CN202323934U - Hole forming device for cast-in-situ triangular composite foundation pile - Google Patents

Hole forming device for cast-in-situ triangular composite foundation pile Download PDF

Info

Publication number
CN202323934U
CN202323934U CN2011201732579U CN201120173257U CN202323934U CN 202323934 U CN202323934 U CN 202323934U CN 2011201732579 U CN2011201732579 U CN 2011201732579U CN 201120173257 U CN201120173257 U CN 201120173257U CN 202323934 U CN202323934 U CN 202323934U
Authority
CN
China
Prior art keywords
triangle
pile
steel casing
cast
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201732579U
Other languages
Chinese (zh)
Inventor
常雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011201732579U priority Critical patent/CN202323934U/en
Application granted granted Critical
Publication of CN202323934U publication Critical patent/CN202323934U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a hole forming device for fast completion of a triangular cast-in-situ concrete large-scale composite foundation pile in a soft soil foundation. The hole forming device comprises a medium and high frequency vibratory hammer, a special clamp device, a circular outer steel casing, a triangular inner steel casing, an embedded triangular reinforced concrete sealed solid pile tip and an articulated triangular steel valve pile tip. The scheme of the utility model can be used for the large-scale composite foundation pile in the treatment of the soft soil foundation, the inner and outer steel casings and the pile tips can be fast deposited to the design scale height of a soil layer by vibration through the medium and high frequency vibratory hammer and a clamp head of the special clamp, and then the cast-in-situ concrete composite foundation pile is further realized. According to the construction method, cast-in-situ concrete can be saved, the single-pile bearing capacity can be improved, the anti-sedimentation and anti-side slip displacement capabilities of the whole compound foundation can be enhanced; and in addition, the construction cost can be reduced by above 20%, the construction unearthed volume can be reduced by 50%, the pollution caused by secondary desilting transportation can be avoided, and the construction method is suitable for construction in different soft soil layers and complex places.

Description

The perforating device that is used for cast-in-place triangle compound foundation pile
Technical field
The utility model relates to a kind of perforating device that soft foundation is accomplished the large-scale compound foundation pile of cast-in-situ concrete triangle fast that is used for; It is applicable to the construction of the compound foundation pile of all kinds of deep weak soil, backfill, can be widely used in the treatment of soft foundation and the processing of the soft foundation in other civil construction of sea wall composite pile foundation, port and pier reclamation by pumping filling.
Background technology
At present; In the pile foundation construction of handling the deep weak soil of all kinds of harbours, harbour, water conservancy, airport, railway and building, backfill; The overwhelming majority still adopts traditional construction technology; Promptly earlier large diameter single steel casing is squeezed into or is pressed in the soil and fetch earth through punching, excavation or auger again, this job practices in pore forming process, need to discharge a large amount of earth, engineering quantity big, bring pollution to site environment, also in secondary desilting transportation, stained surrounding environment once more; When the cast pile body, need use a large amount of concrete simultaneously, not only consuming time taking a lot of work also strengthened engineering cost.
In order to overcome the deficiency that above-mentioned conventional method exists in work progress, reduce the construction cost accelerating construction progress, avoid secondary desilting transportation to pollute, adapt to the construction demand in different soil and place, just become the technical problem that the utility model scheme will solve.
The utility model content
To the problems referred to above, the utility model aims to provide a kind of perforating device that is used for cast-in-place triangle compound foundation pile, and it comprises the medium-high frequency hydraulic vibration driver 1, flange 2, special fixture chute crossbeam 3, the moving telescopic chuck 4, circular outer steel casing 6, steel casing in the triangle 7, build-in type triangle reinforcing bar concrete sealing solid pile point 9With articulated type triangle steel flapper pile tip 13It is through medium-high frequency hydraulic vibration driver and special fixture cartridge device with the clamping of inside and outside steel casing, unclamp and be connected; Said stake position, tip is adopted build-in type triangle reinforcing bar concrete sealing solid pile point respectively 9With articulated type triangle steel flapper pile tip 13Steel casing cavity top is provided with cast-in-situ concrete and pours into the place in the said triangle 5Be provided with a kind of construction technology that reinforcing cage from top to bottom hangs passage in the said triangle between steel casing cavity.
As this patent, said medium-high frequency hydraulic vibration driver 1Be to clamp steel casing in the triangle through the clamping of special fixture cartridge device difference 7With the outer steel casing of circle 6The position, upper end is executed to shake and is exerted pressure, and makes steel casing in the triangle 7, circular outer steel casing 6With build-in type triangle reinforcing bar concrete sealing solid pile point 9Association is shaken fast sinks to underground soil layer design elevation place.
As this patent, said reinforcing cage in the triangle between steel casing cavity the top from top to bottom hang in.
As this patent, said cast-in-situ concrete steel casing cavity top end in the triangle is poured into gradually.
As this patent, after completion is built in said cast-in-situ concrete, start the medium-high frequency hydraulic vibration driver 1Clamp steel casing in the triangle through the clamping of special fixture cartridge device difference 7With the outer steel casing of circle 6The upper end is executed to shake to execute and is pulled out, and simultaneously steel casing in the triangle 7With outer steel casing 6The ground of extricating oneself from a predicament and brace oneself up to action at a slow speed also can be earlier steel casing in the triangle 7The ground of extricating oneself from a predicament and brace oneself up to action at a slow speed, treat that inner chamber body is replenished sufficient concrete after, again outer steel casing 6The ground of extricating oneself from a predicament and brace oneself up to action at a slow speed.
As this patent, said stake position, tip is adopted build-in type triangle reinforcing bar concrete sealing solid pile point respectively 9With articulated type triangle steel flapper pile tip 13
The utility model scheme can be accomplished the complex structure body that is used for the large-scale compound foundation pile of soft foundation cast-in-situ concrete triangle fast; It has not only been practiced thrift cast-in-situ concrete and has improved whole anti-sedimentation and the anti-side sliding displacement capacity that single pile bearing capacity has also been strengthened composite foundation, and this scheme can shorten 4~June of construction period, reduce construction cost 20% or more, reduce construction the be unearthed different soft layer of amount 50%, the pollution of avoiding secondary desilting transportation, adaptation and the construction of complex site.
Description of drawings
Fig. 1 is the comprehensive complete process principle schematic of the utility model.
Fig. 2 is the utility model triangle cast-in-situ concrete compound foundation pile floor map.
Fig. 3 is the utility model build-in triangle reinforcing bar concrete sealing solid pile point floor map.
Fig. 4 is the utility model build-in triangle reinforcing bar concrete sealing solid pile point generalized section.
Fig. 5 is the hinged link floor map of the utility model triangle steel flapper pile tip and steel.
Fig. 6 is the hinged link generalized section of the utility model triangle steel flapper pile tip and steel.
Its description of reference numerals: medium-high frequency hydraulic vibration driver 1, flange 2, special fixture chute crossbeam 3, the moving telescopic chuck 4, cast-in-situ concrete pours into the place 5, circular outer steel casing 6, steel casing in the triangle 7, triangle reinforcing bar concrete sealing solid pile point water jacket 8, build-in type triangle reinforcing bar concrete sealing solid pile point 9, the cavity soil discharge channel between inside and outside steel casing 10, the triangle reinforcing bar concrete stake after building 11, the stake point soft soil that shakes and arranged when sinking to underground soil layer 12, articulated type triangle steel flapper pile tip 13, steel articulated link chain joint 14
The specific embodiment
Below in conjunction with accompanying drawing and practical implementation the utility model scheme is explained further details:
One, like accompanying drawing 1,2,3,4,5, shown in 6, the utility model scheme provides through having the medium-high frequency hydraulic vibration driver 1, flange 2, special fixture chute crossbeam 3, the moving telescopic chuck 4The special fixture association that equipment is formed is simultaneously to the outer steel casing of circle 6With steel casing in the triangle 7Upper end position clamping steps up, and makes steel casing in the triangle 7Bottom elder generation build-in is in build-in type triangle reinforcing bar concrete solid pile point 9On, start the medium-high frequency hydraulic vibration driver 1The enforcement pressure of shaking makes circular outer steel casing 6, steel casing in the triangle 7With build-in type triangle reinforcing bar concrete solid pile point 9Association is sunk to the operation construction technology of the underground soil layer and the inside and outside steel casing of extricating oneself from a predicament and brace oneself up to action at a slow speed fast simultaneously by shaking.
Two, before concreting, must be earlier hang in reinforcing cage from top to bottom in the triangle in the steel casing cavity, again concreting.
Three, if pile crown partly adopts articulated type triangle steel flapper pile tip 13, when practice of construction, still follow one in the above-mentioned specific embodiment, a step construction.
Four, the special-purpose perforating device in the present embodiment is mainly three parts composition: first is for having the medium-high frequency hydraulic vibration driver 1, flange 2 and special fixture chute crossbeam 3, the moving telescopic chuck 4Association's equipment of forming; The outer steel casing of second portion circle 6With steel casing in the triangle 7Form; Third part is a build-in triangle reinforcing bar concrete solid pile point 9Or be hinged triangle steel flap valve pile crown 13And steel articulated link chain joint 14Form.
Practical implementation method and result
1) puts the large-scale compound foundation pile type of cast-in-place mixed earth triangle of reinforcing cage
A, elder generation move on to construction location by portable stake machine drive medium-high frequency vibrating hammer and special hydraulic clamp system, start the medium-high frequency hydraulic vibration driver 1, through the flange connecting dish 2With special fixture chute crossbeam 3, the moving telescopic chuck 4, clamp outer steel casing simultaneously 6Top and interior steel casing 7The top is executed to shake and is exerted pressure, and makes it association and is shaken fast and sink to design soil layer absolute altitude place, unclamps clamping fixture head 4, remove the medium-high frequency hydraulic vibration driver 1
B, accomplish above-mentioned practical implementation method and result 1) behind a, step process, hang onto interior steel casing to the reinforcing cage of having made 7In the cavity, after the reinforcing cage localization examination is accomplished, from interior steel casing cavity upper end 5Fluid concrete, treat that concrete pouring is intact after, restart the medium-high frequency hydraulic vibration driver 1, through the flange connecting dish 2And special fixture 3And chuck 4, clamp inside and outside steel casing top and execute and shake, after 5 seconds of vibration earlier, check the concrete that has watered in the chamber till supplying design elevation, pull out inside and outside steel casing simultaneously slowly until going out ground, and move on to next working procedure.
2) the large-scale compound foundation pile type of cast-in-place plain concrete triangle
Accomplish above-mentioned practical implementation method and result 1) behind a, step process, remove outside the install reinforcing cage step process, directly on interior steel casing cavity 5Fluid concrete, treat that concrete pouring is intact after, restart the medium-high frequency hydraulic vibration driver 1, through the flange connecting dish 2And special fixture 3And chuck 4, clamp inside and outside steel casing top and execute and shake, after 5 seconds of vibration earlier, check the concrete that has watered in the chamber till supplying design elevation, pull out inside and outside steel casing simultaneously slowly until going out ground, and move on to next working procedure.
The above; Be merely preferable case study on implementation in the utility model constructure scheme; Every trickle modification of above case study on implementation being done according to the utility model scheme of any essence all is equal to replacement and improves, and all should be included within the protection domain of the utility model scheme.

Claims (1)

1. perforating device that is used for cast-in-place triangle compound foundation pile, it comprises in medium-high frequency hydraulic vibration driver (1), flange (2), special fixture chute crossbeam (3), moving telescopic chuck (4), circular outer steel casing (6), the triangle that steel casing (7), build-in type triangle reinforcing bar concrete sealing solid pile point (9) and articulated type triangle steel flapper pile tip (13) are sharp; It is through medium-high frequency hydraulic vibration driver and special fixture cartridge device with the clamping of inside and outside steel casing, unclamp and be connected; Said stake position, tip is adopted build-in type triangle reinforcing bar concrete sealing solid pile point (9) and articulated type triangle steel flapper pile tip (13) respectively; Steel casing cavity top is provided with cast-in-situ concrete and pours into place (5) in the said triangle; The reinforcing cage that is provided with from top to bottom between steel casing cavity in the said triangle hangs passage.
CN2011201732579U 2011-05-26 2011-05-26 Hole forming device for cast-in-situ triangular composite foundation pile Expired - Lifetime CN202323934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201732579U CN202323934U (en) 2011-05-26 2011-05-26 Hole forming device for cast-in-situ triangular composite foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201732579U CN202323934U (en) 2011-05-26 2011-05-26 Hole forming device for cast-in-situ triangular composite foundation pile

Publications (1)

Publication Number Publication Date
CN202323934U true CN202323934U (en) 2012-07-11

Family

ID=46435917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201732579U Expired - Lifetime CN202323934U (en) 2011-05-26 2011-05-26 Hole forming device for cast-in-situ triangular composite foundation pile

Country Status (1)

Country Link
CN (1) CN202323934U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102797262A (en) * 2011-05-26 2012-11-28 常雷 Construction method for cast-in-situ triangular composite foundation pile and special hole former therefor
CN104074187A (en) * 2014-07-15 2014-10-01 戴元志 Pile shoe with internal movable petals and method for using pile shoe with internal movable petals during construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102797262A (en) * 2011-05-26 2012-11-28 常雷 Construction method for cast-in-situ triangular composite foundation pile and special hole former therefor
CN102797262B (en) * 2011-05-26 2016-08-03 常雷 The construction treating methods of cast-in-situ triangular compound foundation pile
CN104074187A (en) * 2014-07-15 2014-10-01 戴元志 Pile shoe with internal movable petals and method for using pile shoe with internal movable petals during construction
CN104074187B (en) * 2014-07-15 2016-03-23 戴元志 Interior valve type pile shoe and construction usage method

Similar Documents

Publication Publication Date Title
CN102425159B (en) Pile cutting construction method of bored concrete pile
CN101614020B (en) Flexible bladder type anticorrosion device, anticorrosion pile and construction method using same
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN102383431B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN106907157B (en) A kind of shield machine normal pressure opens the cabin operation construction method
CN104818713A (en) Profile steel cement soil pile construction method adaptive to various stratums
CN104912065A (en) Underwater anchor pile construction method
CN201826302U (en) Boring device for large-diameter cast-in-situ thin-walled concrete composite pile
CN102002945B (en) Capsule type anti-corrosion device with pile shoe and anti-corrosion pile using same and construction method
CN102345287B (en) Construction method of large-diameter cast-in-situ thin-wall concrete composite pile forming device
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN104711975B (en) Construction technology for long spiral cast-in-situ bored pile
CN102677657B (en) Townhouse waters the construction treating methods of knot thin-walled concrete composite pile wall
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN107587502A (en) A kind of spiral-digging pore pressure pour water soil occlusion curtain pile construction method
CN201172820Y (en) Tied joggle pile mould tube with lubricating valve pile toe
CN102828507B (en) The construction treating methods of major diameter cast-in-situ concrete composite pile
CN214245694U (en) Pile forming system for large-diameter cast-in-situ bored pile in karst area
CN104074184B (en) Pile base post-grouted expanded-base bored pile
CN202323934U (en) Hole forming device for cast-in-situ triangular composite foundation pile
CN207109804U (en) A kind of quick spreading structure configuration of soft soil foundation bored concrete pile
CN102797262B (en) The construction treating methods of cast-in-situ triangular compound foundation pile
CN102758434B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN109944238A (en) Pile construction method is rammed in full-sleeve full-rotation
CN102808406B (en) The construction treating methods of townhouse composite pile wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120711

CX01 Expiry of patent term