CN102312429B - Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile - Google Patents

Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile Download PDF

Info

Publication number
CN102312429B
CN102312429B CN 201110193373 CN201110193373A CN102312429B CN 102312429 B CN102312429 B CN 102312429B CN 201110193373 CN201110193373 CN 201110193373 CN 201110193373 A CN201110193373 A CN 201110193373A CN 102312429 B CN102312429 B CN 102312429B
Authority
CN
China
Prior art keywords
pile
pile head
concrete
pile crown
cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110193373
Other languages
Chinese (zh)
Other versions
CN102312429A (en
Inventor
刘卫东
杨文辉
刘鑫
张化锋
高永辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Tieke Construction Engineering Consulting Co., Ltd.
Original Assignee
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Northwest Research Institute Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd, Northwest Research Institute Co Ltd of CREC filed Critical No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN 201110193373 priority Critical patent/CN102312429B/en
Publication of CN102312429A publication Critical patent/CN102312429A/en
Application granted granted Critical
Publication of CN102312429B publication Critical patent/CN102312429B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a rapid separation and integral hoisting method for the pile head of a cast-in-place concrete pile. Before a steel reinforcement cage is lowered down, a sleeve is firstly installed at the top end of the steel reinforcement cage on a main reinforcement with a pile head section which is required to be chiseled off; the two ends of the sleeve are plugged to prevent cement from entering the sleeve; after the strength of concrete in a pile body reaches the design requirement and the pile head is excavated, a slip is cut at the bottom end of the pile head section to be chiseled off along the annular direction of the pile head, and an annular groove is chiseled upwards to expose the sleeve; at least three bores are drilled on the annular side wall of the lower part of the pile head section to be chiseled off, reinforcement short sections are inserted into the drilled bores, and the exposed parts of the reinforcement short sections are used for tying a steel wire rope for hoisting; and hoisting can be conducted after the steel wire rope is well tied, so that the pile head section required to be chiseled off which is separated from the main reinforcement of the pile head is integrally hoisted. Since the concrete of the pile head section to be chiseled off and the main reinforcement are not bonded with each other, when the pile head is chiseled off, the operation for stripping the main reinforcement of the pile head off from the concrete is not required, the pile head chiseling speed is greatly accelerated, and the construction cost is reduced.

Description

Concrete filling pile head separates and integral hoisting method fast
Technical field
The invention belongs to the Concrete Grouting Pale technical field, be specifically related to concrete filling pile head by the super processing method of filling with part of standard.
Background technology
Due to the Concrete Grouting Pale technology maturation, ground adaptability is strong, and supporting capacity is good, is widely used in all kinds of Foundation Designs.In the construction of cast-in-place concrete pile, for guaranteeing the concrete quality of pile crown, therefore filling pile head absolute altitude 0.5~1.0m(that the constructor all will exceed setting by code requirement when concrete perfusion is section doping laitance, mud), and then cut this part exceeded (being referred to as the broken pile head).
Exceed for cutting the concrete of setting the grout pile head part, still adopt the method that artificial chisel removes or the human assistance small-sized machine is abolished at present always.Due to the powerful bond stress of concrete to pile crown master muscle, therefore to peel off one by one the main muscle bonded by concrete and reject unnecessary concrete, expend a large amount of manpower and materials, labour intensity is large, speed of application is slow, particularly the quality of pile body and the main muscle of pile body are damaged greatly, do not conformed to the desired high efficiency of the infrastructure projects of current a large amount of development, high-quality.
Summary of the invention
The object of the invention is to overcome above-mentioned the deficiencies in the prior art, provide a kind of high efficiency and high-quality requirement that can guarantee in infrastructure projects Concrete Grouting Pale, and simple and easy to do concrete filling pile head separates and integral hoisting method fast.
For achieving the above object, the technical scheme that the present invention takes is:
A kind of concrete filling pile head separates and integral hoisting method fast, comprises the following steps:
(i) before descending reinforcing cage, first on the reinforcing cage top, need cut on the main muscle of pile crown section the sleeve pipe that internal diameter is greater than main muscle external diameter is installed;
(ii) shutoff sleeve pipe two ends, while preventing concrete perfusion, cement paste enters sleeve pipe;
(iii) technology descending reinforcing cage, concrete perfusion routinely, after the pile body concrete strength reaches designing requirement and excavates out the pile crown section, need to cut the bottom of pile crown section in design of pile top absolute altitude position, cut along the pile crown hoop joint-cutting that 2~2.5cm is dark, then up dig out along joint-cutting the hoop groove that width is 9~11 cm, to expose sleeve pipe;
(iv) on cutting the bottom hoop sidewall of pile crown, need get out at least three eyes, jewel hole is vertical with the pile body longitudinal axis, cross section equidistantly distributes, and hole depth only need reach 1/5 of a footpath, then the reinforcing bar pipe nipple is inserted in jewel hole, the reinforcing bar pipe nipple will expose one section, in order to the wire rope that is lifting use;
(v) after fastening wire rope, can lift by crane, the concrete that will exceed the pile crown part of design of pile top absolute altitude separates with pile crown master muscle, and the pile crown part integral body that the need after separating are cut hangs out.
Described step (ii) in, during shutoff sleeve pipe two ends, first use the gap between plastics blowing agent shutoff termination master's muscle and internal surface of sleeve pipe, then be wound around tight with adhesive tape.
Described step (v) in, as larger as lifting force, first throw several chocks in the hoop groove cut, the pile crown wedge that need are hung out is disconnected separate after, the concrete part integral body of separation is hung out.
Above-mentioned concrete filling pile head provided by the invention separates and integral hoisting method fast, due to before descending reinforcing cage, sleeve pipe has been installed on the main muscle of the pile crown section top that first need cut at reinforcing cage, pile crown concrete and main muscle are not bonded, after excavation of foundation pit, while cutting pile crown, do not need to carry out pile crown master muscle and concrete overburden operation, cut speed thereby greatly accelerate pile crown, and be convenient to discarded blocking of pile crown section and hang out, reduce construction cost.Compared with prior art, the beneficial effect main manifestations had is in the present invention:
A. convenient and swift: easy to operate, corollary equipment is few, and the constructor is acceptant, and expertly operation very soon;
B. economical: construction equipment and personnel greatly reduce, and speed is accelerated, according to measuring and calculating, this method and original artificial chisel except or the human assistance small-sized machine cut the method comparison, but every pile cost saving is saved time more than one day more than 150 yuan;
C. quality assurance: pile crown master muscle top is equipped with sleeve pipe, while abolishing pile crown, can be easy to make the pile crown concrete to separate with pile crown master muscle, makes pile foundation master muscle injury-free, guarantees pile foundation master muscle and pile body concrete quality;
D. safe and reliable: in pile crown lifting process, all constructors, away from operation site, have eliminated and have hung out the potential safety hazard that the pendant thing damages the constructor, safe and reliable.
The accompanying drawing explanation
Fig. 1 is that the plastic bushing schematic diagram is installed on reinforcing cage master muscle top;
Fig. 2 is for need cut pile crown section bottom part ring to the groove schematic diagram;
Fig. 3 inserts reinforcing bar pipe nipple schematic diagram for cut pile crown pars infrasegmentalis jewel hole at need;
Fig. 4 needs to cut pile crown section cross section distribution reinforcement pipe nipple schematic diagram in Fig. 3;
Fig. 5 is for need cut pile crown section integral hoisting schematic diagram.
In figure: 1-sleeve pipe termination, the 2-sleeve pipe, 3-design of pile top absolute altitude position, 4-reinforcing cage master muscle, 5-need cut the pile crown section, 6-hoop groove, 7-pile body, 8-jewel hole, 9-wire rope.
The specific embodiment
Below in conjunction with the specific embodiment and accompanying drawing thereof, the invention will be further described:
As shown in Figure 1, before descending reinforcing cage, the elbow of reinforcing cage master muscle 4 does not first apply and (in some filling pile construction design, for the be connected effect of reinforcement cast-in-place concrete pile with cushion cap, the termination of reinforcing cage master muscle 4 is made to 90 .elbow), certain-length, wall thickness and hardness first are installed on reinforcing cage master muscle 4 tops (need cut the pile crown section), and internal diameter is greater than the plastic bushing 2(PVC sleeve pipe of reinforcing cage master muscle 4 external diameters), plastic bushing 2 internal diameters, pipe thickness and hardness will meet the demands, the length of plastic bushing 2 and insertion position are consistent with the former pile crown cut, and to, in the process of concrete perfusion, control plastic bushing 2 bottoms well in design of pile top absolute altitude position 3; Shutoff sleeve pipe termination 1, sleeve pipe termination 1 wants shutoff tight, first uses the gap between plastics blowing agent shutoff reinforcing cage master's muscle 4 terminations and plastic bushing 2 inwalls, then is wound around tightly with adhesive tape, and while preventing concrete perfusion, cement paste enters plastic bushing 2.
As shown in Figure 2; after pile body 7 concrete strengths reach designing requirement and excavate out the pile crown section; (degree of depth is less than thickness of concrete cover deeply to cut 2~2.5cm with toothless saw along the pile crown hoop at stake setting 3 places, absolute altitude position, top (needing to cut pile crown section 5 bottoms); and prevent from injuring pile crown master muscle); then machinery up digs out along joint-cutting the hoop groove 6 that width is 9~11 cm, to expose plastic bushing 2.
As shown in Figure 3, Figure 4, cut the eye that machinery on the bottom hoop sidewall of pile crown section 5 gets out four diameter 3cm at need, jewel hole 8 is vertical with the longitudinal axis of pile body 7, cross section is uniform, the degree of depth of jewel hole 8 only need reach 1/5 of a footpath, then the reinforcing bar pipe nipple of four (φ 2.5cm) is inserted in jewel hole 8, this reinforcing bar pipe nipple will expose one section, in order to the wire rope 9 that is lifting.
As shown in Figure 5, can lift by crane after fastening wire rope 9, because concrete tensile strength is very low, needed pull-off force is very little, so easily integral body hangs out.As larger as lifting force, can first throw several chocks in groove 6 in the ring cut, need cut pile crown section 5 and be easy to be broken by wedge.
During the technology descending reinforcing cage, positioning bar appropriately adjusts, and not affect to hang, is advisable routinely.

Claims (2)

1. a concrete filling pile head separates and integral hoisting method fast, it is characterized in that, the method comprises the following steps:
(i) before descending reinforcing cage, first on the reinforcing cage top, need cut on the main muscle of pile crown section the PVC plastic bushing that internal diameter is greater than main muscle external diameter is installed, the internal diameter of PVC plastic bushing, pipe thickness and hardness will meet the demands;
(ii) during shutoff PVC plastic bushing two ends, first use the gap between plastics blowing agent shutoff termination master's muscle and internal surface of sleeve pipe, then be wound around tightly with adhesive tape, while preventing concrete perfusion, cement paste enters the PVC plastic bushing;
(iii) technology descending reinforcing cage, concrete perfusion routinely, after the pile body concrete strength reaches designing requirement and excavates out the pile crown section, need the pile crown bottom cut in design of pile top absolute altitude position, cut along the pile crown hoop joint-cutting that 2~2.5cm is dark, then up dig out along joint-cutting the hoop groove that width is 9~11 cm, to expose the PVC plastic bushing;
(iv) on the pile crown bottom hoop sidewall cut at need, get out at least three eyes, jewel hole is vertical with the pile body longitudinal axis, cross section equidistantly distributes, and hole depth only need reach 1/5 of a footpath, then the reinforcing bar pipe nipple is inserted in jewel hole, the reinforcing bar pipe nipple will expose one section, in order to the wire rope that is lifting use;
(v) after fastening wire rope, can lift by crane, the concrete that will exceed the pile crown part of design of pile top absolute altitude separates with pile crown master muscle, and the pile crown section integral body that the need after separating are cut hangs out.
2. concrete filling pile head according to claim 1 separates fast and integral hoisting method, it is characterized in that, described step (v) in, as larger as lifting force, first throw several chocks in the hoop groove cut, after the disconnected separation of the pile crown wedge that need are cut, then integral body hangs out.
CN 201110193373 2011-07-12 2011-07-12 Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile Expired - Fee Related CN102312429B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110193373 CN102312429B (en) 2011-07-12 2011-07-12 Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110193373 CN102312429B (en) 2011-07-12 2011-07-12 Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile

Publications (2)

Publication Number Publication Date
CN102312429A CN102312429A (en) 2012-01-11
CN102312429B true CN102312429B (en) 2013-08-07

Family

ID=45425967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110193373 Expired - Fee Related CN102312429B (en) 2011-07-12 2011-07-12 Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile

Country Status (1)

Country Link
CN (1) CN102312429B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610455A (en) * 2019-01-28 2019-04-12 中铁局集团有限公司 A kind of filling pile head restructuring bankrupt

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587380A (en) * 2012-02-08 2012-07-18 湖南省第二工程有限公司 Construction method for wholly removing drilling pile head
CN102733374B (en) * 2012-06-06 2014-08-20 中铁四局集团第二工程有限公司 Free hanging positioning system for major-diameter overlong bored pile steel reinforcement cage
CN102828505B (en) * 2012-08-07 2014-12-03 中建三局第一建设工程有限责任公司 Tool type fixing frame for prolonging and protecting cast-in-place pile reinforcement cage
CN102926380A (en) * 2012-11-20 2013-02-13 中铁十九局集团第三工程有限公司 Bridge cast-in-place pile chiseling-free pile head and construction method thereof
CN103452114A (en) * 2013-09-23 2013-12-18 甘肃路桥建设集团有限公司 Bridge cast-in-place pile head chiseling method
CN104343115B (en) * 2014-11-13 2016-08-24 中交隧道工程局有限公司 A kind of pile foundation pile crown entirety abolishes structures and methods
CN104480931B (en) * 2014-12-10 2017-02-08 大连三川建设集团股份有限公司 Fast file head removing method for mechanical pore forming pouring pile
CN105332372B (en) * 2015-11-18 2017-10-20 浙江双和环境建设有限公司 A kind of filling pile cage of reinforcement constructing device and its technique
CN105297729B (en) * 2015-11-23 2017-12-01 中国葛洲坝集团第六工程有限公司 Bridge pile foundation pile head breaking device and method
CN105756063B (en) * 2016-03-02 2018-03-30 华东交通大学 A kind of simple pile crown abolishes auxiliary construction method
CN106400802B (en) * 2016-08-24 2019-02-26 中交一公局厦门工程有限公司 A kind of drilled pile pile crown is pre-buried to exempt from the whole quickly lifting method of ring cutting that drills
CN106400803A (en) * 2016-10-31 2017-02-15 中国葛洲坝集团第六工程有限公司 Integral cast-in-situ bored pile head breaking process
CN106638600A (en) * 2016-11-03 2017-05-10 中冶交通建设集团有限公司 Construction method for breaking bored pile head
CN106939604A (en) * 2017-03-31 2017-07-11 西北水利水电工程有限责任公司 A kind of concrete pile head breaking method of reinforcing bar every slurry protection sleeve pipe
CN106958245A (en) * 2017-04-07 2017-07-18 中交二公局第工程有限公司 The quick structure and method for abolishing concrete pile head
CN108035342A (en) * 2017-11-28 2018-05-15 中国二十冶集团有限公司 Filling pile head construction method
CN108193684A (en) * 2017-12-18 2018-06-22 中国二十冶集团有限公司 Cast-in-situ bored pile pile crown detaches removing method
CN108104116A (en) * 2018-01-19 2018-06-01 中建筑港集团有限公司 A kind of filling pile head processing method and Quick Release pile crown bored concrete pile
CN108265702A (en) * 2018-01-26 2018-07-10 中铁上海工程局集团华海工程有限公司 Diaphram wall cage top reinforcing bar protects structure and construction method
CN108203979B (en) * 2018-02-27 2023-06-06 中建路桥集团有限公司 Pile head breaking system and pile head breaking method adopting vanishing breaking method
CN108867642A (en) * 2018-07-06 2018-11-23 中交第三航务工程勘察设计院有限公司 A kind of efficient bored concrete pile section pile crown method
CN108995049B (en) * 2018-07-10 2021-03-02 广东省建筑工程机械施工有限公司 Method for cutting concrete precast tubular pile head to reserve steel bars
CN109024597A (en) * 2018-07-18 2018-12-18 中铁城建集团第三工程有限公司 It is a kind of to accelerate the casing and its construction method that pile crown is abolished
CN110185036A (en) * 2019-05-31 2019-08-30 五冶集团上海有限公司 A kind of concrete filling pile head restructuring bankrupt
CN110453685A (en) * 2019-09-16 2019-11-15 腾达建设集团股份有限公司 One kind is exempted to dig pile crown device and its application method
CN112030960A (en) * 2020-07-22 2020-12-04 中铁十局集团第一工程有限公司 Construction method of separable fulcrum pile
CN113622427B (en) * 2021-07-06 2023-03-28 中国二十冶集团有限公司 Auxiliary device for chiseling pile head and construction method for chiseling pile head

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3107017B2 (en) * 1997-10-28 2000-11-06 村田機械株式会社 Punch press
CN201268845Y (en) * 2009-03-12 2009-07-08 中铁二十一局集团有限公司 Main reinforcement packaging structure for drill pile top portion
CN101603313A (en) * 2009-07-01 2009-12-16 中铁十三局集团第三工程有限公司 A kind of method for chiseling pile head of filling pile
CN102094423A (en) * 2011-03-14 2011-06-15 江苏华江建设集团有限公司 Pile breaking method for driving concrete square pile

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63308113A (en) * 1987-06-10 1988-12-15 Shimizu Constr Co Ltd Chipping method of pile head of sheet pile in cast-in-place concrete pile
JPH03107017A (en) * 1989-09-21 1991-05-07 Nitto Kensetsu Kk Pile head treatment method for cast-in-place concrete pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3107017B2 (en) * 1997-10-28 2000-11-06 村田機械株式会社 Punch press
CN201268845Y (en) * 2009-03-12 2009-07-08 中铁二十一局集团有限公司 Main reinforcement packaging structure for drill pile top portion
CN101603313A (en) * 2009-07-01 2009-12-16 中铁十三局集团第三工程有限公司 A kind of method for chiseling pile head of filling pile
CN102094423A (en) * 2011-03-14 2011-06-15 江苏华江建设集团有限公司 Pile breaking method for driving concrete square pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109610455A (en) * 2019-01-28 2019-04-12 中铁局集团有限公司 A kind of filling pile head restructuring bankrupt
CN109610455B (en) * 2019-01-28 2021-01-08 中铁一局集团有限公司 Pile head breaking method for cast-in-place pile

Also Published As

Publication number Publication date
CN102312429A (en) 2012-01-11

Similar Documents

Publication Publication Date Title
CN102312429B (en) Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile
CN102493434B (en) Construction method for integrally and quickly hoisting and removing pile head of bored cast-in-place pile
CN106400802B (en) A kind of drilled pile pile crown is pre-buried to exempt from the whole quickly lifting method of ring cutting that drills
CN105297729B (en) Bridge pile foundation pile head breaking device and method
CN105649075B (en) A kind of device and method for reducing drill-pouring negative friction of pile
CN205477660U (en) Little clean apart from tunnel in rock pillar reinforcerment system
CN104631460A (en) Girdling splitting type integral pile breaking method
CN105735317A (en) Construction technology for removing pile heads of cast-in-place piles
CN1963044A (en) Construction method for withdrawal of waste pile
CN107604920A (en) A kind of quick construction method for abolishing filling pile head
CN106400804A (en) Obstructing pulling method pile digging construction device and method
CN101634147B (en) Method for demolishing ultra high cast-in-place pile head
CN106120792A (en) A kind of pile foundation pile crown concrete prestripping assembly and construction method
CN203701092U (en) Extrusion lock stress dispersion type high-tonnage anchor cable
CN102733390A (en) Method for removing underground waste anchor cable/anchor rod
CN205224036U (en) Device is abolished to bridge pile foundation pile head
CN114232628A (en) Cutting hoop for integrally breaking pile head of cast-in-situ bored pile and construction method
CN206110122U (en) Bridge drilled pile convenient to get rid of pile head
CN206859222U (en) The quick structure for abolishing concrete pile head
CN106703034A (en) Construction device and construction method for pulling out piles through cooperation of rotating drilling machine and sleeve drill bit
CN207092073U (en) A kind of protection sleeve pipe of pile crown steel reinforcement cage cage bar
CN108978661A (en) Cast-in-situ bored pile pulls out construction method
CN106939604A (en) A kind of concrete pile head breaking method of reinforcing bar every slurry protection sleeve pipe
CN205062813U (en) But ground tackle of recovery type anchor rope
CN109944246A (en) A kind of construction method of broken pile head

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180226

Address after: 730000 Lanzhou Province, Chengguan District, Gansu Road, No. 365

Co-patentee after: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd.

Patentee after: Gansu Tieke Construction Engineering Consulting Co., Ltd.

Address before: 730000 Lanzhou East Road, Gansu, No. 365

Co-patentee before: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd.

Patentee before: Northwest Research Institute Co., Ltd. of C.R.E.C.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130807

Termination date: 20200712