CN105507129B - Suspension bridge main cable tightening tool structure and design method - Google Patents

Suspension bridge main cable tightening tool structure and design method Download PDF

Info

Publication number
CN105507129B
CN105507129B CN201510912649.5A CN201510912649A CN105507129B CN 105507129 B CN105507129 B CN 105507129B CN 201510912649 A CN201510912649 A CN 201510912649A CN 105507129 B CN105507129 B CN 105507129B
Authority
CN
China
Prior art keywords
main push
towing rope
tool structure
circle
tight cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510912649.5A
Other languages
Chinese (zh)
Other versions
CN105507129A (en
Inventor
苏宗华
马慧华
孟庆辉
陆亮
张冬华
靳亚军
徐飞麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
2nd Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
2nd Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 2nd Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201510912649.5A priority Critical patent/CN105507129B/en
Publication of CN105507129A publication Critical patent/CN105507129A/en
Application granted granted Critical
Publication of CN105507129B publication Critical patent/CN105507129B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a suspension bridge main cable tightening tool structure. The suspension bridge main cable tightening tool structure is characterized in that an upper semicircular cable tightening device 1, a lower semicircular cable tightening device 2, a cable tightening distribution beam 3, tension rods 4 and 30 t jacks 5 are mounted on a main cable 6, wherein the 30 t jacks 5 are arranged between the cable tightening distribution beam 3 and the lower semicircular cable tightening device 2; the tension rods 4 are used for tightening sections of the main cable 6, and a gap being 1-2 mm is formed between the upper semicircular cable tightening device 1 and the lower semicircular cable tightening device 2. The suspension bridge main cable tightening tool structure has the advantages as follows: the structure can be carried by one worker and operated by two workers as a group, operation workers can be saved, the construction efficiency can be improved, and the construction cost can be saved; the sections of the main cable tightened by the tool has good out-of-roundness, a cable clamp can be mounted smoothly, the cable clamp mounting efficiency is improved, and the working efficiency is improved, so that the cost is saved. The tool structure is concise, convenient to use, rapid, simple, safe and reliable and has great promotional value, components are light, the construction efficiency is high, and the cable tightening effect is good.

Description

The tight cable tool structure of main rope of suspension bridge and method for designing
Technical field
The present invention relates to a kind of tight cable tool structure of new type suspension bridge main push-towing rope and method for designing, are loose by many Single strand section the special frock of the circular cross-section for reaching the voidage that design needs is tightened up into by this frock.Belong to bridge Beam technical field of construction.
Background technology
In existing suspension bridge bridge construction, main push-towing rope is typically made up of many strands, takes partly accepting and partly rejecting between multiply Principle set up when, strand section is non-round, voidage is big, it is impossible to meet install cord clip needs.A kind of instrument is needed for this Loose strand is tightened up the circular cross-section for design needs and reaches voidage and is required.When typically adopting large-scale cable compacting machine, Due to complex structure, cable compacting machine limited amount(General every only 2, bridge)Tight cable efficiency is low, and tight cable out-of-roundness difference is difficult to meet design Need.Conventional cable compacting machine is not suitable for duration nervous suspension bridge main cable construction.
The content of the invention
Proposed by the present invention is a kind of tight cable tool structure of main rope of suspension bridge and design cycle, and its purpose is intended to using steel structure Upper and lower two parts oval structure made by part, by jack tension upper lower half circle is tightened up, and reaches the voidage that design needs, Simultaneously out-of-roundness reaches control well, facilitates follow-up installing Cable-clamp.
The technical solution of the present invention:
The tight cable tool structure of main rope of suspension bridge, its structure is upper semi-circle bitt compressor 1, lower half circle bitt compressor 2, tight cable distribution beam 3rd, tension rod 4,30t jack 5 are arranged on main push-towing rope 6, wherein being 30t jack between tight cable distribution beam 3 and lower half circle bitt compressor 2 5;Tensioning tension rod 4 has the gap of 1 ~ 2mm tightening up the section of main push-towing rope 6 between upper semi-circle bitt compressor 1 and lower half circle bitt compressor 2.
The method for designing of the tight cable tool structure of main rope of suspension bridge, comprises the steps:
1)Upper semi-circle bitt compressor 1 is installed on the main push-towing rope of original state;
2)Tension rod 4 and top nut are installed, then lower half circle bitt compressor 2 and intermediate nut are installed, tight cable distribution is finally installed Beam 3 and lower nuts;
3)30t jack 5 are installed, the section of main push-towing rope 6 is tightened up by jack tension tension rod, until reaching design needs Section voidage;Because the radius of bitt compressor is calculated according to the voidage that design needs, the out-of-roundness of rear main push-towing rope 6 is tightened up Automatically design needs are met;
4)Main push-towing rope section is fixed with strap, tight cable tool structure is removed and is moved on to next main push-towing rope section operation.
Advantages of the present invention:Using this kind of tight cable frock, many operations can be realized with many sets of little cost manufacture, dispersion construction Construct simultaneously in face;It is simultaneously simple for structure, it is easy to operation, tight cable speed is fast;Using Manual tightening, control out-of-roundness can be in real time measured And voidage, tight cable quality is easily controlled.Low cost when this tight cable frock is constructed, it is fast and convenient, it is safe and reliable, with larger Promotional value.
Description of the drawings
Accompanying drawing 1 is the tight cable frock general assembly drawing of main rope of suspension bridge.
Fig. 2-1 is the schematic diagram that upper semi-circle bitt compressor is installed on main push-towing rope.
Insert for Fig. 2-2 pair and lower half circle tightener is installed, finish rolling deformed bar is penetrated, the schematic diagram that two ends are attached the names of pre-determined candidates.
Fig. 2-3 installs reaction beam and jack, installs the schematic diagram of reaction beam back nut.
Main push-towing rope is tightened up in Fig. 2-4 jack finish rolling deformed bar tensioning, until the porosity for needing, is fixed with bailing band After loosen jack, moving on to next place carries out the schematic diagram of tight cable work.
In figure 1 is upper semi-circle bitt compressor, 2 is lower half circle bitt compressor, 3 is tight cable distribution beam, 4 is tension rod, 5 is 30t Jack, 6 be main push-towing rope, 7 be nut.
Specific embodiment
Control Fig. 1, the tight cable frock of main rope of suspension bridge, its structure is upper semi-circle bitt compressor 1, lower half circle bitt compressor 2, tight cable point It is arranged on main push-towing rope 6, wherein being 30t thousand between tight cable distribution beam 3 and lower half circle bitt compressor 2 with beam 3, tension rod 4,30t jack 5 Jin top 5;Tensioning tension rod 4 has 1 ~ 2mm's tightening up the section of main push-towing rope 6 between upper semi-circle bitt compressor 1 and lower half circle bitt compressor 2 Gap.
Control accompanying drawing 2-1,2-2,2-3,2-4, the method for designing of the tight cable tool structure of main rope of suspension bridge, including following step Suddenly:
1)Upper semi-circle bitt compressor 1 is installed on the main push-towing rope of original state;
2)Tension rod 4 and top nut are installed, then lower half circle bitt compressor 2 and intermediate nut are installed, tight cable distribution is finally installed Beam 3 and lower nuts;
3)30t jack 5 are installed, the section of main push-towing rope 6 is tightened up by jack tension tension rod, until reaching design needs Section voidage;Because the radius of bitt compressor is calculated according to the voidage that design needs, the out-of-roundness of rear main push-towing rope 6 is tightened up Automatically design needs are met;
4)Main push-towing rope section is fixed with strap, tight cable tool structure is removed and is moved on to next main push-towing rope section operation.
The effect of described 30t jack 5 is mainly tensioning tension rod 4 to tighten up the section of main push-towing rope 6, selects appropriate height Jack selects the jack of appropriate tonnage can reach tight cable can be put between tight cable distribution beam 3 and lower half circle bitt compressor 2 Objective air void, general 30t can meet needs.
During processing tool equipment, note there should be 1 ~ 2mm gaps between upper semi-circle bitt compressor 1 and lower half circle bitt compressor 2, protect Card both fit clearances, at the same between coating butter, to reduce frictional force.
The semi-circular ends of upper semi-circle bitt compressor 1 and lower half circle bitt compressor 2 set chamfering, when being easy to tighten up main push-towing rope 6, main push-towing rope steel wire Smoothly wedging.

Claims (2)

1. the tight cable tool structure of main rope of suspension bridge, it is characterized in that upper semi-circle bitt compressor, lower half circle bitt compressor, tight cable distribution beam, Pull bar, 30t jack are arranged on main push-towing rope, wherein being 30t jack between tight cable distribution beam and lower half circle bitt compressor;Tensioning tensioning Bar has the gap of 1 ~ 2mm tightening up the section of main push-towing rope between upper semi-circle bitt compressor and lower half circle bitt compressor;
The method for designing of the tight cable tool structure of main rope of suspension bridge comprises the steps:
1)Upper semi-circle bitt compressor is installed on the main push-towing rope of original state;
2)Tension rod and top nut are installed, then lower half circle bitt compressor and intermediate nut are installed, finally install tight cable distribution beam and under Portion's nut;
3)30t jack are installed, main push-towing rope section is tightened up by jack tension tension rod, until reaching the section that design needs Voidage;Because the radius of bitt compressor is calculated according to the voidage that design needs, the out-of-roundness for tightening up rear main push-towing rope is automatically full Foot design needs;
4)Main push-towing rope section is fixed with strap, tight cable tool structure is removed and is moved on to next main push-towing rope section operation.
2. the tight cable tool structure of main rope of suspension bridge as claimed in claim 1, is characterized in that described upper semi-circle bitt compressor and lower half circle The semi-circular ends of bitt compressor set chamfering, and when being easy to tighten up main push-towing rope, main push-towing rope steel wire is smoothly wedged.
CN201510912649.5A 2015-12-11 2015-12-11 Suspension bridge main cable tightening tool structure and design method Active CN105507129B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510912649.5A CN105507129B (en) 2015-12-11 2015-12-11 Suspension bridge main cable tightening tool structure and design method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510912649.5A CN105507129B (en) 2015-12-11 2015-12-11 Suspension bridge main cable tightening tool structure and design method

Publications (2)

Publication Number Publication Date
CN105507129A CN105507129A (en) 2016-04-20
CN105507129B true CN105507129B (en) 2017-04-19

Family

ID=55715408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510912649.5A Active CN105507129B (en) 2015-12-11 2015-12-11 Suspension bridge main cable tightening tool structure and design method

Country Status (1)

Country Link
CN (1) CN105507129B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114941288B (en) * 2022-03-16 2023-05-09 中铁九桥工程有限公司 Construction method for suspension bridge loose cable sleeve

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07180111A (en) * 1993-12-24 1995-07-18 Nippon Steel Corp Press quiz machine for suspension bridge
JPH10237820A (en) * 1997-02-26 1998-09-08 Ishikawajima Harima Heavy Ind Co Ltd Fastening molding device of suspension bridge main cable
CN200985492Y (en) * 2006-12-26 2007-12-05 中交第二公路工程局有限公司 Construction positioning device for suspending bridge main cable
CN101173501A (en) * 2007-11-26 2008-05-07 中铁大桥局集团第七工程有限公司 Cable jam-packed machine and its jamming method
CN101210414A (en) * 2006-12-26 2008-07-02 中交第二公路工程局有限公司 Fastening positioning device for suspension bridge main cable construction
CN202073039U (en) * 2011-04-11 2011-12-14 西南交通大学 Mechanical automatic cable clamping device for cable operation
CN203530861U (en) * 2013-11-11 2014-04-09 重庆万桥交通科技发展有限公司 Cable fastening device for super-large-sized steel strand inhaul cable
CN103758042A (en) * 2014-01-16 2014-04-30 中交第一公路工程局有限公司 Cable compacting machine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07180111A (en) * 1993-12-24 1995-07-18 Nippon Steel Corp Press quiz machine for suspension bridge
JPH10237820A (en) * 1997-02-26 1998-09-08 Ishikawajima Harima Heavy Ind Co Ltd Fastening molding device of suspension bridge main cable
CN200985492Y (en) * 2006-12-26 2007-12-05 中交第二公路工程局有限公司 Construction positioning device for suspending bridge main cable
CN101210414A (en) * 2006-12-26 2008-07-02 中交第二公路工程局有限公司 Fastening positioning device for suspension bridge main cable construction
CN101173501A (en) * 2007-11-26 2008-05-07 中铁大桥局集团第七工程有限公司 Cable jam-packed machine and its jamming method
CN202073039U (en) * 2011-04-11 2011-12-14 西南交通大学 Mechanical automatic cable clamping device for cable operation
CN203530861U (en) * 2013-11-11 2014-04-09 重庆万桥交通科技发展有限公司 Cable fastening device for super-large-sized steel strand inhaul cable
CN103758042A (en) * 2014-01-16 2014-04-30 中交第一公路工程局有限公司 Cable compacting machine

Also Published As

Publication number Publication date
CN105507129A (en) 2016-04-20

Similar Documents

Publication Publication Date Title
CN101967796B (en) Method for arranging parallel steel wire stay cable
CN204266120U (en) Guy of twisted steel cable single tendon stretch anchoring converter
CN104631329A (en) Method for adjusting overall line shape of continuous catwalk of suspension bridge
CN105507129B (en) Suspension bridge main cable tightening tool structure and design method
CN106401196A (en) Steel strand tensioning device for pre-stressed anchorage device
CN202461363U (en) Disc steel bar straightening machine for building
CN105952160A (en) Prestressing double-cable synchronous tensioning tool
CN203282420U (en) Double conductor tension indicating wire grip
CN201803895U (en) Drawing force tooling
CN104724615A (en) Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane
CN201152732Y (en) Portable leading screw calibrator
CN205917366U (en) Broken strand device of wire rope
CN102155094A (en) Method for controlling pre-stress tension failure for reinforced concrete
CN203756202U (en) Rapid feeder for vertical anchor cable
CN205061461U (en) Area promotes preloading device's lifting jack
CN201737517U (en) Waste lead recovery device
CN106087748B (en) A kind of steel strand stay cable Suo Fangfa
CN202586230U (en) Anti-slip pre-twisted shockproof hammer
CN202925477U (en) Steel strand blanking traction device
CN103100581A (en) Wire unloading method of wire coiling plate of drawing machine
CN206667062U (en) A kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip
CN210057199U (en) Safety belt fixer
CN202934683U (en) Automatic mud strip forming machine control device
CN204905824U (en) Wire rope circle cable plastics dolly
CN201195675Y (en) Cable adjusting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant