CN101967796B - Method for arranging parallel steel wire stay cable - Google Patents

Method for arranging parallel steel wire stay cable Download PDF

Info

Publication number
CN101967796B
CN101967796B CN2010102855580A CN201010285558A CN101967796B CN 101967796 B CN101967796 B CN 101967796B CN 2010102855580 A CN2010102855580 A CN 2010102855580A CN 201010285558 A CN201010285558 A CN 201010285558A CN 101967796 B CN101967796 B CN 101967796B
Authority
CN
China
Prior art keywords
anchor head
suspension cable
end anchor
tower end
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010102855580A
Other languages
Chinese (zh)
Other versions
CN101967796A (en
Inventor
欧阳钢
陈明宪
刘玉兰
颜江平
黄继军
万华
刘武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Road and Bridge Construction Group Co Ltd
Original Assignee
Hunan Road and Bridge Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Road and Bridge Construction Group Co Ltd filed Critical Hunan Road and Bridge Construction Group Co Ltd
Priority to CN2010102855580A priority Critical patent/CN101967796B/en
Publication of CN101967796A publication Critical patent/CN101967796A/en
Application granted granted Critical
Publication of CN101967796B publication Critical patent/CN101967796B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a method for arranging a parallel steel wire stay cable, which comprises the following steps of: 1) arranging a tower end anchor head at the end of the stay cable; 2) arranging a planetary jack and a tower end anchor head nut of the stay cable on an anchor backing plate which is arranged at the pipe orifice of a cable guide pipe on the inner side of the wall of a cable bent tower; 3) lengthening a pulling steel stranded wire meeting the requirement at the tower end anchor head of the stay cable; 4) hoisting the tower end anchor head of the stay cable to a position nearby the pipe orifice of the cable guide pipe on the outer side of the wall of the cable bent tower by using a hoisting machine on the top of the cable bent tower; 5) pulling the end of the pulling steel stranded wire to pass through the cable guide pipe and anchoring on the planetary jack; and 6) pulling the pulling steel stranded wire by using the planetary jack, pulling part of the tower end anchor head of the stay cable to exceed the anchor backing plate and screwing the tower end anchor head nut of the stay cable at the tower end anchor head so as to cap the tower head anchor head. The method can effectively avoid the sling accidents of the stay cable, makes the whole construction process convenient and quick and contributes to the linear control of bridges.

Description

A kind of mounting method of parallel steel wire suspension cable
Technical field
The invention belongs to method for bridge construction, be specifically related to a kind of mounting method of parallel steel wire suspension cable.
Background technology
At present, in the installation of parallel steel wire suspension cable, mainly contain the traction mounting means of the beam-ends soft or hard combination of the traction mounting means of tower end soft or hard combination of soft traction stiffened traction and the traction of soft traction stiffened.
First kind of mounting means adopts the continous way jack to add the traction that steel strand add the rigidity tension rod of different length to carry out stretch-draw construction method again: this job practices utilizes the less jack of tonnage by steel strand the termination of rigidity tension rod to be pulled out anchor plate earlier, utilize clasp nut to be attached the names of pre-determined candidates in the tension rod termination, then that tonnage is less jack is converted to the inclined guy cable stretching jack, utilize inclined guy cable stretching jack tension tension rod, the suspension cable anchor head is drawn to the tower end position of attaching the names of pre-determined candidates.This job practices takies very greatly owing to multiple reason is easy to cause tension rod fracture that suspension cable falling accident and construction operation space take place in work progress, uses often restricted.
Second method need be utilized at the semi girder front end large-scale removable suspension bracket carries out suspension cable as operation platform installation is set.The general tonnage of this suspension bracket is bigger, and is big to the linear influence of bridge, and construction monitoring is difficulty comparatively, and efficiency of construction is low, the duration is also longer, and personnel are in that to be exposed to the dangerous operation face time long.
Summary of the invention
The purpose of this invention is to provide a kind of safer, easy construction, the mounting method of parallel steel wire suspension cable efficiently.
The technical scheme that realizes the object of the invention is: the mounting method of parallel steel wire suspension cable may further comprise the steps:
1, with suspension cable behind bridge floor exhibition rope, in the end of suspension cable tower end anchor head is installed;
2, the tower end anchor head nut of planet jack and suspension cable is set on the anchor plate that is located at the Sarasota wall medial strand conduit mouth of pipe;
3, satisfactory traction steel strand are longer on the tower end anchor head of suspension cable;
4, the hoist engine that utilizes the Sarasota top is promoted to the tower end anchor head of suspension cable near the Sarasota wall outside mouth of pipe of cable guide pipe;
5, will draw the traction of steel strand termination by the cableway pipe, and be anchored on the planet jack;
6, utilize planet jack traction traction steel strand, the tower end anchor head of suspension cable is partly drawn exceed anchor plate, the tower end anchor head nut screwing clamping of suspension cable is realized that on the tower end anchor head of suspension cable tower end anchor head attaches the names of pre-determined candidates.
In the described step 3, the length of described satisfactory traction steel strand and radical are finished under the situation of installation at its tower end anchor head according to precalculated suspension cable, and the tower end anchor head required tractive force of attaching the names of pre-determined candidates is determined.
In the described step 6, the length that the tower end anchor head of described suspension cable exceeds anchor plate is as the criterion with the thickness of the tower end anchor head nut of suspension cable.
The characteristics of the inventive method are, utilize steel strand that the tower end anchor head of suspension cable is pulled out anchor plate to the position of attaching the names of pre-determined candidates fully, do not adopt the rigidity tension rod to draw in whole distraction procedure.It not only can make the generation of effectively having stopped to take place because of the tension rod fracture bob rope accident, be not subjected to the restriction in construction operation space substantially, and work progress is less to the linear influence of bridge, personnel's job safety.Its whole construction course is convenient, fast, and has shortened the duration greatly.This method is applicable to the suspension cable installation of all cable stayed bridges.
Description of drawings
Accompanying drawing is the embodiment schematic diagram of the inventive method.
Among the figure: 1 is the planet jack; 2 is planet jack spike; 3 is the tower end anchor head nut of suspension cable; 4 is anchor plate; 5 is cable guide pipe; 6 are the traction steel strand; 7 is gland; 8 is the P anchor; 9 is the tower end anchor head of suspension cable; 10 are the traction steel strand anchorage; 11 is wire rope; 12 is the suspension cable anchor ear; 13 is suspension cable; 14 is Sarasota.
Specific implementation method
The mounting method of parallel steel wire suspension cable of the present invention carries out according to the following steps referring to accompanying drawing:
1, suspension cable is opened up rope at bridge floor;
2, the tower end anchor head 9 of suspension cable is installed;
3, vertical on the anchor plate 4 that is located at Sarasota 14 wall medial strand conduits 5 mouths of pipe, tower end anchor head nut 3 that centering arranges planet jack 1, planet jack spike 2 and suspension cable;
4, finish under the situation of installation at its tower end anchor head 9 according to precalculated suspension cable 13, traction suspension cable 13 to its tower end anchor head 9 required tractive force of attaching the names of pre-determined candidates is determined the length and the radical of traction steel strand 6, by gland 7, P anchor 8 and draw steel strand anchorage 10 and will draw on the tower end anchor head 9 that steel strand 6 are longer in suspension cable;
5, utilize and to be located at wire rope 11 that Sarasota 14 top hoist engines send downwards and to bind round near the suspension cable anchor ear 12 near the suspension cable 13 tower end anchor head of suspension cable is promoted to the tower end anchor head 9 of suspension cable the Sarasota 14 walls outside mouth of pipe of cable guide pipe 5 by enclosing;
6, will draw the traction of steel strand 6 terminations by cableway pipe 5, planet jack spike 2, and it will be anchored on the planet jack 1;
7, utilize planet jack 1 traction traction steel strand 6, tower end anchor head 9 parts of suspension cable are pulled out anchor plate 4, the length that tower end anchor head 9 exceeds anchor plate 4 is as the criterion with the thickness of the tower end anchor head nut 3 of suspension cable, the tower end anchor head nut 3 of suspension cable is tightened in realize on the tower end anchor head 9 of suspension cable that tower end anchor head 9 attaches the names of pre-determined candidates;
8, remove traction steel strand 6, planet jack 1, planet jack spike;
9. inclined guy cable stretching equipment,, two of finishing suspension cable are installed.

Claims (2)

1. the mounting method of a parallel steel wire suspension cable is characterized in that may further comprise the steps:
1), with suspension cable behind bridge floor exhibition rope, in the end of suspension cable tower end anchor head is installed;
The tower end anchor head nut of planet jack and suspension cable 2), is set on the anchor plate that is located at the Sarasota wall medial strand conduit mouth of pipe;
3), satisfactory traction steel strand are longer on the tower end anchor head of suspension cable, the length and the radical of traction steel strand are finished under the situation of installation at its tower end anchor head according to precalculated suspension cable, and the tower end anchor head required tractive force of attaching the names of pre-determined candidates is determined;
4), the hoist engine that utilizes the Sarasota top is promoted to the tower end anchor head of suspension cable near the Sarasota wall outside mouth of pipe of cable guide pipe;
5), will draw steel strand termination traction by the cableway pipe, and be anchored on the planet jack;
6), utilize planet jack traction traction steel strand, the tower end anchor head of suspension cable partly drawn exceed anchor plate, the tower end anchor head nut screwing clamping of suspension cable is realized that on the tower end anchor head of suspension cable tower end anchor head attaches the names of pre-determined candidates.
2. the mounting method of parallel steel wire suspension cable according to claim 1 is characterized in that in the described step 6, and the length that the tower end anchor head of described suspension cable exceeds anchor plate is as the criterion with the thickness of the tower end anchor head nut of suspension cable.
CN2010102855580A 2010-09-19 2010-09-19 Method for arranging parallel steel wire stay cable Active CN101967796B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102855580A CN101967796B (en) 2010-09-19 2010-09-19 Method for arranging parallel steel wire stay cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102855580A CN101967796B (en) 2010-09-19 2010-09-19 Method for arranging parallel steel wire stay cable

