CN104850954A - System and method for processing construction information of architectural decoration project - Google Patents

System and method for processing construction information of architectural decoration project Download PDF

Info

Publication number
CN104850954A
CN104850954A CN201510270346.8A CN201510270346A CN104850954A CN 104850954 A CN104850954 A CN 104850954A CN 201510270346 A CN201510270346 A CN 201510270346A CN 104850954 A CN104850954 A CN 104850954A
Authority
CN
China
Prior art keywords
information
construction
module
classification
setting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510270346.8A
Other languages
Chinese (zh)
Inventor
郭智伟
曹继浩
翟长林
潘颖
胡建兵
丁波
黄丽娟
周康
韩雪
王会翔
徐重元
陶妍君
李志�
常波
马绿丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201510270346.8A priority Critical patent/CN104850954A/en
Publication of CN104850954A publication Critical patent/CN104850954A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a system for processing construction information of an architectural decoration project. The system comprises a construction region establishing module, an information entry module, an information classification module, an information distribution module, and an information updating module. The construction region establishing module is used to determine and establish a construction region of a project object, so as to establish a part of information. The information entry module is used to input and establish a part of information of a construction project to a server platform and a logic processing module. The information classification module is used to classify input information into a plurality of categories according to setting. The categories are corresponding to a plurality of construction stages arranged in sequence. The information distribution module is used to distribute information in the different construction stages to different responsible parties. The information updating module is used to realize real-time update of the information and update the information to the server platform, until the construction is completed. Compared with the prior art, the system realizes segmentation, responsiblized, and comprehensive processing of construction information of a project, realizes induction and guidance on the construction process, so as to improve overall efficiency and quality of construction.

Description

Building decoration engineering construction information disposal system and method
Technical field
The present invention relates to the computer software technology that a kind of building decoration engineering uses, be specifically related to a kind of building decoration engineering construction information disposal system and method.
Background technology
Along with the development of computer networking technology, with computer software form, the new development trend that information and resource process have become a kind of industry is carried out to large-scale decorative engineering work progress.Information in building decoration work progress includes multiple stage such as preliminary planning, process control and final acceptance of construction and relate to many-sided information such as drawing in-depth, quality, progress, investment, contract management, and constantly increase along with the scale of construction of decorative engineering, technical requirement, complexity are more and more higher, control risk and also just increase thereupon.In this time, computer software technology just becomes a kind of very urgent demand for the construction of building decoration engineering.
Current working sources process software mainly carries out " single factor test " superposing type processing mode, namely simple and basic Data Enter and query function can only be carried out, and section, responsibility and the process of generalization cannot be carried out to the construction information of engineering, also cannot conclude work progress and instruct, make last construction quality out also cannot reach desired target, not only affect the efficiency of construction, also affect the total quality of construction.
Summary of the invention
In order to solve the problems of the technologies described above, the invention provides a kind of building decoration engineering construction information disposal system and the method that effectively can improve operating efficiency and construction quality.
In order to achieve the above object, technical scheme of the present invention is as follows:
Building decoration engineering construction information disposal system, it comprises server platform and logic processing module, is also provided with in this logic processing module:
Construction area sets up module, for determining and setting up the construction area of engineering object, sets up a part of information with this;
Data Enter module, for inputting and setting up a part of information of engineering project in server platform and logic processing module;
Information classification module, for the information of input is divided into multiple classification according to setting classification, classification is corresponded in multiple construction stage be arranged in order;
Information assigning module, for by the information distribution in the different construction stages to different party responsible, party responsible constructs according to the order of construction stage;
Information updating module, for carrying out real-time input to information in work progress, realizes the real-time update to information and the platform that uploads onto the server, until the end of construction.
System of the present invention sets up module by construction area and Data Enter module sets up the information required for constructing, then by information classification module, these information are classified, and information arrangement in multiple construction stage set gradually, these information distribution are given different party responsiblies according to the construction stage by information assigning module again, party responsible carries out real-time renewal by information updating module to information again in work progress, make work progress be among state that is orderly and that follow up in real time always, realize the section to the construction information of engineering, responsibility and the process of generalization, and by the ordered categorization of real-time follow-up and information, also can so that conclude work progress and instruct, thus make the whole efficiency of construction and quality obtain raising.
Therefore, the present invention compared with prior art, has abandoned traditional " single factor test " superposing type processing mode, has accomplished to carry out section, responsibility and the process of generalization to the construction information of engineering, achieve the conclusion to work progress and guidance, thus improve whole efficiency and the quality of construction.
On the basis of technique scheme, system of the present invention can also do following improvement:
As preferred scheme, the information in the construction stage is also divided into multiple classification according to setting classification by above-mentioned information classification module, and this classification corresponds in multiple tactical operation.
Adopt above-mentioned preferred scheme, the information in the construction stage can be classified and refinement further.
As preferred scheme, the information in tactical operation is dispensed to different party responsiblies according to setting by above-mentioned information assigning module further, and party responsible constructs according to the information in tactical operation.
Adopt above-mentioned preferred scheme, make the workmen of party responsible can also complete construction according to the requirement of tactical operation and guidance in each construction stage, thus construction quality can be improved further.
As preferred scheme, above-mentioned construction area is set up module and also engineering object is divided into multiple region according to different parts, with this region computational engineering amount respectively, set up coordinate system one to one with this quantities and drawing decorative position, set up the information of construction area with this.
Adopt above-mentioned preferred scheme, can with more convenient, fast mode come collection to the information of construction area and foundation.
As preferred scheme, above-mentioned building decoration engineering construction information disposal system also comprises information inquiry and modified module, for carrying out inquiring about and revising for the information in work progress and after having constructed.
Adopt above-mentioned preferred scheme, the inquiry to information in system and amendment can be realized, thus the envelop of function of expansion native system.
As preferred scheme, above-mentioned building decoration engineering construction information disposal system, is characterized in that, also comprise priority assignation module, for setting the use of end user and the authority of usable range, and in multiple modules setting result be applied to.
Adopt above-mentioned preferred scheme, the setting to system access personnel authority can be realized, improve the security performance of native system.
Building decoration engineering construction information disposal route, use a kind of building decoration engineering construction information disposal system, system comprises server platform and logic processing module, and the method comprises the following steps:
1) set up module by construction area to determine and the construction area setting up engineering object, set up a part of information with this, inputted in server platform and logic processing module by Data Enter module and set up a part of information of engineering project;
2) information just inputted by information classification module is divided into multiple classification according to setting classification, and classification is corresponded in multiple construction stage be arranged in order;
3) by information assigning module by the information distribution in the different construction stages to different party responsible, party responsible constructs according to the order of construction stage;
4) in work progress, real-time input is carried out to information by information updating module, realize the real-time update to information and the platform that uploads onto the server, until the end of construction.
System of the present invention sets up module by construction area and Data Enter module sets up the information required for constructing, then by information classification module, these information are classified, and information arrangement in multiple construction stage set gradually, these information distribution are given different party responsiblies according to the construction stage by information assigning module again, party responsible carries out real-time renewal by information updating module to information again in work progress, make work progress be among state that is orderly and that follow up in real time always, realize the section to the construction information of engineering, responsibility and the process of generalization, and by the ordered categorization of real-time follow-up and information, also can so that conclude work progress and instruct, thus make the whole efficiency of construction and quality obtain raising.
Therefore, the present invention compared with prior art, has abandoned traditional " single factor test " superposing type processing mode, has accomplished to carry out section, responsibility and the process of generalization to the construction information of engineering, achieve the conclusion to work progress and guidance, thus improve whole efficiency and the quality of construction.
On the basis of technique scheme, method of the present invention can also do following improvement:
As preferred scheme, the above-mentioned the 2nd), in step, the information in the construction stage is also divided into multiple classification according to setting classification by information classification module, and classification corresponds in multiple tactical operation; 3rd), in step, the information in tactical operation is dispensed to different party responsiblies according to setting by information assigning module further, and party responsible constructs according to the information in tactical operation.
Adopt above-mentioned preferred scheme, information in construction stage can be classified and refinement further, make the workmen of party responsible can also complete construction according to the requirement of tactical operation and guidance in each construction stage, thus construction quality can be improved further.
As preferred scheme, above-mentioned the 1st) in step, construction area is set up module and also engineering object is divided into multiple region according to different parts, with this region computational engineering amount respectively, set up coordinate system one to one with this quantities and drawing decorative position, set up the information of construction area with this.
Adopt above-mentioned preferred scheme, can with more convenient, fast mode come collection to the information of construction area and foundation.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of building decoration engineering construction information disposal system of the present invention.
Fig. 2 is the process flow diagram of building decoration engineering construction information disposal route of the present invention.
Embodiment
The preferred embodiment of the present invention is described in detail below in conjunction with accompanying drawing.
In order to reach object of the present invention, as shown in Figure 1, in the some of them embodiment of building decoration engineering construction information disposal system of the present invention, it comprises server platform and logic processing module, this server platform and logic processing module can select the computing machine possessing the operating systems such as windows to realize, also be provided with in this logic processing module: construction area sets up module, for determining and setting up the construction area of engineering object, set up a part of information with this, Data Enter module, for inputting in server platform and logic processing module and setting up a part of information of engineering project, such as " project name ", " job location ", " contract price ", " open completion date of construction ", filling in of " project brief " etc., " project status ", " project manager " then can be able to select according to setting, after all information is improved, preserve again, if project information input is wrong, also can click " replacement " to re-enter, after project is set up, construction manager can also carry out project's earlier stage in this system, the flow operations of every construction management work in process and later stage etc., information classification module, for the information of input is divided into multiple classification according to setting classification, classification is corresponded in multiple construction stage be arranged in order, which specify the various actions content of item construction management and each Division of labour at post, and carry out procedural acts by the Contents and request of regulation, carry out dynamic management with engineering construction progress, such as, can by six stages of item dividing, i.e. " in earlier stage-0 stage ", " 0-50 stage ", " 50-80 stage ", " 80-95 stage ", " 95-100 stage ", " after 100 " six stages, information assigning module, for by the information distribution in the different construction stages to different party responsible, party responsible constructs according to the order of construction stage, such as, construct successively according to above-mentioned six stages, information updating module, for carrying out real-time input to information in work progress, realizes the real-time update to information and the platform that uploads onto the server, until the end of construction.
Native system sets up module by construction area and Data Enter module sets up the information required for constructing, then by information classification module, these information are classified, and information arrangement in multiple construction stage set gradually, these information distribution are given different party responsiblies according to the construction stage by information assigning module again, party responsible carries out real-time renewal by information updating module to information again in work progress, make work progress be among state that is orderly and that follow up in real time always, realize the section to the construction information of engineering, responsibility and the process of generalization, and by the ordered categorization of real-time follow-up and information, also can so that conclude work progress and instruct, thus make the whole efficiency of construction and quality obtain raising.Therefore, native system compared with prior art, has abandoned traditional " single factor test " superposing type processing mode, has accomplished to carry out section, responsibility and the process of generalization to the construction information of engineering, achieve the conclusion to work progress and guidance, thus improve whole efficiency and the quality of construction.
In order to optimize implementation result of the present invention further, in other embodiments of building decoration engineering construction information disposal system of the present invention, on the basis of the above, information in construction stage is also divided into multiple classification according to setting classification by above-mentioned information classification module, and this classification is to corresponding in multiple tactical operation; Such as, refine to the tactical operation in each post in each stage, totally 37 tactical operations, each movement content, user can download and preserves and check, movement content is uploaded covering by project management department each corresponding post personnel in time.Adopt the scheme of this embodiment, the information in the construction stage can be classified and refinement further.These tactical operations can comprise:
(1) " in earlier stage-0 stage ": project bidding stage, 1-6 the tactical operation that project management department need complete: action 1: Design of Construction Organization-project manager; Action 2: answer questions before bid-project manager; Action 3: item characteristic describes and supplements-Deepen Design person; Action 4: tender drawing is answerred questions-Deepen Design person; Action 5: bidding document inventory measuring and calculating cost and Practical Project amount Cost comparisons-budget and final account person; Action 6: accurately estimate contract price-budget and final account person temporarily;
(2) " 0-50 stage ": this phased project portion execution 7-action 22 totally 16 tactical operations: action 7: site safety inspection record table-security official; Action 8: two is got it right ratio--budget and final account person; Action 9: in-depth catalogue three-dimensional nodes catalogue-Deepen Design person; Action 10: as-constructed drawing catalogue Plan and implement-Deepen Design person; Action 11: node full-page proof model inventory-Deepen Design person; Action 12: on-site coordination is on the arrangement-builder affecting construction part; Action 13: meticulous schedule and personnel by row and to critical process control-builder;-Deepen Design person, builder are checked in action 14:3D entity unwrapping wire and scanning; Action 15: selective examination personnel ' s efficiency-budget and final account person; Action 16: dynamic cost management and control-budget and final account person; Action 17: same type of material spatially gathers accurate bid and purchase volume-budget and final account person by facade; Action 18: storehouse management account record-warehouse keeper; Action 19: back court rapidoprint coding and classification-Deepen Design person, materialman; Action 20: facilitate material scale processing-Deepen Design person, materialman; Action 21: process quality control and two single table-Quality Inspectors; Action 22: to the timely confirmation-budget and final account person of complete qualified construction content class to amount;
(3) " 50-80 stage ": this phased project portion execution 23-action 26 totally 4 tactical operations: action 23: the inventory plan of adjustment ending at any time and personnel placement-builder; Action 24: secondary two is got it right ratio-budget and final account person; Action 25: amount valency is separated table Data Update-budget and final account person; Action 26: check planning as-constructed drawing-Deepen Design person;
(4) " 80-95 stage ": this phased project portion execution 27-action 29 totally 3 tactical operations: action 27: gradual perfection as-constructed drawing-Deepen Design person; Action 28: budget and final account inventory renewal-budget and final account person; Action 29: split unit valency-budget and final account person in specific item;
(5) " 95-100 stage ": this phased project portion execution 30-action 34 totally 5 tactical operations: action is got it right for 30: three times two ratio-budget and final account person; Action 31: planning establishment clearing-budget and final account person; Action 32: the details correction inventory cencelling of terms-budget and final account person; Action 33: promote to examine-budget and final account person in completion; Action 34: warehouse account record-warehouse keeper;
After (6) 100 stages: this phased project portion execution 35-action 37 totally 3 actions: action 35: promote audit progress-budget and final account person; Action 36: establishment list maintenance-builder; Action 37: summary finishing node quality-project management department's members.
In order to optimize implementation result of the present invention further, in other embodiments of building decoration engineering construction information disposal system of the present invention, on the basis of the above, information in tactical operation is dispensed to different party responsiblies according to setting by above-mentioned information assigning module further, party responsible constructs according to the information in tactical operation, i.e. each side described in the 1-6 stage described above.Adopt the scheme of this embodiment, make the workmen of party responsible can also complete construction according to the requirement of tactical operation and guidance in each construction stage, thus construction quality can be improved further.
In order to optimize implementation result of the present invention further, in other embodiments of building decoration engineering construction information disposal system of the present invention, on the basis of the above, above-mentioned construction area is set up module and also engineering object is divided into multiple region according to different parts, with this region computational engineering amount respectively, set up coordinate system one to one with this quantities and drawing decorative position, set up the information of construction area with this.Such as, can be separated underlying table by formation volume valency, decorative engineering is divided different floor, and every floor divides zones of different, the room that each Region dividing is different, and each room divides ground, end face and several facade, respectively corresponding drawing computational engineering amount.Quantities and drawing decorative position are set up one to one " coordinate system ", underlying table arranges " local gradation division ", " construction content and subitem ", " drawing number ", " whether changing ", " unit ", " drawing calculating formula ", " drawing quantities ", " checking " column, amount valency is separated underlying table and can downloads and carry out upgrading in time, uploading according to change in the work, project manager checks, and implements dynamic management.Adopt the scheme of this embodiment, can with more convenient, fast mode come collection to the information of construction area and foundation.
In order to optimize implementation result of the present invention further, as shown in Figure 1, in other embodiments of building decoration engineering construction information disposal system of the present invention, on the basis of the above, above-mentioned building decoration engineering construction information disposal system also comprises information inquiry and modified module, for carrying out inquiring about and revising for the information in work progress and after having constructed.Adopt the scheme of this embodiment, the inquiry to information in system and amendment can be realized, thus the envelop of function of expansion native system.Such as, can dynamic budget and final account inventory be set in this module: this plate is the necessary upload contents of project management department, if visitor wants to check, download and separately deposit, the form of renewal also interim can be uploaded covering by project management department member, any query is had to exchange by direct-on-line " I will put question to " in view procedure, the experience accumulation for many years of this inventory content Shi Ji company, contain and complete situation and relevant factor description from project bid to completion related work content and data, need to divide first class catalogue according to engineering characteristic, second-level directory, three grades of catalogues, level Four catalogue, wherein first class catalogue 11: comprehensive overview, in earlier stage data, preliminary planning, process data is sent the documents, process data message in-coming, clearing planning, clearing engineering metering, gathering record, internal contract account, cost dynamic table, 1-7 volume completion information catalogue.
In order to optimize implementation result of the present invention further, as shown in Figure 1, in other embodiments of building decoration engineering construction information disposal system of the present invention, on the basis of the above, above-mentioned building decoration engineering construction information disposal system also comprises priority assignation module, for setting the use of end user and the authority of usable range, and in multiple modules that setting result is applied to.Adopt the scheme of this embodiment, the setting to system access personnel authority can be realized, improve the security performance of native system.
In order to reach object of the present invention, as shown in Figure 1-2, in the some of them embodiment of building decoration engineering construction information disposal route of the present invention, use a kind of building decoration engineering construction information disposal system, namely above-mentioned system, this system comprises server platform and logic processing module, and the method comprises the following steps:
S101: set up module by construction area and determine and the construction area setting up engineering object, set up a part of information with this, is inputted by Data Enter module and sets up a part of information of engineering project in server platform and logic processing module;
S102: the information just inputted by information classification module is divided into multiple classification according to setting classification, and classification is corresponded in multiple construction stage be arranged in order;
S103: by information assigning module by party responsiblies extremely different for the information distribution in the different construction stages, party responsible constructs according to the order of construction stage;
S104: carry out real-time input to information by information updating module in work progress, realizes the real-time update to information and the platform that uploads onto the server, until the end of construction.
This method sets up module by construction area and Data Enter module sets up the information required for constructing, then by information classification module, these information are classified, and information arrangement in multiple construction stage set gradually, these information distribution are given different party responsiblies according to the construction stage by information assigning module again, party responsible carries out real-time renewal by information updating module to information again in work progress, make work progress be among state that is orderly and that follow up in real time always, realize the section to the construction information of engineering, responsibility and the process of generalization, and by the ordered categorization of real-time follow-up and information, also can so that conclude work progress and instruct, thus make the whole efficiency of construction and quality obtain raising.Therefore, this method compared with prior art, has abandoned traditional " single factor test " superposing type processing mode, has accomplished to carry out section, responsibility and the process of generalization to the construction information of engineering, achieve the conclusion to work progress and guidance, thus improve whole efficiency and the quality of construction.
In order to optimize implementation result of the present invention further, in other embodiments of building decoration engineering construction information disposal route of the present invention, on the basis of the above, above-mentioned the 2nd) in step, information in construction stage is also divided into multiple classification according to setting classification by information classification module, and classification is to corresponding in multiple tactical operation; 3rd), in step, the information in tactical operation is dispensed to different party responsiblies according to setting by information assigning module further, and party responsible constructs according to the information in tactical operation.Adopt the scheme of this embodiment, information in construction stage can be classified and refinement further, make the workmen of party responsible can also complete construction according to the requirement of tactical operation and guidance in each construction stage, thus construction quality can be improved further.
In order to optimize implementation result of the present invention further, in other embodiments of building decoration engineering construction information disposal route of the present invention, on the basis of the above, above-mentioned the 1st) in step, construction area is set up module and also engineering object is divided into multiple region according to different parts, with this region computational engineering amount respectively, set up coordinate system one to one with this quantities and drawing decorative position, set up the information of construction area with this.Adopt the scheme of this embodiment, can with more convenient, fast mode come collection to the information of construction area and foundation.
Above-described is only the preferred embodiment of the present invention, it should be pointed out that for the person of ordinary skill of the art, and without departing from the concept of the premise of the invention, can also make some distortion and improvement, these all belong to protection scope of the present invention.

