CN102659017B - Steel column hoisting system - Google Patents
Steel column hoisting system Download PDFInfo
- Publication number
- CN102659017B CN102659017B CN201210151470.9A CN201210151470A CN102659017B CN 102659017 B CN102659017 B CN 102659017B CN 201210151470 A CN201210151470 A CN 201210151470A CN 102659017 B CN102659017 B CN 102659017B
- Authority
- CN
- China
- Prior art keywords
- cuff
- steel
- steel column
- rope
- steel bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to a steel column hoisting system, which belongs to the field of construction machinery. The steel column hoisting system is provided with a ferrule, wherein the ferrule is of a square-shaped structure, the three corners of the ferrule are hinged through bolts, a steel penetrating rod is inserted and arranged on the upper side of the other corner, lifting lugs are processed on two opposite side frames of the ferrule, the two lifting lugs are connected with the two lifting lugs below an iron carrying pole via steel wire ropes, the two lifting lugs above the iron carrying pole are hung on a hanging hook of a hoisting machine via the steel wire ropes, a fixed pulley is further mounted on the hanging hook of the hoisting machine, a traction rope is wound on the fixed pulley, and one end of the traction rope is fixed on the steel penetrating rod. The steel column hoisting system disclosed by the invention can mount and detach a hoisting tool on the ground and further has the advantages of high construction efficiency, low safety risk, repeated utilization, no need of changing a steel member and great safety, practicality and economy.
Description
Technical field
The present invention relates to vehicle for construction field, at length say it is a kind of steel column Lift-on/Lift-off System.
Background technology
As everyone knows, detached column lifting conventional in structural steelwork construction is at present, at capital, hanger is set separately, utilize steel bar and automatically-unhooked system to lift, finally hanger is excised, then the touch-up paint of polishing in hanger position, before lifting, on steel column, weld hanger like this, waste of manpower, material resources, financial resources, when hanger excises after rigging out, aspect safety and efficiency, just there will be following several problem: first, during excision, belong to aloft work, no matter be, before rack is installed or after installing, excise, all can not provide a job platform for workmen, therefore a job platform must be artificially set excises, no matter this platform is movable Scaffold or hanging ladder, or even steel cat ladder, all need to spend more manpower or elevator machinery moves man-hour, reduced greatly work efficiency.The second, the cutting of hanger, the work difficulty of polishing are all larger, are difficult to reach requirement in perception.
Summary of the invention
In order to overcome the deficiencies in the prior art, the invention provides a kind of steel column Lift-on/Lift-off System, realized lifting device at ground Assembly &Disassembly, operating efficiency is high, and security risk is low, can reuse, steel member itself is not done to any change again, thereby safety, practicality, economy are all fine.
The technical solution adopted for the present invention to solve the technical problems is: a kind of steel column Lift-on/Lift-off System, be provided with cuff, it is characterized in that, cuff is " mouth " font structure, its three angles are hinged through bolt, the upside at another angle is fitted with steel bar, on relative two frames of cuff, be processed with hanger, two hangers are connected with two hangers of fringed iris herb below through steel rope, two hangers of fringed iris herb top hang on hoisting machinery lift hook through steel rope, a fixed pulley is also installed on hoisting machinery lift hook, on fixed pulley, be wound with hauling rope, one end of hauling rope is fixed on steel bar.
The present invention also can be achieved by the following measures: the lower end of steel bar is connected with safety rope.On cuff, be fixed with a wire rope handling ring, hauling rope passes in wire rope handling ring.
The invention has the beneficial effects as follows, realized lifting device at ground Assembly &Disassembly, operating efficiency is high, and security risk is low, can reuse, and steel member itself is not done to any change again, thereby safety, practicality, economy are all fine.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is structural representation of the present invention, is also the schematic diagram of a kind of embodiment.
Fig. 2 is the schematic diagram of cuff of the present invention.
Fig. 3 is the structural representation of fringed iris herb of the present invention.
1. steel ropes in figure; 2. fringed iris herb; 3. cuff; 4. abacus; 5. steel column; 6. steel bar; 7. wire rope handling ring; 8. fixed pulley; 9. hauling rope; 10. hoisting machinery lift hook, 11. safety ropes.
The specific embodiment
In Fig. 1, the present invention is provided with cuff 3, and cuff 3 is " mouth " font structure, and its three angles are hinged through bolt, and the upside at another angle is fitted with steel bar 6, and the lower end of steel bar 6 is connected with safety rope 11.On relative two frames of cuff 3, be processed with hanger, two hangers are connected with two hangers of fringed iris herb 2 belows through steel rope 1, two hangers of fringed iris herb 2 tops hang on hoisting machinery lift hook 10 through steel rope, a fixed pulley 8 is also installed on hoisting machinery lift hook 10, on fixed pulley 8, be wound with hauling rope 9, one end of hauling rope 9 is fixed on steel bar 6, is fixed with a wire rope handling ring 7 on cuff 3, and hauling rope 9 passes in wire rope handling ring 7.
Cuff 3 of the present invention is four connecting ring type structures, and cuff 3 is " mouth " font when closed, in order to mesh the abacus 4 of steel column." mouth " font cuff 3 interior leading dimensionss are less than abacus 4 outer profile sizes, thereby guarantee that cuff 3 can not come off from steel column abacus 4 in installation process.Three high strength bolts that intersection location is set to not tighten in length and breadth of " mouth " font connect, the 4th the steel bar 6 that connection location is arranged to penetrate up and down, cuff 3 closures when steel bar 6 penetrates, while extracting, cuff 3 can launch, thereby makes the interior leading dimensions of cuff 3 be greater than the object that abacus 4 outer profile sizes depart to reach cuff system and steel column 5.Cuff 3 is comprised of " Π " shape and "T"-shaped steel plate respectively, forms three block plate overlaying states in junction.For guaranteeing the smooth folding of cuff 3, between three ply board is folded, gap is set to 2mm, and more than high strength bolt is lengthened to 15mm than common calculated length, makes nut have enough move places, has guaranteed the smooth folding of cuff 3.
Steel bar 6 is designed to round table-like, after insertion cuff 3, can by cuff 3, not clamped and be difficult to extract.Steel bar 6 lower ends are processed with eyelet hole in order to penetrate safety rope 11, and safety rope 11 is extended down to ground and is dragged tightly by special messenger, and safety rope 11 is not extracted steel bar 6 out can not deviate from cuff 3; Steel bar 6 upper ends and hauling rope 9 one end are tied, on hoisting machinery lift hook 10, hang a fixed pulley 8, the hauling rope 9 of steel bar 6 upper ends extends to ground by fixed pulley 8, after a steel column rigging out, will pull hauling rope 9 downwards pulls out steel bar 6, cuff 3 is opened and then cuff 3 is taken off, thereby reached personnel, makes the cuff 3 in high-altitude and the object of steel column disengaging in terrestrial operation.
Cuff 3 upper ends are connected with a fringed iris herb 2 by steel rope, make steel column 5 automatically in vertical state, have improved steel column 5 installation effectiveness, also easier when cuff 3 departs from steel column 5.
The invention enables lifting device installation and steel column lifting synchronously to carry out, realized lifting device at ground Assembly &Disassembly, operating efficiency is high, security risk is low, can reuse, steel member itself not done to any change again, thereby safety, practicality, economy are all fine.
In engineering, need according to the weight of lifting weight, corresponding wirerope diameter and high strength bolt to be selected, suppose 3 tons of steel column gross weights, steel column state, for lying low, is stood up after cuff installs.Each cuff has four points of connection, supposes that steel column stands up to only have two cover high strength bolts stressed in process.Consider extreme case, only have a set of bolt strained.Connecting joint are that three ply board is folded, and screw rod is subject to double shear.
Claims (1)
1. a steel column Lift-on/Lift-off System, be provided with cuff, it is characterized in that: cuff is " mouth " font structure, its three angles are hinged through bolt, the upside at another angle is fitted with steel bar, on relative two frames of cuff, be processed with hanger, two hangers are connected with two hangers of fringed iris herb below through steel rope, two hangers of fringed iris herb top hang on hoisting machinery lift hook through steel rope, a fixed pulley is also installed on hoisting machinery lift hook, on fixed pulley, be wound with hauling rope, one end of hauling rope is fixed on steel bar, the lower end of described steel bar is connected with safety rope, on described cuff, be fixed with a wire rope handling ring, hauling rope passes in wire rope handling ring, cuff is " mouth " font when closed, in order to mesh the abacus of steel column, in " mouth " font cuff, leading dimensions is less than abacus outer profile size, thereby guarantee that cuff can not come off from steel column abacus in installation process, three high strength bolts that intersection location is set to not tighten in length and breadth of " mouth " font connect, the 4th the steel bar that connection location is arranged to penetrate up and down, when steel bar penetrates, cuff is closed, while extracting, cuff can launch, thereby make leading dimensions in cuff be greater than the object that abacus outer profile size departs to reach cuff system and steel column, cuff is comprised of " Π " shape and "T"-shaped steel plate respectively, in junction, form three block plate overlaying states.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210151470.9A CN102659017B (en) | 2012-05-16 | 2012-05-16 | Steel column hoisting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210151470.9A CN102659017B (en) | 2012-05-16 | 2012-05-16 | Steel column hoisting system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102659017A CN102659017A (en) | 2012-09-12 |
CN102659017B true CN102659017B (en) | 2014-11-26 |
Family
ID=46768642
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210151470.9A Active CN102659017B (en) | 2012-05-16 | 2012-05-16 | Steel column hoisting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102659017B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105257228B (en) * | 2015-10-26 | 2017-10-17 | 中国石油集团西部钻探工程有限公司 | Outlet landwaste collection device is returned for gas underbalance well drilling |
CN107101893A (en) * | 2016-02-22 | 2017-08-29 | 南通太平洋海洋工程有限公司 | The water pressure test sealing frock and hydraulic test method of pipeline |
CN106044536B (en) * | 2016-06-06 | 2017-12-01 | 中国工程物理研究院流体物理研究所 | A kind of lifting device for accelerating cavity centering installation |
CN109368485B (en) * | 2018-11-29 | 2020-11-03 | 聚隆创环保科技(嘉兴)有限公司 | Balanced hoisting accessory of trees for environmental engineering |
CN110143517B (en) * | 2019-06-10 | 2024-07-12 | 中铁十八局集团第二工程有限公司 | Recyclable platform for quick hoisting of steel truss arch rod |
CN112110328A (en) * | 2019-06-21 | 2020-12-22 | 中国航发商用航空发动机有限责任公司 | Aircraft engine turbine disk hoist |
JP7477339B2 (en) | 2020-03-27 | 2024-05-01 | 大和ハウス工業株式会社 | Pillar hanging jig |
CN112340590A (en) * | 2020-09-29 | 2021-02-09 | 中铁二局集团有限公司 | Steel pipe column swivel hoisting device and steel pipe column swivel hoisting method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6102351A (en) * | 1999-03-08 | 2000-08-15 | Akrep; Michael | Uniform section rotary spreader beam |
CN201301173Y (en) * | 2008-10-09 | 2009-09-02 | 天津二十冶建设有限公司 | Auxiliary lifting appliance for large-sized component |
CN201354298Y (en) * | 2008-12-30 | 2009-12-02 | 上海宝冶建设有限公司 | Equalizing beam for hoisting rotor |
CN101723240A (en) * | 2009-12-29 | 2010-06-09 | 广东省工业设备安装公司 | Special fixture for hoisting rectangular section steel column and hoisting method by using same |
CN201850777U (en) * | 2010-11-16 | 2011-06-01 | 中国建筑一局(集团)有限公司 | Special hoisting tool for heavy box-shaped section member |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08218641A (en) * | 1995-02-20 | 1996-08-27 | Penta Ocean Constr Co Ltd | Method of standing up pillar member in the air and device therefor |
JP4274991B2 (en) * | 2004-03-31 | 2009-06-10 | 大和ハウス工業株式会社 | Hanging jig |
CN200985246Y (en) * | 2006-12-27 | 2007-12-05 | 上海汽轮机有限公司 | High-power heavy type steam turbine rotor vertical hoisting tool |
-
2012
- 2012-05-16 CN CN201210151470.9A patent/CN102659017B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6102351A (en) * | 1999-03-08 | 2000-08-15 | Akrep; Michael | Uniform section rotary spreader beam |
CN201301173Y (en) * | 2008-10-09 | 2009-09-02 | 天津二十冶建设有限公司 | Auxiliary lifting appliance for large-sized component |
CN201354298Y (en) * | 2008-12-30 | 2009-12-02 | 上海宝冶建设有限公司 | Equalizing beam for hoisting rotor |
CN101723240A (en) * | 2009-12-29 | 2010-06-09 | 广东省工业设备安装公司 | Special fixture for hoisting rectangular section steel column and hoisting method by using same |
CN201850777U (en) * | 2010-11-16 | 2011-06-01 | 中国建筑一局(集团)有限公司 | Special hoisting tool for heavy box-shaped section member |
Also Published As
Publication number | Publication date |
---|---|
CN102659017A (en) | 2012-09-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102659017B (en) | Steel column hoisting system | |
CN102409838B (en) | Moveable operating platform and method for constructing suspended ceiling of roof by using same | |
CN102900021A (en) | Split mounting type bridge wet joint construction method | |
CN202594610U (en) | I-shaped beam hoisting device for hoisting of pressure steel pipe tiles | |
CN205114843U (en) | Prefabricated post hoist device with unhook function | |
CN204454235U (en) | A kind of novel many suspension centres equalizing bar device | |
CN204529087U (en) | A kind of Lift-on/Lift-off System of ground control decoupling device | |
CN202098968U (en) | Dedicated lifting appliance for balance beam of gantry crane | |
CN203998604U (en) | The be threaded vertical reinforcement erecting equipment of form of employing | |
CN203674618U (en) | Dedicated ladder facilitating operation of 220 KV/ 66 KV in-and-out wire | |
CN103264966A (en) | Self-hoisting device and method of dismounting member of tower crane | |
CN201598093U (en) | Hoisting fixture for large-sized sectional box-type beam | |
CN205527435U (en) | Installation and device of dismantling jib loading boom | |
CN205241086U (en) | Template hoist and mount and ann gun carriage of disassembling and using | |
CN106049896A (en) | Dismantling method for resisting impact load in high-altitude overhanging steel-structure-platform dismantling process | |
CN201649606U (en) | Following type elevator hoistway construction platform | |
CN204040598U (en) | The two rocker pole of a kind of remote control hydraulic | |
CN207484292U (en) | Bent cap bed die removes device | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
CN112227378B (en) | Auxiliary device for hoisting reinforcement cage | |
CN104016247B (en) | Hoisting device of weight frame and crane test equipment | |
CN204588457U (en) | Self lighting type steel box column lifting tong device | |
CN211198328U (en) | Fabricated bridge lower pier column lifting appliance | |
CN208869171U (en) | One kind lifting reusable porous grade for steelwork tower truss and hangs lid | |
CN207986495U (en) | A kind of Bridge High-pier main reinforcement hanging apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |