CN107604920A - A kind of quick construction method for abolishing filling pile head - Google Patents

A kind of quick construction method for abolishing filling pile head Download PDF

Info

Publication number
CN107604920A
CN107604920A CN201710829161.5A CN201710829161A CN107604920A CN 107604920 A CN107604920 A CN 107604920A CN 201710829161 A CN201710829161 A CN 201710829161A CN 107604920 A CN107604920 A CN 107604920A
Authority
CN
China
Prior art keywords
pile
concrete
pile crown
sleeve pipe
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710829161.5A
Other languages
Chinese (zh)
Inventor
李涛
童秀东
方云波
郑开盛
王文洪
张栋梁
陈卓睿
李卫
王云志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment Fifth Construction Co Ltd
Original Assignee
Yunnan Construction Investment Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment Fifth Construction Co Ltd filed Critical Yunnan Construction Investment Fifth Construction Co Ltd
Priority to CN201710829161.5A priority Critical patent/CN107604920A/en
Publication of CN107604920A publication Critical patent/CN107604920A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of quick construction method for abolishing filling pile head, its step is to entangle on every main reinforcement top of steel reinforcement cage with sleeve pipe, and seal sleeve pipe upper and lower ends port, then pile foundation filling concrete is carried out, until exceeding design of pile top absolute altitude, when being poured at stake top absolute altitude, embedded bar suspension ring in pile crown concrete more than stake top absolute altitude, after pile concrete solidification, the pile crown surrounding earthwork is dug out, measure and identify need cut a stake position, along mark at border uniformly drilling after with splitter separate pile crown concrete, pile crown concrete is hung out and transported.Present invention efficiently solves the damage in work progress to reinforcing bar and pile body, efficiency of construction is improved, ensure that construction quality.

Description

A kind of quick construction method for abolishing filling pile head
Technical field
The present invention relates to building construction cast-in-place pile construction method technical field, and in particular to one kind quickly abolishes grout pile The construction method of head.
Background technology
When pouring into a mould bored concrete pile, in process of vibrating, aggregate sinks concrete, and it is upward that cement mortar carries bubble Return, cause stake top concrete strength relatively low.To ensure pile foundation concrete strength, after the completion of pile foundation pours, it will be above stake top and set Reinforcing bar is exposed in the pile crown part of meter absolute altitude after abolishing, and then uses the reinforcing bar of bar connecting upper strata suspended deck structure, progress superstructure Pour.Currently used pile crown restructuring bankrupt is:Manually it is aided with small machine to cut, or pile crown is adopted in designed elevation position Ring cutting is carried out with abrasive machine, then artificial chisel removes the cover concrete of pile crown, and cage bar peeled off into concrete from lateral, then by stake The piecemeal cleaning of head concrete.Bending can be caused to damage when so causing to cut pile crown to reinforcing bar, easily cause reinforcing bar from bottom break, It need to weld again.This construction method work efficiency is low, it is difficult to ensures that pile crown abolishes the construction quality of rear reinforcing bar, and needs a large amount of work Power, have a strong impact on construction quality and progress.
The content of the invention
It is effective to solve to construct it is an object of the invention to provide a kind of quick construction method for abolishing filling pile head To the damage of reinforcing bar and pile body in journey, efficiency of construction is improved, ensures construction quality.
The technical scheme that the present invention takes is as follows:
A kind of quick construction method for abolishing filling pile head, comprises the following steps:
(1) every main reinforcement top of steel reinforcement cage is entangled with sleeve pipe, and seals sleeve pipe upper and lower ends port;
(2) pile foundation filling concrete is carried out, until exceeding design of pile top absolute altitude;When being poured at stake top absolute altitude, in stake Embedded bar suspension ring in pile crown concrete more than top mark is high;
(3) after pile concrete solidification, the pile crown surrounding earthwork is dug out, measuring and identifying needs to cut stake position;
(4) needing cut stake site marking at, along mark at border uniformly drilling after with splitter separate pile crown coagulation Soil;
(5) pre-buried reinforcing bar suspension ring are hooked with lifting appliance, pile crown concrete is hung out, transports pile crown.
Step (1) described sleeve pipe internal diameter of the present invention is thicker 3~5mm than reinforcing bar, is fastened and is sealed above and below sleeve pipe using iron wire Both ends port.
Compared with existing construction method, the present invention has advantages below:
A. pile crown departs from pile body by overall vertical lifting upwards, can effectively avoid during Stake head handling to the damage of reinforcing bar Wound, makes cage bar parallel, does not bend, and realizes the soap-free emulsion polymeization between the concrete that need to remove;
B. pile crown is integrally hung out upwards, can reduce and pile concrete is impacted or damaged, it is ensured that pile foundation and cushion cap it Between connection;The construction speed for abolishing filling pile head is improved, reduces the labor intensity of workmen;
C. ensure construction quality, and avoid the dust pollution surrounding environment that traditional broken pile head cuts concrete, improvement is manually applied Work operating environment.
D. construction and installation of the present invention are convenient, and are remarkably improved efficiency of construction.
Brief description of the drawings
Fig. 1 is that every cage bar top puts plastic bushing and pre-buried suspension ring schematic diagram;
Fig. 2 is pile crown concrete separation schematic diagram;
Fig. 3 is that pile crown concrete carries out hanging out schematic diagram;
Fig. 4 is the view after pile crown concrete removes.
Embodiment
A kind of quick construction method for abolishing filling pile head, comprises the following steps:
(1) as shown in figure 1, in steel reinforcement cage processing and fabricating, stake top absolute altitude above section is located to cage bar 1 without curved Folding, keeping parallelism state;Every cage bar is located at stake top absolute altitude (in Fig. 1 at horizontal line A) above section and is inserted in sleeve pipe 2, sleeve pipe is adopted Tightened with soft plastic tube, and by two mouthfuls above and below sleeve pipe using iron wire winding, it is make pile crown reinforcing bar and perfusion mixed that it, which is acted on, Do not bonded between solidifying soil;Casing inner diameter is thicker 3~5mm than reinforcing bar;
(2) pile foundation filling concrete is carried out, until exceeding design of pile top absolute altitude;As shown in Figure 1 and Figure 2, it is being poured into stake top When at absolute altitude, the pre-buried reinforcing bar suspension ring 3 for meeting pile crown integral hoisting force request in the pile crown concrete more than stake top absolute altitude, Expose on pile crown top of concrete the upper end of reinforcing bar suspension ring 3.Reinforcing bar suspension ring are used for hanger when pile crown removes;
(3) when the intensity that pile concrete is solidified to concrete reaches the 30% of design strength, by the pile crown surrounding earthwork Dig out, and the position for needing to cut stake position is measured and identified according to the designed elevation of bored concrete pile, needing the position at section stake position Do line mark in place;
(4) as shown in Fig. 2 needing to cut at the site marking of stake, cutting machine is used along after tag line B borders uniformly drilling 4 Pile crown bottom is cut along tag line border, separates the concrete of pile crown 5 with splitter afterwards;
(5) it is overall vertically to sling and remove pile crown 5 as shown in figure 3, hooking pre-buried reinforcing bar suspension ring 3 with lifting appliance, cover Pipe 2 is removed together with pile crown.Bored concrete pile state after pile crown removes is as shown in Figure 4.To remaining filling pile head top surface After carrying out manual amendment, you can constructed into next procedure.

Claims (2)

1. a kind of quick construction method for abolishing filling pile head, it is characterised in that comprise the following steps:
(1) every main reinforcement top of steel reinforcement cage is entangled with sleeve pipe, and seals sleeve pipe upper and lower ends port;
(2) pile foundation filling concrete is carried out, until exceeding design of pile top absolute altitude;When being poured at stake top absolute altitude, in stake top mark Embedded bar suspension ring in pile crown concrete more than high;
(3) after pile concrete solidification, the pile crown surrounding earthwork is dug out, measuring and identifying needs to cut stake position;
(4) needing cut stake site marking at, along mark at border uniformly drilling after with splitter separate pile crown concrete;
(5) pre-buried reinforcing bar suspension ring are hooked with lifting appliance, pile crown concrete is hung out, transports pile crown.
A kind of 2. quick construction method for abolishing filling pile head according to claim 1, it is characterised in that step (1) Described sleeve pipe internal diameter is thicker 3~5mm than reinforcing bar, is fastened using iron wire and seals sleeve pipe upper and lower ends port.
CN201710829161.5A 2017-09-14 2017-09-14 A kind of quick construction method for abolishing filling pile head Pending CN107604920A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710829161.5A CN107604920A (en) 2017-09-14 2017-09-14 A kind of quick construction method for abolishing filling pile head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710829161.5A CN107604920A (en) 2017-09-14 2017-09-14 A kind of quick construction method for abolishing filling pile head

Publications (1)

Publication Number Publication Date
CN107604920A true CN107604920A (en) 2018-01-19

Family

ID=61062732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710829161.5A Pending CN107604920A (en) 2017-09-14 2017-09-14 A kind of quick construction method for abolishing filling pile head

Country Status (1)

Country Link
CN (1) CN107604920A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824431A (en) * 2018-07-17 2018-11-16 中冶建工集团有限公司 Superfilled pile head handles construction method
CN109989394A (en) * 2019-05-14 2019-07-09 贵州建工集团有限公司 A kind of cast-in-place concrete pile section stake partition and its construction method
CN111424663A (en) * 2020-03-26 2020-07-17 中电建十一局工程有限公司 Environment-friendly and efficient pile head breaking method
CN112160322A (en) * 2020-09-11 2021-01-01 山西省交通科技研发有限公司 Pile head softening treatment method for concrete cast-in-place pile
CN114541394A (en) * 2022-02-21 2022-05-27 陕西建工机械施工集团有限公司 Construction method convenient for breaking pile head of cast-in-place pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56131712A (en) * 1980-03-17 1981-10-15 Kensuke Asakura Removing method of defective concrete at upper part of pile when driving pile in site
CN105735317A (en) * 2016-03-09 2016-07-06 中天路桥有限公司 Construction technology for removing pile heads of cast-in-place piles
CN106759336A (en) * 2016-12-19 2017-05-31 中交路桥建设有限公司 A kind of cast-in-situ bored pile quickly abolishes pile crown construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56131712A (en) * 1980-03-17 1981-10-15 Kensuke Asakura Removing method of defective concrete at upper part of pile when driving pile in site
CN105735317A (en) * 2016-03-09 2016-07-06 中天路桥有限公司 Construction technology for removing pile heads of cast-in-place piles
CN106759336A (en) * 2016-12-19 2017-05-31 中交路桥建设有限公司 A kind of cast-in-situ bored pile quickly abolishes pile crown construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824431A (en) * 2018-07-17 2018-11-16 中冶建工集团有限公司 Superfilled pile head handles construction method
CN109989394A (en) * 2019-05-14 2019-07-09 贵州建工集团有限公司 A kind of cast-in-place concrete pile section stake partition and its construction method
CN111424663A (en) * 2020-03-26 2020-07-17 中电建十一局工程有限公司 Environment-friendly and efficient pile head breaking method
CN112160322A (en) * 2020-09-11 2021-01-01 山西省交通科技研发有限公司 Pile head softening treatment method for concrete cast-in-place pile
CN114541394A (en) * 2022-02-21 2022-05-27 陕西建工机械施工集团有限公司 Construction method convenient for breaking pile head of cast-in-place pile

Similar Documents

Publication Publication Date Title
CN107604920A (en) A kind of quick construction method for abolishing filling pile head
CN106759336A (en) A kind of cast-in-situ bored pile quickly abolishes pile crown construction method
CN106400802B (en) A kind of drilled pile pile crown is pre-buried to exempt from the whole quickly lifting method of ring cutting that drills
CN105297729B (en) Bridge pile foundation pile head breaking device and method
CN109629455A (en) The construction method of highway reconstruction bridge
CN102720186B (en) Underwater once pouring method for variable cross-section bored cast-in-place pile
CN103088814A (en) Rotary drilling rig coordinated with percussion drill hole-forming construction method
CN108166771A (en) Steel reinforced concrete pool structural reform makes construction method
CN108612109A (en) The carrierless method for dismounting of concrete support beam
CN104631460A (en) Girdling splitting type integral pile breaking method
CN106958245A (en) The quick structure and method for abolishing concrete pile head
CN108547331B (en) Cast-in-place pile concrete elevation measurement and over-grouting control method
CN106245654B (en) Deposited reinforced concrete pile exempts from inter-pile soil excavation construction method
CN105926672A (en) Mined metro station steel pipe column construction method
CN102912806A (en) Construction method of precipitation well
CN108005060A (en) Filling pile head reinforcing bar protective device and its construction method
CN114232628A (en) Cutting hoop for integrally breaking pile head of cast-in-situ bored pile and construction method
CN207739259U (en) A kind of filling pile head cuts device
CN106978809A (en) A kind of construction method of casing off concrete protective reserved steel bar
CN100523389C (en) Ballastless track steel reinforced concrete pile-net construction method
CN106638600A (en) Construction method for breaking bored pile head
CN206859222U (en) The quick structure for abolishing concrete pile head
CN211922619U (en) Pile head breaking device
CN106939604A (en) A kind of concrete pile head breaking method of reinforcing bar every slurry protection sleeve pipe
CN208105272U (en) One kind preventing superfilled device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180119