Claims (9)

1. building decoration engineering construction information disposal system, it comprises server platform and logic processing module, it is characterized in that, is also provided with in described logic processing module:
Construction area sets up module, for determining and setting up the construction area of engineering object, sets up a part of information with this;
Data Enter module, for inputting and setting up a part of information of engineering project in described server platform and logic processing module;
Information classification module, for the information of input is divided into multiple classification according to setting classification, described classification is corresponded in multiple construction stage be arranged in order;
Information assigning module, for by the information distribution in the different construction stages to different party responsible, party responsible constructs according to the order of construction stage;
Information updating module, for carrying out real-time input to information in work progress, realizing the real-time update of information and being uploaded to described server platform, until the end of construction.
2. building decoration engineering construction information disposal system according to claim 1, is characterized in that, the information in the construction stage is also divided into multiple classification according to setting classification by described information classification module, and described classification corresponds in multiple tactical operation.
3. building decoration engineering construction information disposal system according to claim 2, it is characterized in that, information in tactical operation is dispensed to different party responsiblies according to setting by described information assigning module further, and party responsible constructs according to the information in tactical operation.
4. building decoration engineering construction information disposal system according to claim 1, it is characterized in that, described construction area is set up module and also engineering object is divided into multiple region according to different parts, with this region computational engineering amount respectively, set up coordinate system one to one with this quantities and drawing decorative position, set up the information of construction area with this.
5., according to the arbitrary described building decoration engineering construction information disposal system of claim 1-4, it is characterized in that, also comprise information inquiry and modified module, for carrying out inquiring about and revising for the information in work progress and after having constructed.
6. building decoration engineering construction information disposal system according to claim 5, is characterized in that, also comprise priority assignation module, for setting the use of end user and the authority of usable range, and setting result is applied in described multiple modules.
7. building decoration engineering construction information disposal route, use a kind of building decoration engineering construction information disposal system, described system comprises server platform and logic processing module, it is characterized in that, said method comprising the steps of:
1) set up module by construction area to determine and the construction area setting up engineering object, set up a part of information with this, inputted in described server platform and logic processing module by Data Enter module and set up a part of information of engineering project;
2) information just inputted by information classification module is divided into multiple classification according to setting classification, and described classification is corresponded in multiple construction stage be arranged in order;
3) by information assigning module by the information distribution in the different construction stages to different party responsible, party responsible constructs according to the order of construction stage;
4) in work progress, real-time input is carried out to information by information updating module, realize the real-time update of information and be uploaded to described server platform, until the end of construction.
8. building decoration engineering construction information disposal route according to claim 7, is characterized in that,
Described 2nd), in step, the information in the construction stage is also divided into multiple classification according to setting classification by described information classification module, and described classification corresponds in multiple tactical operation;
Described 3rd), in step, the information in tactical operation is dispensed to different party responsiblies according to setting by described information assigning module further, and party responsible constructs according to the information in tactical operation.
9. the building decoration engineering construction information disposal route according to claim 7 or 8, it is characterized in that, described 1st) in step, described construction area is set up module and also engineering object is divided into multiple region according to different parts, with this region computational engineering amount respectively, set up coordinate system one to one with this quantities and drawing decorative position, set up the information of construction area with this.
CN201510270346.8A 2015-05-25 2015-05-25 System and method for processing construction information of architectural decoration project Pending CN104850954A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510270346.8A CN104850954A (en) 2015-05-25 2015-05-25 System and method for processing construction information of architectural decoration project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510270346.8A CN104850954A (en) 2015-05-25 2015-05-25 System and method for processing construction information of architectural decoration project

Publications (1)

Publication Number Publication Date
CN104850954A true CN104850954A (en) 2015-08-19

Family

ID=53850586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510270346.8A Pending CN104850954A (en) 2015-05-25 2015-05-25 System and method for processing construction information of architectural decoration project

Country Status (1)

Country Link
CN (1) CN104850954A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105844451A (en) * 2016-04-15 2016-08-10 中交上海三航科学研究院有限公司 Construction informatization management method, system and service terminal
CN106503966A (en) * 2016-10-24 2017-03-15 深圳神马宝典信息技术有限公司 Information of building project management system
CN108364112A (en) * 2017-12-26 2018-08-03 中国移动通信集团广东有限公司 Task-decomposing system and computer readable storage medium
CN110020791A (en) * 2019-03-19 2019-07-16 杭州全视软件有限公司 A kind of product design method based on liability management
CN112084997A (en) * 2020-09-22 2020-12-15 江西锦路科技开发有限公司 Engineering quantity splitting and counting system
CN112668860A (en) * 2020-12-23 2021-04-16 中哲国际工程设计有限公司 Building construction management system and method based on neural network
CN114841788A (en) * 2022-05-23 2022-08-02 北京新机场建设指挥部 Engineering project construction management completion settlement overall process management system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101404584A (en) * 2008-04-09 2009-04-08 陈荣泉 Decoration intelligentized control system and method for operating system
CN101504741A (en) * 2009-02-18 2009-08-12 路桥集团国际建设股份有限公司 Intelligent metering management system and method for construction engineering
CN102955982A (en) * 2011-08-18 2013-03-06 大连博特软件科技有限公司 System for managing construction project contracting

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101404584A (en) * 2008-04-09 2009-04-08 陈荣泉 Decoration intelligentized control system and method for operating system
CN101504741A (en) * 2009-02-18 2009-08-12 路桥集团国际建设股份有限公司 Intelligent metering management system and method for construction engineering
CN102955982A (en) * 2011-08-18 2013-03-06 大连博特软件科技有限公司 System for managing construction project contracting

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105844451A (en) * 2016-04-15 2016-08-10 中交上海三航科学研究院有限公司 Construction informatization management method, system and service terminal
CN106503966A (en) * 2016-10-24 2017-03-15 深圳神马宝典信息技术有限公司 Information of building project management system
CN108364112A (en) * 2017-12-26 2018-08-03 中国移动通信集团广东有限公司 Task-decomposing system and computer readable storage medium
CN110020791A (en) * 2019-03-19 2019-07-16 杭州全视软件有限公司 A kind of product design method based on liability management
CN112084997A (en) * 2020-09-22 2020-12-15 江西锦路科技开发有限公司 Engineering quantity splitting and counting system
CN112668860A (en) * 2020-12-23 2021-04-16 中哲国际工程设计有限公司 Building construction management system and method based on neural network
CN114841788A (en) * 2022-05-23 2022-08-02 北京新机场建设指挥部 Engineering project construction management completion settlement overall process management system
CN114841788B (en) * 2022-05-23 2022-11-22 北京新机场建设指挥部 Completion settlement overall process management system for engineering project construction management

Similar Documents

Publication Publication Date Title
CN104850954A (en) System and method for processing construction information of architectural decoration project
Zhang et al. A simulation-based approach for plant layout design and production planning
CN110909972B (en) BIM-based steel structure full life cycle management system and method
Luo et al. Supply chain management for prefabricated building projects in Hong Kong
Li et al. Research on construction schedule management based on BIM technology
Cheng et al. Dynamic construction material layout planning optimization model by integrating 4D BIM
CN104281729B (en) A kind of BIM methods manufactured applied to steel building Digital manufacturing
Du et al. RFID and multi-agent based architecture for information sharing in prefabricated component supply chain
Yu et al. A BIM-based dynamic model for site material supply
CN107133375B (en) Facility site selection optimization method based on Euclidean distance linear approximation
Ng et al. Digital fabrication, BIM and early contractor involvement in design in construction projects: A comparative case study
Lee et al. Concurrent material flow analysis by P3R-driven modeling and simulation in PLM
CN103761618A (en) Control method and system of science and technology item
CN110390607A (en) Objective cost measuring method, system and computer readable storage medium based on subject index system
Dou et al. Tracking the research on ten emerging digital technologies in the AECO industry
Ding et al. Construction cost management strategy based on BIM technology and neural network model
CN109636092A (en) A kind of warehouse goods yard distribution method based on double factor optimization
Peiris et al. Digitalising modular construction: Enhancement of off-site manufacturing productivity via a manufacturing execution & control (MEC) system
Zeng et al. BIM-enabled Kanban system in construction logistics for real-time demand reporting and pull replenishment
CN104252667A (en) Material production scheduling simulation device
Xiao et al. Study on Construction Engineering Management Based on BIM from the perspective of big data
Kim et al. Interpretive structural modeling in the adoption of IoT services
Golmohammadi et al. A Novel Cell Layout Problem with Reliability and Stochastic Failures
Qi et al. Challenges of implementing emerging technologies in residential modular construction
Lehtinen Increasing integration in construction projects: A case study on a PPP project adopting BIM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150819