Publications (2)

Publication Number Publication Date
CN101967796A CN101967796A (en) 2011-02-09
CN101967796B true CN101967796B (en) 2011-11-23

Family

ID=43547011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102855580A Active CN101967796B (en) 2010-09-19 2010-09-19 Method for arranging parallel steel wire stay cable

Country Status (1)

Country Link
CN (1) CN101967796B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556573B (en) * 2013-10-08 2015-08-12 中交第二航务工程局有限公司 A kind of parallel steel stranded wire inclined guy cable stretching control method
CN107201721B (en) * 2016-03-16 2018-10-16 中铁十五局集团有限公司 A kind of suspension cable construction method of installation
CN106348034B (en) * 2016-08-30 2018-08-17 中国能源建设集团安徽电力建设第一工程有限公司 Suspension cable steel construction large-scale power station coal transporting trestle stayed Cable Construction method
CN106544959B (en) * 2016-12-12 2018-05-29 中铁大桥局集团有限公司 The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN109024295B (en) * 2018-08-22 2020-03-17 中铁九局集团第二工程有限公司 Construction method for measuring and positioning cable-stayed bridge end cable guide pipe based on measuring robot
CN110184930B (en) * 2019-05-27 2021-11-02 法尔胜泓昇集团有限公司 Construction method of stay cable of short-tower cable-stayed bridge
CN110241736A (en) * 2019-06-17 2019-09-17 中交路桥华南工程有限公司 Suspension cable Fast Installation construction method
CN111593674A (en) * 2020-06-12 2020-08-28 安徽省公路桥梁工程有限公司 Suspended casting beam cable construction structure and construction method for n-shaped beam bridge
CN114436116B (en) * 2022-02-10 2023-11-24 中铁广州工程局集团有限公司 Method for hanging stay cable of super-long and super-heavy steel strand

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1122741C (en) * 1998-11-09 2003-10-01 柳州欧维姆建筑机械有限公司 Method for stretching guy of twisted steel cable for cable stayed bridge
CN1122742C (en) * 1998-11-09 2003-10-01 柳州欧维姆建筑机械有限公司 Method and system for suspending oblique guys of cable stayed bridge
CN2861262Y (en) * 2005-11-24 2007-01-24 吴立鹏 Inclined bracing cable connector
CN200978388Y (en) * 2006-12-06 2007-11-21 江阴法尔胜住电新材料有限公司 Steel strand inclined dragline force conversion device
CN101761035A (en) * 2010-01-14 2010-06-30 中交第二公路工程局有限公司 Soft and hard combined traction method for long-cable installation of cable-stayed bridge

Also Published As

Publication number Publication date
CN101967796A (en) 2011-02-09

Similar Documents

Publication Publication Date Title
CN101967796B (en) Method for arranging parallel steel wire stay cable
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN201272942Y (en) Mounting angle regulation apparatus for stay cable column end of stayed-cable bridge
CN202012047U (en) Steel strand inclined pulling and buckling system of tower
CN210003305U (en) Construction system for achieving traction in place in narrow anchor space of ultra-long tunnel in modes
CN109973130A (en) Once draw construction system and method in place in a kind of main cable strand realization narrow space of Super Long Tunnel anchor
CN212025936U (en) Equipment for mounting continuous steel strand stay cable at tower end of cable-stayed bridge
CN106401196A (en) Steel strand tensioning device for pre-stressed anchorage device
CN206768626U (en) A kind of steel hinge line lashing accessory system
CN100580182C (en) Soft and hard composite three-level traction technique for stay cables and connecting device thereof
JP5597443B2 (en) Construction method of PC structure
CN202461363U (en) Disc steel bar straightening machine for building
CN212670303U (en) Stay cable beam end mounting structure
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN110172919A (en) A kind of low-pylon cable-stayed bridge is reeved method and system
CN210714046U (en) Device for lifting inverted chimney steel inner cylinder by using steel twisted rope hydraulic pressure
CN201507113U (en) Electric climbing-formwork device used for building and construction
CN110541599A (en) Device for lifting inverted chimney steel inner cylinder by using steel twisted rope hydraulic pressure
CN102849622B (en) Mast-based section-by-section vertical lifting assembling method of tower
CN214527565U (en) Quick laying structure of deep vertical shaft steel wire rope
CN209779465U (en) main tower erects cable-stay bridge's string cable construction system that changes
CN205916922U (en) Cable machine walking dolly is supplementary to be pull ropeway carrying -rope and crosses river structure
CN201474306U (en) Hoisting ring device used on discharging platform
CN201102869Y (en) Large arm device of midair-disassembling horizontal lazy-arm type tower crane
CN207896560U (en) A kind of skyscraper cable-laying gear

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 410004 Hunan province Changsha Yuhua District of Shaoshan City Road No. 239

Patentee after: Hunan Road & Bridge Construction Group Co., Ltd.

Address before: 410004 Hunan province Changsha Yuhua District of Shaoshan City Road No. 239

Patentee before: Hunan Road & Bridge Construction Group Corp.