CN109629557A - A kind of cast-in-situ bored pile pile crown isolating device and its application method - Google Patents

A kind of cast-in-situ bored pile pile crown isolating device and its application method Download PDF

Info

Publication number
CN109629557A
CN109629557A CN201811547705.XA CN201811547705A CN109629557A CN 109629557 A CN109629557 A CN 109629557A CN 201811547705 A CN201811547705 A CN 201811547705A CN 109629557 A CN109629557 A CN 109629557A
Authority
CN
China
Prior art keywords
pile
cast
isolating device
concrete
pile crown
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811547705.XA
Other languages
Chinese (zh)
Inventor
赵鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201811547705.XA priority Critical patent/CN109629557A/en
Publication of CN109629557A publication Critical patent/CN109629557A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/72Pile shoes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A kind of cast-in-situ bored pile pile crown isolating device, including a pallet, several casings, it is characterized by: the pallet is circular ring shape plastic plate, described sleeve pipe is plastic tube, plastics length of tube is equal to filling pile head reinforcing bar length+30mm, wherein: the interior tooth screwed connection of every plastics bottom of the tube outer tooth screw thread and plastic plate edge through-hole makes plastic tube be vertically fixed on the upper surface of plastic plate, reaches cast-in-situ bored pile pile crown isolating device.Cast-in-situ bored pile pile crown isolating device of the invention and its application method have pile crown isolating device structure simple, easy to make, it avoids bonding phenomenon between pile crown concrete and pile crown main reinforcement, when except pile crown, reinforcing bar is injury-free, reduce that the consumings of manpower and material resources, construction efficiency be high, easy to operate, short time limit, the advantages of reduction engineering cost.

Description

A kind of cast-in-situ bored pile pile crown isolating device and its application method
Technical field
The present invention relates to a kind of cast-in-situ bored pile pile crowns for building underground infrastructure, specifically, being a kind of drilling filling Infuse pile head isolating device.
Background technique
Currently, increasing with building height, architectural engineering basis is most of to use pore-forming pouring concrete pile, in order to protect Stake top concrete quality is demonstrate,proved, superfilled (general superfilled 500mm) can be carried out when construction to pile foundation, again by superfilled stake after pile crown is dug out Head is cut, and application relatively widely cuts the main following four mode of pile crown at present: first is that artificial cutting ring removing cuts pile crown, by stake top Superfilled place's concrete excision, reuses pneumatic pick and removes concrete on the outside of pile crown reinforcing bar, and reinforcing bar strips out, and uses wind in stake top position Pick beats multiple holes, and insertion separating wedge is fast, and external force taps, until pile crown and pile body are completed to disconnect, but this mode is time-consuming, applies Work process noise is big, a large amount of dust, the influence that vulnerable to the price of labour power goes up big to construction personnel's health effect.Cut pile crown Of poor quality, pile crown out-of-flatness, reinforcing bar is flexible;Second is that mechanical cut pile crown, piles with different is adapted to together using multiple block combiners The construction of diameter, and be connected in parallel by fluid pressure line, it realizes that synchronization action, same section multiple spot squeeze pile body simultaneously, realizes The pile body in the section is broken, but which equipment price is high, simultaneously as stake diameter multiplicity needs mainframe to equipment investment height Tool is used cooperatively, and easily causes to damage to reinforcing bar, is generated a large amount of concrete slags, should not be cleared up;Third is that chemical agent cuts pile crown, pass through It being introduced into stake to by chemical substance, positioning conveyance conduit to cut-off position chemically reacts, swelling stress is generated, thus By pile crown spalling, but this mode targeted duct is not easy to control, easily causes to damage to useful pile body, while medicament application is few, no Preferably buy;Fourth is that water-jet method cuts pile crown can clearly be mixed using the water jet for having crunch in the case where not damaging reinforcing bar Solidifying soil, but this mode manual operation risk is high, full-automatic mechanical is at high cost, big using difficulty, range is small.
Therefore known superfilled pile head cut processing mode there are problems that it is above-mentioned various inconvenient and.
Summary of the invention
The purpose of the present invention is to propose that one kind avoids bonding between bored concrete pile main reinforcement in pile crown concrete and superfilled pile head Cast-in-situ bored pile pile crown isolating device.
To achieve the above object, the technical solution of the invention is as follows:
A kind of cast-in-situ bored pile pile crown isolating device, including a pallet, several casings, it is characterised in that:
The pallet is circular ring shape plastic plate, plastics plate thickness >=40mm, plastic plate outer circumferential edges setting edge through-hole, edge Number of openings is consistent with bored concrete pile main reinforcement quantity, the interior tooth screw thread for being 40mm equipped with depth in edge through-hole;Plastic plate center is set There is concrete pump pipe access opening;
Described sleeve pipe is plastic tube, and plastics length of tube is equal to filling pile head reinforcing bar length+30mm, and plastics pipe diameter compares bored concrete pile The big 15mm of main reinforcement diameter, plastics bottom of the tube are equipped with the outer tooth screw thread that length is 40mm;
Wherein: the interior tooth screwed connection of every plastics bottom of the tube outer tooth screw thread and plastic plate edge through-hole keeps plastic tube vertically solid It is scheduled on the upper surface of plastic plate, reaches cast-in-situ bored pile pile crown isolating device.
Cast-in-situ bored pile pile crown isolating device of the invention can also be further achieved by the following technical measures.
Cast-in-situ bored pile pile crown isolating device above-mentioned, wherein the material of the pallet is PVC.
Cast-in-situ bored pile pile crown isolating device above-mentioned, wherein the material of the plastic tube is PVC.
Cast-in-situ bored pile pile crown isolating device above-mentioned, wherein the annulus outer diameter is 100mm smaller than grout pile diameter.
A kind of cast-in-situ bored pile pile crown isolating device application method, it is characterised in that the following steps are included:
A, prefabricated four brackets
Bracket is made into the reinforced steel bar ring of diameter 20mm using the reinforcing bar of C32, and the joint of reinforced steel bar ring carries out overlap joint welding, the lap of splice For 10 times of bar diameters;
B, four brackets are buried
When Pile overhead reaches designed elevation, and before breast wall concrete pours, along the grout pile crown Facial planes circumference exposes to half of ring of reinforced steel bar ring on the outside of breast wall concrete for holding to pre-buried four reinforced steel bar rings are arranged cross Plastic plate is carried, another half of ring is cast in outer breast wall concrete;
C, cast-in-situ bored pile pile crown isolating device is installed, comprising the following steps:
(1) bored concrete pile main reinforcement is handled
Each bored concrete pile main reinforcement enters superfilled pile head position after the stretching of the steel reinforcement cage of bored concrete pile, is wrapped up with plastic film superfilled The bored concrete pile main reinforcement (5) at pile crown position;
(2) each bored concrete pile main reinforcement through plastic film package is inserted into each plastic tube from plastic plate bottom respectively, makes plastic tube Length be greater than the length of bored concrete pile main reinforcement, it is with bubble chamber film plug that plastic tube top opening is stifled real, then seal with adhesive tape;
(3) plastic plate is horizontally placed on four reinforcing bar semi-rings being exposed on the outside of breast wall concrete;
(4) make concrete pump pipe by through-hole, and movable in through-holes;
D, superfilled pile head concrete is poured
Superfilled pile head concrete is poured, pulls out superfilled pile head using simple hoisting machinery in subsequent taking-up superfilled pile head.
Cast-in-situ bored pile pile crown isolating device application method of the invention can also be using technical measures below come into one Step is realized.
Method above-mentioned, wherein the plastic plate is positioned to precisely on four reinforcing bar semi-rings, guarantee pile crown length.
Method above-mentioned, wherein the overlapping splice of the reinforced steel bar ring wants firm welding.
After adopting the above technical scheme, cast-in-situ bored pile pile crown isolating device of the invention and its application method are with following Advantage:
1, pile crown isolating device structure is simple, easy to make;
2, it avoids bonding phenomenon between pile crown concrete and pile crown main reinforcement, when removing pile crown, reinforcing bar is injury-free;
3, reduce that the consumings of manpower and material resources, construction efficiency be high, easy to operate, short time limit, reduction engineering cost.
Detailed description of the invention
Fig. 1 is the cast-in-situ bored pile pile crown isolating device structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the rack arrangement floor map of the embodiment of the present invention;
Fig. 3 is the use state diagram of the cast-in-situ bored pile pile crown isolating device of the embodiment of the present invention.
In figure: 1 pallet, 2 concrete pump pipe access openings, 3 casings, 4 brackets, 5 bored concrete pile main reinforcements, 6 bored concrete pile stirrups, 7 fill Infuse stake, 8 concrete guard walls.The channel of hole pouring pile main reinforcement concrete pump pipe.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
Cast-in-situ bored pile pile crown isolating device of the invention, including a pallet, several casings.
It is the cast-in-situ bored pile pile crown isolating device structural schematic diagram of the embodiment of the present invention referring now to Fig. 1, Fig. 1.Such as figure Shown, the pallet 1 is circular ring shape plastic plate, and edge through-hole, side is arranged with a thickness of 40mm, plastic plate outer circumferential edges in plastic plate Edge number of openings is consistent with bored concrete pile main reinforcement quantity, the interior tooth screw thread for being 40mm equipped with depth in edge through-hole;Plastic plate center Equipped with concrete pump pipe access opening 2;
Described sleeve pipe 3 is plastic tube, and plastics length of tube is equal to filling pile head reinforcing bar length+30mm, and plastics pipe diameter is than perfusion The stake big 15mm of main reinforcement diameter, plastics bottom of the tube are equipped with the outer tooth screw thread that length is 40mm;
Wherein: the interior tooth screwed connection of every plastics bottom of the tube outer tooth screw thread and plastic plate edge through-hole keeps plastic tube vertically solid It is scheduled on the upper surface of plastic plate, reaches cast-in-situ bored pile pile crown isolating device.The material of the pallet is PVC.The plastic tube Material be PVC.The annulus outer diameter is 100mm smaller than grout pile diameter.
Embodiment 2
Fig. 3 is the use state diagram of the cast-in-situ bored pile pile crown isolating device of the embodiment of the present invention.Drilling of the invention fills Infuse pile head isolating device application method, comprising the following steps:
A, prefabricated four brackets: bracket is made into the reinforced steel bar ring of diameter 20mm using the reinforcing bar of C32, and the joint of reinforced steel bar ring is taken Welding is connect, the lap of splice is 10 times of bar diameters.
B, bury four brackets: Fig. 2 is the rack arrangement floor map of the embodiment of the present invention.When cast-in-situ bored pile pile crown When top reaches designed elevation, and before breast wall concrete pours, along filling pile head top planes circumference to being arranged cross Pre-buried four reinforced steel bar rings expose to half of ring of reinforced steel bar ring for carrying plastic plate on the outside of breast wall concrete, and another half of ring pours It builds in outer breast wall concrete;The plastic plate is positioned to precisely on four reinforcing bar semi-rings, guarantee pile crown length.The steel The overlapping splice of muscle ring wants firm welding.
C, cast-in-situ bored pile pile crown isolating device is installed, comprising the following steps:
(1) bored concrete pile main reinforcement is handled: each bored concrete pile main reinforcement enters superfilled pile head position after the stretching of the steel reinforcement cage of bored concrete pile, With the bored concrete pile main reinforcement 5 at plastic film package superfilled pile head position.
(2) each bored concrete pile main reinforcement through plastic film package is inserted into each plastic tube from plastic plate bottom respectively, makes to mould The length of expects pipe is greater than the length of bored concrete pile main reinforcement, with bubble chamber film plug that plastic tube top opening is stifled real, then seals with adhesive tape.
(3) plastic plate is horizontally placed on four reinforcing bar semi-rings being exposed on the outside of breast wall concrete.
(4) make concrete pump pipe by through-hole, and movable in through-holes.
D, it pours superfilled pile head concrete: pouring superfilled pile head concrete, in subsequent taking-up superfilled pile head using simple Hoisting machinery pull out superfilled pile head.
The present invention has substantive distinguishing features and significant technological progress, cast-in-situ bored pile pile crown isolating device stake of the invention Head isolating device structure is simple, easy to make, when abolishing superfilled concrete pile head, stake can effectively be avoided to cut pile crown quality It is poor, time-consuming, the traditional problems such as the strong noise of work progress, a large amount of dust, meanwhile, the health of operator is protected, It is environmentally protective, it improves work efficiency, save the cost, receives operator and management, the welcome using unit.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (7)

1. a kind of cast-in-situ bored pile pile crown isolating device, including a pallet, several casings, it is characterised in that:
The pallet is circular ring shape plastic plate, plastics plate thickness >=40mm, plastic plate outer circumferential edges setting edge through-hole, edge Number of openings is consistent with bored concrete pile main reinforcement quantity, the interior tooth screw thread for being 40mm equipped with depth in edge through-hole;Plastic plate center is set There is concrete pump pipe access opening;
Described sleeve pipe is plastic tube, and plastics length of tube is equal to filling pile head reinforcing bar length+30mm, and plastics pipe diameter compares bored concrete pile The big 15mm of main reinforcement diameter, plastics bottom of the tube are equipped with the outer tooth screw thread that length is 40mm;
Wherein: the interior tooth screwed connection of every plastics bottom of the tube outer tooth screw thread and plastic plate edge through-hole keeps plastic tube vertically solid It is scheduled on the upper surface of plastic plate, reaches cast-in-situ bored pile pile crown isolating device.
2. cast-in-situ bored pile pile crown isolating device as described in claim 1, which is characterized in that the material of the pallet is PVC.
3. cast-in-situ bored pile pile crown isolating device as described in claim 1, which is characterized in that the material of the plastic tube is PVC。
4. cast-in-situ bored pile pile crown isolating device as described in claim 1, which is characterized in that the annulus outer diameter compares bored concrete pile The small 100mm of stake diameter.
5. a kind of cast-in-situ bored pile pile crown isolating device application method as described in claim 1, it is characterised in that including following Step:
A, prefabricated four brackets
Bracket is made into the reinforced steel bar ring of diameter 20mm using the reinforcing bar of C32, and the joint of reinforced steel bar ring carries out overlap joint welding, the lap of splice For 10 times of bar diameters;
B, four brackets are buried
When Pile overhead reaches designed elevation, and before breast wall concrete pours, along the grout pile crown Facial planes circumference exposes to half of ring of reinforced steel bar ring on the outside of breast wall concrete for holding to pre-buried four reinforced steel bar rings are arranged cross Plastic plate is carried, another half of ring is cast in outer breast wall concrete;
C, cast-in-situ bored pile pile crown isolating device is installed, comprising the following steps:
(1) bored concrete pile main reinforcement is handled
Each bored concrete pile main reinforcement enters superfilled pile head position after the stretching of the steel reinforcement cage of bored concrete pile, is wrapped up with plastic film superfilled The bored concrete pile main reinforcement (5) at pile crown position;
(2) each bored concrete pile main reinforcement through plastic film package is inserted into each plastic tube from plastic plate bottom respectively, makes plastic tube Length be greater than the length of bored concrete pile main reinforcement, it is with bubble chamber film plug that plastic tube top opening is stifled real, then seal with adhesive tape;
(3) plastic plate is horizontally placed on four reinforcing bar semi-rings being exposed on the outside of breast wall concrete;
(4) make concrete pump pipe by through-hole, and movable in through-holes;
D, superfilled pile head concrete is poured
Superfilled pile head concrete is poured, pulls out superfilled pile head using simple hoisting machinery in subsequent taking-up superfilled pile head.
6. cast-in-situ bored pile pile crown isolating device application method as claimed in claim 5, which is characterized in that the plastic plate exists It is positioned to precisely on four reinforcing bar semi-rings, guarantee pile crown length.
7. cast-in-situ bored pile pile crown isolating device application method as claimed in claim 5, which is characterized in that the reinforced steel bar ring Overlapping splice wants firm welding.
CN201811547705.XA 2018-12-18 2018-12-18 A kind of cast-in-situ bored pile pile crown isolating device and its application method Pending CN109629557A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811547705.XA CN109629557A (en) 2018-12-18 2018-12-18 A kind of cast-in-situ bored pile pile crown isolating device and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811547705.XA CN109629557A (en) 2018-12-18 2018-12-18 A kind of cast-in-situ bored pile pile crown isolating device and its application method

Publications (1)

Publication Number Publication Date
CN109629557A true CN109629557A (en) 2019-04-16

Family

ID=66074919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811547705.XA Pending CN109629557A (en) 2018-12-18 2018-12-18 A kind of cast-in-situ bored pile pile crown isolating device and its application method

Country Status (1)

Country Link
CN (1) CN109629557A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989394A (en) * 2019-05-14 2019-07-09 贵州建工集团有限公司 A kind of cast-in-place concrete pile section stake partition and its construction method
CN110700259A (en) * 2019-11-06 2020-01-17 陕西建工第八建设集团有限公司 Breaking device and method for breaking super-poured concrete of underground continuous wall in advance
CN111395342A (en) * 2020-03-26 2020-07-10 中国一冶集团有限公司 Construction method for cast-in-place pile broken pile head, auxiliary isolation net and preparation method of auxiliary isolation net
CN111877312A (en) * 2020-07-13 2020-11-03 中国一冶集团有限公司 Pile head separation type device and pile breaking construction method
CN113089669A (en) * 2021-03-29 2021-07-09 中国十九冶集团有限公司 Pile head breaking device for large-diameter cast-in-place pile and using method thereof
CN113293755A (en) * 2021-05-28 2021-08-24 福建九鼎建设集团有限公司 Pile head isolation device and construction operation method thereof
CN113737794A (en) * 2021-08-30 2021-12-03 中交二航局第一工程有限公司 Fast cut-off device for pile head of cast-in-situ bored pile and use method thereof
CN114108606A (en) * 2020-08-31 2022-03-01 兰代根 Bored concrete pile cuts stake and reserves reinforcing bar protection device fast
CN117569363A (en) * 2024-01-16 2024-02-20 江苏神禹港务工程有限公司 Connecting device and connecting method for PHC pipe pile and high-strength prestress bearing platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995640A (en) * 2012-12-31 2013-03-27 龚正圣 Combined partition device used for chiseling pouring pile head concrete and dismounting method thereof
CN204343285U (en) * 2014-11-13 2015-05-20 中交隧道工程局有限公司 A kind of pile foundation pile crown entirety abolishes structure
CN108193684A (en) * 2017-12-18 2018-06-22 中国二十冶集团有限公司 Cast-in-situ bored pile pile crown detaches removing method
CN108411918A (en) * 2018-03-27 2018-08-17 中国冶集团有限公司 Pore-creating filling pile pile crown abolishes device and its construction method
CN108547303A (en) * 2018-04-11 2018-09-18 云南建投基础工程有限责任公司 A kind of filling pile head abolishes auxiliary device and pile crown restructuring bankrupt
CN207974103U (en) * 2018-01-26 2018-10-16 中国建筑第八工程局有限公司 The isolating device of cast-in-situ bored pile pile crown

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995640A (en) * 2012-12-31 2013-03-27 龚正圣 Combined partition device used for chiseling pouring pile head concrete and dismounting method thereof
CN204343285U (en) * 2014-11-13 2015-05-20 中交隧道工程局有限公司 A kind of pile foundation pile crown entirety abolishes structure
CN108193684A (en) * 2017-12-18 2018-06-22 中国二十冶集团有限公司 Cast-in-situ bored pile pile crown detaches removing method
CN207974103U (en) * 2018-01-26 2018-10-16 中国建筑第八工程局有限公司 The isolating device of cast-in-situ bored pile pile crown
CN108411918A (en) * 2018-03-27 2018-08-17 中国冶集团有限公司 Pore-creating filling pile pile crown abolishes device and its construction method
CN108547303A (en) * 2018-04-11 2018-09-18 云南建投基础工程有限责任公司 A kind of filling pile head abolishes auxiliary device and pile crown restructuring bankrupt

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989394A (en) * 2019-05-14 2019-07-09 贵州建工集团有限公司 A kind of cast-in-place concrete pile section stake partition and its construction method
CN110700259B (en) * 2019-11-06 2024-05-31 陕西建工第八建设集团有限公司 Device and method for advanced breaking of underground diaphragm wall superfilling concrete
CN110700259A (en) * 2019-11-06 2020-01-17 陕西建工第八建设集团有限公司 Breaking device and method for breaking super-poured concrete of underground continuous wall in advance
CN111395342A (en) * 2020-03-26 2020-07-10 中国一冶集团有限公司 Construction method for cast-in-place pile broken pile head, auxiliary isolation net and preparation method of auxiliary isolation net
CN111877312A (en) * 2020-07-13 2020-11-03 中国一冶集团有限公司 Pile head separation type device and pile breaking construction method
CN111877312B (en) * 2020-07-13 2022-05-20 中国一冶集团有限公司 Pile head separation type device and pile breaking construction method
CN114108606A (en) * 2020-08-31 2022-03-01 兰代根 Bored concrete pile cuts stake and reserves reinforcing bar protection device fast
CN113089669A (en) * 2021-03-29 2021-07-09 中国十九冶集团有限公司 Pile head breaking device for large-diameter cast-in-place pile and using method thereof
CN113293755A (en) * 2021-05-28 2021-08-24 福建九鼎建设集团有限公司 Pile head isolation device and construction operation method thereof
CN113737794A (en) * 2021-08-30 2021-12-03 中交二航局第一工程有限公司 Fast cut-off device for pile head of cast-in-situ bored pile and use method thereof
CN113737794B (en) * 2021-08-30 2023-02-24 中交二航局第一工程有限公司 Fast cut-off device for pile head of cast-in-situ bored pile and use method thereof
CN117569363A (en) * 2024-01-16 2024-02-20 江苏神禹港务工程有限公司 Connecting device and connecting method for PHC pipe pile and high-strength prestress bearing platform
CN117569363B (en) * 2024-01-16 2024-04-09 江苏神禹港务工程有限公司 Pile foundation supergrouting concrete removing device and method thereof

Similar Documents

Publication Publication Date Title
CN109629557A (en) A kind of cast-in-situ bored pile pile crown isolating device and its application method
CN105297729B (en) Bridge pile foundation pile head breaking device and method
CN101761083B (en) Underground continuous wall obstacle clearing construction method for traversing ultra-thick obstacle
CN101975067B (en) Light-section mud shield powder fine sand layer receiving method
CN110409510B (en) Water stopping structure at joint of engagement pile and ground continuous wall
CN111396067B (en) Comprehensive shield steel sleeve receiving construction method in complex environment
CN111719565A (en) Deep foundation pit support structure and construction method thereof
CN106759336A (en) A kind of cast-in-situ bored pile quickly abolishes pile crown construction method
CN110042844B (en) Construction method of cast-in-situ large-diameter foundation pit supporting tubular pile
CN205224036U (en) Device is abolished to bridge pile foundation pile head
CN109339031B (en) Underground concrete continuous wall connects anti-seepage device
JP2006009242A (en) Impervious underground wall constructing method
CN105970961B (en) A kind of bored concrete pile goes along with sb. to guard him deep pit monitor and cuts piling method
CN107816068B (en) Construction method of underground diaphragm wall brushing concrete bypass flow detection and treatment device
CN202323934U (en) Hole forming device for cast-in-situ triangular composite foundation pile
CN109930602A (en) A kind of Water Cutting vibration immersed tube pile pulling device
CN106638618B (en) Ground-connecting-wall goes along with sb. to guard him the construction method of foundation pit reinforced concrete support construction
CN107829426A (en) A kind of restructuring bankrupt of diaphram wall, forming method and its top of a wall part
CN202347516U (en) Pore-forming device for linked composite piling wall
CN216405402U (en) Plugging structure applied to leakage stoppage of anchor cable
CN210239685U (en) Tunnel circumference slip casting structure
CN211621582U (en) Device for improving pile head breaking efficiency
JP2001214504A (en) Method for removing existing line
JP6206899B2 (en) Earth retaining pipe for reaching mine and underground pipe construction method using the same
JPH1162469A (en) Structure of earth retaining wall in shield pit, and starting and reaching method of shield machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190416

RJ01 Rejection of invention patent application after publication