CN107268439B - It is a kind of to make the quick construction method in place of main cable strand in Tunnel-Type Anchorage of Suspension Bridge using special fixture - Google Patents
It is a kind of to make the quick construction method in place of main cable strand in Tunnel-Type Anchorage of Suspension Bridge using special fixture Download PDFInfo
- Publication number
- CN107268439B CN107268439B CN201710479900.2A CN201710479900A CN107268439B CN 107268439 B CN107268439 B CN 107268439B CN 201710479900 A CN201710479900 A CN 201710479900A CN 107268439 B CN107268439 B CN 107268439B
- Authority
- CN
- China
- Prior art keywords
- special fixture
- strand
- tunnel
- place
- anchor head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/16—Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
- E01D2101/32—Metal prestressed
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Make the quick construction method in place of strand in Tunnel-Type Anchorage of Suspension Bridge using special fixture the invention discloses a kind of;It is characterized by comprising following steps: (1) special fixture processing;(2) special fixture is connect with strand anchor head;(3) the special fixture of elevator machine travel is in place;Implementation through the invention: 1, anchor face before being drawn using special fixture auxiliary main cable strand to tunnel anchorage.2, avoid traction rope to strand anchor head friction damage using special fixture.3, special fixture is furnished with pulley blocks, and propulsive efficiency can be improved by cabling, is suitable for more tonnage hoist engines.4, special fixture can be recycled, and substantially increase the efficiency in place of main push-towing rope in tunnel anchorage, reduce costs.
Description
Technical field
The present invention relates to field of civil engineering, and in particular to a kind of main cable strand realized in Tunnel-Type Anchorage of Suspension Bridge quickly arrives
Up to the quick construction method in place in preceding anchor face.
Background technique
After anchorage is drawn using the main rope of suspension bridge strand of tunnel anchorage to tunnel anchorage, because there is space in tunnel anchorage
Limit, heavy mechanical equipment can not start tunneling, cause main cable strand cannot reach before anchor face.Elevator machine travel can only be used at this time
Anchor face before the method that steel cable pulls strand anchor head reaches it.Directly steel cable is bundled on strand anchor head and is possible to damage anchor head
Or rub with strand steel wire, therefore need to be improved.
Summary of the invention
Before so that main rope of suspension bridge strand is quickly reached tunnel anchorage the purpose of the present invention is to provide a kind of special fixture of utilization
The method in anchor face;Increase main push-towing rope propulsive efficiency, and main cable strand will not be had an impact.
Step 1: special fixture processing:
Special fixture is all made of 20mm thick steel plate, jig frame by jig frame, pulley blocks, upper lower clamp plate composition, material
And 25 bolt hole of φ is arranged in upper lower clamp plate, is connected using M24 plain bolt;
Step 2: special fixture is connect with strand anchor head:
Jig frame is covered in main cable strand anchor head position, lower clamp plate is installed, uses the fixed special fixture of bolt and rope
Stock anchor head;
Step 3: it is in place that hoist engine draws strand:
After special fixture and strand anchor head connect, it is connect around pulley cabling with hoist engine by steel cable, starts elevator
Machine travel strand reaches anchor face before tunnel anchorage.
It is of the present invention it is a kind of so that main rope of suspension bridge strand is quickly reached tunnel anchorage using special fixture before anchor face construction
Method;Main rope of suspension bridge propulsive efficiency is improved, and guarantees construction quality.
The present invention has the advantages that the present invention is connect using special fixture with strand anchor head by improving, then by dragging
The mode for dragging fixture can achieve same effect and will not influence strand.In addition pulley blocks are installed on special fixture can be improved
Efficiency is pulled, various tonnage hoist engines are suitable for, construction efficiency is high, and cost reduces.The present invention also has the following advantages that;
1, special clamp structure is simple, easy to use, and propulsive efficiency can be improved.
2, special fixture and strand anchor head are easy to connect.
3, special fixture will not damage influence to main cable strand anchor head in use.
4, special fixture can be recycled, and reduce costs.
Detailed description of the invention
Fig. 1 is special fixture and main cable strand anchor head connection schematic diagram;
Fig. 2 is upper and lower clamping plate schematic diagram;
Fig. 3 is the jig frame schematic diagram for assembling pulley.
Wherein: jig frame 1, pulley blocks 2, upper lower clamp plate 3.
Specific embodiment
Below in conjunction with attached drawing 1- Fig. 3, the present invention is described in detail, technical solution in the embodiment of the present invention into
Row clearly and completely describes, it is clear that described embodiments are only a part of the embodiments of the present invention, rather than whole realities
Apply example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without making creative work
Every other embodiment, shall fall within the protection scope of the present invention.
The present invention a kind of makes in Tunnel-Type Anchorage of Suspension Bridge main cable strand quickly using special fixture by improving to provide herein
The construction method of position;Increase the speed of main rope of suspension bridge strand location and installation in tunnel anchorage, operation becomes simple, to protect
Demonstrate,prove construction quality and save the cost.
1-3 the present invention is further explained specific embodiment with reference to the accompanying drawing:
It is a kind of to make the quick construction method in place of main cable strand in Tunnel-Type Anchorage of Suspension Bridge using special fixture, make suspension bridge master
The speed of cable stock location and installation in tunnel anchorage increases, and operation becomes simple, to guarantee construction quality and save the cost.
Step 1: special fixture processing: special fixture is made of jig frame 1, pulley blocks 2, upper lower clamp plate 3, and material is equal
Using 20mm thick steel plate, 25 bolt hole of φ is arranged in jig frame and upper lower clamp plate, is connected using M24 plain bolt;
Step 2: special fixture is connect with strand anchor head: by 1 set of jig frame in main cable strand anchor head position, being installed
Lower clamp plate uses bolt stationary fixture and strand anchor head;
Step 3: hoist engine traction strand is in place: after special fixture is connected with strand anchor head, by steel cable around special
Fixture middle pulley cabling is connect with hoist engine, and starting hoist engine traction strand reaches anchor face before tunnel anchorage.
The present invention has the advantages that
1, special clamp structure is simple, easy to use, and propulsive efficiency can be improved.
2, special fixture and strand anchor head are easy to connect.
3, special fixture will not damage influence to main cable strand anchor head in use.
4, special fixture can be recycled, and reduce costs.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention.
Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention
It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one
The widest scope of cause.
Claims (1)
1. a kind of make the quick construction method in place of Tunnel-Type Anchorage of Suspension Bridge main cable strand using special fixture, it is characterised in that: packet
Include following steps:
Step 1: special fixture processing:
Special fixture is all made of 20mm thick steel plate, fixture by jig frame (1), pulley blocks (2), upper lower clamp plate (3) composition, material
25 bolt hole of φ is arranged in frame (1) and upper lower clamp plate (3), is connected using M24 plain bolt;
Step 2: special fixture is connect with strand anchor head:
Jig frame (1) is covered in main cable strand anchor head position, lower clamp plate (3) are installed, using the fixed special fixture of bolt with
Strand anchor head;
Step 3: it is in place that hoist engine draws strand:
After special fixture and strand anchor head connect, it is connect around pulley cabling with hoist engine by steel cable, starting hoist engine is led
Straw line stock reaches anchor face before tunnel anchorage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710479900.2A CN107268439B (en) | 2017-06-22 | 2017-06-22 | It is a kind of to make the quick construction method in place of main cable strand in Tunnel-Type Anchorage of Suspension Bridge using special fixture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710479900.2A CN107268439B (en) | 2017-06-22 | 2017-06-22 | It is a kind of to make the quick construction method in place of main cable strand in Tunnel-Type Anchorage of Suspension Bridge using special fixture |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107268439A CN107268439A (en) | 2017-10-20 |
CN107268439B true CN107268439B (en) | 2019-02-15 |
Family
ID=60068604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710479900.2A Active CN107268439B (en) | 2017-06-22 | 2017-06-22 | It is a kind of to make the quick construction method in place of main cable strand in Tunnel-Type Anchorage of Suspension Bridge using special fixture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107268439B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021162811A1 (en) * | 2020-02-12 | 2021-08-19 | Commscope Technologies Llc | Convertible strand and pole small cell mounts and assemblies |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1213110A1 (en) * | 1983-10-11 | 1986-02-23 | Куйбышевский институт инженеров железнодорожного транспорта | Suspension bridge |
ES2367737B8 (en) * | 2011-06-30 | 2012-06-19 | Universidad De Cantabria | CONTINUOUS DISPLACEMENT DEVICE OF STRUCTURES. |
CN202865743U (en) * | 2012-11-14 | 2013-04-10 | 贺宏亮 | Dragline device of large-scale bridge girder |
CN104372742A (en) * | 2013-08-12 | 2015-02-25 | 湖北鄂南起重运输机械有限公司 | Puller for paying-off ropes of suspension bridge |
CN203890885U (en) * | 2014-05-04 | 2014-10-22 | 中国水电顾问集团贵阳勘测设计研究院有限公司 | Connecting device for steel cable and pull rod of horizontally-stayed cable bridge |
CN204455861U (en) * | 2015-02-10 | 2015-07-08 | 中交一航局第一工程有限公司 | A kind of hoisting connecting piece of large sections steel box-girder |
CN205501827U (en) * | 2016-03-08 | 2016-08-24 | 贵州中交贵瓮高速公路有限公司 | A horizontal cable bogie for catwalk system of shaking |
-
2017
- 2017-06-22 CN CN201710479900.2A patent/CN107268439B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107268439A (en) | 2017-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101967796B (en) | Method for arranging parallel steel wire stay cable | |
CN107119572A (en) | A kind of main rope of suspension bridge strand second traction enters the construction method of tunnel anchorage | |
CN110042768A (en) | A kind of combination beam cable-stayed bridge main-beam binodal section circulation construction method | |
CN107268439B (en) | It is a kind of to make the quick construction method in place of main cable strand in Tunnel-Type Anchorage of Suspension Bridge using special fixture | |
CN109973130B (en) | Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand | |
CN102545103A (en) | Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method | |
CN103500964A (en) | Method of live-wire replacement of overhead ground wire | |
CN204139609U (en) | A kind of mounting structure of overhanging unloading platform | |
CN106087759B (en) | A kind of threading method of prestressed strand threader and prestressed strand | |
CN202461363U (en) | Disc steel bar straightening machine for building | |
CN108104852A (en) | A kind of low stretch-draw anchor construction method for reducing loss of prestress | |
CN104242142B (en) | The installation method of suspension type tube type bus | |
CN104724615A (en) | Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane | |
CN203529710U (en) | Special device for hoisting cable reel | |
CN203345975U (en) | Installation device of hoisting steel wire rope and tower crane | |
CN210457158U (en) | Curtain type mounting structure for quickly hoisting square concrete pier column hooping | |
CN208656387U (en) | A kind of wirerope binding method drilling cable mounting mechanism | |
CN203756202U (en) | Rapid feeder for vertical anchor cable | |
CN105350782B (en) | A kind of semi-mechanization steel strand wires laying method for round silo | |
CN211230287U (en) | Guy rope arrangement fixing device for vehicle-mounted workover rig in moving state | |
CN203486866U (en) | Automobile hoisting hydraulic aerial cage balancing device | |
CN205346692U (en) | Swing arm tower machine of supporting multiple mounting means becomes width of cloth pulley yoke | |
CN105507129B (en) | Suspension bridge main cable tightening tool structure and design method | |
CN203932835U (en) | Distribution insulated conductor is carried line car | |
CN204343649U (en) | A kind of tool-type wire rope draw ring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |