CN218094692U - FPSO module major diameter oil gas pipeline hoisting machine constructs - Google Patents

FPSO module major diameter oil gas pipeline hoisting machine constructs Download PDF

Info

Publication number
CN218094692U
CN218094692U CN202221922362.2U CN202221922362U CN218094692U CN 218094692 U CN218094692 U CN 218094692U CN 202221922362 U CN202221922362 U CN 202221922362U CN 218094692 U CN218094692 U CN 218094692U
Authority
CN
China
Prior art keywords
gas pipeline
major diameter
diameter oil
oil gas
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221922362.2U
Other languages
Chinese (zh)
Inventor
海燕
黄奇峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bomesc Offshore Engineering Co Ltd
Original Assignee
Bomesc Offshore Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bomesc Offshore Engineering Co Ltd filed Critical Bomesc Offshore Engineering Co Ltd
Priority to CN202221922362.2U priority Critical patent/CN218094692U/en
Application granted granted Critical
Publication of CN218094692U publication Critical patent/CN218094692U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a FPSO module major diameter oil gas pipeline hoisting machine constructs, including installing the pipeline gallows in the oil gas pipeline left and right sides respectively, be fixed with a hydro-cylinder on the gallows respectively, weld respectively in both sides around last grip block one along the guide post that the horizontal direction set up, two guide posts are inserted respectively around correspond the guide way of the connecting plate that sets up and can be followed the guide way and slided from top to bottom. The FPSO module major diameter oil gas pipeline hoist and mount in-process has been solved to this structure receives the influence of environmental factor, solves phenomenons such as the easy landing of hoist and mount in-process major diameter pipeline, easy mousing-hook, the utility model discloses the suitability is high, the laminating degree is high, is difficult for droing, has guaranteed the security performance of major diameter oil gas pipeline hoist and mount process, improves hoist and mount efficiency.

Description

FPSO module major diameter oil gas pipeline hoisting machine constructs
Technical Field
The utility model relates to a crane structure of ocean engineering is served FPSO module major diameter oil gas pipeline hoisting machine very much and is constructed.
Background
In the ocean engineering FPSO construction process, the large-diameter oil-gas pipeline needs to be welded in advance and then installed in a hoisting mode. In the installation of FPSO module major diameter oil gas pipeline, the method that often adopts is that the mode that adopts the hoist to carry out combined hoisting is gone on, the mode that this kind of hoist combined hoisting needs to go on in step, can not receive weather environment's such as wind, rain influence at the hoist and mount in-process, and at the in-process of hoist and mount, the mode that constructor adopted usually is tied up with wire rope, then adopt the hoist to hoist and mount again, this kind of mode of tying up produces major diameter pipeline landing, phenomenons such as unhook very easily at the hoist and mount in-process, can cause serious hoist and mount accident under the serious condition. Therefore, the utility model provides a FPSO major diameter oil gas pipeline hoisting machine constructs.
Disclosure of Invention
An object of the utility model is to overcome prior art's is not enough, provide a hoisting machine who serves FPSO module major diameter oil gas pipeline constructs. When the large-diameter pipeline of the FPSO module is hoisted, the problems of pipeline slipping, unhooking and the like caused by external influence during hoisting of the large-diameter pipeline in the hoisting process are solved, and hoisting accidents are reduced, so that the hoisting requirement on the large-diameter pipeline is met.
In order to achieve the above object, the utility model adopts the following technical scheme:
FPSO module major diameter oil gas pipeline hoisting machine construct, including installing the pipeline gallows in the oil gas pipeline left and right sides respectively, each the pipeline gallows include the last roof that sets up along the horizontal direction, four connecting plate roofs that set up along vertical direction are fixed respectively around last roof on the diapire of border position department about both sides, it has the guide way to open along vertical direction on each connecting plate, be fixed with an hydro-cylinder respectively in the left and right sides of last roof, the telescopic link of each hydro-cylinder passes the roof and the tip passes through the nut and links to each other with last grip block is fixed along vertical direction, it has a guide post that sets up along the horizontal direction to weld respectively in both sides around last grip block, two guide posts are inserted respectively and are corresponded the guide way of the connecting plate that sets up around and can be followed the guide way and slide from top to bottom. The top wall of a lower clamping plate is fixedly connected with the bottom walls of the four connecting plates respectively.
The utility model has the advantages that:
the utility model discloses a hydraulic pressure centre gripping scheme has solved the FPSO module major diameter oil gas pipeline hoist and mount in-process and has received the influence of environmental factor, solves phenomenons such as the easy landing of major diameter pipeline, easy unhook among the hoist and mount process, the utility model discloses the suitability is high, the laminating degree is high, is difficult for droing, has guaranteed the security performance of major diameter oil gas pipeline hoist and mount process, improves hoist and mount efficiency.
Drawings
FIG. 1 is an installation diagram of a large-diameter oil and gas pipeline hoisting mechanism of the FPSO module of the utility model;
FIG. 2 is a front view of the pipeline hanger of the present invention;
figure 3 is a side view of the pipeline hanger of the present invention.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
As shown in the attached drawings, the FPSO module major diameter oil gas pipeline hoisting mechanism comprises pipeline hangers 2 respectively arranged at the left and right sides of a major diameter oil gas pipeline 1.
Each pipeline hanger 2 comprises an upper top plate 2-1 arranged in the horizontal direction, top walls of four connecting plates 2-2 arranged in the vertical direction are respectively fixed on bottom walls at the left and right edge positions of the front and back sides of the upper top plate 2-1, a guide groove is formed in each connecting plate 2-2 in the vertical direction, oil cylinders 2-3 are respectively fixed on the left and right sides of the upper top plate 2-1, a telescopic rod of each oil cylinder 2-3 penetrates through the upper top plate 2-1 in the vertical direction, the end part of each oil cylinder is fixedly connected with an upper clamping plate 2-4 through nuts 2-5, guide columns 2-7 arranged in the horizontal direction are respectively welded on the front and back sides of the upper clamping plate 2-4, and the two guide columns 2-7 are respectively inserted into the guide grooves of the connecting plates 2-2 correspondingly arranged in the front and back directions and can slide up and down along the guide grooves. The top wall of one lower clamping plate 2-8 is fixedly connected with the bottom walls of the four connecting plates 2-2 respectively.
Rubber layers 2-6 are respectively bonded on the bottom wall of the upper clamping plate 2-4 and the top wall of the lower clamping plate 2-8.
Two lifting lugs 2-9 are respectively fixed at the left and right ends of the front and rear sides of the top wall of the upper top plate 2-1 of each pipeline hanger 2, and the two lifting lugs 2-9 at the front side and the two lifting lugs at the rear side are respectively connected to a lifting ring 4 of a crane through steel strands 3.
Preferably, the upper clamping plate 2-4 and the lower clamping plate 2-8 are in a V-shaped structure.
The specific working principle is as follows:
retracting telescopic rods of oil cylinders 2-3 of a pipeline hanger 2, respectively installing the pipeline hanger 2 on the left side and the right side of a large-diameter oil-gas pipeline 1, wherein the bottom end of a steel strand 3 is tied and fixed on lifting lugs 2-9 of the pipeline hanger 2, the top of the steel strand is tied and fixed on a lifting ring 4, and the lifting ring 4 is installed on a lifting hook of a crane. After the installation is finished, the telescopic rods of the oil cylinders 2-3 of the pipeline hanging bracket 2 are extended out, the large-diameter oil-gas pipeline 1 is clamped on the lower clamping plates 2-8 through the upper clamping plates 2-4, after the clamping is finished, a hoisting worker operates a crane to hoist the large-diameter oil-gas pipeline 1 to the installation position, after the hoisting is finished, the telescopic rods of the oil cylinders 2-3 of the pipeline hanging bracket 2 are retracted, the pipeline hanging bracket 2 is detached, and next hoisting preparation is carried out.

Claims (4)

  1. FPSO module major diameter oil gas pipeline hoisting machine constructs, its characterized in that: including installing the pipeline gallows in the major diameter oil gas pipeline left and right sides respectively, each the pipeline gallows include the last roof that sets up along the horizontal direction, four connecting plate roof that set up along vertical direction are fixed respectively on the diapire of border position department about both sides around last roof, it has the guide way to open along vertical direction on each connecting plate, be fixed with an hydro-cylinder respectively in the left and right sides of last roof, the telescopic link of each hydro-cylinder passes last roof and the tip passes through the nut and links to each other with last grip block is fixed along vertical direction, it has a guide post that sets up along the horizontal direction to weld respectively in both sides around last grip block, two guide posts are inserted respectively around corresponding in the guide way of the connecting plate that sets up and can be followed the guide way and slided from top to bottom, the roof of grip block links to each other with the diapire of four connecting plates is fixed respectively.
  2. 2. The FPSO module major diameter oil and gas pipeline hoisting mechanism of claim 1, wherein: rubber layers are respectively bonded on the bottom wall of the upper clamping plate and the top wall of the lower clamping plate.
  3. 3. The FPSO module large-diameter oil-gas pipeline hoisting mechanism of claim 1 or 2, characterized in that: the upper clamping plate and the lower clamping plate are of V-shaped structures.
  4. 4. The FPSO module major diameter oil and gas pipeline hoisting mechanism of claim 3, wherein: the left end and the right end of the front side and the rear side of the top wall of the upper top plate of each pipeline hanging bracket are respectively fixed with a lifting lug, and the two lifting lugs on the front side and the two lifting lugs on the rear side are respectively connected to a lifting ring of a crane through steel strands.
CN202221922362.2U 2022-07-25 2022-07-25 FPSO module major diameter oil gas pipeline hoisting machine constructs Active CN218094692U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221922362.2U CN218094692U (en) 2022-07-25 2022-07-25 FPSO module major diameter oil gas pipeline hoisting machine constructs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221922362.2U CN218094692U (en) 2022-07-25 2022-07-25 FPSO module major diameter oil gas pipeline hoisting machine constructs

Publications (1)

Publication Number Publication Date
CN218094692U true CN218094692U (en) 2022-12-20

Family

ID=84481697

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221922362.2U Active CN218094692U (en) 2022-07-25 2022-07-25 FPSO module major diameter oil gas pipeline hoisting machine constructs

Country Status (1)

Country Link
CN (1) CN218094692U (en)

Similar Documents

Publication Publication Date Title
CN201460182U (en) Construction trolley on trolley line of bridge crane
CN202358849U (en) Small-size suspension crane
CN106081926A (en) Harbour Radix Saposhnikoviae crane with mechanical arm gripping device
CN102659017B (en) Steel column hoisting system
CN105417403A (en) Method for installing ultrahigh ultra-large type floating crane in dock
CN203112377U (en) Marine wind power generator set split hoisting device
CN102910532A (en) Method for butting and hoisting large box type derricks in air
CN218094692U (en) FPSO module major diameter oil gas pipeline hoisting machine constructs
CN201703776U (en) Inverted lifting device of storage tank
CN106365048A (en) Tower crane convenient to carry
CN206815182U (en) A kind of suspension arrangement of bridge maintaining
CN205590168U (en) Overturning lifting device
CN211644308U (en) Hoisting structure of deck room
CN203173741U (en) Steel strand lifting and clamping device
CN203321336U (en) Device for adopting drilling line to realize lifting of oil rig self-elevating derrick
CN203716876U (en) Separating type workover rig
CN209779465U (en) main tower erects cable-stay bridge's string cable construction system that changes
CN203187370U (en) Inner mast hoisting device
CN205892550U (en) Flexible hoist and mount system of suspension bridge stiffening beam
CN101457516B (en) Multilayer horizontal stay fixing method
CN204959605U (en) Knotted rope hookup
CN104709813A (en) Method for mounting blast furnace framework structure by utilizing transverse hoisting beam
CN216737134U (en) Hoist and mount bent cap support bailey piece
CN218145297U (en) Suspension type pier top platform
CN214989893U (en) Reverse construction hoisting system for large-diameter working well movable formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant