Summary of the invention
In order to solve the problems referred to above, the present invention provides Material Management System based on BIM and control method thereof, and it can be more preferable
Realize on-the-spot dynamically management, accelerate site operation speed, and it is easy to use, pollution-free, can effectively prevent the waste of material, joint
About cost.
The present invention solves that above-mentioned technical problem the technical scheme is that
Material Management System based on BIM, including:
Central processor equipment, on-the-spot for construction simulation, plan and divide component and bank up region and process feedback information;
Identification code, with region one_to_one corresponding the region of banking up for identification means placement of banking up;
Terminal, for identification marking code feedback information.
Preferably, central processor equipment includes the computer processing data, and computer is provided with BIM module, described BIM
Module is on-the-spot for construction simulation, plan and divide component banks up region.
Preferably, identification code is Quick Response Code.
Preferably, terminal includes scanner and information input equipment.
The control method of Material Management System based on BIM, comprises the steps:
Step one: set up model, and carry out virtual construction;
Step 2: plan according to virtual construction and divide component and bank up region, generate the identification code identifying region of banking up;
Step 3: each component in model is decomposed and numbers;
Step 4: derive the component detail in region of respectively banking up and generate Quick Response Code;
Step 5: purchase according to virtual construction and Quick Response Code and produce component, concentrating packaging element respectively according to region of banking up, and
It is attached to identification code concentrate in packaging;
Step 6: according to the identification code concentrated in packaging, component be placed in the region of banking up of correspondence and derive in a model
Bank up information;
Step 7: use component.
Preferably, virtual construction is for carry out three-dimensional artificial construction simulation based on model, and carries out collision detection, correction,
To final model.
Preferably, step 8 is also included after step 7: generate in a model, derive component finished product information, finished product information
Including component installation situation, set-up time, quality, examination situation.
Preferably, present invention additionally comprises step 9: generate in a model, derive the component waste product damaging loss in step 7
Information, waste product information includes component damage reason and processes structure.
Preferably, the control method of Material Management System based on BIM realizes by BIM software.
Preferably, component is building block brick.
The invention has the beneficial effects as follows: the present invention carries out the division of region, job site by BIM technology, is derived by modeling
Build material engineering amount, and by identification code and Quick Response Code, formulate the construction material buying plan of marching into the arena of each region, integrated management,
Effectively convenient construction management, it is ensured that on-the-spot civilized construction is good, improves again carrying efficiency of construction, saves material, and completely
Pollution-free, more meet the theory of environmental protection.
Detailed description of the invention
Reference Fig. 1, Material Management System based on BIM, including:
Central processor equipment, on-the-spot for construction simulation, plan and divide component and bank up region and process feedback information;
Identification code, with region one_to_one corresponding the region of banking up for identification means placement of banking up;
Terminal, for identification marking code feedback information.
Preferably, central processor equipment includes the computer processing data, and computer is provided with BIM module,
BIM module is on-the-spot for construction simulation, plan and divide component banks up region;Identification code is Quick Response Code;Terminal includes scanner
And information input equipment.
With reference to Fig. 2, the control method of Material Management System based on BIM, comprise the steps:
Step one: set up model, and carry out virtual construction, virtual construction for carry out three-dimensional artificial construction simulation based on model, and
Carry out collision detection, correction, obtain final model;
Step 2: plan according to virtual construction and divide component and bank up region, generate the identification code identifying region of banking up;
Step 3: each component in model is decomposed and numbers;
Step 4: derive the component detail in region of respectively banking up and generate Quick Response Code;
Step 5: purchase according to virtual construction and Quick Response Code and produce component, concentrating packaging element respectively according to region of banking up, and
It is attached to identification code concentrate in packaging;
Step 6: according to the identification code concentrated in packaging, component be placed in the region of banking up of correspondence and derive in a model
Banking up information, the information of banking up includes that construction material is marched into the arena inventory etc.;
Step 7: use component.
Step 8: generate in a model, derive component finished product information, when finished product information includes component installation situation, installation
Between, quality, examination situation.
Step 9: generating in a model, derive the component waste product information damaging loss in step 7, waste product information includes structure
The part source of damage and process structure.
Preferably, described step realizes by BIM software.
With reference to Fig. 3, the concrete management method of the present invention is described as a example by building block brick below:
(1) building block brick management of shifting products design and research
By use BIM technology be simulated construction, and based on ERP(Enterprise Resources Plan) management philosophy, building build
Building engineering uses production control and management and logistics management etc. that brick carries out systematicness management, accomplishes dynamically to manage, from material
Storehouse being learnt, whole project, field warehousing amount etc. determine buying hour, quantity.
(2) BIM modeling and region divide
Application BIM technology sets up the threedimensional model of engineering project, and carries out region division according to threedimensional model, by Engineering Division
N number of region generate the identification code identifying each region of banking up of banking up;Subregion can be carried out by different room functions, levels etc..
(3) derived materials table, statistical summaries
By brick bill of quantities needed for BIM derivation masonry project;Add up the consumption in each region of banking up;Finally collect.
(4) material places an order
Before engineering starts, the material in 1 ~ 2 region of banking up that first places an order;During further according to on-the-spot quantity in stock and construction speed,
Determine purchase quantity and time.
(5) packing is marched into the arena
Notifying that supplier (producer) marches into the arena the time, supplier carries out batch according to quantity and packs and apposition identification code on the packaging.
(6) lifting/carrying
Goods is reached the spot, and by identification code identification, carries out checking confirmation and marches into the arena quantity, finally be hoisted to execute by goods with crane
Work point, and in BIM model, derive information of banking up.
(7) onsite application
Building construction starts, and fragment of brick comes into operation, and the particle produced in building process is collected concentrating, recycling profit
With, it is ensured that on-the-spot civilized construction.
(8) in BIM model, finished product information and waste product information are derived
According to the information of banking up, finished product information and waste product information supervision and management job site, and adjust BIM model at any time, accomplish to move
State management and analysis work progress, to be improved.
In sum, present invention achieves convenient management, construction is simple, rapid, and the purpose that operating efficiency is high, the present invention subtracts
Lack the haulage equipment of 20% and the carrying personnel of 50%, improve materials moving efficiency, reduced waste of material, reduced engineering and become
This, and present invention reduces site safety civilized construction, accomplish that, entirely without pollution, environmental benefit is good.
Certainly, the foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for this area
Technical staff for, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, made appoint
What amendment, equivalent, improvement etc., should be included within the scope of the present invention.