CN207484292U - Bent cap bed die removes device - Google Patents

Bent cap bed die removes device Download PDF

Info

Publication number
CN207484292U
CN207484292U CN201720999584.7U CN201720999584U CN207484292U CN 207484292 U CN207484292 U CN 207484292U CN 201720999584 U CN201720999584 U CN 201720999584U CN 207484292 U CN207484292 U CN 207484292U
Authority
CN
China
Prior art keywords
cover beam
bent cap
fixing
bottom form
bed die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720999584.7U
Other languages
Chinese (zh)
Inventor
王鹏飞
徐峰
郭彦领
杨国红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
THIRD ENGINEERING Co Ltd OF CCCC FOURTH HIGHWAY ENGINEERING Co Ltd
Original Assignee
THIRD ENGINEERING Co Ltd OF CCCC FOURTH HIGHWAY ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by THIRD ENGINEERING Co Ltd OF CCCC FOURTH HIGHWAY ENGINEERING Co Ltd filed Critical THIRD ENGINEERING Co Ltd OF CCCC FOURTH HIGHWAY ENGINEERING Co Ltd
Priority to CN201720999584.7U priority Critical patent/CN207484292U/en
Application granted granted Critical
Publication of CN207484292U publication Critical patent/CN207484292U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to highway bridge construction technical field, more particularly to a kind of bent cap bed die removes device, including being arranged along bent cap width direction, and the fixing device being fixedly connected with bent cap, the both ends of the fixing device are connected with hoist engine, the hoist engine is connect by steel wire rope and with the hook that the steel wire rope is connect with bent cap bed die, for providing upward pulling force for the bent cap bed die in demolishing process.The utility model is simple and strong in structure, can slowly fall by the hoist engine being fixed on above bent cap when removing capping beam template and anchor ear, achievees the effect that whole form removal, while without using crane, and can ensure safety of workers.

Description

盖梁底模拆除装置Bottom mold removal device for cover beam

技术领域technical field

本实用新型属于公路桥梁建设技术领域,尤其涉及一种盖梁底模拆除装置。The utility model belongs to the technical field of highway and bridge construction, in particular to a device for removing a bottom formwork of a cover beam.

背景技术Background technique

目前,在公路桥梁建设中广泛应用的拆除盖梁底模方式一般采用人工配合吊车拆除,在拆除过程中,施工人员站立在底模附近,安全隐患较大;另外抱箍及底模需要逐个的拆除,占用吊车时间较长,有待进一步改进。At present, the method of dismantling the bottom formwork of cover beams, which is widely used in highway bridge construction, is generally removed manually with a crane. During the demolition process, construction personnel stand near the bottom formwork, which poses a great safety hazard; It takes a long time to dismantle the crane and needs further improvement.

实用新型内容Utility model content

为解决上述技术问题,本实用新型的目的是提供一种结构简单牢固、能够保障工人安全且有助于拆除桥梁盖梁底模、抱箍的拆除装置。In order to solve the above technical problems, the purpose of this utility model is to provide a simple and firm structure, which can ensure the safety of workers and help to remove the bottom formwork and hoop of the bridge cover beam.

本实用新型提供了一种盖梁底模拆除装置,包括沿盖梁宽度方向布置,且与盖梁固定连接的固定装置,固定装置的两端连接有卷扬机,卷扬机通过钢丝绳及与钢丝绳连接的挂钩与盖梁底模连接,用于为拆除过程中的盖梁底模提供向上的拉力。The utility model provides a device for removing the bottom mold of the cover beam, which includes a fixing device arranged along the width direction of the cover beam and fixedly connected with the cover beam. The two ends of the fixing device are connected with a hoist, and the hoist passes through a steel wire rope and a hook connected with the steel wire rope. Connected with the cap beam bottom form, it is used to provide upward pulling force for the cap beam bottom form during demolition.

进一步地,固定装置包括与盖梁顶面连接的第一固定件及与盖梁侧面连接的第二固定件,第一固定件与第二固定件固定连接。Further, the fixing device includes a first fixing piece connected to the top surface of the cover girder and a second fixing piece connected to the side surface of the cover girder, and the first fixing piece is fixedly connected to the second fixing piece.

进一步地,第一固定件及第二固定件由工字钢制成。Further, the first fixing piece and the second fixing piece are made of I-shaped steel.

进一步地,卷扬机布置于盖梁的两侧,并与第一固定件固定连接。Further, the hoist is arranged on both sides of the cover beam and is fixedly connected with the first fixing member.

进一步地,卷扬机通过螺栓与第一固定件固定连接。Further, the hoist is fixedly connected to the first fixing member through bolts.

进一步地,固定装置与支撑盖梁的立柱对应布置。Further, the fixing device is arranged correspondingly to the column supporting the cover beam.

进一步地,挂钩连接盖梁底模与立柱的连接端。Further, the hook is connected to the connecting end of the bottom form of the cover beam and the column.

借由上述方案,该盖梁底模拆除装置,结构简单牢固,在拆除盖梁模板和抱箍时能借助固定在盖梁上面的卷扬机缓缓下落,达到整体拆模的效果,同时无需使用吊车,且能保障工人安全。With the above scheme, the device for removing the bottom formwork of the cover beam has a simple and firm structure. When removing the formwork and hoop of the cover beam, it can be slowly lowered by means of the winch fixed on the cover beam, so as to achieve the effect of overall form removal without using a crane , and can guarantee the safety of workers.

上述说明仅是本实用新型技术方案的概述,为了能够更清楚了解本实用新型的技术手段,并可依照说明书的内容予以实施,以下以本实用新型的较佳实施例并配合附图详细说明如后。The above description is only an overview of the technical solution of the utility model. In order to understand the technical means of the utility model more clearly and implement it according to the contents of the specification, the following is a detailed description of the preferred embodiment of the utility model with accompanying drawings. back.

附图说明Description of drawings

图1是本实用新型盖梁底模拆除装置的结构示意图;Fig. 1 is the structural representation of the utility model cap beam bottom form removal device;

图2是本实用新型盖梁底模拆除装置未工作时示意图。Fig. 2 is a schematic diagram when the device for removing the bottom form of the cover beam of the utility model is not working.

图中标号:Labels in the figure:

11-盖梁;12-立柱;13-盖梁底模;14-抱箍;11-cover beam; 12-column; 13-cover beam bottom mold; 14-holding hoop;

21-第一固定件;22-第二固定件;23-卷扬机;24-钢丝绳。21-first fixing part; 22-second fixing part; 23-hoisting machine; 24-wire rope.

具体实施方式Detailed ways

下面结合附图和实施例,对本实用新型的具体实施方式作进一步详细描述。以下实施例用于说明本实用新型,但不用来限制本实用新型的范围。Below in conjunction with accompanying drawing and embodiment, the specific embodiment of the utility model is described in further detail. The following examples are used to illustrate the utility model, but not to limit the scope of the utility model.

参图1及图2所示,本实施例提供了一种盖梁底模拆除装置,包括沿盖梁 11宽度方向布置,且与盖梁11固定连接的固定装置,固定装置的两端连接有卷扬机23,卷扬机23通过钢丝绳24及与钢丝绳24连接的挂钩与盖梁底模13 连接,用于为拆除过程中的盖梁底模13提供向上的拉力。Referring to Fig. 1 and Fig. 2, the present embodiment provides a device for removing the bottom mold of the cover beam, including a fixing device arranged along the width direction of the cover beam 11 and fixedly connected with the cover beam 11, and the two ends of the fixing device are connected with Hoist 23, hoist 23 is connected with cover beam bottom mold 13 through wire rope 24 and the hook connected with wire rope 24, is used for providing upward pulling force for cover beam bottom mold 13 in dismantling process.

本实施例提供的盖梁底模拆除装置,结构简单牢固,在拆除盖梁模板和抱箍时能借助固定在盖梁上面的卷扬机缓缓下落,达到整体拆模的效果,同时也不用占用吊车使用时间,且能保障工人安全。The cover beam bottom form removal device provided in this embodiment has a simple and firm structure. When removing the cover beam formwork and hoops, it can be slowly lowered by means of a hoist fixed on the cover beam to achieve the effect of overall form removal without occupying a crane. Use time, and can guarantee worker safety.

在本实施例中,固定装置包括与盖梁11顶面连接的第一固定件21及与盖梁11侧面连接的第二固定件22,第一固定件21与第二固定件22固定连接,通过将第二固定件22卡接在盖梁11两侧,可将固定装置稳定地固定在盖梁11 上,且结构简单,易于实现,制作成本低。In this embodiment, the fixing device includes a first fixing piece 21 connected to the top surface of the cover beam 11 and a second fixing piece 22 connected to the side surface of the cover beam 11, the first fixing piece 21 is fixedly connected to the second fixing piece 22, By clamping the second fixing member 22 on both sides of the cover beam 11, the fixing device can be stably fixed on the cover beam 11, and the structure is simple, easy to implement, and low in manufacturing cost.

在本实施例中,第一固定件21及第二固定件22由工字钢制成,坚固耐用、制作方便。In this embodiment, the first fixing member 21 and the second fixing member 22 are made of I-shaped steel, which are durable and easy to manufacture.

在本实施例中,卷扬机23布置于盖梁11的两侧,并与第一固定件21固定连接,可为盖梁模板13提供均匀、稳定的拉力。In this embodiment, the winches 23 are arranged on both sides of the cover beam 11 and fixedly connected with the first fixing member 21 , which can provide uniform and stable pulling force for the cover beam formwork 13 .

在本实施例中,卷扬机23通过螺栓与第一固定件21固定连接,方便卷扬机23的拆装及维护。In this embodiment, the winch 23 is fixedly connected to the first fixing member 21 through bolts, which facilitates disassembly and maintenance of the winch 23 .

在本实施例中,该拆除装置包括两个固定装置以及4台3T的卷扬机,固定装置与支撑盖梁的立柱对应布置,每台卷扬机挂钩和盖梁模板与立柱的连接端相固定连接。在底模拆除后需要更换盖梁位置时只需借用吊车将卷扬机以及固定装置调运至另外一片盖梁上即可,不仅安全可靠,而且可提高盖梁底模的拆除效率。In this embodiment, the removal device includes two fixing devices and four 3T winches, the fixing devices are arranged correspondingly to the columns supporting the cover beam, and the hooks of each winch and the cover beam formwork are fixedly connected to the connecting ends of the columns. When the position of the cover beam needs to be replaced after the bottom form is removed, it is only necessary to use a crane to transfer the hoist and the fixing device to another cover beam, which is not only safe and reliable, but also improves the removal efficiency of the cover beam bottom form.

本实用新型的技术效果包括:The technical effects of the utility model include:

1、节约施工时间。1. Save construction time.

本装置采用整体式拆除盖梁底模和抱箍,拆除时间短,不需要吊车便可直接拆除,能够大大的缩短施工时间而且还能够增强施工安全。The device adopts integral removal of the bottom formwork and hoop of the cover beam, the removal time is short, and it can be removed directly without a crane, which can greatly shorten the construction time and can also enhance construction safety.

2、节约吊车使用时间,降低安全隐患。2. Save the time of crane use and reduce potential safety hazards.

现有盖梁底模和抱箍拆除方法需要通过吊车配合人工将盖梁模板运送地面,这种工艺需要吊车使用时间长,但是使用频率低,并且吊车在吊装模板时存在安全隐患。使用本实施例提供的拆除装置,吊车只需将卷扬机,工字钢吊运至合理位置,工人将其连接加固拼接即可,大大节省了吊车使用时间,同时也降低了安全隐患。The existing cover beam bottom form and hoop removal method needs to use a crane to manually transport the cover beam formwork to the ground. This process requires the crane to be used for a long time, but the frequency of use is low, and there are potential safety hazards when the crane lifts the formwork. Using the dismantling device provided in this embodiment, the crane only needs to hoist the winch and the I-beam to a reasonable position, and the workers can connect, strengthen and splice them, which greatly saves the use time of the crane and also reduces potential safety hazards.

以上所述仅是本实用新型的优选实施方式,并不用于限制本实用新型,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本实用新型的保护范围。The above is only a preferred embodiment of the utility model, and is not intended to limit the utility model. It should be pointed out that for those of ordinary skill in the art, they can also do Several improvements and modifications are made, and these improvements and modifications should also be regarded as the protection scope of the present utility model.

Claims (7)

1.一种盖梁底模拆除装置,其特征在于,包括沿盖梁宽度方向布置,且与盖梁固定连接的固定装置,所述固定装置的两端连接有卷扬机,所述卷扬机通过钢丝绳及与所述钢丝绳连接的挂钩与盖梁底模连接,用于为拆除过程中的盖梁底模提供向上的拉力。1. a cover beam bottom form removal device, it is characterized in that, comprise and arrange along the cover beam width direction, and the fixing device that is fixedly connected with cover beam, the two ends of described fixing device are connected with winch, and described winch passes steel wire rope and The hook connected with the wire rope is connected with the bottom form of the cover beam, and is used to provide upward pulling force for the bottom form of the cover beam during the dismantling process. 2.根据权利要求1所述的盖梁底模拆除装置,其特征在于,所述固定装置包括与盖梁顶面连接的第一固定件及与盖梁侧面连接的第二固定件,所述第一固定件与第二固定件固定连接。2. The device for removing the bottom form of the cover beam according to claim 1, wherein the fixing device includes a first fixing piece connected to the top surface of the cover beam and a second fixing piece connected to the side surface of the cover beam, the The first fixing part is fixedly connected with the second fixing part. 3.根据权利要求2所述的盖梁底模拆除装置,其特征在于,所述第一固定件及第二固定件由工字钢制成。3. The device for removing the cover beam bottom form according to claim 2, characterized in that, the first fixing piece and the second fixing piece are made of I-shaped steel. 4.根据权利要求3所述的盖梁底模拆除装置,其特征在于,所述卷扬机布置于盖梁的两侧,并与所述第一固定件固定连接。4 . The device for removing the bottom form of the cover beam according to claim 3 , wherein the hoist is arranged on both sides of the cover beam and is fixedly connected with the first fixing member. 5.根据权利要求4所述的盖梁底模拆除装置,其特征在于,所述卷扬机通过螺栓与所述第一固定件固定连接。5 . The device for removing the bottom form of the cover beam according to claim 4 , wherein the winch is fixedly connected to the first fixing member through bolts. 6 . 6.根据权利要求1所述的盖梁底模拆除装置,其特征在于,所述固定装置与支撑盖梁的立柱对应布置。6. The device for removing the bottom form of the cover beam according to claim 1, characterized in that, the fixing device is arranged correspondingly to the column supporting the cover beam. 7.根据权利要求6所述的盖梁底模拆除装置,其特征在于,所述挂钩连接盖梁底模与立柱的连接端。7 . The device for removing the bottom formwork of the cover beam according to claim 6 , wherein the hook is connected to the connecting end of the bottom formwork of the cover beam and the column.
CN201720999584.7U 2017-08-11 2017-08-11 Bent cap bed die removes device Expired - Fee Related CN207484292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720999584.7U CN207484292U (en) 2017-08-11 2017-08-11 Bent cap bed die removes device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720999584.7U CN207484292U (en) 2017-08-11 2017-08-11 Bent cap bed die removes device

Publications (1)

Publication Number Publication Date
CN207484292U true CN207484292U (en) 2018-06-12

Family

ID=62484817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720999584.7U Expired - Fee Related CN207484292U (en) 2017-08-11 2017-08-11 Bent cap bed die removes device

Country Status (1)

Country Link
CN (1) CN207484292U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930228A (en) * 2018-08-06 2018-12-04 广州市第三市政工程有限公司 The construction method of bent cap hoop bracket overall pulling down
CN113981825A (en) * 2021-10-19 2022-01-28 中铁十六局集团第四工程有限公司 An integrally removable cover beam construction platform
CN118932857A (en) * 2024-07-12 2024-11-12 中交路桥建设有限公司 A construction method for removing the bottom formwork of a large cantilever cap beam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930228A (en) * 2018-08-06 2018-12-04 广州市第三市政工程有限公司 The construction method of bent cap hoop bracket overall pulling down
CN113981825A (en) * 2021-10-19 2022-01-28 中铁十六局集团第四工程有限公司 An integrally removable cover beam construction platform
CN118932857A (en) * 2024-07-12 2024-11-12 中交路桥建设有限公司 A construction method for removing the bottom formwork of a large cantilever cap beam

Similar Documents

Publication Publication Date Title
CN106276577B (en) A kind of suspension bracket and operating method of framework isolated footing
CN205932941U (en) A device for handling of precast box girder template
CN103711078A (en) Temporary girder-type support for bridge construction and dismantling method thereof
CN106368127A (en) Whole support landing device and method for box girder support
CN110820560A (en) Method for disassembling hoop support of bent cap
CN203113793U (en) Large formwork installation system of oblique structure
CN210238297U (en) Detaching device for bent cap support
CN202482772U (en) Collapse-proof stop block mounting system for railway bridge
CN203795311U (en) Multi-leg high pier and slip form construction device
CN205329547U (en) Lid corbel frame dismounting device
CN203613464U (en) Slip form construction cargo transportation device
CN204999517U (en) Coal transporting trestle steel truss hoist device in power plant's chimney
CN203613461U (en) Slip form construction lifting system
CN208167536U (en) A kind of operation platform removed for bridge temporary support
CN204959611U (en) A lifting device for highway construction bridge railing base template
CN203531381U (en) Temporary hanging and supporting device used for steel bar truss formworks
CN202878454U (en) T-shaped beam template installing and dismantling device
CN203200719U (en) Hanging type slope pouring template device
CN208950170U (en) A kind of frame column reinforcing bar preventing offsetting device
CN208009267U (en) A kind of middle cross beam tensioning protective platform
CN205555868U (en) A overhead hoist that is used for precasting yard roof beam, board side form
CN206706580U (en) A kind of guardrail template for being easy to Fast Installation to dismantle
CN204778565U (en) Well lid handling device
CN205034948U (en) Rack formula hanging beam device
CN204126237U (en) A kind of elevator hoistway construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180612