CN106429817B CN201611012330.8A CN201611012330A CN106429817B CN 106429817 B CN106429817 B CN 106429817B CN 201611012330 A CN201611012330 A CN 201611012330A CN 106429817 B CN106429817 B CN 106429817B
Authority
CN
China
Prior art keywords
extra
sleeve pipe
high voltage
lifting
voltage sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611012330.8A
Other languages
Chinese (zh)
Other versions
CN106429817A (en
Inventor
薛尚青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611012330.8A priority Critical patent/CN106429817B/en
Publication of CN106429817A publication Critical patent/CN106429817A/en
Application granted granted Critical
Publication of CN106429817B publication Critical patent/CN106429817B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B17/00Insulators or insulating bodies characterised by their form
    • H01B17/56Insulating bodies
    • H01B17/58Tubes, sleeves, beads, or bobbins through which the conductor passes
    • H01B17/583Grommets; Bushings

Abstract

The present invention relates to a kind of extra-high voltage sleeve pipe hanging method; by installing cuff on extra-high voltage sleeve pipe; extra-high voltage sleeve pipe is lifted by crane for protectiveness; reduce lifting difficulty; and ensure the integrality of extra-high voltage sleeve pipe during lifting; damage of the sleeve pipe hoisting process to full skirt is avoided, also ensures that sleeve pipe is in vertical position in abutting joint, effectively improves sleeve pipe lifting speed, protection sleeve pipe damage.The present apparatus is simple in construction, easy to use.

Description

Extra-high voltage sleeve pipe hanging method
Technical field
The present invention relates to a kind of extra-high voltage sleeve pipe hanging method.
Background technology
Power system extra-high voltage sleeve pipe is elongated porcelain piece, weighs about 6 tons, is generally all right angle setting.In two sets of tackling systems Under mutual cooperation, sleeve pipe lifting needs to complete to become the process hung from horizontal lifting, horizontal level to upright position.To ensure sleeve pipe Plumbness is in during lifting, prevents elongated sleeve pipe from tilting, it is necessary to waist hoop rope fixed sleeving and adjust sleeve position, but adopt The damage of sleeve pipe full skirt is easily caused with waist hoop rope, and only only a few professional can skillfully fasten waist hoop rope, and this is direct It is related to the safety of sleeve hoisting and installs smooth.
The content of the invention
The present invention has made improvements in view of the above-mentioned problems of the prior art, i.e., the technical problems to be solved by the invention are A kind of extra-high voltage sleeve pipe hanging method is provided, avoids damage of the sleeve pipe hoisting process to full skirt, also ensures that sleeve pipe is pacified in docking It is in vertical position during dress, effectively improve sleeve pipe lifting speed, protection sleeve pipe damage.
In order to solve the above-mentioned technical problem, the technical scheme is that:A kind of extra-high voltage sleeve pipe hanging method, by following Step is carried out:
(1)Prefabricated component prepares:Prefabricated one is used to be enclosed on the cuff in the middle part of extra-high voltage sleeve pipe on full skirt, and the cuff madial wall is set Rubber blanket is equipped with, a wing plate is provided with two opposite side walls, rope clamp head and retainer ring are provided with wing plate, and in extra-high gland The fixed plate of top bolt connection one of pipe, the both sides of the fixed plate are provided with through hole;
(2)Banding fixed:Cuff is fastened in the middle part of extra-high voltage sleeve pipe on full skirt, is connected respectively with two static lines The side through hole of plate one and the retainer ring of cuff side, prevent cuff to be moved during lifting;
(3)Lifting rope is installed:Prepare two cranes, two lifting ropes is kept flat installation on two lifting ropes of First crane Capable boatswain chair, the boatswain chair both sides are symmetrically arranged with the hanging hole for allowing lifting rope to pass through, and two lifting ropes are connected into extra-high voltage by chain link On two preset lifting bolts of casing shoe flange, then the rope clamp head this two lifting ropes being each passed through on cuff wing plate, lead to Cross rope clamp head locking lifting rope;It is preset that two lifting ropes of second crane by chain link are connected to extra-high voltage casing shoe flange On two lifting bolts;
(4)Lifting:Two cranes lift by crane simultaneously, extra-high voltage sleeve pipe keep level is increased until corresponding height, second Crane remains stationary as, and First crane continues to rise lifting, until extra-high voltage sleeve pipe is changed into plumbness, extra-high voltage during this Sleeve pipe whole process is not in contact with the ground;
(5)Installation:Two lifting ropes of second crane are removed from extra-high voltage sleeve pipe, will be extra-high by First crane Gland pipe moves to region to be installed and carries out installation exercise.
Further, the cuff includes two semicircle external members being fixedly connected by fastener, the external member inner side Wall is provided with rubber blanket, and rectangular-shaped wing plate is provided with the middle part of the external member lateral wall, is provided with the wing plate for fixing The through hole of rope clamp head and retainer ring.
Further, external member both ends lateral wall is provided with convex portion, and multiple bolts hole, institute are provided with the convex portion It is bolt and nut component to state fastener, and the fastener is locked on bolt hole.
Further, the static line includes a steel wire rope, and the both ends of steel wire rope are provided with rope clamp head, the steel wire rope Middle part be provided with adjustment rope capacity stringing button.
Compared with prior art, the invention has the advantages that:This method can avoid sleeve pipe hoisting process to umbrella The damage of skirt, also ensure that sleeve pipe is in vertical position in abutting joint, effectively improve sleeve pipe lifting speed, protection sleeve pipe is exempted from It is damaged.
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
Brief description of the drawings
Fig. 1 is the organigram of the embodiment of the present invention.
Fig. 2 is the organigram of cuff in the embodiment of the present invention.
In figure:1- external members, 11- convex portions, 2- bolt and nut components, 3- wing plates, 4- rope clamp heads, 41- retainer rings, 5- rubber Pad, 6- extra-high voltage sleeve pipes, 61- flanges, 62- fixed plates, 7- static lines, 71- stringing buttons, 8- lifting ropes.
Embodiment
Embodiment one:As shown in Figure 1 and 2, a kind of extra-high voltage sleeve pipe hanging method, is carried out according to the following steps:
(1)Prefabricated component prepares:Prefabricated one cuff for being enclosed on the middle part full skirt of extra-high voltage sleeve pipe 6, the cuff madial wall Rubber blanket is provided with, a wing plate 3 is provided with two opposite side walls, rope clamp first 4 and retainer ring 41 are provided with wing plate, and in spy The fixed plate 62 of top bolt connection one of bushing, the both sides of the fixed plate are provided with through hole;
(2)Banding fixed:Cuff is fastened in the middle part of extra-high voltage sleeve pipe on full skirt, connected respectively with two static lines 7 solid The side through hole of fixed board one and the retainer ring of cuff side, prevent cuff to be moved during lifting;
(3)Lifting rope is installed:Prepare two cranes, keep two lifting ropes installation on two lifting ropes 8 of First crane Parallel boatswain chair, the boatswain chair both sides are symmetrically arranged with the hanging hole for allowing lifting rope to pass through, and two lifting ropes are connected to by chain link extra-high On two preset lifting bolts of gland ttom of pipe end flanges 61, then the rope clamp this two lifting ropes being each passed through on cuff wing plate Head, lifting rope is locked by rope clamp head;Two lifting ropes of second crane are connected to extra-high voltage casing shoe flange by chain link On two preset lifting bolts;
(4)Lifting:Two cranes lift by crane simultaneously, extra-high voltage sleeve pipe keep level is increased until corresponding height, second Crane remains stationary as, and First crane continues to rise lifting, until extra-high voltage sleeve pipe is changed into plumbness, extra-high voltage during this Sleeve pipe whole process is not in contact with the ground;
(5)Installation:Two lifting ropes of second crane are removed from extra-high voltage sleeve pipe, will be extra-high by First crane Gland pipe moves to region to be installed and carries out installation exercise.
In the present embodiment, the cuff includes two semicircle external members 1 being fixedly connected by fastener, in the external member Side wall is provided with rubber blanket 5, is provided with rectangular-shaped wing plate 3 in the middle part of the external member lateral wall, is provided with and is used on the wing plate The through hole of static line chuck 4 and retainer ring 41.
In the present embodiment, external member both ends lateral wall is provided with convex portion 11, and multiple bolts are provided with the convex portion Hole, the fastener are bolt and nut component 2, and the fastener is locked on bolt hole.In use, two external members are entangled into sleeve pipe On, locked with bolt and nut, rope clamp head locking lifting rope.
In the present embodiment, the static line includes a steel wire rope, and the both ends of steel wire rope are provided with rope clamp head, the steel wire The stringing that adjustment rope capacity is provided with the middle part of rope buckles 71.
The foregoing is only presently preferred embodiments of the present invention, all equivalent changes done according to scope of the present invention patent with Modification, it should all belong to the covering scope of the present invention.

Claims (4)

1. a kind of extra-high voltage sleeve pipe hanging method, it is characterised in that carry out according to the following steps:
(1)Prefabricated component prepares:Prefabricated one is used to be enclosed on the cuff in the middle part of extra-high voltage sleeve pipe on full skirt, and the cuff madial wall is provided with Rubber blanket, a wing plate is provided with two opposite side walls, rope clamp head and retainer ring are provided with wing plate, and in extra-high voltage sleeve pipe The fixed plate of top bolt connection one, the both sides of the fixed plate are provided with through hole;
(2)Banding fixed:Cuff is fastened in the middle part of extra-high voltage sleeve pipe on full skirt, is connected respectively plate one with two static lines Side through hole and the retainer ring of cuff side, prevent cuff to be moved during lifting;
(3)Lifting rope is installed:Prepare two cranes, two lifting rope keeping parallelisms are made to installation on two lifting ropes of First crane Boatswain chair, the boatswain chair both sides are symmetrically arranged with the hanging hole for allowing lifting rope to pass through, and two lifting ropes are connected into extra-high voltage sleeve pipe by chain link On two preset lifting bolts of bottom flange, then the rope clamp head this two lifting ropes being each passed through on cuff wing plate, pass through rope Chuck locks lifting rope;Two lifting ropes of second crane are connected to preset two of extra-high voltage casing shoe flange by chain link On lifting bolt;
(4)Lifting:Two cranes lift by crane simultaneously, extra-high voltage sleeve pipe keep level is increased until corresponding height, second crane Remaining stationary as, First crane continues to rise lifting, until extra-high voltage sleeve pipe is changed into plumbness, extra-high voltage sleeve pipe during this It is whole not in contact with the ground;
(5)Installation:Two lifting ropes of second crane are removed from extra-high voltage sleeve pipe, by First crane by extra-high gland Pipe moves to region to be installed and carries out installation exercise.
2. extra-high voltage sleeve pipe hanging method according to claim 1, it is characterised in that:The cuff includes two by tight The semicircle external member that firmware is fixedly connected, the external member madial wall are provided with rubber blanket, are provided with the middle part of the external member lateral wall Rectangular-shaped wing plate, the through hole for static line chuck and retainer ring is provided with the wing plate.
3. extra-high voltage sleeve pipe hanging method according to claim 2, it is characterised in that:External member both ends lateral wall is all provided with Convex portion is equipped with, multiple bolts hole are provided with the convex portion, the fastener is bolt and nut component, and the fastener is locked at spiral shell On keyhole.
4. extra-high voltage sleeve pipe hanging method according to claim 1, it is characterised in that:The static line includes a steel wire Rope, the both ends of steel wire rope are provided with rope clamp head, and the stringing that adjustment rope capacity is provided with the middle part of the steel wire rope is buckled.
CN201611012330.8A 2016-11-17 2016-11-17 Extra-high voltage sleeve pipe hanging method Active CN106429817B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611012330.8A CN106429817B (en) 2016-11-17 2016-11-17 Extra-high voltage sleeve pipe hanging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611012330.8A CN106429817B (en) 2016-11-17 2016-11-17 Extra-high voltage sleeve pipe hanging method

Publications (2)

Publication Number Publication Date
CN106429817A CN106429817A (en) 2017-02-22
CN106429817B true CN106429817B (en) 2017-12-05

Family

ID=58220586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611012330.8A Active CN106429817B (en) 2016-11-17 2016-11-17 Extra-high voltage sleeve pipe hanging method

Country Status (1)

Country Link
CN (1) CN106429817B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109422200B (en) * 2017-09-04 2020-10-13 烟台中集来福士海洋工程有限公司 Installation method of tensioning hydraulic cylinder of drilling platform marine riser
CN108358047B (en) * 2018-01-16 2019-06-11 浙江大学 A kind of vertical clamping hanging device of the cylinder type objects applied to narrow space
CN114906725B (en) * 2022-03-29 2024-03-08 中信重工机械股份有限公司 Overturning vertical hoisting tool and method for extra-heavy large-diameter-variable shaft parts

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101830393A (en) * 2010-05-21 2010-09-15 中国石化集团第五建设公司 Hoisting method of thin-wall long and thin large-size equipment
CN202138946U (en) * 2011-03-23 2012-02-08 青海送变电工程公司 Special hoisting tool for transformer sleeves
CN203529713U (en) * 2013-09-17 2014-04-09 中国十九冶集团有限公司 High-pressure sleeve hoisting structure
CN104961044A (en) * 2015-05-29 2015-10-07 云南省送变电工程公司 Method for installing or removing high voltage bushing by using C-shaped hoseclamp cross binding strap
CN103935882B (en) * 2014-04-25 2015-10-21 中石化宁波工程有限公司 A kind of pocket of large thin-wall dryer hangs method
CN105275253A (en) * 2015-11-11 2016-01-27 国网河北阜城县供电公司 Equal-diameter rod erecting device and application method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3915311A (en) * 1974-01-21 1975-10-28 Caterpillar Tractor Co Method and apparatus for handling large, fragile objects

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101830393A (en) * 2010-05-21 2010-09-15 中国石化集团第五建设公司 Hoisting method of thin-wall long and thin large-size equipment
CN202138946U (en) * 2011-03-23 2012-02-08 青海送变电工程公司 Special hoisting tool for transformer sleeves
CN203529713U (en) * 2013-09-17 2014-04-09 中国十九冶集团有限公司 High-pressure sleeve hoisting structure
CN103935882B (en) * 2014-04-25 2015-10-21 中石化宁波工程有限公司 A kind of pocket of large thin-wall dryer hangs method
CN104961044A (en) * 2015-05-29 2015-10-07 云南省送变电工程公司 Method for installing or removing high voltage bushing by using C-shaped hoseclamp cross binding strap
CN105275253A (en) * 2015-11-11 2016-01-27 国网河北阜城县供电公司 Equal-diameter rod erecting device and application method thereof

Also Published As

Publication number Publication date
CN106429817A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106429817B (en) Extra-high voltage sleeve pipe hanging method
CN107614417B (en) Modular self-adaptive folding device for climbing crane
US10100525B2 (en) Wind turbine with a concrete tower and method for the assembly thereof
CN106836498A (en) A kind of super-span Stadium roof system steel truss lifting construction engineering method
CN101734560B (en) High-altitude dismantling method of inside-climbing tower crane for towering structure construction
CN109911770B (en) Construction method for hoisting gantry crane
KR20180127066A (en) Prefabricated shoring system
CN109236012A (en) A kind of dry font Guywire tower hanging method of transmission line of electricity
KR20190066241A (en) Gang form safety apparatus with integrated safety hook
CN208454282U (en) A kind of suspender for precast-concrete form overturning and handling
CN207109546U (en) A kind of interim hinge device of arch rib
CN208686053U (en) A kind of elevator well sizing climbing platforms device
JP5589183B2 (en) Cylindrical structure scaffolding apparatus and moving method thereof
CN110195411A (en) A kind of self-propelled bridge formwork Mobile workbench
CN104314315B (en) The construction method that steel arch-shelf is installed
CN207435902U (en) A kind of pier shaft hanging basket mounting platform
CN108946500B (en) Movable material handling system
CN106760462A (en) Steel containment vessel of nuclear power station cylinder operation platform
CN208201662U (en) High pier bridge pier shaft reinforcing bar binding operation protective frame
WO2021035974A1 (en) Transportation system and method for blast furnace shell
JP5773343B2 (en) Method for constructing multi-story building and lifting device for multi-story scaffold used therefor
CN215803378U (en) Umbrella type cast-in-place elevator shaft edge protection device
CN112373652A (en) High strutting arrangement of platform is dismantled in semi-submerged formula jack-up
JP3567425B2 (en) Horizontal stay for tower crane
CN206128607U (en) Lifting platform device of chimney derrick

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant