CN105275253A - Equal-diameter rod erecting device and application method thereof - Google Patents

Equal-diameter rod erecting device and application method thereof Download PDF

Info

Publication number
CN105275253A
CN105275253A CN201510764155.7A CN201510764155A CN105275253A CN 105275253 A CN105275253 A CN 105275253A CN 201510764155 A CN201510764155 A CN 201510764155A CN 105275253 A CN105275253 A CN 105275253A
Authority
CN
China
Prior art keywords
equal
diameter rod
isometrical bar
shaped anchor
isometrical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510764155.7A
Other languages
Chinese (zh)
Inventor
陈根生
张建海
张文梦
孙鹏义
杨青松
张赞靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fucheng Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Fucheng Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fucheng Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Fucheng Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority to CN201510764155.7A priority Critical patent/CN105275253A/en
Publication of CN105275253A publication Critical patent/CN105275253A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明属于立杆装置技术领域,公开了一种等径杆立杆器及其使用方法。其主要技术特征为:包括两个U型抱箍,所述的两个U型抱箍的顶端通过螺母、螺栓相连接,两个U型抱箍的尾端分别设置有加强板,加强板的尾端设置有吊装眼。本发明提供的等径杆立杆器使用时,先将等径杆杆顶的方盘焊接牢固,再把两个U型抱箍用螺母、螺栓固定在方盘下方的等径杆上,然后将吊装机的钢丝绳穿过吊装眼,吊装机起吊等径杆。由于两个U型抱箍对称设置,等径杆起吊后与地面垂直,只需一个人矫正一下等径杆位置,等径杆就会容易地进入杆坑,然后将等径杆固定。吊装过程节省了人力的同时保证了施工的安全。

The invention belongs to the technical field of pole devices, and discloses an equal-diameter pole pole device and a using method thereof. Its main technical features are: it includes two U-shaped hoops, the tops of the two U-shaped hoops are connected by nuts and bolts, and the tail ends of the two U-shaped hoops are respectively provided with reinforcement plates, and the reinforcement plates There is a lifting eye at the end. When the equal-diameter rod erector provided by the present invention is used, the square plate on the top of the equal-diameter rod is first welded firmly, and then two U-shaped hoops are fixed on the equal-diameter rod below the square plate with nuts and bolts, and then Pass the wire rope of the hoist through the hoisting eye, and the hoist lifts the equal-diameter rod. Because the two U-shaped hoops are arranged symmetrically, the equal-diameter rod is vertical to the ground after being hoisted. Only one person needs to correct the position of the equal-diameter rod, and the equal-diameter rod will easily enter the rod pit, and then fix the equal-diameter rod. The hoisting process saves manpower while ensuring the safety of construction.

Description

等径杆立杆器及其使用方法Isometric rod erector and method of use thereof

技术领域 technical field

本发明属于立杆装置技术领域,具体地讲涉及一种等径杆立杆器及其使用方法。 The invention belongs to the technical field of pole devices, and in particular relates to an equal-diameter pole pole device and a use method thereof.

背景技术 Background technique

等径杆是变电站内一切架构的支撑,因此组立等径杆是一项很重要的工作。等径杆在杆顶都焊有300-400厘米的方盘,以前立杆起吊前,用钢丝绳拴在等径杆靠近杆顶部位,也就是方盘的下面。起吊时由于等径杆受力不均,会与地面有一定的夹角,并且下落时经常会螺旋打转,很难垂直进入杆坑,需要3到4人扶正才能进入杆坑,同时存在一定的隐患。 The equal diameter rod is the support of all the structures in the substation, so the assembly of the equal diameter rod is a very important task. A 300-400 cm square plate is welded on the top of the equal-diameter pole. Before the vertical pole was hoisted, the steel wire rope was used to tie the equal-diameter pole near the top of the pole, that is, under the square plate. When hoisting, due to the uneven force on the equal-diameter pole, there will be a certain angle with the ground, and it will often spiral when falling, and it is difficult to enter the pole pit vertically. It takes 3 to 4 people to straighten it to enter the pole pit. At the same time, there is a certain Hidden danger.

发明内容 Contents of the invention

本发明要解决的第一个技术问题就是提供一种结构简单、使用方便、安全可靠的等径杆立杆器。 The first technical problem to be solved by the present invention is to provide an isometric rod erector with simple structure, convenient use, safety and reliability.

为解决上述技术问题,本发明采用的技术方案为:包括两个U型抱箍,所述的两个U型抱箍的顶端通过螺母、螺栓相连接,两个U型抱箍的尾端分别设置有加强板,加强板的尾端设置有吊装眼。 In order to solve the above-mentioned technical problems, the technical solution adopted by the present invention is: comprising two U-shaped hoops, the top ends of the two U-shaped hoops are connected by nuts and bolts, and the tail ends of the two U-shaped hoops are respectively A reinforcing plate is provided, and a hoisting eye is provided at the tail end of the reinforcing plate.

其附加技术特征为:所述的U型抱箍为半圆形; Its additional technical features are: the U-shaped hoop is semicircular;

所述U型抱箍的横截面为矩形; The cross section of the U-shaped hoop is rectangular;

所述的加强板纵向设置,加强板的顶部为平面或齿状,加强板顶部伸入U型抱箍; The reinforcing plate is arranged vertically, the top of the reinforcing plate is flat or toothed, and the top of the reinforcing plate extends into the U-shaped hoop;

所述吊装眼的半径为23-25厘米; The radius of the lifting eye is 23-25 cm;

所述吊装眼的半径为24厘米。 The radius of the lifting eye is 24 cm.

本发明要解决的第二个技术问题就是提供一种等径杆立杆器的使用方法。 The second technical problem to be solved by the present invention is to provide a method for using the equal-diameter rod erector.

为解决上述技术问题,本发明采用的技术方案包括下述步骤: In order to solve the problems of the technologies described above, the technical solution adopted in the present invention comprises the following steps:

第一步焊接方盘 The first step is to weld the square plate

将等径杆杆顶的方盘焊接牢固; Weld the square plate at the top of the equal-diameter rod firmly;

第二步安装抱箍 The second step is to install the hoop

把两个U型抱箍用螺母、螺栓固定在方盘下方的等径杆上; Fix the two U-shaped hoops on the equal-diameter rod under the square plate with nuts and bolts;

第三步吊装 The third step hoisting

将吊装机的钢丝绳穿过吊装眼,吊装机起吊等径杆,等径杆起吊后与地面垂直,一个人矫正一下等径杆位置,等径杆进入杆坑,将等径杆固定; Pass the steel wire rope of the hoist through the hoisting eye, hoist the equal-diameter rod, and the equal-diameter rod is vertical to the ground after being hoisted. One person corrects the position of the equal-diameter rod, enters the rod pit, and fixes the equal-diameter rod;

第四步拆卸抱箍 The fourth step is to remove the hoop

把固定两个U型抱箍的螺母、螺栓松开,吊装机的钢丝绳将两个U型抱箍放置地面,将钢丝绳由吊装眼抽离,将两个U型抱箍回收入库。 Loosen the nuts and bolts that fix the two U-shaped hoops, place the two U-shaped hoops on the ground with the wire rope of the hoisting machine, pull the wire ropes away from the hoisting eye, and put the two U-shaped hoops back into storage.

本发明提供的等径杆立杆器使用时,先将等径杆杆顶的方盘焊接牢固,再把两个U型抱箍用螺母、螺栓固定在方盘下方的等径杆上,然后将吊装机的钢丝绳穿过吊装眼,吊装机起吊等径杆。由于两个U型抱箍对称设置,等径杆起吊后与地面垂直,只需一个人矫正一下等径杆位置,等径杆就会容易地进入杆坑,然后将等径杆固定。吊装完毕,把固定两个U型抱箍的螺母、螺栓松开,吊装机的钢丝绳将两个U型抱箍放置地面,将钢丝绳由吊装眼抽离,将两个U型抱箍回收入库。吊装过程节省了人力的同时保证了施工的安全。而U型抱箍为半圆形,易于安装固定。U型抱箍的横截面为矩形,在保证稳固的同时减轻重量。加强板纵向设置,加强板的顶部为平面或齿状,加强板顶部伸入U型抱箍,加强板与U型抱箍焊接稳固。根据需要,吊装眼的半径为23-25厘米,最好吊装眼的半径为24厘米。 When the equal-diameter rod erector provided by the present invention is used, the square plate on the top of the equal-diameter rod is first welded firmly, and then two U-shaped hoops are fixed on the equal-diameter rod below the square plate with nuts and bolts, and then Pass the steel wire rope of the hoist through the hoisting eye, and the hoist lifts the equal-diameter rod. Because the two U-shaped hoops are arranged symmetrically, the equal-diameter rod is vertical to the ground after being hoisted. Only one person needs to correct the position of the equal-diameter rod, and the equal-diameter rod will easily enter the rod pit, and then fix the equal-diameter rod. After hoisting, loosen the nuts and bolts that fix the two U-shaped hoops, place the two U-shaped hoops on the ground with the steel wire rope of the hoisting machine, pull the wire rope away from the hoisting eye, and put the two U-shaped hoops back into storage . The hoisting process saves manpower while ensuring the safety of construction. The U-shaped hoop is semicircular, easy to install and fix. The cross section of the U-shaped hoop is rectangular, which reduces weight while ensuring stability. The reinforcement plate is arranged longitudinally, the top of the reinforcement plate is flat or toothed, the top of the reinforcement plate extends into the U-shaped hoop, and the reinforcement plate and the U-shaped hoop are welded firmly. According to needs, the radius of the hoisting eye is 23-25 cm, and the radius of the hoisting eye is preferably 24 cm.

附图说明 Description of drawings

图1为本发明提供的等径杆立杆器的结构示意图; Fig. 1 is the structural representation of the isometric rod erector provided by the present invention;

图2为加强板与U型抱箍的第一种连接结构示意图; Fig. 2 is a schematic diagram of the first connection structure between the reinforcing plate and the U-shaped hoop;

图3为加强板与U型抱箍的第二种连接结构示意图; Fig. 3 is a schematic diagram of the second connection structure between the reinforcing plate and the U-shaped hoop;

图4为等径杆立杆器的使用结构示意图。 Fig. 4 is a schematic diagram of the use structure of the isometric rod erector.

具体实施方式 detailed description

下面结合附图对本发明所提供的等径杆立杆器及其使用方法做进一步详细说明。 The isometric rod erector provided by the present invention and its usage method will be described in further detail below in conjunction with the accompanying drawings.

如图1所示,本发明所提供的等径杆立杆器包括两个U型抱箍1,U型抱箍1为半圆形,两个U型抱箍1的顶端通过螺母2、螺栓3相连接,两个U型抱箍1的尾端分别设置有加强板4。 As shown in Figure 1, the equal-diameter rod erector provided by the present invention includes two U-shaped hoops 1, the U-shaped hoops 1 are semicircular, and the tops of the two U-shaped hoops 1 pass through nuts 2, bolts 3 are connected, and the tail ends of the two U-shaped hoops 1 are respectively provided with reinforcement plates 4 .

如图2所示,U型抱箍1的横截面为矩形,U型抱箍1的尾端设置有加强板4,加强板4的尾端设置有吊装眼5,加强板4纵向设置,加强板4的顶部为平面,加强板4顶部伸入U型抱箍1。 As shown in Figure 2, the cross section of the U-shaped hoop 1 is rectangular, the tail end of the U-shaped hoop 1 is provided with a reinforcement plate 4, the tail end of the reinforcement plate 4 is provided with a hoisting eye 5, and the reinforcement plate 4 is arranged longitudinally to strengthen The top of the plate 4 is a plane, and the top of the reinforcing plate 4 extends into the U-shaped hoop 1 .

如图3所示,加强板4的尾端设置有吊装眼5,加强板4纵向设置,加强板4的顶部为齿状,加强板4顶部伸入U型抱箍1。 As shown in Figure 3, the tail end of the reinforcing plate 4 is provided with a hoisting eye 5, the reinforcing plate 4 is arranged longitudinally, the top of the reinforcing plate 4 is toothed, and the top of the reinforcing plate 4 extends into the U-shaped hoop 1.

本发明提供的等径杆立杆器使用时,如图4所示,先将等径杆6杆顶的方盘7焊接牢固,再把两个U型抱箍1用螺母2、螺栓3固定在方盘7下方的等径杆6上,然后将吊装机8的钢丝绳9穿过吊装眼5,吊装机8起吊等径杆6。由于两个U型抱箍1对称设置,等径杆6起吊后等径杆6与地面垂直,只需一个人矫正一下等径杆6位置,等径杆6就会容易地进入杆坑,然后将等径杆6固定。吊装完毕,把固定两个U型抱箍1的螺母2、螺栓3松开,吊装机8的钢丝绳9将两个U型抱箍1放置地面,将钢丝绳9由吊装眼5抽离,将两个U型抱箍1回收入库。吊装过程节省了人力的同时保证了施工的安全。而U型抱箍1为半圆形,易于安装固定。U型抱箍1的横截面为矩形,在保证稳固的同时减轻重量。加强板4纵向设置,加强板4的顶部为平面或齿状,加强板4顶部伸入U型抱箍1,加强板4与U型抱箍1焊接稳固。根据需要,吊装眼5的半径为23-25厘米,最好吊装眼5的半径为24厘米。 When the equal-diameter rod erector provided by the present invention is used, as shown in Figure 4, the square plate 7 on the top of the equal-diameter rod 6 is first welded firmly, and then the two U-shaped hoops 1 are fixed with nuts 2 and bolts 3 On the equal-diameter rod 6 below the square plate 7, the wire rope 9 of the hoisting machine 8 is passed through the hoisting eye 5, and the hoisting machine 8 lifts the equal-diameter rod 6. Since the two U-shaped hoops 1 are arranged symmetrically, the equal diameter rod 6 is perpendicular to the ground after the equal diameter rod 6 is hoisted, and only one person needs to correct the position of the equal diameter rod 6, and the equal diameter rod 6 will enter the rod pit easily, and then Fix the equal diameter rod 6. After the hoisting is completed, loosen the nuts 2 and bolts 3 that fix the two U-shaped hoops 1. The steel wire rope 9 of the hoisting machine 8 places the two U-shaped hoops 1 on the ground, pulls the wire rope 9 away from the hoisting eye 5, and pulls the two One U-shaped hoop is stored in storage once. The hoisting process saves manpower while ensuring the safety of construction. And the U-shaped hoop 1 is a semicircle, which is easy to install and fix. The cross section of the U-shaped hoop 1 is rectangular, which reduces weight while ensuring stability. The reinforcing plate 4 is vertically arranged, the top of the reinforcing plate 4 is flat or toothed, the top of the reinforcing plate 4 extends into the U-shaped hoop 1, and the reinforcing plate 4 and the U-shaped hoop 1 are welded firmly. According to needs, the radius of hoisting eye 5 is 23-25 centimetres, preferably the radius of hoisting eye 5 is 24 centimetres.

本发明的保护范围不仅仅局限于上述实施例,只要结构与本发明等径杆立杆器结构相同,就落在本发明保护的范围。 The protection scope of the present invention is not limited to the above-mentioned embodiments, as long as the structure is the same as that of the isometric rod erector of the present invention, it falls within the protection scope of the present invention.

Claims (7)

1. isometrical bar standing device, comprises two U-shaped anchor ears, it is characterized in that: the top of two described U-shaped anchor ears is connected by nut, bolt, and the tail end of two U-shaped anchor ears is respectively arranged with stiffener, and the tail end of stiffener is provided with lifting eye.
2. isometrical bar standing device according to claim 1, is characterized in that: described U-shaped anchor ear is for semicircle.
3. isometrical bar standing device according to claim 1, is characterized in that: the cross section of described U-shaped anchor ear is rectangle.
4. isometrical bar standing device according to claim 1, is characterized in that: described stiffener is longitudinally arranged, and the top of stiffener is plane or dentation, and U-shaped anchor ear is stretched at stiffener top.
5. isometrical bar standing device according to claim 1, is characterized in that: the radius of described lifting eye is 23-25 centimetre.
6. isometrical bar standing device according to claim 5, is characterized in that: the radius of described lifting eye is 24 centimetres.
7. the using method of the isometrical bar standing device described in any one of claim 1 to 6, is characterized in that, comprise the steps:
First step welding square plate
By the square plate firm welding of isometrical bar masthead;
Second step installs anchor ear
Two U-shaped anchor ear nuts, be bolted to below square plate isometrical bar on;
3rd step lifting
By the steel wire penetrating of hoisting machine lifting eye, hoisting machine lifts by crane isometrical bar, and perpendicular to the ground after isometrical bar lifting, a people corrects isometrical bar position, and isometrical bar enters bar hole, is fixed by isometrical bar;
4th step dismounting anchor ear
Nut, the bolt of fixing two U-shaped anchor ears are unclamped, and two U-shaped anchor ears are placed ground by the wire rope of hoisting machine, are detached by wire rope by lifting eye, and two U-shaped anchor ears are reclaimed warehouse-in.
CN201510764155.7A 2015-11-11 2015-11-11 Equal-diameter rod erecting device and application method thereof Pending CN105275253A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510764155.7A CN105275253A (en) 2015-11-11 2015-11-11 Equal-diameter rod erecting device and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510764155.7A CN105275253A (en) 2015-11-11 2015-11-11 Equal-diameter rod erecting device and application method thereof

Publications (1)

Publication Number Publication Date
CN105275253A true CN105275253A (en) 2016-01-27

Family

ID=55144997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510764155.7A Pending CN105275253A (en) 2015-11-11 2015-11-11 Equal-diameter rod erecting device and application method thereof

Country Status (1)

Country Link
CN (1) CN105275253A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106429817A (en) * 2016-11-17 2017-02-22 国网福建省电力有限公司 Ultrahigh-voltage bushing hosting method
CN110077948A (en) * 2019-05-14 2019-08-02 上海外高桥造船有限公司 The hanging method of the module stool of lifting device and FPSO
CN110203812A (en) * 2019-06-14 2019-09-06 上海外高桥造船有限公司 Lift the lifting localization method of positioning tool and module stool
CN110469272A (en) * 2019-07-31 2019-11-19 中国一冶集团有限公司 A kind of construction of pile foundation casing follow-up step reaming and recyclable device
CN110745692A (en) * 2019-10-23 2020-02-04 上海市安装工程集团有限公司 Lifting fixture and its adjustment method
CN111056419A (en) * 2019-12-16 2020-04-24 上海市机械施工集团有限公司 Sleeve clamp for hoisting and hoisting method of component
CN111891905A (en) * 2019-05-05 2020-11-06 中国航发商用航空发动机有限责任公司 Aircraft engine turbine disc lifting appliance and operation method thereof
CN112110328A (en) * 2019-06-21 2020-12-22 中国航发商用航空发动机有限责任公司 Aircraft engine turbine disk hoist

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110058359A (en) * 2009-11-26 2011-06-01 이창남 Insertion base plate and joint method of steel column
CN203048409U (en) * 2013-01-04 2013-07-10 中天钢铁集团有限公司 Rope for vertically lifting cylindrical transmission shaft
CN203201216U (en) * 2013-04-25 2013-09-18 国家电网公司 Vertical rod centralizer
CN204030371U (en) * 2014-05-26 2014-12-17 国家电网公司 The vertical suspender of a kind of two electric pole group
CN204324676U (en) * 2014-11-14 2015-05-13 山东海湾吊装工程股份有限公司 Anchor ear lifting device
CN205089034U (en) * 2015-11-11 2016-03-16 国网河北阜城县供电公司 Constant diameter pole pole setting ware

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110058359A (en) * 2009-11-26 2011-06-01 이창남 Insertion base plate and joint method of steel column
CN203048409U (en) * 2013-01-04 2013-07-10 中天钢铁集团有限公司 Rope for vertically lifting cylindrical transmission shaft
CN203201216U (en) * 2013-04-25 2013-09-18 国家电网公司 Vertical rod centralizer
CN204030371U (en) * 2014-05-26 2014-12-17 国家电网公司 The vertical suspender of a kind of two electric pole group
CN204324676U (en) * 2014-11-14 2015-05-13 山东海湾吊装工程股份有限公司 Anchor ear lifting device
CN205089034U (en) * 2015-11-11 2016-03-16 国网河北阜城县供电公司 Constant diameter pole pole setting ware

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106429817A (en) * 2016-11-17 2017-02-22 国网福建省电力有限公司 Ultrahigh-voltage bushing hosting method
CN106429817B (en) * 2016-11-17 2017-12-05 国网福建省电力有限公司 Extra-high voltage sleeve pipe hanging method
CN111891905A (en) * 2019-05-05 2020-11-06 中国航发商用航空发动机有限责任公司 Aircraft engine turbine disc lifting appliance and operation method thereof
CN110077948A (en) * 2019-05-14 2019-08-02 上海外高桥造船有限公司 The hanging method of the module stool of lifting device and FPSO
CN110203812A (en) * 2019-06-14 2019-09-06 上海外高桥造船有限公司 Lift the lifting localization method of positioning tool and module stool
CN112110328A (en) * 2019-06-21 2020-12-22 中国航发商用航空发动机有限责任公司 Aircraft engine turbine disk hoist
CN110469272A (en) * 2019-07-31 2019-11-19 中国一冶集团有限公司 A kind of construction of pile foundation casing follow-up step reaming and recyclable device
CN110469272B (en) * 2019-07-31 2020-10-23 中国一冶集团有限公司 Reaming and recovering device for pile foundation casing follow-up construction
CN110745692A (en) * 2019-10-23 2020-02-04 上海市安装工程集团有限公司 Lifting fixture and its adjustment method
CN111056419A (en) * 2019-12-16 2020-04-24 上海市机械施工集团有限公司 Sleeve clamp for hoisting and hoisting method of component

Similar Documents

Publication Publication Date Title
CN105275253A (en) Equal-diameter rod erecting device and application method thereof
CN102359303B (en) UHV ordinary line iron tower assembly method
CN103967277B (en) Super High Core Walls Structure tilts the construction method of shear wall
CN103243651B (en) Method for fixedly installing and leveling base of metal upright column of bridge guardrail
CN107100187B (en) Tower crane steel girder erection structure and installation method
CN204751674U (en) Unwrapping wire reinforcing apparatus is rolled up to steel strand wires
CN102561669A (en) Cantilever scaffold and construction method thereof
CN204324676U (en) Anchor ear lifting device
CN204848091U (en) Steel sheet cross arm hoisting accessory
CN203583884U (en) Outer climbing frame follow-up type discharging platform
CN101402436A (en) Method and apparatus for disassembling cargo boom of climbing tower crane
CN202945798U (en) Overhanging type scaffold corner device
CN205397790U (en) A subassembly that is used for construction elevator to attach wall pull rod overlength
CN203022328U (en) Climbing operation platform
CN203439984U (en) Handjack for pole
CN205089034U (en) Constant diameter pole pole setting ware
CN104612166B (en) The combination supporting device of a kind of supporting hole wall and method for protecting support
CN211473342U (en) Overhanging scaffolding pole with anti-skid device
CN206457187U (en) A kind of pole of mounting steel chimney
CN204326658U (en) LNG storage tank reinforced mesh wind-resistant column bracing means
CN104727743B (en) A kind of cat ladder
CN203347211U (en) Iron tower steering platform fixing support
CN105129633B (en) A kind of auxiliary tower crane disassemblerassembler and preparation method thereof
CN204476247U (en) A kind of cat ladder
CN205500628U (en) Climb in tower crane and install conversion equipment who climbs between roof beam and bracket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160127