CN105350782B - A kind of semi-mechanization steel strand wires laying method for round silo - Google Patents

A kind of semi-mechanization steel strand wires laying method for round silo Download PDF

Info

Publication number
CN105350782B
CN105350782B CN201510687262.4A CN201510687262A CN105350782B CN 105350782 B CN105350782 B CN 105350782B CN 201510687262 A CN201510687262 A CN 201510687262A CN 105350782 B CN105350782 B CN 105350782B
Authority
CN
China
Prior art keywords
strand wires
steel strand
steel
wire rope
hoist engine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510687262.4A
Other languages
Chinese (zh)
Other versions
CN105350782A (en
Inventor
吴建国
田永伟
张煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510687262.4A priority Critical patent/CN105350782B/en
Publication of CN105350782A publication Critical patent/CN105350782A/en
Application granted granted Critical
Publication of CN105350782B publication Critical patent/CN105350782B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Abstract

The invention discloses a kind of semi-mechanization steel strand wires laying method for round silo.It comprises the following steps:S1, the repacking of slip form platform support body are reinforced;S2, hoist engine installation;S3, the installation of barrel steel strand wires fixed mount, centering;S4, the pre- of steel wire rope of windlass are worn;S5, steel strand wires and steel wire rope connection;S6, steel wire rope is withdrawn with hoist engine, artificial fine setting is in place to steel strand wires, unties the connection between steel wire rope and steel strand wires, steel strand wires are tightened with steel strand wires fixed mount with tied silk.Laying method proposed by the present invention realizes the purpose of semi-mechanization laying steel strand wires using hoist engine, solve the problems, such as that steel strand wires laying operating personnel's consumption is big in slding form operation, progress is slow, the device economical rationality of selection, reduces construction cost, has saved operation holding time.

Description

A kind of semi-mechanization steel strand wires laying method for round silo
Technical field
The present invention relates to steel strand wires to lay field, is specifically related to a kind of semi-mechanization steel strand wires for round silo and spreads Equipment, method.
Background technology
At present, steel strand wires construction is generally using artificial laying in the industry, and when steel strand wires are laid, front needs a people to adjust steel strand wires Wear direction, rear personnel are held steel strand wires and pushed forward with hand-tight.This construction method not only labor intensive, with 30m diameter cylinders Exemplified by storehouse, the laying of per tour steel strand wires at least needs 12 workers not stop operation;It is and intensive in construction large silo, steel strand wires arrangement In the case of it is difficult to ensure that steel strand wires laying progress meets the construction speed of barrel, often occur because steel strand wires laying goes out not in time Situations such as existing work holdup.And semimechanized laying laying method is used, the labor intensity of operating personnel can be greatly reduced, improved The laying efficiency of steel strand wires;And using semi-automatic steel strand wires laying apparatus, reduce operating personnel, reduce silo construction When slip form platform load, improve the security of slip form platform, substantially reduce the risk of accident generation.
The content of the invention
For technical problem present in prior art, it is used for the half of round silo it is an object of the invention to provide a kind of Mechanization steel strand wires laying method.
To achieve these goals, the technical solution adopted in the present invention is:A kind of semi-mechanization for round silo Steel strand wires laying method, comprises the following steps:
S1, the repacking of slip form platform support body:
In some steel strand wires tip positions at barrel, hoist engine installation site is selected, to the sliding formwork of installation site Platform support body carries out repacking reinforcing;
S2, hoist engine installation:
Hoist engine is installed on the slip form platform support body after repacking is reinforced, the stability of hoist engine must is fulfilled for follow-up steel and twisted The dilatory work of line;
S3, the installation of barrel steel strand wires fixed mount, centering:
Some steel strand wires fixed mounts are installed in the track that first of steel strand wires on the estimation need to lay, and utilize steel strand wires Fixed mount replaces the vertical distributing bar of part barrel;
S4, the pre- of steel wire rope of windlass are worn:
Cable wire end on hoist engine is passed through to the steel strand wires fixed mount of round silo, until steel strand wires tip position;
S5, steel strand wires and steel wire rope connection:
Utilize steel cable clamp, by cable wire end connection parallel with steel strand wires termination, buckle and steel strand wires contact position The rubber blanket that steel strand wires are damaged in dragging is prevented on pad;
S6, steel wire rope is withdrawn with hoist engine, artificial fine setting is in place to steel strand wires, unties the company between steel wire rope and steel strand wires Connect, steel strand wires are tightened with steel strand wires fixed mount with tied silk.
Beneficial effects of the present invention are shown:
Laying method proposed by the present invention realizes the purpose of semi-mechanization laying steel strand wires using hoist engine, solves in cunning The problem of steel strand wires laying operating personnel's consumption is big when mould is constructed, progress is slow, the device economical rationality of selection, reduces and is constructed into This, has saved operation holding time.
Brief description of the drawings
Fig. 1 is step S4 schematic diagram.
Fig. 2 is step S5 schematic diagram.
Embodiment
To further describe the present invention, it is described further with reference to embodiment.
A kind of semi-mechanization steel strand wires laying method for round silo, comprise the following steps:
S1, slip form platform support body 1 are reequiped:
In the tip position of some steel strand wires 2 at barrel, the installation site of hoist engine 3 is selected, to the cunning of installation site Mould platform support body 1 carries out repacking reinforcing.
S2, hoist engine 3 are installed:
Hoist engine 3 is installed on the slip form platform support body 1 after repacking is reinforced, the stability of hoist engine 3 must is fulfilled for subsequently The dilatory work of steel strand wires 2.
S3, barrel steel strand wires fixed mount 4 are installed, centering:
Some steel strand wires fixed mounts 4 are installed in the track that first of steel strand wires 2 on the estimation need to lay, and are twisted using steel Line fixed mount 4 replaces the vertical distributing bar of part barrel.
S4, the pre- of steel wire rope 5 of hoist engine 3 are worn:
Such as Fig. 1, the steel strand wires fixed mount 4 by the fag end of steel wire rope 5 on hoist engine 3 through round silo, until steel strand wires 2 Tip position.
S5, steel strand wires 2 and steel wire rope 5 connection:
Such as Fig. 2, using steel cable clamp 6, by the connection parallel with the termination of steel strand wires 2 of the fag end of steel wire rope 5, buckle 6 twists with steel The rubber blanket 7 that steel strand wires are damaged in dragging is prevented on the contact position pad of line 2.
S6, steel wire rope 5 is withdrawn with hoist engine 3, artificial fine setting is in place to steel strand wires 2, untie steel wire rope 5 and steel strand wires 2 it Between connection, steel strand wires 2 and steel strand wires fixed mount 4 are tightened with tied silk.
The present invention proposes a kind of semi-mechanization steel strand wires laying method for round silo, and principle of the invention is exactly By it is former should utilize to lay thrust of the steel strand wires personnel at rear and change into hoist engine 3 tighten up steel wire rope 5 in front and bring steel and twist The pulling force of line 2;Hoist engine 3 should be tightened up slowly;When tightening up, operating personnel guard is set by steel strand wires 2, prevents steel strand wires 2 from being twisted with steel Line fixed mount 4 is stuck to cause damage, and after steel strand wires 2 are in place, personnel remove the connection of steel strand wires 2 and steel wire rope 5 immediately, and steel is twisted Line 2 is tightened with steel strand wires fixed mount 4 with tied silk.
Above content is only to design example and explanation of the invention, affiliated those skilled in the art Various modifications or supplement are made to described specific embodiment or is substituted using similar mode, without departing from invention Design or surmount scope defined in the claims, protection scope of the present invention all should be belonged to.

Claims (1)

1. a kind of semi-mechanization steel strand wires laying method for round silo, it is characterised in that comprise the following steps:
S1, slip form platform support body(1)Repacking:
In some steel strand wires at barrel(2)Tip position, select hoist engine(3)Installation site, to the cunning of installation site Mould platform support body(1)Carry out repacking reinforcing;
S2, hoist engine(3)Installation:
Slip form platform support body after repacking is reinforced(1)Upper installation hoist engine(3), hoist engine(3)Stability must be fulfilled for after Continuous steel strand wires(2)Dilatory work;
S3, barrel steel strand wires fixed mount(4)Installation, centering:
First of steel strand wires on the estimation(2)The track for needing to lay is installed by some steel strand wires fixed mounts(4), and twisted using steel Line fixed mount(4)Instead of the vertical distributing bar of part barrel;
S4, hoist engine(3)Steel wire rope(5)Pre- wear:
By hoist engine(3)On steel wire rope(5)Fag end passes through the steel strand wires fixed mount of round silo(4), until steel strand wires(2)End Head position;
S5, steel strand wires(2)With steel wire rope(5)Connection:
Utilize steel cable clamp(6), by steel wire rope(5)Fag end and steel strand wires(2)The parallel connection in termination, buckle(6)With steel strand wires (2)The rubber blanket that steel strand wires are damaged in dragging is prevented on contact position pad(7);
S6, use hoist engine(3)Withdraw steel wire rope(5), artificial fine setting to steel strand wires(2)In place, steel wire rope is untied(5)With steel strand wires (2)Between connection, by steel strand wires(2)With steel strand wires fixed mount(4)Tightened with tied silk.
CN201510687262.4A 2015-10-22 2015-10-22 A kind of semi-mechanization steel strand wires laying method for round silo Active CN105350782B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510687262.4A CN105350782B (en) 2015-10-22 2015-10-22 A kind of semi-mechanization steel strand wires laying method for round silo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510687262.4A CN105350782B (en) 2015-10-22 2015-10-22 A kind of semi-mechanization steel strand wires laying method for round silo

Publications (2)

Publication Number Publication Date
CN105350782A CN105350782A (en) 2016-02-24
CN105350782B true CN105350782B (en) 2017-12-05

Family

ID=55326830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510687262.4A Active CN105350782B (en) 2015-10-22 2015-10-22 A kind of semi-mechanization steel strand wires laying method for round silo

Country Status (1)

Country Link
CN (1) CN105350782B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117605286A (en) * 2024-01-23 2024-02-27 中国电建集团山东电力建设第一工程有限公司 Wind power mixing tower prestress steel strand threading tool and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635238A (en) * 2012-05-03 2012-08-15 中国十九冶集团有限公司 Large-scale coal bunker wall prestress anchor sealing construction method and structure
CN103669214A (en) * 2013-11-19 2014-03-26 中建三局建设工程股份有限公司 Superlong prestress strand combing, binding and strand pulling integrated device
JP2015101867A (en) * 2013-11-22 2015-06-04 株式会社竹中工務店 Manufacturing method for exterior panel unit
CN204475874U (en) * 2015-03-13 2015-07-15 中国土木工程集团有限公司 A kind of novel pre-stressed steel strand draw-gear

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561706B (en) * 2012-03-19 2016-07-06 中冶天工集团有限公司 Threading method in large-span space prestressed steel structure steel strand wires body

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635238A (en) * 2012-05-03 2012-08-15 中国十九冶集团有限公司 Large-scale coal bunker wall prestress anchor sealing construction method and structure
CN103669214A (en) * 2013-11-19 2014-03-26 中建三局建设工程股份有限公司 Superlong prestress strand combing, binding and strand pulling integrated device
JP2015101867A (en) * 2013-11-22 2015-06-04 株式会社竹中工務店 Manufacturing method for exterior panel unit
CN204475874U (en) * 2015-03-13 2015-07-15 中国土木工程集团有限公司 A kind of novel pre-stressed steel strand draw-gear

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
储配仓混凝土结构中无粘结预应力施工技术;韩斯明;《安徽建筑》;20141220(第6期);第55-56页 *

Also Published As

Publication number Publication date
CN105350782A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN105016184B (en) Vertical multirope friction winder process for replacing hoisting ropes
CN102312429B (en) Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile
CN100440660C (en) Mechanical laying method for overlength large section cable
CN102444086A (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN101967796B (en) Method for arranging parallel steel wire stay cable
CN104631329B (en) A kind of suspension bridge continuous way cat road integral linear method of adjustment
JP5812325B2 (en) Electric wire tension reduction device and electric wire tension reduction method
CN109973130B (en) Construction system and method for realizing one-time traction of extra-long tunnel anchor narrow space by main cable strand
CN103500964A (en) Method of live-wire replacement of overhead ground wire
CN105350782B (en) A kind of semi-mechanization steel strand wires laying method for round silo
CN204958233U (en) Tower crane plays to rise wire rope and holds in palm rope device
CN206768626U (en) A kind of steel hinge line lashing accessory system
CN107324231B (en) Endless rope winch wire rope distributing technique
CN103775734B (en) Gas drainage pipeline system construction method under large-diameter well
CN105375389B (en) Wire fixing device
CN110884523A (en) Slope net type car fishing device for cable car running
CN214660350U (en) Split initial tunneling pipeline extension supporting device of shield tunneling machine
KR101104807B1 (en) Loop type installation method of electric wire and communication line
CN204947485U (en) A kind of auxiliary tunnel inner cable walks the device of lining trolley
CN108130859B (en) Beam end installation method of stay cable
CN104344075B (en) Shaft construction hangs the quick handling of interim edema due to wind pathogen pipeline and installation method using the borehole wall
CN103362124A (en) Recoverable anchor cable for civil engineering
CN107268439B (en) It is a kind of to make the quick construction method in place of main cable strand in Tunnel-Type Anchorage of Suspension Bridge using special fixture
CN112290457A (en) Construction method of carbon fiber composite core wire
CN203455531U (en) Optical cable tightener

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant