CN206110122U - Bridge drilled pile convenient to get rid of pile head - Google Patents

Bridge drilled pile convenient to get rid of pile head Download PDF

Info

Publication number
CN206110122U
CN206110122U CN201621111676.9U CN201621111676U CN206110122U CN 206110122 U CN206110122 U CN 206110122U CN 201621111676 U CN201621111676 U CN 201621111676U CN 206110122 U CN206110122 U CN 206110122U
Authority
CN
China
Prior art keywords
pile
pile crown
pile head
construction
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621111676.9U
Other languages
Chinese (zh)
Inventor
唐维东
王红凯
姚家贵
员利军
邓英海
马士强
易先坤
杨少龙
梁卿恺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201621111676.9U priority Critical patent/CN206110122U/en
Application granted granted Critical
Publication of CN206110122U publication Critical patent/CN206110122U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of the bridge drilled pile, work efficiency is low when solving current bridge drilled pile and get rid of the pile head, and machinery, the labour cost is high and can cause the technical problem of the damage of buckling of pile head reinforcing bar, provides a bridge drilled pile convenient to get rid of pile head, including pile body and pile head, the main muscle at pile head position do not buckle and every main muscle on respectively the cover have a protective case, protective case's length and the high phase -match of pile head, a plurality of recess I are radially offered with the position that the pile body contacted along the pile foundation to the pile head, are equipped with the swelling agent in the recess I, and the swelling agent peripheral hardware has a chuck that is used for stopping up the swelling agent in the recess I, a recess II of being convenient for insert the rod iron is seted up to pile head upper portion left and right sides symmetry. The utility model discloses reduced the amount of labour used, improved the pile head efficiency of construction, reduced construction noise, both guaranteed construction quality, reduced construction cost again, improved the workman environmental quality that is under construction simultaneously.

Description

A kind of bridge drilling stake for being easy to remove pile crown
Technical field
This utility model belongs to bridge drilling stake technical field, and in particular to a kind of bridge drilling for being easy to remove pile crown Stake.
Background technology
In existing bridge drilling stake filling pile construction, need to remove pile crown after the completion of bridge drilling pile driving construction, at present Conventional pile crown construction method has:Manually coordinated using equipments such as air compressor machine, impact drill, iron hammer, gads and cut, concrete grammar is Ring cutting is carried out using abrasive machine to pile crown in designed elevation position, then artificial chisel removes super pile crown concrete cover to reinforcement, Cage bar is peeled off into concrete from lateral, then is drilled in designed elevation position and gad is squeezed into using iron hammer, by pile crown concrete from Rupture designed elevation position.Low using these method construction efficiency, the Stake head handling time is long, causes the foundation pit construction cycle long, people Work, machinery expenses are high, waste a large amount of artificial, and the bending of pile crown reinforcing bar can be caused to damage.
The content of the invention
This utility model to solve inefficiency when existing highway bridge drilled pile removes pile crown, machinery, labour cost it is high with And the technical problem of the bending damage of pile crown reinforcing bar can be caused, there is provided a kind of bridge drilling stake for being easy to remove pile crown.
The technical solution adopted in the utility model is as follows:
A kind of bridge drilling stake for being easy to remove pile crown, including pile body and pile crown, the cage bar at pile crown position do not bend and often It is cased with a protection sleeve pipe in root cage bar respectively, the length of protection sleeve pipe is matched with the height of pile crown, pile crown and pile body phase The position of contact radially opens up some groove I along pile foundation, and extender is provided with groove I, and in groove I, extender is externally provided with for blocking up The timber wedge of plug extender, the pile crown top left and right sides symmetrically opens up a groove II for facilitating insertion into rod iron.
The depth of the groove I for Pile Diameter 1/5 ~ 1/4.
The suspension ring for being easy to lift pile crown are provided with the top of pile crown.
The beneficial effects of the utility model:
1. this utility model realizes pile crown with pile body in Pile Foundations Design elevation location point using the expansive force effect of extender From reducing the amount of labour used, improve pile crown efficiency of construction, reduce construction noise, both ensure that construction quality, reduced and apply again Work cost, while improve workman's construction environment quality.
2. this utility model is cased with protecting sleeve pipe in the cage bar at pile crown position, and pile foundation can be protected when pile crown is abolished Reinforcing bar so that pile foundation reinforcing bar is not destroyed.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure:1- pile bodies, 2- pile crowns, 3- cage bars, 4- protection sleeve pipes, 5- groove I, 6- extenders, 7- timber wedges, 8- rod irons, 9- groove II, 10- suspension ring.
Specific embodiment
As shown in figure 1, a kind of bridge drilling stake for being easy to remove pile crown, including pile body 1 and pile crown 2, the master at 2 position of pile crown Muscle 3 does not bend and is cased with every cage bar 3 respectively a protection sleeve pipe 4, the length of the protection sleeve pipe 4 and the height phase of pile crown 2 Matching, the position that pile crown 2 is contacted with pile body 1 radially open up some groove I5 along pile foundation, and the depth of the groove I5 is set to The 1/5 ~ 1/4 of Pile Diameter, is provided with extender 6 in groove I5, in groove I5, extender 6 is externally provided with for blocking extender 6 Timber wedge 7, the 2 top left and right sides of the pile crown symmetrically open up a groove II9 for facilitating insertion into rod iron 8.
For larger drilled pile, pile crown is hung away in order to be able to more reliable, a suspension ring can be also added at the top of pile crown 2 10。
Concrete making of the present utility model and the step of abolish pile crown it is as follows:
Step 1, steel reinforcement cage processing:During steel reinforcement cage processing and fabricating, the cage bar 3 that pile crown 2 is stretched in cushion cap is not bent, and is protected Parastate is held, and protection sleeve pipe 4 is inserted in every cage bar 3, made between pile crown reinforcing bar and the concrete of perfusion without bonding;
Step 2, reinforcement installation:In reinforcement installation, steel reinforcement cage absolute altitude need to be accurately controlled;
Step 3, excavation of foundation pit;
Step 4, after excavation of foundation pit is in place, in Pile Foundations Design elevation location(The position that i.e. pile body is contacted with pile crown)Along footpath To drilling, then load extender 6 in hole, blocked using timber wedge 7, pile crown 2 and stake are realized using the expansive force effect of extender 6 Body 1 is separated in Pile Foundations Design elevation location;
Step 5, on pile crown 2, radial bore insertion rod iron 8, hangs steel wire rope, and directly integrally being sling with loop wheel machine removes stake Head.
This utility model can be protected pile foundation reinforcing bar, reduce recruitment, improve pile crown efficiency of construction, reduce applying when pile crown is abolished Work noise, both ensure that construction quality, reduce construction cost again, while improve workman's construction environment quality.

Claims (3)

1. a kind of bridge drilling stake for being easy to remove pile crown, including pile body(1)And pile crown(2), it is characterised in that:Pile crown(2)Portion The cage bar of position(3)Do not bend and every cage bar(3)It is upper to be cased with a protection sleeve pipe respectively(4), the protection sleeve pipe(4)Length with Pile crown(2)Height match, pile crown(2)With pile body(1)The position for contacting radially opens up some groove I along pile foundation(5), it is recessed Groove I(5)Extender is provided with inside(6), groove I(5)Interior extender(6)It is externally provided with for blocking extender(6)Timber wedge(7), institute State pile crown(2)The top left and right sides symmetrically opens up one and facilitates insertion into rod iron(8)Groove II(9).
2. a kind of bridge drilling stake for being easy to remove pile crown according to claim 1, it is characterised in that:The groove I(5) Depth for Pile Diameter 1/5 ~ 1/4.
3. a kind of bridge drilling stake for being easy to remove pile crown according to claim 1 and 2, it is characterised in that:Pile crown(2)Top Portion is provided with to be easy to lift pile crown(2)Suspension ring(10).
CN201621111676.9U 2016-10-11 2016-10-11 Bridge drilled pile convenient to get rid of pile head Active CN206110122U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621111676.9U CN206110122U (en) 2016-10-11 2016-10-11 Bridge drilled pile convenient to get rid of pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621111676.9U CN206110122U (en) 2016-10-11 2016-10-11 Bridge drilled pile convenient to get rid of pile head

Publications (1)

Publication Number Publication Date
CN206110122U true CN206110122U (en) 2017-04-19

Family

ID=58528440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621111676.9U Active CN206110122U (en) 2016-10-11 2016-10-11 Bridge drilled pile convenient to get rid of pile head

Country Status (1)

Country Link
CN (1) CN206110122U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108239932A (en) * 2017-07-04 2018-07-03 楼晓帅 A kind of improved bridge equipment
CN111424664A (en) * 2020-04-17 2020-07-17 中铁九局集团第七工程有限公司 Construction method for removing pile head of pre-fractured bored pile
CN111424663A (en) * 2020-03-26 2020-07-17 中电建十一局工程有限公司 Environment-friendly and efficient pile head breaking method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108239932A (en) * 2017-07-04 2018-07-03 楼晓帅 A kind of improved bridge equipment
CN111424663A (en) * 2020-03-26 2020-07-17 中电建十一局工程有限公司 Environment-friendly and efficient pile head breaking method
CN111424664A (en) * 2020-04-17 2020-07-17 中铁九局集团第七工程有限公司 Construction method for removing pile head of pre-fractured bored pile

Similar Documents

Publication Publication Date Title
CN102312429B (en) Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile
CN106400802B (en) A kind of drilled pile pile crown is pre-buried to exempt from the whole quickly lifting method of ring cutting that drills
CN206110122U (en) Bridge drilled pile convenient to get rid of pile head
CN106400803A (en) Integral cast-in-situ bored pile head breaking process
CN104404950B (en) A kind of reinforcing bar is isolated dustless orientation and is autotomyed the construction method of pile crown
CN105297729A (en) Bridge pile foundation pile head breaking device and method
CN102828513A (en) Tool type operating platform for pile foundation tremie extension
CN104631460A (en) Girdling splitting type integral pile breaking method
CN111005378A (en) Construction method for breaking pile head of cast-in-situ bored pile through static spalling
CN212130547U (en) Temporary water retaining device for rapidly processing water and mud gushing problem in tunnel
CN205224036U (en) Device is abolished to bridge pile foundation pile head
CN105862862B (en) A kind of large diameter pile buries hammer Refloatation method
CN207260148U (en) Service sleeve pile crown integrally abolishes device
CN204238218U (en) A kind of cartridge type hangs a device
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN203270575U (en) Bored concrete pile pile-head breaking combined loosening device
CN203022001U (en) Pile-pulling device with vibrating sleeve ring
CN202492845U (en) Ground anchor capable of serially anchoring
CN211922619U (en) Pile head breaking device
CN205742193U (en) A kind of pile crown surpasses the device stopping to contact between filling concrete and reinforcing bar
CN204982894U (en) High pressure is washed by water and is pulled out device of old engineering stake in underground
CN109371961B (en) Steel pipe column for subway station and construction process thereof
CN203924072U (en) The retaining wall supporting and protection structure of the super dark hand excavated pile of a kind of super large
CN203853941U (en) Exploring drill rod puller for project supervision
CN105586968A (en) Novel construction technology for removing pile heads of bored piles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant