CN104778564A - Prefabricated part construction management method based on information coding - Google Patents
Prefabricated part construction management method based on information coding Download PDFInfo
- Publication number
- CN104778564A CN104778564A CN201510228334.9A CN201510228334A CN104778564A CN 104778564 A CN104778564 A CN 104778564A CN 201510228334 A CN201510228334 A CN 201510228334A CN 104778564 A CN104778564 A CN 104778564A
- Authority
- CN
- China
- Prior art keywords
- component
- stockyard
- information
- message
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a prefabricated part construction management method based on information coding. A part information base which is built according to relevant part information is included. The method is characterized in that relevant information is extracted from the part information base according to part numbers to build coding information of three stages, site entering, site stacking and construction installation, of prefabricated parts, on the basis of the coding information, when the prefabricated parts enter a site, the parts meeting the requirements can be determined to be directly lifted and constructed or stacked on the site according to site entering coding information and site stacking coding information, the lifting position, lifting unit and installation technology also can be determined, and the informatization management of prefabricated part site construction can be achieved. Compared with the prior art, the prefabricated part construction management method based on information coding has the advantages that the detailed information of the prefabricated parts can be quickly recognized and inquired, site entering, site stacking and installation of the prefabricated parts can be effectively guided, the informatization management of the prefabricated part site construction can be achieved, the management efficiency can be improved, and tracking management can be performed on the whole life cycle of key parts.
Description
Technical field
The present invention relates to construction work areas of information technology, especially a kind of prefabricated components execution management method therefor based on information coding.
Background technology
Industrialized construction is the developing direction of construction work, especially at the continuous upward period of the human cost of building trade, the importance of environmental protection and energy-saving and emission-reduction improve constantly and national policy huge thrust under, the development of prefabrication technology and apply imperative.But prefabrication, there are a large amount of prefabricated components in especially large-scale industrialization construction project, not yet forms effectively practical prefabricated components management method.
At present, information bank do not set up by a large amount of prefabricated components, still continues to use traditional labor management method to the engineering management of prefabricated components, and not only labour intensity is large, inefficiency, but also easily causes mistake, affects project progress and construction quality.In production, supply, transport, construction and operational phase, effective whole-life cycle fee is implemented to these prefabricated components and will significantly improve build guality and the efficiency of engineering.
Summary of the invention
The object of the invention is a kind of prefabricated components execution management method therefor based on information coding designed for the deficiencies in the prior art, Component-Based Development information bank sets up marching into the arena of prefabricated components, the coded message of stockyard and construction and installation three phases, these coded message prefabricated components can according to coded message of marching into the arena when marching into the arena, check component transport batch and with batch number of components of the same race, according to stockyard coded message, direct lifting construction is determined to satisfactory component or carries out on-the-spot stockyard, need stacking by stockyard coded message of stockyard, and check same stockyard number of components of the same race, can according to construction and installation coded message when component carries out construction and installation, determine the installation site of prefabricated components, lifting unit and mounting process, realize the information system management of prefabricated components site operation, improve the prefabricated assembled efficiency of management of industrialization construction project, combined with intelligent cognition technology, tracking and managing can be carried out to the life cycle management of key member.
The object of the present invention is achieved like this: a kind of prefabricated components execution management method therefor based on information coding, comprise and numbering by component, design, produce, transport, stockyard, the component information storehouse that lifting and mounting process information are set up, be characterized in that from component information storehouse, extracting relevant information by component numbering sets up marching into the arena of prefabricated components, stockyard and the triphasic coded message of construction and installation, can according to coded message of marching into the arena when marching into the arena based on these coded message prefabricated components, check component transport batch and with batch number of components of the same race, according to stockyard coded message, direct lifting construction is determined to satisfactory component or carries out on-the-spot stockyard, need stacking by stockyard coded message of stockyard, and check same stockyard number of components of the same race, component can according to construction and installation coded message when construction and installation, determine the installation site of prefabricated components, lifting unit and mounting process, realize the information system management of prefabricated components site operation.
Described coded message of marching into the arena be made up of with numeral letter and represents that component is numbered, stage code name, to transport batch, together six groups of message codes of batch number of components of the same race, component specification and material form, by space-separated between each group of message code, wherein approach phase code name is represented by alphabetical JC, and respectively the message code of group and the coded message one_to_one corresponding in component information storehouse represent for other.
Described stockyard coded message to be made up of with numeral letter and to represent that component is numbered, stage code name, lifting time, position, stockyard and five groups of message codes with stockyard number of components of the same race form, by space-separated between each group of message code, wherein code name is represented by alphabetical DC the stockyard stage, and respectively message code of group and the coded message one_to_one corresponding in component information storehouse represent for other.
Described construction and installation coded message to be made up of with numeral letter and to represent that component is numbered, stage code name, installation site, lifting unit and mounting process five groups of message codes form, by space-separated between each group of message code, wherein code name is represented by alphabetical SG the construction and installation stage, and respectively message code of group and the coded message one_to_one corresponding in component information storehouse represent for other.
The present invention compared with prior art has the detailed information identifying and inquire about prefabricated components fast, effectively instruct the site construction management of the marching into the arena of prefabricated components, stockyard and installation three phases, realize the information system management of prefabricated components site operation, improve the prefabricated assembled efficiency of management of industrialization construction project, combined with intelligent cognition technology, can carry out tracking and managing to the life cycle management of key member.
Accompanying drawing explanation
Fig. 1 is operational flowchart of the present invention.
Embodiment
The present invention includes the component information storehouse set up by component numbering, design, production, transport, stockyard, lifting and mounting process information, prefabricated components are numbered by component and from component information storehouse, are extracted relevant information set up the marching into the arena of prefabricated components, stockyard and the triphasic coded message of construction and installation.Described coded message of marching into the arena be made up of with numeral letter and represents that component is numbered, stage code name, to transport batch, together six groups of message codes of batch number of components of the same race, component specification and material form, by space-separated between each group of message code, wherein approach phase code name is represented by alphabetical JC, and respectively the message code of group and the coded message one_to_one corresponding in component information storehouse represent for other.Described stockyard coded message to be made up of with numeral letter and to represent that component is numbered, stage code name, lifting time, position, stockyard and five groups of message codes with stockyard number of components of the same race form, by space-separated between each group of message code, wherein code name is represented by alphabetical DC the stockyard stage, and respectively message code of group and the coded message one_to_one corresponding in component information storehouse represent for other.Described construction and installation coded message to be made up of with numeral letter and to represent that component is numbered, stage code name, installation site, lifting unit and mounting process five groups of message codes form, by space-separated between each group of message code, wherein code name is represented by alphabetical SG the construction and installation stage, and respectively message code of group and the coded message one_to_one corresponding in component information storehouse represent for other.Can according to coded message of marching into the arena when marching into the arena based on these coded message prefabricated components, check component transport batch and with batch number of components of the same race, according to stockyard coded message, direct lifting construction is determined to satisfactory component or carries out on-the-spot stockyard, need stacking by stockyard coded message of stockyard, and check same stockyard number of components of the same race, component can according to construction and installation coded message when construction and installation, determine the installation site of prefabricated components, lifting unit and mounting process, realize the information system management of prefabricated components site operation.
The invention will be further described to be numbered the prefabricated components of YZ0100 according to certain engineering component below:
Enter component information storehouse according to component numbering YZ0100 and obtain the transport batch of this component for the 5th; A same batch number of components of the same race is 500; Component specification is KL11; Material is C30; The lifting time is 150430; Position, stockyard is A1; Be 15 with stockyard number of components of the same race; Installation site is 0105A04; Lifting unit be JYGS and mounting process is 01, and the relevant information transferred according to component information storehouse adopts coding method of the present invention to set up the triphasic coded message of these prefabricated components to represent as follows:
The coded message of approach phase is: YZ0100 JC 05 500 KL11 C30;
The coded message in stockyard stage is: YZ0100 DC 150430 A1 015;
The coded message in construction and installation stage is: YZ0100 SG 0105A04 JYGS 01.
Accompanying drawings 1, the present invention carries out the marching into the arena of prefabricated components, stockyard and the triphasic site construction management of installation as follows:
(1), prefabricated components are when marching into the arena: by reading the coded message of approach phase: YZ0100 JC 05 500 KL11 C30, the transport batch obtaining this component is 05, with batch component of the same race totally 500, component specification is KL11, material is C30, examines above information, checks that transport batch to judge that whether component time of marching into the arena is correct, the member arrangements met the demands is marched into the arena, the component do not met the demands and producer are changed.
(2), prefabricated components are after marching into the arena: by reading the coded message in stockyard stage: YZ0100 DC 150430 A1 015, the lifting time obtaining this component is 150430, judge whether it arrives the lifting date, when not yet arriving the lifting time, stockyard is carried out to it, its position, stockyard is A1, and the quantity that same specification component is stacked in this place is simultaneously 15.
(3) component is when construction and installation: by reading the coded message in construction and installation stage: YZ0100 SG 0105A04 JYGS 01, the lifting Unit code obtaining this component is JYGS, determine that the installation site of this component is 0105A04, it represents that implication is No. 1 building 5 floor A axis and 04 axes intersect position, determines that mounting process is 01 technique.
More than just the present invention is further illustrated, and be not used to limit this patent, allly implements for the present invention's equivalence, within the right that all should be contained in this patent.
Claims (4)
1. the prefabricated components execution management method therefor based on information coding, comprise and numbering by component, design, produce, transport, stockyard, the component information storehouse that lifting and mounting process information are set up, it is characterized in that from component information storehouse, extracting relevant information by component numbering sets up marching into the arena of prefabricated components, stockyard and the triphasic coded message of construction and installation, can according to coded message of marching into the arena when marching into the arena based on these coded message prefabricated components, check component transport batch and with batch number of components of the same race, according to stockyard coded message, direct lifting construction is determined to satisfactory component or carries out on-the-spot stockyard, need stacking by stockyard coded message of stockyard, and check same stockyard number of components of the same race, component can according to construction and installation coded message when construction and installation, determine the installation site of prefabricated components, lifting unit and mounting process, realize the information system management of prefabricated components site operation.
2. according to claim 1 based on the prefabricated components execution management method therefor of information coding, coded message of marching into the arena described in it is characterized in that be made up of with numeral letter and represents that component is numbered, stage code name, to transport batch, together six groups of message codes of batch number of components of the same race, component specification and material form, by space-separated between each group of message code, wherein approach phase code name is represented by alphabetical JC, and respectively the message code of group and the coded message one_to_one corresponding in component information storehouse represent for other.
3. according to claim 1 based on the prefabricated components execution management method therefor of information coding, it is characterized in that described stockyard coded message to be made up of with numeral letter represent that component is numbered, stage code name, lifting time, position, stockyard and five groups of message codes with stockyard number of components of the same race form, by space-separated between each group of message code, wherein code name is represented by alphabetical DC the stockyard stage, and respectively message code of group and the coded message one_to_one corresponding in component information storehouse represent for other.
4. according to claim 1 based on the prefabricated components execution management method therefor of information coding, it is characterized in that described construction and installation coded message to be made up of with numeral letter represent that component is numbered, stage code name, installation site, lifting unit and mounting process five groups of message codes form, by space-separated between each group of message code, wherein code name is represented by alphabetical SG the construction and installation stage, and respectively message code of group and the coded message one_to_one corresponding in component information storehouse represent for other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510228334.9A CN104778564A (en) | 2015-05-07 | 2015-05-07 | Prefabricated part construction management method based on information coding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510228334.9A CN104778564A (en) | 2015-05-07 | 2015-05-07 | Prefabricated part construction management method based on information coding |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104778564A true CN104778564A (en) | 2015-07-15 |
Family
ID=53620015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510228334.9A Pending CN104778564A (en) | 2015-05-07 | 2015-05-07 | Prefabricated part construction management method based on information coding |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104778564A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105333272A (en) * | 2015-11-19 | 2016-02-17 | 无锡市工业设备安装有限公司 | Prefabrication combined system for equipment and pipes in machine room |
CN109146118A (en) * | 2018-06-19 | 2019-01-04 | 浙江省建工集团有限责任公司 | A kind of prefabricated components stockyard optimization system and its optimization method based on optimization algorithm |
CN109577654A (en) * | 2017-09-29 | 2019-04-05 | 中国二十冶集团有限公司 | Assembly concrete component total logistics cost hanging method based on BIM technology |
CN112508151A (en) * | 2020-11-09 | 2021-03-16 | 上海建工集团股份有限公司 | Method for reusing integral climbing steel platform formwork component |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101183373A (en) * | 2007-12-17 | 2008-05-21 | 渤海船舶重工有限责任公司 | Encode coding method of marine vehicle material computer management |
CN202177927U (en) * | 2011-07-29 | 2012-03-28 | 罗勇 | Material uniformly-coding checking management system |
JP2012123589A (en) * | 2010-12-08 | 2012-06-28 | Kubota Corp | Piping construction management system, portable terminal and construction information management server |
CN103559525A (en) * | 2013-10-21 | 2014-02-05 | 沈阳建筑大学 | Precast concrete member provided with implanted radio frequency chip |
CN103793783A (en) * | 2014-01-09 | 2014-05-14 | 中建钢构有限公司 | Steel-structure overall-process tracking method and system |
-
2015
- 2015-05-07 CN CN201510228334.9A patent/CN104778564A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101183373A (en) * | 2007-12-17 | 2008-05-21 | 渤海船舶重工有限责任公司 | Encode coding method of marine vehicle material computer management |
JP2012123589A (en) * | 2010-12-08 | 2012-06-28 | Kubota Corp | Piping construction management system, portable terminal and construction information management server |
CN202177927U (en) * | 2011-07-29 | 2012-03-28 | 罗勇 | Material uniformly-coding checking management system |
CN103559525A (en) * | 2013-10-21 | 2014-02-05 | 沈阳建筑大学 | Precast concrete member provided with implanted radio frequency chip |
CN103793783A (en) * | 2014-01-09 | 2014-05-14 | 中建钢构有限公司 | Steel-structure overall-process tracking method and system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105333272A (en) * | 2015-11-19 | 2016-02-17 | 无锡市工业设备安装有限公司 | Prefabrication combined system for equipment and pipes in machine room |
CN109577654A (en) * | 2017-09-29 | 2019-04-05 | 中国二十冶集团有限公司 | Assembly concrete component total logistics cost hanging method based on BIM technology |
CN109146118A (en) * | 2018-06-19 | 2019-01-04 | 浙江省建工集团有限责任公司 | A kind of prefabricated components stockyard optimization system and its optimization method based on optimization algorithm |
CN109146118B (en) * | 2018-06-19 | 2020-09-08 | 浙江省建工集团有限责任公司 | Prefabricated part storage yard optimization system based on optimization algorithm and optimization method thereof |
CN112508151A (en) * | 2020-11-09 | 2021-03-16 | 上海建工集团股份有限公司 | Method for reusing integral climbing steel platform formwork component |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110008648B (en) | Intelligent building site integration implementation method based on BIM model | |
CN104778564A (en) | Prefabricated part construction management method based on information coding | |
CN104766177A (en) | Prefabricated part information library establishing method based on industrialized construction project | |
CN104573999A (en) | Application method of steel structure BIM (building information modeling) information platform | |
CN109146118B (en) | Prefabricated part storage yard optimization system based on optimization algorithm and optimization method thereof | |
CN107386660A (en) | Tower crane system in prefabricated concrete structure construction based on BIM technology | |
WO2003036469A3 (en) | A template-based method and system for reverse engineering | |
CN108228862A (en) | A kind of method for processing abnormal data and system of energy consumption monitoring platform | |
CN107368972A (en) | It is a kind of that work platform and its application method are sent based on BIM technology | |
Laurini et al. | Technology 4.0 for buildings management: from building site to the interactive building book | |
CN112288384A (en) | Application of P-BIAS-based fabricated building full-life-cycle management | |
Nowotarski et al. | Lean and agile management synergy in construction of high-rise office building | |
CN104537498A (en) | Electric power information device management system based on two-dimensional codes | |
CN104850724A (en) | Rapid airplane template design system and method | |
CN101748915B (en) | Modularization construction method for nuclear power station nuclear island | |
Girardet | Cities and the Culture of Sustainability | |
CN108959824A (en) | A kind of city of battalion plans pipeline BIM design section figure layer secondaryization generation method | |
CN105844016B (en) | A method of the proposed building quantity of acquisition based on buildings model cutting | |
Shin et al. | Development of optimum construction lift operation system using sensing information for high-rise building | |
CN209560345U (en) | A kind of organic fertilizer production EMS | |
CN102542082B (en) | Method for simplifying deepened design of spatial steel structure construction drawing | |
Lidelöw et al. | The structure and predefinition of the industrialized construction value chain | |
CN112765711A (en) | BIM modeling method for green building simulation calculation | |
CN107288264A (en) | Reinforcing bar carries out forming processing technology in steel mill | |
CN109015705A (en) | Remote control system based on robot identity card |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150715 |
|
WD01 | Invention patent application deemed withdrawn after publication |