CN205224036U - Device is abolished to bridge pile foundation pile head - Google Patents
Device is abolished to bridge pile foundation pile head Download PDFInfo
- Publication number
- CN205224036U CN205224036U CN201520933835.2U CN201520933835U CN205224036U CN 205224036 U CN205224036 U CN 205224036U CN 201520933835 U CN201520933835 U CN 201520933835U CN 205224036 U CN205224036 U CN 205224036U
- Authority
- CN
- China
- Prior art keywords
- pile
- pile foundation
- body part
- invalid
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model provides a device is abolished to bridge pile foundation pile head, includes that PVC sleeve pipe, flexible rubber hose, steel engrave on gold or silver, lift by crane the unit, and many PVC sleeve pipes embolia many pile foundation owner muscle, sounding pipe is last, and many PVC sleeve pipes are used for the isolation of pile foundation owner muscle, sounding pipe and pile foundation concrete, and PVC sleeve pipe bottom is through sticky tape and pile foundation owner muscle, sealed the fixing in sounding pipe winding back. Flexible rubber hose becomes annular arrangement in the peripheral round of invalid pile body part of pile foundation, connects handing -over department at flexible rubber hose, with the vertical pile head top outside that causes in one of them pile foundation owner muscle outside that the pile foundation is followed to one of them end connector, leaks free section outward. The steel is engraved on gold or silver between the effective pile body part that is located the pile foundation, the invalid pile body part. Lift by crane the unit in pile foundation concrete placement, in pre -buried invalid pile body to the pile foundation is partial. The utility model relates to a device is abolished to bridge pile foundation pile head, its simple structure, flexible operation, with low costs, economy high efficiency are applicable to the pile foundation pile head and abolish the construction.
Description
Technical field
Device abolished by a kind of bridge pile foundation pile crown of the utility model, relates to bridge, house construction engineering Bored Pile Foundation construction field.
Background technology
In existing Bored Pile of Bridge construction technology, Bored Pile of Bridge mostly is bored pile, for guaranteeing pile foundation quality, during pile foundation concreting, need build to the above 50cm of design pile foundation absolute altitude, after pile foundation concrete reaches some strength, the invalid pile crown of the above 50cm of Pile Foundations Design absolute altitude is cut, the above pier stud construction of pile foundation can be continued.
At present, pile crown is abolished construction and is taked Traditional Man to cut method more, manually by pneumatic pick, more than Pile Foundations Design absolute altitude invalid pile body block-by-block is cut, abolish in process at pile crown, because pile body periphery is provided with sound detecting pipe, manual control is improper, may damage sound detecting pipe, causes occurring extremely during later stage pile measurement.In addition, due to the restriction of the main muscle height of pile foundation periphery, pile crown abolish after concrete when outwards carrying, often vertical for pile foundation periphery main muscle is bent outwardly and reduces height, slag tap to facilitate a dead lift, and the concrete block that main muscle adheres to, iron hammer need be adopted to beat cleaning treatment, also need afterwards manually main for pile foundation muscle to be set back.It is slow that construction speed abolished by pile crown, and at substantial manpower and materials, environment pollution is large, noise is large, operation is loaded down with trivial details, steel bar quality can not be guaranteed.
Summary of the invention
For solving the problems of the technologies described above, the utility model provides a kind of bridge pile foundation pile crown to abolish device, effectively solving bridge pile foundation pile crown abolishes in construction, the damage problem of pile foundation sound ranging pipes and the main muscle of pile foundation, avoid pile crown and abolish damage to sound detecting pipe under pneumatic pick in construction or External Force Acting, ensure that later stage sound detecting pipe ultrasound examination is without exception, and the invalid pile crown of pile foundation disposablely can be abolished and puts in place, pile crown is abolished the main muscle of rear pile foundation and is repaired without the need to secondary adjustment, ensures pile foundation reinforcement construction quality.This apparatus structure is simple, and flexible operation, cost are low, economical and efficient, are applicable to pile foundation pile crown and abolish construction.
The technical scheme that the utility model adopts is:
Device abolished by a kind of bridge pile foundation pile crown, comprise PVC sleeve pipe, rubber hose, steel engraving tool, lifting unit, many PVC sleeve pipes are inserted on the main muscle of many piles base, sound detecting pipe, many PVC sleeve pipes are used for the main muscle of pile foundation, sound detecting pipe and the concrete isolation of pile foundation, and PVC sleeve bottom seals fixing after being wound around by adhesive tape and the main muscle of pile foundation, sound detecting pipe.Rubber hose is arranged in invalid pile body part peripheral one circle of pile foundation circlewise, and in rubber hose connection junction, a wherein end joint is vertically caused pile crown top outer outside the main muscle of a wherein pile base of pile foundation, and leak outside free segment.Steel is carved between effective pile body part, invalid pile body part of pile foundation.Lifting unit is in pile foundation concreting, pre-buried in the invalid pile body part of pile foundation.
Described PVC sleeve covers scope is the invalid pile body part of pile foundation,
The radius that length is more than or equal to pile foundation carved by described steel, and the cutting device formed between effective pile body part and invalid pile body part carved by steel.
Described lifting unit comprises hoisting ring, lifting rope, and hoisting ring is that reinforcement fabrication forms, and is symmetrical set, and is embedded in the invalid pile body part of pile foundation; Described lifting rope is wire rope, ties form lifting unit with lifting latch closure.
Described rubber hose adopt thin wire and the main muscle of pile foundation temporary fixed at interval of certain distance.
Device abolished by a kind of bridge pile foundation pile crown of the utility model, effectively solves the damage problem that bridge pile foundation pile crown abolishes construction pile foundation sound detecting pipe and the main muscle of pile foundation.Avoid pile crown to abolish damage to sound detecting pipe under pneumatic pick in construction or External Force Acting, and the invalid pile crown of pile foundation disposablely can be abolished and puts in place, pile crown is abolished the main muscle of rear pile foundation and is repaired without the need to secondary adjustment.This apparatus structure is simple, and flexible operation, cost are low, economical and efficient.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Detailed description of the invention
As shown in Figure 1, device abolished by a kind of bridge pile foundation pile crown, comprises isolated location, lifting unit, and described isolated location is carved 4 by PVC sleeve pipe 1, rubber hose 2 and steel and formed; Lifting unit is made up of hoisting ring 3 and lifting rope 6.
Described PVC sleeve pipe 1 is the protective casing of the main muscle 5 of pile foundation, sound detecting pipe 8; diameter is φ 25mm or φ 55mm; many PVC sleeve pipes 1 are inserted on the main muscle 5 of many piles base, sound detecting pipe 8; coverage is the invalid pile body part 10 of pile foundation; PVC sleeve pipe 1, mainly as the main muscle 5 of pile foundation, sound detecting pipe 8 and concrete seven isolation sleeve pipe, seals after adopting adhesive tape 9 and the main muscle 5 of pile foundation, sound detecting pipe 8 to be wound around a few, fixes bottom PVC sleeve pipe 1.
Described rubber hose 2 circlewise, make a circle outside the invalid pile body part 10 bottom reinforcement bars cage (Pile Foundations Design absolute altitude H) being arranged in pile foundation, adopt thin wire and pile foundation main muscle 5 temporary fixed at interval of certain distance, in rubber hose 2 joint junction, wherein will vertically cause pile crown top outer by an end joint outside pile foundation wherein a main muscle, leak outside free segment 30cm.
Described steel is carved 4 and is carved for engineering ordinary steel, and the radius that 4 length are more than or equal to pile foundation carved by steel, and the later stage is as the cutting device between effective pile body part 11 of pile foundation and invalid pile body part 10.
Described hoisting ring 3 is plain bars processing and fabricating, and pre-buried to invalid pile body part 10 in pile foundation concrete seven is built, hoisting ring 3 is symmetrical set, and length of embedment is not less than 30cm.
Described lifting rope 6 is wire rope, and later stage and hoisting ring 3 are detained to tie and formed boom hoisting.
Implementation step:
1), pile foundation steel bar cage adds man-hour, according to design drawing pile foundation length, reinforcing cage measured design stake top mark high, and encloses on the main muscle 5 of pile foundation at reinforcing cage one and make mark; PVC sleeve pipe 1 is inserted in the main muscle 5 of the pile foundation of more than design elevation H, sound detecting pipe 8, main muscle 5, sound detecting pipe 8 seal after being wound around a few, fix with pile foundation by bottom PVC sleeve pipe 1 to adopt adhesive tape 9, do not enter in PVC sleeve pipe 1 when ensureing concreting, adhesive tape 9 stretches into 5cm in effective pile body part 11.
In reinforcing cage design elevation position, rubber hose 2 is adopted to enclose along the peripheral horizontal wrap one of reinforcing cage, and adopt thin wire interval temporary fixed, rubber hose 2 joint junction, wherein will vertically cause pile foundation main muscle 5 top by an end joint outside pile foundation wherein a main muscle 5, and reserved free segment 30cm.After being in place, all brushing release agent is together for PVC sleeve pipe 1, rubber hose 2.
2), by the reinforcing cage processed put into stake holes, pile foundation concrete can be built after the assay was approved.
3), pile foundation concrete reaches some strength, as: after 70%, carry out invalid pile crown and abolish construction, the artificial free segment firmly drawing rubber hose 2 in certain direction, thin wall concrete that is vertical and design elevation position horizontal segment outside rubber hose 2 is caused to come off, and take out rubber hose 2, now form a circle horizontal groove around pile body, it is high that this horizontal level is design stake top mark.
4), adopt pneumatic pick along described horizontal groove at interval of certain distance to pile body centre-drilling hole, drilling depth controls at 20cm, in boring, squeeze into steel after having holed carve 4, steel engraving tool 4 is squeezed in process and is frequently upwards prized for several times, due to plain concrete fragility characteristic, form horizontal breaking face at concrete groove position, effective pile body part 11 is all blocked with invalid pile body part 10 and is separated.
5), link closely firmly by lifting rope 6 and hoisting ring 3, adopt the lifting appliances such as backhoe will block pile body lifting, pile crown has been abolished.Remove the PVC sleeve pipe 1 that the main muscle 5 of pile foundation, sound detecting pipe 8 are inserted in advance, cleaning pile crown can carry out the pier stud construction of pile foundation top.
Claims (5)
1. device abolished by a bridge pile foundation pile crown, comprise PVC sleeve pipe (1), rubber hose (2), steel engraving tool (4), lifting unit, it is characterized in that, many PVC sleeve pipes (1) are inserted on the main muscle of many piles base (5), sound detecting pipe (8), many PVC sleeve pipes (1), for the main muscle of pile foundation (5), sound detecting pipe (8) and the isolation of pile foundation concrete (7), seal fixing bottom PVC sleeve pipe (1) by adhesive tape (9) and the main muscle of pile foundation (5), sound detecting pipe (8) after being wound around; Make a circle outside the invalid pile body part (10) that rubber hose (2) is arranged in pile foundation circlewise, in rubber hose (2) joint junction, a wherein end joint is vertically caused pile crown top outer along the wherein main muscle of a pile base (5) outside of pile foundation, and leak outside free segment; Steel is carved (4) and is positioned between effective pile body part (11) of pile foundation, invalid pile body part (10); Lifting unit is in pile foundation concrete (7) is built, pre-buried in the invalid pile body part (10) of pile foundation.
2. device abolished by a kind of bridge pile foundation pile crown according to claim 1, it is characterized in that, described PVC sleeve pipe (1) coverage is the invalid pile body part (10) of pile foundation.
3. device abolished by a kind of bridge pile foundation pile crown according to claim 1, it is characterized in that, the radius that (4) length is more than or equal to pile foundation carved by described steel, and steel engraving tool (4) forms the cutting device between effective pile body part (11) and invalid pile body part (10).
4. device abolished by a kind of bridge pile foundation pile crown according to claim 1, it is characterized in that, described lifting unit comprises hoisting ring (3), lifting rope (6), and hoisting ring (3) forms for reinforcement fabrication, be symmetrical set, be embedded in the invalid pile body part (10) of pile foundation; Described lifting rope (6) is wire rope, detains to tie to form lifting unit with hoisting ring (3).
5. device abolished by a kind of bridge pile foundation pile crown according to claim 1, it is characterized in that, described rubber hose (2) adopt thin wire and the main muscle of pile foundation (5) temporary fixed at interval of certain distance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520933835.2U CN205224036U (en) | 2015-11-23 | 2015-11-23 | Device is abolished to bridge pile foundation pile head |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520933835.2U CN205224036U (en) | 2015-11-23 | 2015-11-23 | Device is abolished to bridge pile foundation pile head |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205224036U true CN205224036U (en) | 2016-05-11 |
Family
ID=55899111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520933835.2U Expired - Fee Related CN205224036U (en) | 2015-11-23 | 2015-11-23 | Device is abolished to bridge pile foundation pile head |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205224036U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105297729A (en) * | 2015-11-23 | 2016-02-03 | 中国葛洲坝集团第六工程有限公司 | Bridge pile foundation pile head breaking device and method |
CN106087981A (en) * | 2016-06-08 | 2016-11-09 | 中国十七冶集团有限公司 | A kind of cast-in-situ bored pile pile crown and pile crown restructuring bankrupt thereof |
CN108547304A (en) * | 2018-05-17 | 2018-09-18 | 山东电力建设第三工程有限公司 | The invalid pile crown of deposited reinforced concrete pile integrally abolishes construction technology |
CN114324605A (en) * | 2021-12-23 | 2022-04-12 | 陕西省建筑科学研究院有限公司 | Device and method for detecting compactness of steel pipe concrete |
-
2015
- 2015-11-23 CN CN201520933835.2U patent/CN205224036U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105297729A (en) * | 2015-11-23 | 2016-02-03 | 中国葛洲坝集团第六工程有限公司 | Bridge pile foundation pile head breaking device and method |
CN106087981A (en) * | 2016-06-08 | 2016-11-09 | 中国十七冶集团有限公司 | A kind of cast-in-situ bored pile pile crown and pile crown restructuring bankrupt thereof |
CN108547304A (en) * | 2018-05-17 | 2018-09-18 | 山东电力建设第三工程有限公司 | The invalid pile crown of deposited reinforced concrete pile integrally abolishes construction technology |
CN114324605A (en) * | 2021-12-23 | 2022-04-12 | 陕西省建筑科学研究院有限公司 | Device and method for detecting compactness of steel pipe concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105297729B (en) | Bridge pile foundation pile head breaking device and method | |
CN205224036U (en) | Device is abolished to bridge pile foundation pile head | |
CN106400802B (en) | A kind of drilled pile pile crown is pre-buried to exempt from the whole quickly lifting method of ring cutting that drills | |
CN102312429B (en) | Rapid separation and integral hoisting method for pile head of cast-in-place concrete pile | |
CN106759336A (en) | A kind of cast-in-situ bored pile quickly abolishes pile crown construction method | |
CN102493434A (en) | Construction method for integrally and quickly hoisting and removing pile head of bored cast-in-place pile | |
CN105951826A (en) | Suction ground anchor device in tubular pile and water pressure injection method thereof | |
CN111851484B (en) | Method for cutting off semi-invasive prestressed anchor cable in supporting pile by rotary drilling rig | |
CN106592591A (en) | Drilling pile head overall removal construction method | |
CN110042844B (en) | Construction method of cast-in-situ large-diameter foundation pit supporting tubular pile | |
CN109629557A (en) | A kind of cast-in-situ bored pile pile crown isolating device and its application method | |
CN104631460A (en) | Girdling splitting type integral pile breaking method | |
CN207739259U (en) | A kind of filling pile head cuts device | |
CN106120792A (en) | A kind of pile foundation pile crown concrete prestripping assembly and construction method | |
CN108286268A (en) | A kind of deep basal pit monitoring inclinometer pipe protective device and method | |
CN114232628A (en) | Cutting hoop for integrally breaking pile head of cast-in-situ bored pile and construction method | |
CN206110122U (en) | Bridge drilled pile convenient to get rid of pile head | |
CN110820728A (en) | Cast-in-situ bored pile construction method for penetrating underground deep-buried waste pipeline | |
CN106638600A (en) | Construction method for breaking bored pile head | |
CN109680681A (en) | A kind of pile crown restructuring bankrupt of cast-in-situ bored pile | |
CN114960715A (en) | Underground engineering surge treatment device and control method | |
CN113668529A (en) | Construction method for breaking and removing pile head with template based on steel wedge-shaped gap | |
CN105970972A (en) | Novel secant pile supporting structure and construction method thereof | |
CN203270575U (en) | Bored concrete pile pile-head breaking combined loosening device | |
CN210031773U (en) | Civil construction engineering is with prefabricated pile foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160511 Termination date: 20201123 |