Sigma NEST system, automatically generate needs
Steel plate specification and its information;
Step 7: marker map being inputted into numerically-controlled machine tool, automatically generates cutting NC code, completes the preparation that part blanking generates;
Step 8: the steel plate specification and its information of needs being imported into ERP system with the ERP output function of Sigma NEST system;
Step 9:ERP system automatically generated stock inventory.
Preferably, before step 5, with the batch facility of Sigma NEST system, edit part technique dosage,
Cutting mode, blanking priority.
Preferably, ERP system connects steel mill's ERP system, directly transmission purchase order.
The present invention also protects a kind of intelligent steel construction stock preparation system, by BIM system, Sigma NEST system and ERP
System composition, using above-mentioned stock method.
Beneficial effects of the present invention: this feature of artificial treatment is relied on substantially for existing steel construction stock, is jumped out existing
Thinking, integration are developed, the multiple function of double optimization BIM system, Sigma NEST system and ERP system, are formed intelligent
Steel construction stock preparation system realizes high quality, high efficiency, the stock of low cost;The stock accident for avoiding design data mistake from causing,
Manual typing bring operation error is eliminated, the Man Graphics time is saved;Improve the operation flow of Steel structure manufacturing enterprises, significantly
Improve the core competitiveness of enterprise.
Detailed description of the invention
Fig. 1 is a kind of flow chart of intelligent steel construction stock method.
Specific embodiment
Technical scheme in the embodiment of the invention is clearly and completely described with reference to the accompanying drawing, it is clear that described
Embodiment be only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ability
Domain those of ordinary skill every other embodiment obtained, shall fall within the protection scope of the present invention.
Embodiment 1
A kind of intelligence steel construction stock preparation system, is made of BIM system, Sigma NEST system and ERP system, use it is standby
Material method as shown in Figure 1, specifically includes the following steps:
Step 1: the information-based threedimensional model of project is established using BIM system;
Step 2: establishing unitem data source to each part automatic numbering in threedimensional model, and generating includes each zero
The part report inventory of part information realizes Whole Life Cycle of Projects information sharing;Parts information includes but is not limited to Part No., cuts
Face profile, material, specification, weight;
Step 3: using the AutoLink function of Sigma NEST system and BIM system, all information of project being imported into Sigma
In NEST system, all information of project include at least part report inventory, steel mill's rolling power data, equipment processing ability number
According to, logistics transportation capacity data;Part report inventory can be edited according to demand before importing Sigma NEST system;
Step 4: with the batch facility of Sigma NEST system, according in design drawing batch editor's part report inventory
Attribute of component, attribute of component include but is not limited to order number, priority, whether abnormity, affiliated structure position;
Step 5: with the Auto-matching function of Sigma NEST system, grouped task being carried out with work order, is ordered according to work
Single grouping Auto-matching part and its information;
Step 6: according to work order, drawing marker map with the Stock plug-in unit of Sigma NEST system, automatically generate needs
Steel plate specification and its information;
Step 7: marker map being inputted into numerically-controlled machine tool, automatically generates cutting NC code, completes the preparation that part blanking generates;
Step 8: the steel plate specification and its information of needs being imported into ERP system with the ERP output function of Sigma NEST system;
Step 9:ERP system automatically generated stock inventory.
Before step 5, with the batch facility of Sigma NEST system, technique dosage, the cutting side of part are edited
Formula, blanking priority;ERP system connects steel mill's ERP system, directly transmission purchase order.
The present invention relies on this feature of artificial treatment for existing steel construction stock substantially, jumps out existing thinking, integrates, opens
The multiple function of hair, double optimization BIM system, Sigma NEST system and ERP system forms intelligent steel construction stock system
System realizes high quality, high efficiency, the stock of low cost;The stock accident for avoiding design data mistake from causing eliminates manual typing
The Man Graphics time is saved in bring operation error;The operation flow for improving Steel structure manufacturing enterprises, significantly improves the core of enterprise
Heart competitiveness.
BIM system development, double optimization explanation: before the present patent application, applicant completes the product based on BIM technology
The building-up work of lifecycle management service platform (iBIM V1.0), and have been achieved with Copyright in Computer Software.The platform
Using BIM technology as carrier, by Design of digital and digital process management, realizes the information sharing of project overall process, push away
Wide application develops unique based on BIM technology to realize that the digitlization construction of bridge steel structure project provides data basis
Collaborative platform framework is managed, practical engineering BOM coding scheme is established, double optimization threedimensional model lightweight platform imports skill
Art and super large model rendering and browser technology realize completely new steel construction model of project management and service mode, pass through foundation
Structural steelwork product 3D model and construction relevant information resources integration one are realized the system based on BIM by BIM modeling
Make the dynamic integration management and work progress of installation progress, safety, quality, cost, manpower, material, equipment and Ground arrangement etc.
Visual Simulation will interconnect for future and lays the foundation.
ERP system exploitation, double optimization explanation: before the present patent application, applicant's Cooperative Design adaptation steel construction
The ERP-PS V10.2 system of project management, develops completely new handling of goods and materials program, contract management program, information management journey
Sequence, quality management program have carried out double optimization to in-company operation flow and management process, realize and client ERP
The network interdynamic of system is directly combined closely between raw material supplier by system, is sent steel purchase order, is increased
The ability interacted with market.
Sigma NEST system development, double optimization explanation: before the present patent application, applicant completes Sigma
NEST system adapts to secondary the opening of the parts information import modul, report export module, DXF format output module of steel construction project
Work is sent out, and develops the completely new process for using for adapting to steel construction project jacking, stock, numerically-controlled machine tool NC and exporting;It completes
The interface of Sigma NEST system and iBIM V1.0, ERP-PS V10.2 system are built, and are coupled three systems effectively, are interacted
Intercommunication supports steel construction project to shorten the preparatory period of Project Technical and goods and materials, reduce manufacturing cost, calculate bid price again
Lattice further increase the core competitiveness of enterprise.
Finally, it should also be noted that listed above is only a specific embodiment of the invention.Obviously, the present invention is unlimited
In above embodiments, acceptable there are many deformations.Those skilled in the art can directly lead from present disclosure
Out or all deformations for associating, it is considered as protection scope of the present invention.
Claims (7)
1. a kind of intelligence steel construction stock method, which is characterized in that integrate BIM system, Sigma NEST system and ERP system
The multiple function of system realizes intelligentized steel construction stock, specifically includes the following steps:
Step 1: the information-based threedimensional model of project is established using BIM system;
Step 2: establishing unitem data source to each part automatic numbering in threedimensional model, and generating includes each zero
The part report inventory of part information;
Step 3: using the AutoLink function of Sigma NEST system and BIM system, all information of project being imported into Sigma
In NEST system, including the part report inventory in BIM system;
Step 4: with the batch facility of Sigma NEST system, according in design drawing batch editor's part report inventory
Attribute of component;
Step 5: with the Auto-matching function of Sigma NEST system, grouped task being carried out with work order, is ordered according to work
Single grouping Auto-matching part and its information;
Step 6: according to work order, drawing marker map with the Stock plug-in unit of Sigma NEST system, automatically generate needs
Steel plate specification and its information;
Step 7: marker map being inputted into numerically-controlled machine tool, automatically generates cutting NC code, completes the preparation that part blanking generates;
Step 8: the steel plate specification and its information of needs being imported into ERP system with the ERP output function of Sigma NEST system;
Step 9:ERP system automatically generated stock inventory.
2. intelligence steel construction stock method according to claim 1, which is characterized in that the parts information packet in step 2
Include but be not limited to Part No., section profile, material, specification, weight.
3. intelligence steel construction stock method according to claim 1, which is characterized in that all letters of project in step 3
Breath includes at least part report inventory, steel mill's rolling power data, equipment processing ability data, logistics transportation capacity data.
4. intelligence steel construction stock method according to claim 1, which is characterized in that the attribute of component packet in step 4
Include but be not limited to order number, priority, whether abnormity, affiliated structure position.
5. intelligence steel construction stock method according to claim 1, which is characterized in that before step 5, use
The batch facility of Sigma NEST system edits the technique dosage, cutting mode, blanking priority of part.
6. intelligence steel construction stock method according to claim 1, which is characterized in that ERP system connects steel mill ERP system
System, directly transmission purchase order.
7. a kind of intelligence steel construction stock preparation system, which is characterized in that by BIM system, Sigma NEST system and ERP system
Composition, using working method described in claim 1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810686612.9A CN109032075A (en) | 2018-06-28 | 2018-06-28 | A kind of intelligence steel construction stock method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810686612.9A CN109032075A (en) | 2018-06-28 | 2018-06-28 | A kind of intelligence steel construction stock method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109032075A true CN109032075A (en) | 2018-12-18 |
Family
ID=65520641
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810686612.9A Pending CN109032075A (en) | 2018-06-28 | 2018-06-28 | A kind of intelligence steel construction stock method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109032075A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110490523A (en) * | 2019-08-20 | 2019-11-22 | Oppo(重庆)智能科技有限公司 | Generation method, device and the electronic equipment of stock inventory |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130339078A1 (en) * | 2012-06-18 | 2013-12-19 | Coaxis, Inc. | System and method linking building information modeling and enterprise resource planning |
CN105303308A (en) * | 2015-10-22 | 2016-02-03 | 张玉英 | Management system and method for whole steel bar engineering process based on 3D figure information platform |
CN105868502A (en) * | 2016-04-22 | 2016-08-17 | 广州硕品物联网科技有限公司 | BIM (building information modeling) based material management system and control method thereof |
CN206162531U (en) * | 2016-08-31 | 2017-05-10 | 中建安装工程有限公司 | Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique |
-
2018
- 2018-06-28 CN CN201810686612.9A patent/CN109032075A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130339078A1 (en) * | 2012-06-18 | 2013-12-19 | Coaxis, Inc. | System and method linking building information modeling and enterprise resource planning |
CN105303308A (en) * | 2015-10-22 | 2016-02-03 | 张玉英 | Management system and method for whole steel bar engineering process based on 3D figure information platform |
CN105868502A (en) * | 2016-04-22 | 2016-08-17 | 广州硕品物联网科技有限公司 | BIM (building information modeling) based material management system and control method thereof |
CN206162531U (en) * | 2016-08-31 | 2017-05-10 | 中建安装工程有限公司 | Does reinforcing bar turn over appearance and calculates modularization processingequipment based on BIM technique |
Non-Patent Citations (2)
Title |
---|
唐建华: "《Tekla Structures在钢结构工程中的应用》", 《安装》 * |
岳长勇: "《基于BIM技术的钢桥制造应用》", 《铁路技术创新》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110490523A (en) * | 2019-08-20 | 2019-11-22 | Oppo(重庆)智能科技有限公司 | Generation method, device and the electronic equipment of stock inventory |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113033001B (en) | Three-dimensional digital factory modeling method and system for digital twin application | |
CN101763068B (en) | Preparation system of quick numerical control machining of complex parts of airplane and method | |
CN102411333B (en) | Fast numerical control machining process system for complex parts of airplane | |
CN107256005A (en) | A kind of reinforcing steel bar numerical control processing method and equipment based on BIM technology | |
CN109325736B (en) | Three-dimensional digital manufacturing system with full life cycle for industrial manufacturing and implementation method thereof | |
CN101329747A (en) | Die enterprise informatization management system | |
CN104680320A (en) | BIM-based project management system and method | |
CN106295078A (en) | A kind of reinforcement detailing computing module system of processing based on BIM technology and method | |
CN104679954A (en) | Method and system for lightening BIM (Building Information Modeling) model | |
CN112036953A (en) | Power transmission and transformation project cost calculation system and cost calculation method based on three-dimensional model | |
CN111651818A (en) | BIM model rapid change method | |
CN113673104A (en) | Manufacturing workshop process planning system based on digital twin | |
CN207216403U (en) | A kind of reinforcing steel bar numerical control process equipment based on BIM technology | |
CN111459116A (en) | High-efficiency digital management system for intelligent production line of pipes | |
CN107292473A (en) | The online estimating and examining system of planning feasibility study business and method based on process optimization | |
CN109032075A (en) | A kind of intelligence steel construction stock method and system | |
CN108121874A (en) | A kind of bus parameter bill of materials and process route automatic generation method | |
CN103870633B (en) | A kind of large scale structure rapid modeling system | |
Xiao et al. | Study on Construction Engineering Management Based on BIM from the perspective of big data | |
Mon et al. | Evaluation of technological development for the definition of Industries 4.0 | |
CN113610484A (en) | Intelligent manufacturing production execution system L-MES and manufacturing method thereof | |
CN110689263A (en) | River channel quality management and control system based on BIM technology | |
CN113536422A (en) | BIM platform based on multiple selection sets and use method | |
CN113031556A (en) | Multisource industrial data acquisition system based on network collaborative manufacturing | |
Gabriel et al. | Analysis of environmental potential by implementing industry 4.0 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |