CN206667062U - A kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip - Google Patents

A kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip Download PDF

Info

Publication number
CN206667062U
CN206667062U CN201720243457.4U CN201720243457U CN206667062U CN 206667062 U CN206667062 U CN 206667062U CN 201720243457 U CN201720243457 U CN 201720243457U CN 206667062 U CN206667062 U CN 206667062U
Authority
CN
China
Prior art keywords
depression
bar
main
rope
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720243457.4U
Other languages
Chinese (zh)
Inventor
庞庆
王志强
杨浩
单晓东
孙存良
张占国
丁功茂
刘帅帅
蔡悬
王鹏
王浩
孙凯
张森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co Ltd
CCCC Fourth Highway Engineering Co Ltd
Original Assignee
Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co Ltd
CCCC Fourth Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co Ltd, CCCC Fourth Highway Engineering Co Ltd filed Critical Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co Ltd
Priority to CN201720243457.4U priority Critical patent/CN206667062U/en
Application granted granted Critical
Publication of CN206667062U publication Critical patent/CN206667062U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip, including two depression bars being vertically arranged, the upper end of two depression bars is equipped with through hole, and a pull bar activity is interspersed in the through hole of two depression bar upper ends, and the both ends of the pull bar are equipped with stop nut;Weld one and stretch out and the horizontal force bar vertical with depression bar, the hook of a chain block one end and the suspension hook of the other end are articulated on two horizontal force bars respectively in the lower end of two depression bars.

Description

A kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip
Technical field
This belongs to cord clip of suspension bridge installation field using new, and in particular to fastening master when one kind coordinates installing Cable-clamp Cable, the device for preventing wired or scraping and compressing main push-towing rope temporarily.
Background technology
In suspension bridge bridge structure, cord clip be used for connect main push-towing rope and hoist cable, be undertake bridge deck deadweight and mobile load it is important Primary structure member.Main rope of suspension bridge cord clip installation surveying and locating is typically carried out at temperature stable night, but installing Cable-clamp one As select daytime carry out, during installing Cable-clamp, often due to temperature influence and main push-towing rope deadweight reason, cause main push-towing rope in approximation Ellipse, installation difficulty is may result under this state during installing Cable-clamp, or wired, scraping phenomenon occur, to main push-towing rope knot It is configured to damage.
The content of the invention
The purpose of this utility model is to provide the device that main push-towing rope is fastened during a kind of cord clip of suspension bridge installation, is applied in installing Cable-clamp It in man-hour, can guarantee that installing Cable-clamp is smoothed out, and be avoided that wired, scraping causes to damage to main push-towing rope.
The technical solution of the utility model is as follows:
A kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip, it is characterised in that:It is vertically arranged including two Depression bar, the upper end of two depression bars is equipped with through hole, and a pull bar activity is interspersed in the through hole of two depression bar upper ends, the two of the pull bar End is equipped with stop nut;The lower end of two depression bars is welded one and stretched out and the horizontal force bar vertical with depression bar, and one pulls The hook of cucurbit one end and the suspension hook of the other end are articulated on two horizontal force bars respectively.
The utility model fastens main push-towing rope temporarily in installing Cable-clamp, in cord clip neighbouring position, when can avoid installing Cable-clamp Because external environmental factor and main push-towing rope self reason cause main push-towing rope non-round and wired, scraping phenomenon is produced, ensures that installing Cable-clamp is suitable Profit is carried out, and improves installing Cable-clamp efficiency, ensures installing Cable-clamp quality.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
As shown in figure 1, the utility model includes two depression bars 1 being vertically arranged, the upper ends of two depression bars is equipped with through hole, one The activity of pull bar 2 is interspersed in the through hole of two depression bar upper ends, and the both ends of the pull bar 2 are equipped with stop nut 3;Under two depression bars 1 End welding one stretches out and the horizontal force bar 4 vertical with depression bar, the hook 6 of the one end of a chain block 5 and the other end Suspension hook 7 is articulated on two horizontal force bars 4 respectively.
As the utility model one embodiment, compressor arm can use channel-section steel Two bors d's oeuveres, be welded between Two bors d's oeuveres using channel-section steel, upper end Through hole is cut, for interting pull bar;Pull bar uses fining twisted steel, and diameter is less than the through hole of depression bar upper end, is conveniently adjusted two pressures Spacing between bar, two nuts are installed at pull bar both ends, for spacing to depression bar;The horizontal force bar of depression bar lower end welding is also adopted With channel-section steel, notch is upward, and a breach is cut among notch, for mounting the hook and suspension hook of chain block;Using common 2t chain blocks, chain block one end be provided with hook, one end is provided with suspension hook.
When the utility model is used to coordinate installing Cable-clamp, chain block 5 is first removed, installing Cable-clamp position is hung over by pull bar 2 On main push-towing rope 8 near putting, by two stop nuts 3 at the both ends of adjusting yoke 2, make the width between the upper end of two depression bar 1 smaller In cord clip internal diameter, then the suspension hook 6 of chain block 5 and hook 7 are hung on two horizontal force bars 4, pull chain block Guide chain, the stress of two depression bar 1 is set to extrude main push-towing rope 8, until two parts notch smoothly closes up cord clip up and down.Treat that cord clip bolt fastens Afterwards, chain block is unclamped, the device is transferred into the next position continues to coordinate installing Cable-clamp.

Claims (1)

  1. A kind of 1. main push-towing rope fastener for the installation of main rope of suspension bridge cord clip, it is characterised in that:It is vertically arranged including two Depression bar, the upper end of two depression bars are equipped with through hole, and a pull bar activity is interspersed in the through hole of two depression bar upper ends, the both ends of the pull bar It is equipped with stop nut;The lower end of two depression bars is welded one and stretched out and the horizontal force bar vertical with depression bar, and one pulls calabash Lu Yiduan hook and the suspension hook of the other end are articulated on two horizontal force bars respectively.
CN201720243457.4U 2017-03-13 2017-03-13 A kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip Expired - Fee Related CN206667062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720243457.4U CN206667062U (en) 2017-03-13 2017-03-13 A kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720243457.4U CN206667062U (en) 2017-03-13 2017-03-13 A kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip

Publications (1)

Publication Number Publication Date
CN206667062U true CN206667062U (en) 2017-11-24

Family

ID=60376326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720243457.4U Expired - Fee Related CN206667062U (en) 2017-03-13 2017-03-13 A kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip

Country Status (1)

Country Link
CN (1) CN206667062U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442256A (en) * 2018-05-25 2018-08-24 中交四公局第五工程有限公司 A kind of double restrained beams and construction method of the installation of rope-suspension bridge bulk noose

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442256A (en) * 2018-05-25 2018-08-24 中交四公局第五工程有限公司 A kind of double restrained beams and construction method of the installation of rope-suspension bridge bulk noose

Similar Documents

Publication Publication Date Title
CN203967713U (en) For the terminal clamping device of crane cable
CN104242152A (en) Lifting device for lifting overhead ground wire on straight concrete pole
CN207878295U (en) Suspension bridge changes rope device
CN206667062U (en) A kind of main push-towing rope fastener for the installation of main rope of suspension bridge cord clip
CN106401196A (en) Steel strand tensioning device for pre-stressed anchorage device
CN205591632U (en) Pole setting device
CN203281765U (en) Special tool for stay wire making
CN203382365U (en) Lifting appliance system for lifting thin, long and thin-wall equipment integrally
CN205222470U (en) Ideophone of falling L protective screen acoustic baffle installation gallows
CN211521362U (en) Aluminum profile lifting device
CN206815182U (en) A kind of suspension arrangement of bridge maintaining
CN203438182U (en) Chain tensioning tool
CN205377164U (en) Special fixture of large -tonnage II type suspension insulator wire end
CN210482007U (en) Slab band device at bottom of bridge hollow slab
CN207361602U (en) A kind of steel structure hoisting instrument
CN205892550U (en) Flexible hoist and mount system of suspension bridge stiffening beam
CN202284115U (en) Device for lifting side wall of automobile
CN206693730U (en) Composite construction formula power transmission tower
CN203813318U (en) Clamp for connecting power steel strands with sleeve
CN218094692U (en) FPSO module major diameter oil gas pipeline hoisting machine constructs
CN202575837U (en) Multipurpose lifting pulley
CN216235585U (en) Track hoisting device
CN203474251U (en) Crane suspension hook anti-falloff locking plate device
CN202561404U (en) Hoisting device
CN220735980U (en) Anti-falling safety rope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171124

CF01 Termination of patent right due to non-payment of annual fee