CN108959824A - A kind of city of battalion plans pipeline BIM design section figure layer secondaryization generation method - Google Patents
A kind of city of battalion plans pipeline BIM design section figure layer secondaryization generation method Download PDFInfo
- Publication number
- CN108959824A CN108959824A CN201810882202.1A CN201810882202A CN108959824A CN 108959824 A CN108959824 A CN 108959824A CN 201810882202 A CN201810882202 A CN 201810882202A CN 108959824 A CN108959824 A CN 108959824A
- Authority
- CN
- China
- Prior art keywords
- cross
- node
- sectional
- view
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000013461 design Methods 0.000 title claims abstract description 34
- 238000000034 method Methods 0.000 title claims abstract description 23
- 238000010586 diagram Methods 0.000 claims abstract description 42
- 238000002955 isolation Methods 0.000 claims abstract description 4
- 238000005070 sampling Methods 0.000 claims description 37
- 230000001788 irregular Effects 0.000 claims description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 239000000567 combustion gas Substances 0.000 claims description 3
- 239000010865 sewage Substances 0.000 claims description 3
- 230000001174 ascending effect Effects 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 description 15
- 238000010276 construction Methods 0.000 description 9
- 238000012986 modification Methods 0.000 description 5
- 230000004048 modification Effects 0.000 description 5
- 238000013507 mapping Methods 0.000 description 4
- 206010054949 Metaplasia Diseases 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 238000007726 management method Methods 0.000 description 3
- 230000015689 metaplastic ossification Effects 0.000 description 3
- 238000011160 research Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000012549 training Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000013517 stratification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/01—Input arrangements or combined input and output arrangements for interaction between user and computer
- G06F3/048—Interaction techniques based on graphical user interfaces [GUI]
- G06F3/0487—Interaction techniques based on graphical user interfaces [GUI] using specific features provided by the input device, e.g. functions controlled by the rotation of a mouse with dual sensing arrangements, or of the nature of the input device, e.g. tap gestures based on pressure sensed by a digitiser
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Human Computer Interaction (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Processing Or Creating Images (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810882202.1A CN108959824B (en) | 2018-08-06 | 2018-08-06 | BIM design section layer layering generation method for Ying Yi planning pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810882202.1A CN108959824B (en) | 2018-08-06 | 2018-08-06 | BIM design section layer layering generation method for Ying Yi planning pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108959824A true CN108959824A (en) | 2018-12-07 |
CN108959824B CN108959824B (en) | 2020-10-02 |
Family
ID=64467715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810882202.1A Active CN108959824B (en) | 2018-08-06 | 2018-08-06 | BIM design section layer layering generation method for Ying Yi planning pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108959824B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111597628A (en) * | 2020-07-24 | 2020-08-28 | 广东博智林机器人有限公司 | Model marking method and device, storage medium and electronic equipment |
CN115146363A (en) * | 2022-07-26 | 2022-10-04 | 中铁长江交通设计集团有限公司 | Civil 3D-based damming structure and construction drawing creation method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040010767A1 (en) * | 2002-07-12 | 2004-01-15 | Lattice Semiconductor Corporation | Hierarchical general interconnect architecture for high density fpga's |
CN102708515A (en) * | 2012-05-03 | 2012-10-03 | 南信大影像技术工程(苏州)有限公司 | Space analysis module applied to three-dimensional pipeline management system of chemical industry park |
CN104631826A (en) * | 2015-01-21 | 2015-05-20 | 中国十七冶集团有限公司 | Construction general layout method based on BIM |
CN106446349A (en) * | 2016-08-31 | 2017-02-22 | 中国冶集团有限公司 | Method for calculating in-place amortization of earthwork based on revit software |
KR101736666B1 (en) * | 2016-04-05 | 2017-05-29 | 엘에스산전 주식회사 | Method FOR MANAGING WATER IN WATER PIPE NETWORK |
CN107423518A (en) * | 2017-08-02 | 2017-12-01 | 中建基础设施勘察设计建设集团有限公司 | The pipe gallery all fronts BIM collaborative design methods combined using Civil3D with Revit |
CN107766645A (en) * | 2017-10-19 | 2018-03-06 | 上海营邑城市规划设计股份有限公司 | One kind planning BIM pipeline collision detecting system memory management units |
-
2018
- 2018-08-06 CN CN201810882202.1A patent/CN108959824B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040010767A1 (en) * | 2002-07-12 | 2004-01-15 | Lattice Semiconductor Corporation | Hierarchical general interconnect architecture for high density fpga's |
CN102708515A (en) * | 2012-05-03 | 2012-10-03 | 南信大影像技术工程(苏州)有限公司 | Space analysis module applied to three-dimensional pipeline management system of chemical industry park |
CN104631826A (en) * | 2015-01-21 | 2015-05-20 | 中国十七冶集团有限公司 | Construction general layout method based on BIM |
KR101736666B1 (en) * | 2016-04-05 | 2017-05-29 | 엘에스산전 주식회사 | Method FOR MANAGING WATER IN WATER PIPE NETWORK |
CN106446349A (en) * | 2016-08-31 | 2017-02-22 | 中国冶集团有限公司 | Method for calculating in-place amortization of earthwork based on revit software |
CN107423518A (en) * | 2017-08-02 | 2017-12-01 | 中建基础设施勘察设计建设集团有限公司 | The pipe gallery all fronts BIM collaborative design methods combined using Civil3D with Revit |
CN107766645A (en) * | 2017-10-19 | 2018-03-06 | 上海营邑城市规划设计股份有限公司 | One kind planning BIM pipeline collision detecting system memory management units |
Non-Patent Citations (1)
Title |
---|
黄浩 等: "BIM技术应用于管线综合的方法探索", 《上海城市规划》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111597628A (en) * | 2020-07-24 | 2020-08-28 | 广东博智林机器人有限公司 | Model marking method and device, storage medium and electronic equipment |
CN115146363A (en) * | 2022-07-26 | 2022-10-04 | 中铁长江交通设计集团有限公司 | Civil 3D-based damming structure and construction drawing creation method |
Also Published As
Publication number | Publication date |
---|---|
CN108959824B (en) | 2020-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113239543A (en) | Digital factory simulation system based on virtual reality technology | |
CN108959824A (en) | A kind of city of battalion plans pipeline BIM design section figure layer secondaryization generation method | |
Yang et al. | Research on building information model (BIM) technology | |
CN110390145A (en) | A kind of house type graphic design method based on BIM | |
CN110359550A (en) | Assembled architecture PC component method for arranging based on BIM technology | |
Zhao | An application of bim technology in computer-aided building energy saving design | |
Yeh et al. | Planning for a better urban living environment in Asia | |
Jianfeng et al. | Construction of intelligent building design system based on BIM and AI | |
Xiaolei | Research on the Application of BIM Concept and BIM Software in Architectural Design | |
Zhu et al. | BIM digital technology in the construction industry in the field of application | |
Zhang et al. | Application of BIM technology in energy-saving design of green building [J] | |
Han et al. | Maintenance engineering for urban utility tunnel using 3D simulation | |
Qingmin et al. | Research on Optimization of Pipeline Layout in Mechanical and Electrical Installation of BIM Technology | |
Alexander | [Book review] Dockside Green: The story of the most sustainable development in the world | |
Fang | Research on Humanization Design of Green Building Based on Big Data | |
Wu et al. | Research on Electrical Technology Application of Super High-rise Building based on BIM | |
Duan et al. | Synthesis of Design | |
Wang | Research on the Design of Old Building Reconstruction from the Perspective of Urban Catalyst Theory | |
Kehua et al. | Optimization Of Spatial Form Of Ancestral Temples In Guangfu | |
Li et al. | Research Front and Review of BIM Based on China Knowledge Resource Integrated Database | |
Bi | Application Research of Building Information Model in the Construction Project Life Cycle | |
Wu | Application of BIM Technology in Building Operation and Maintenance Management | |
Zhai et al. | Application and Realization of BIM in Construction Engineering Management | |
Zhao | Design of Intelligent IoT System for Construction Engineering Based on BIM and Virtual Reality Technology | |
Jacoby | Collective forms and collective spaces: a discussion of urban design thinking and practice based on research in Chinese cities |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Hierarchical Generation Method for BIM Design Section of Yingyi Planned Pipeline Effective date of registration: 20221213 Granted publication date: 20201002 Pledgee: Industrial Bank Co.,Ltd. Shanghai Huashan sub branch Pledgor: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD. Registration number: Y2022310000371 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 200233 3rd floor, building 19, 810 Yishan Road, Xuhui District, Shanghai Patentee after: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD. Address before: Room 1802, Block K, No. 343 Huaihai West Road, Xuhui District, Shanghai, 200030 Patentee before: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD. |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20201002 Pledgee: Industrial Bank Co.,Ltd. Shanghai Huashan sub branch Pledgor: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD. Registration number: Y2022310000371 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Hierarchical Generation Method for BIM Design Section Diagram of Urban Planning Pipeline Granted publication date: 20201002 Pledgee: Industrial Bank Co.,Ltd. Shanghai Huashan sub branch Pledgor: SHANGHAI YINGYI URBAN PLANNING AND DESIGN CO.,LTD. Registration number: Y2024310000098 |