CN105507129B - Suspension bridge main cable tightening tool structure and design method - Google Patents
Suspension bridge main cable tightening tool structure and design method Download PDFInfo
- Publication number
- CN105507129B CN105507129B CN201510912649.5A CN201510912649A CN105507129B CN 105507129 B CN105507129 B CN 105507129B CN 201510912649 A CN201510912649 A CN 201510912649A CN 105507129 B CN105507129 B CN 105507129B
- Authority
- CN
- China
- Prior art keywords
- main push
- towing rope
- tool structure
- circle
- tight cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/02—Suspension bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/16—Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention provides a suspension bridge main cable tightening tool structure. The suspension bridge main cable tightening tool structure is characterized in that an upper semicircular cable tightening device 1, a lower semicircular cable tightening device 2, a cable tightening distribution beam 3, tension rods 4 and 30 t jacks 5 are mounted on a main cable 6, wherein the 30 t jacks 5 are arranged between the cable tightening distribution beam 3 and the lower semicircular cable tightening device 2; the tension rods 4 are used for tightening sections of the main cable 6, and a gap being 1-2 mm is formed between the upper semicircular cable tightening device 1 and the lower semicircular cable tightening device 2. The suspension bridge main cable tightening tool structure has the advantages as follows: the structure can be carried by one worker and operated by two workers as a group, operation workers can be saved, the construction efficiency can be improved, and the construction cost can be saved; the sections of the main cable tightened by the tool has good out-of-roundness, a cable clamp can be mounted smoothly, the cable clamp mounting efficiency is improved, and the working efficiency is improved, so that the cost is saved. The tool structure is concise, convenient to use, rapid, simple, safe and reliable and has great promotional value, components are light, the construction efficiency is high, and the cable tightening effect is good.
Description
Technical field
The present invention relates to a kind of tight cable tool structure of new type suspension bridge main push-towing rope and method for designing, are loose by many
Single strand section the special frock of the circular cross-section for reaching the voidage that design needs is tightened up into by this frock.Belong to bridge
Beam technical field of construction.
Background technology
In existing suspension bridge bridge construction, main push-towing rope is typically made up of many strands, takes partly accepting and partly rejecting between multiply
Principle set up when, strand section is non-round, voidage is big, it is impossible to meet install cord clip needs.A kind of instrument is needed for this
Loose strand is tightened up the circular cross-section for design needs and reaches voidage and is required.When typically adopting large-scale cable compacting machine,
Due to complex structure, cable compacting machine limited amount(General every only 2, bridge)Tight cable efficiency is low, and tight cable out-of-roundness difference is difficult to meet design
Need.Conventional cable compacting machine is not suitable for duration nervous suspension bridge main cable construction.
The content of the invention
Proposed by the present invention is a kind of tight cable tool structure of main rope of suspension bridge and design cycle, and its purpose is intended to using steel structure
Upper and lower two parts oval structure made by part, by jack tension upper lower half circle is tightened up, and reaches the voidage that design needs,
Simultaneously out-of-roundness reaches control well, facilitates follow-up installing Cable-clamp.
The technical solution of the present invention:
The tight cable tool structure of main rope of suspension bridge, its structure is upper semi-circle bitt compressor 1, lower half circle bitt compressor 2, tight cable distribution beam
3rd, tension rod 4,30t jack 5 are arranged on main push-towing rope 6, wherein being 30t jack between tight cable distribution beam 3 and lower half circle bitt compressor 2
5;Tensioning tension rod 4 has the gap of 1 ~ 2mm tightening up the section of main push-towing rope 6 between upper semi-circle bitt compressor 1 and lower half circle bitt compressor 2.
The method for designing of the tight cable tool structure of main rope of suspension bridge, comprises the steps:
1)Upper semi-circle bitt compressor 1 is installed on the main push-towing rope of original state;
2)Tension rod 4 and top nut are installed, then lower half circle bitt compressor 2 and intermediate nut are installed, tight cable distribution is finally installed
Beam 3 and lower nuts;
3)30t jack 5 are installed, the section of main push-towing rope 6 is tightened up by jack tension tension rod, until reaching design needs
Section voidage;Because the radius of bitt compressor is calculated according to the voidage that design needs, the out-of-roundness of rear main push-towing rope 6 is tightened up
Automatically design needs are met;
4)Main push-towing rope section is fixed with strap, tight cable tool structure is removed and is moved on to next main push-towing rope section operation.
Advantages of the present invention:Using this kind of tight cable frock, many operations can be realized with many sets of little cost manufacture, dispersion construction
Construct simultaneously in face;It is simultaneously simple for structure, it is easy to operation, tight cable speed is fast;Using Manual tightening, control out-of-roundness can be in real time measured
And voidage, tight cable quality is easily controlled.Low cost when this tight cable frock is constructed, it is fast and convenient, it is safe and reliable, with larger
Promotional value.
Description of the drawings
Accompanying drawing 1 is the tight cable frock general assembly drawing of main rope of suspension bridge.
Fig. 2-1 is the schematic diagram that upper semi-circle bitt compressor is installed on main push-towing rope.
Insert for Fig. 2-2 pair and lower half circle tightener is installed, finish rolling deformed bar is penetrated, the schematic diagram that two ends are attached the names of pre-determined candidates.
Fig. 2-3 installs reaction beam and jack, installs the schematic diagram of reaction beam back nut.
Main push-towing rope is tightened up in Fig. 2-4 jack finish rolling deformed bar tensioning, until the porosity for needing, is fixed with bailing band
After loosen jack, moving on to next place carries out the schematic diagram of tight cable work.
In figure 1 is upper semi-circle bitt compressor, 2 is lower half circle bitt compressor, 3 is tight cable distribution beam, 4 is tension rod, 5 is 30t
Jack, 6 be main push-towing rope, 7 be nut.
Specific embodiment
Control Fig. 1, the tight cable frock of main rope of suspension bridge, its structure is upper semi-circle bitt compressor 1, lower half circle bitt compressor 2, tight cable point
It is arranged on main push-towing rope 6, wherein being 30t thousand between tight cable distribution beam 3 and lower half circle bitt compressor 2 with beam 3, tension rod 4,30t jack 5
Jin top 5;Tensioning tension rod 4 has 1 ~ 2mm's tightening up the section of main push-towing rope 6 between upper semi-circle bitt compressor 1 and lower half circle bitt compressor 2
Gap.
Control accompanying drawing 2-1,2-2,2-3,2-4, the method for designing of the tight cable tool structure of main rope of suspension bridge, including following step
Suddenly:
1)Upper semi-circle bitt compressor 1 is installed on the main push-towing rope of original state;
2)Tension rod 4 and top nut are installed, then lower half circle bitt compressor 2 and intermediate nut are installed, tight cable distribution is finally installed
Beam 3 and lower nuts;
3)30t jack 5 are installed, the section of main push-towing rope 6 is tightened up by jack tension tension rod, until reaching design needs
Section voidage;Because the radius of bitt compressor is calculated according to the voidage that design needs, the out-of-roundness of rear main push-towing rope 6 is tightened up
Automatically design needs are met;
4)Main push-towing rope section is fixed with strap, tight cable tool structure is removed and is moved on to next main push-towing rope section operation.
The effect of described 30t jack 5 is mainly tensioning tension rod 4 to tighten up the section of main push-towing rope 6, selects appropriate height
Jack selects the jack of appropriate tonnage can reach tight cable can be put between tight cable distribution beam 3 and lower half circle bitt compressor 2
Objective air void, general 30t can meet needs.
During processing tool equipment, note there should be 1 ~ 2mm gaps between upper semi-circle bitt compressor 1 and lower half circle bitt compressor 2, protect
Card both fit clearances, at the same between coating butter, to reduce frictional force.
The semi-circular ends of upper semi-circle bitt compressor 1 and lower half circle bitt compressor 2 set chamfering, when being easy to tighten up main push-towing rope 6, main push-towing rope steel wire
Smoothly wedging.
Claims (2)
1. the tight cable tool structure of main rope of suspension bridge, it is characterized in that upper semi-circle bitt compressor, lower half circle bitt compressor, tight cable distribution beam,
Pull bar, 30t jack are arranged on main push-towing rope, wherein being 30t jack between tight cable distribution beam and lower half circle bitt compressor;Tensioning tensioning
Bar has the gap of 1 ~ 2mm tightening up the section of main push-towing rope between upper semi-circle bitt compressor and lower half circle bitt compressor;
The method for designing of the tight cable tool structure of main rope of suspension bridge comprises the steps:
1)Upper semi-circle bitt compressor is installed on the main push-towing rope of original state;
2)Tension rod and top nut are installed, then lower half circle bitt compressor and intermediate nut are installed, finally install tight cable distribution beam and under
Portion's nut;
3)30t jack are installed, main push-towing rope section is tightened up by jack tension tension rod, until reaching the section that design needs
Voidage;Because the radius of bitt compressor is calculated according to the voidage that design needs, the out-of-roundness for tightening up rear main push-towing rope is automatically full
Foot design needs;
4)Main push-towing rope section is fixed with strap, tight cable tool structure is removed and is moved on to next main push-towing rope section operation.
2. the tight cable tool structure of main rope of suspension bridge as claimed in claim 1, is characterized in that described upper semi-circle bitt compressor and lower half circle
The semi-circular ends of bitt compressor set chamfering, and when being easy to tighten up main push-towing rope, main push-towing rope steel wire is smoothly wedged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510912649.5A CN105507129B (en) | 2015-12-11 | 2015-12-11 | Suspension bridge main cable tightening tool structure and design method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510912649.5A CN105507129B (en) | 2015-12-11 | 2015-12-11 | Suspension bridge main cable tightening tool structure and design method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105507129A CN105507129A (en) | 2016-04-20 |
CN105507129B true CN105507129B (en) | 2017-04-19 |
Family
ID=55715408
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510912649.5A Active CN105507129B (en) | 2015-12-11 | 2015-12-11 | Suspension bridge main cable tightening tool structure and design method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105507129B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114941288B (en) * | 2022-03-16 | 2023-05-09 | 中铁九桥工程有限公司 | Construction method for suspension bridge loose cable sleeve |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07180111A (en) * | 1993-12-24 | 1995-07-18 | Nippon Steel Corp | Press quiz machine for suspension bridge |
JPH10237820A (en) * | 1997-02-26 | 1998-09-08 | Ishikawajima Harima Heavy Ind Co Ltd | Fastening molding device of suspension bridge main cable |
CN200985492Y (en) * | 2006-12-26 | 2007-12-05 | 中交第二公路工程局有限公司 | Construction positioning device for suspending bridge main cable |
CN101173501A (en) * | 2007-11-26 | 2008-05-07 | 中铁大桥局集团第七工程有限公司 | Cable jam-packed machine and its jamming method |
CN101210414A (en) * | 2006-12-26 | 2008-07-02 | 中交第二公路工程局有限公司 | Fastening positioning device for suspension bridge main cable construction |
CN202073039U (en) * | 2011-04-11 | 2011-12-14 | 西南交通大学 | Mechanical automatic cable clamping device for cable operation |
CN203530861U (en) * | 2013-11-11 | 2014-04-09 | 重庆万桥交通科技发展有限公司 | Cable fastening device for super-large-sized steel strand inhaul cable |
CN103758042A (en) * | 2014-01-16 | 2014-04-30 | 中交第一公路工程局有限公司 | Cable compacting machine |
-
2015
- 2015-12-11 CN CN201510912649.5A patent/CN105507129B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07180111A (en) * | 1993-12-24 | 1995-07-18 | Nippon Steel Corp | Press quiz machine for suspension bridge |
JPH10237820A (en) * | 1997-02-26 | 1998-09-08 | Ishikawajima Harima Heavy Ind Co Ltd | Fastening molding device of suspension bridge main cable |
CN200985492Y (en) * | 2006-12-26 | 2007-12-05 | 中交第二公路工程局有限公司 | Construction positioning device for suspending bridge main cable |
CN101210414A (en) * | 2006-12-26 | 2008-07-02 | 中交第二公路工程局有限公司 | Fastening positioning device for suspension bridge main cable construction |
CN101173501A (en) * | 2007-11-26 | 2008-05-07 | 中铁大桥局集团第七工程有限公司 | Cable jam-packed machine and its jamming method |
CN202073039U (en) * | 2011-04-11 | 2011-12-14 | 西南交通大学 | Mechanical automatic cable clamping device for cable operation |
CN203530861U (en) * | 2013-11-11 | 2014-04-09 | 重庆万桥交通科技发展有限公司 | Cable fastening device for super-large-sized steel strand inhaul cable |
CN103758042A (en) * | 2014-01-16 | 2014-04-30 | 中交第一公路工程局有限公司 | Cable compacting machine |
Also Published As
Publication number | Publication date |
---|---|
CN105507129A (en) | 2016-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101967796B (en) | Method for arranging parallel steel wire stay cable | |
CN204266120U (en) | Guy of twisted steel cable single tendon stretch anchoring converter | |
CN104631329A (en) | Method for adjusting overall line shape of continuous catwalk of suspension bridge | |
CN105507129B (en) | Suspension bridge main cable tightening tool structure and design method | |
CN106401196A (en) | Steel strand tensioning device for pre-stressed anchorage device | |
CN202461363U (en) | Disc steel bar straightening machine for building | |
CN105952160A (en) | Prestressing double-cable synchronous tensioning tool | |
CN203282420U (en) | Double conductor tension indicating wire grip | |
CN201803895U (en) | Drawing force tooling | |
CN104724615A (en) | Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane | |
CN201152732Y (en) | Portable leading screw calibrator | |
CN205917366U (en) | Broken strand device of wire rope | |
CN102155094A (en) | Method for controlling pre-stress tension failure for reinforced concrete | |
CN203756202U (en) | Rapid feeder for vertical anchor cable | |
CN205061461U (en) | Area promotes preloading device's lifting jack | |
CN201737517U (en) | Waste lead recovery device | |
CN106087748B (en) | A kind of steel strand stay cable Suo Fangfa | |
CN202586230U (en) | Anti-slip pre-twisted shockproof hammer | |
CN202925477U (en) | Steel strand blanking traction device | |
CN103100581A (en) | Wire unloading method of wire coiling plate of drawing machine | |
CN206667062U (en) | A kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip | |
CN210057199U (en) | Safety belt fixer | |
CN202934683U (en) | Automatic mud strip forming machine control device | |
CN204905824U (en) | Wire rope circle cable plastics dolly | |
CN201195675Y (en) | Cable adjusting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |