Rack formula hanging beam device Download PDFInfo
- Publication number
- CN205034948U CN205034948U CN201520765951.8U CN201520765951U CN205034948U CN 205034948 U CN205034948 U CN 205034948U CN 201520765951 U CN201520765951 U CN 201520765951U CN 205034948 U CN205034948 U CN 205034948U
- Authority
- CN
- China
- Prior art keywords
- channel steel
- short channel
- steel
- long channel
- reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型涉及一种网架式吊梁装置,包括长槽钢和短槽钢,其特征在于:所述长槽钢和所述短槽钢相互垂直固定连接,且形成长方体框架结构;所述长槽钢上端设有均匀分布的吊耳,该吊耳连接有钢丝绳;所述短槽钢两两之间的对角线方向设置有一根加强斜撑;所述长槽钢与所述短槽钢连接处设置有加强板;所述加强板与所述加强斜撑固定连接。本实用新型避免了起吊时造成梁的二次损伤,且一次性可起吊两根梁,提高了生产效率,节约了维修成本,保证了生产人员的安全。
The utility model relates to a grid-type hanging beam device, which comprises a long channel steel and a short channel steel, and is characterized in that: the long channel steel and the short channel steel are vertically fixedly connected to each other and form a cuboid frame structure; The upper end of the long channel steel is provided with uniformly distributed lifting lugs, and the lifting lugs are connected with steel wire ropes; a reinforcing diagonal brace is provided between the two short channel steels in the diagonal direction; the long channel steel and the short channel steel A reinforcing plate is provided at the steel connection; the reinforcing plate is fixedly connected with the reinforcing diagonal brace. The utility model avoids secondary damage to the beams during lifting, and can lift two beams at one time, thereby improving production efficiency, saving maintenance costs, and ensuring the safety of production personnel.
Description
技术领域 technical field
本实用新型涉及风电设备领域,尤其涉及一种网架式吊梁装置。 The utility model relates to the field of wind power equipment, in particular to a grid-type hanging beam device.
背景技术 Background technique
目前,在叶片铺层上梁时,起吊叶片通常使用的梁较重,每次上梁时只能够吊1根梁,浪费了大量时间,而且由于梁的结构是中间重两边轻,在梁起吊时梁的两边发生剧烈晃动,容易造成梁受力弯曲、变形,不但损坏了梁的结构而且给梁造成2次伤害,增加了维修费用,同时梁的变形会给安全生产带来隐患,严重威胁着作业人员的生命安全。 At present, when the beam is laid on the blade layer, the beam usually used for lifting the blade is relatively heavy, and only one beam can be lifted each time the beam is lifted, which wastes a lot of time. When the two sides of the beam shake violently, it is easy to cause the beam to bend and deform under force, which not only damages the structure of the beam but also causes secondary damage to the beam, which increases the maintenance cost. At the same time, the deformation of the beam will bring hidden dangers to safe production and seriously threaten the operation. safety of personnel.
实用新型内容 Utility model content
为了解决上述问题,本实用新型提供一种为避免起吊时造成梁的二次损伤、不浪费工作时间、节约了维修成本、保证生产人员安全的网架式吊梁装置。 In order to solve the above problems, the utility model provides a grid-type lifting beam device to avoid secondary damage to the beam during lifting, not waste working time, save maintenance costs, and ensure the safety of production personnel.
为解决上述问题,本实用新型所述的一种网架式吊梁装置,包括长槽钢和短槽钢,其特征在于:所述长槽钢和所述短槽钢相互垂直固定连接,且形成长方体框架结构;所述长槽钢上端设有均匀分布的吊耳,该吊耳连接有钢丝绳;所述短槽钢两两之间的对角线方向设置有一根加强斜撑;所述长槽钢与所述短槽钢连接处设置有加强板;所述加强板与所述加强斜撑固定连接。 In order to solve the above problems, a grid-type suspension beam device described in the utility model includes a long channel steel and a short channel steel, and is characterized in that: the long channel steel and the short channel steel are vertically fixedly connected to each other, and form a rectangular parallelepiped frame structure; the upper end of the long channel steel is provided with evenly distributed lifting lugs, and the lifting lugs are connected with steel wire ropes; a reinforcing diagonal brace is set between two short channel steels in the diagonal direction; the long channel steel A reinforcing plate is provided at the joint between the channel steel and the short channel steel; the reinforcing plate is fixedly connected with the reinforcing diagonal brace.
本实用新型与现有技术相比具有以下优点: Compared with the prior art, the utility model has the following advantages:
本实用新型长方体框架整体上采用斜撑和加强板加强,提高了框架的稳定性,起吊梁时,梁不会发生弯曲变形,避免了起吊时造成梁的二次损伤,且一次性可起吊两根梁,提高了生产效率,节约了维修成本,保证了生产人员的安全。 The cuboid frame of the utility model is reinforced by diagonal braces and reinforcing plates as a whole, which improves the stability of the frame. When the beam is hoisted, the beam will not be bent and deformed, which avoids secondary damage to the beam during hoisting, and can be hoisted twice at a time. The root beam improves production efficiency, saves maintenance costs and ensures the safety of production personnel.
附图说明 Description of drawings
图1为本实用新型结构示意图。 Fig. 1 is the structural representation of the utility model.
图中1.加强板,2.吊耳,3.加强斜撑,4.短槽钢,5.钢丝绳,6.长槽钢。 In the figure 1. Reinforcing plate, 2. Lifting lug, 3. Reinforced diagonal brace, 4. Short channel steel, 5. Steel wire rope, 6. Long channel steel.
具体实施方式 detailed description
根据附图1所示,一种网架式吊梁装置,包括长槽钢6和短槽钢4。长槽钢6和短槽钢4相互垂直固定连接,且形成长方体框架结构;长槽钢6上端设有均匀分布的吊耳2,吊耳2连接有钢丝绳5;短槽钢4两两之间的对角线方向设置有一根加强斜撑3;长槽钢6与短槽钢4连接处设置有加强板1;加强板1与加强斜撑3固定。 According to accompanying drawing 1 shown, a kind of grid type hanging beam device comprises long channel steel 6 and short channel steel 4. The long channel steel 6 and the short channel steel 4 are vertically fixedly connected to each other, and form a cuboid frame structure; the upper end of the long channel steel 6 is provided with evenly distributed lifting lugs 2, and the lifting lugs 2 are connected to the steel wire rope 5; A reinforced diagonal brace 3 is arranged in the diagonal direction of the center; a reinforced plate 1 is arranged at the connection between the long channel steel 6 and the short channel steel 4; the reinforced plate 1 and the reinforced diagonal brace 3 are fixed.
使用时,用吊带将第1根梁固定在长槽钢6底部,确认捆绑牢固后,将第2根梁固定捆绑第一根梁下方,然后将钢丝绳5挂在天车吊钩上,缓慢起吊,起吊过程中加强板1和加强斜撑3对长槽钢6和短槽钢4起到加固作用,使其不发生变形,再将梁吊到需要放置的位置松开吊带,放置好梁后,将装置吊到指定放置位置,取下天车吊钩上的钢丝绳5。 When in use, fix the first beam to the bottom of the long channel steel 6 with a sling. After confirming that the binding is firm, fix the second beam under the first beam, and then hang the steel wire rope 5 on the hook of the crown block and lift slowly. , during the lifting process, the reinforcing plate 1 and the reinforcing diagonal brace 3 play a reinforcing role on the long channel steel 6 and the short channel steel 4 so that they do not deform. , hoist the device to the designated placement location, and take off the wire rope 5 on the crane hook.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520765951.8U CN205034948U (en) | 2015-09-30 | 2015-09-30 | Rack formula hanging beam device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520765951.8U CN205034948U (en) | 2015-09-30 | 2015-09-30 | Rack formula hanging beam device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205034948U true CN205034948U (en) | 2016-02-17 |
Family
ID=55293863
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520765951.8U Expired - Lifetime CN205034948U (en) | 2015-09-30 | 2015-09-30 | Rack formula hanging beam device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205034948U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110304543A (en) * | 2019-07-16 | 2019-10-08 | 山鹰国际控股股份公司 | A kind of dry rack safety device |
| CN111747284A (en) * | 2020-06-18 | 2020-10-09 | 中国三冶集团有限公司 | Net frame type combined lifting appliance |
-
2015
- 2015-09-30 CN CN201520765951.8U patent/CN205034948U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110304543A (en) * | 2019-07-16 | 2019-10-08 | 山鹰国际控股股份公司 | A kind of dry rack safety device |
| CN111747284A (en) * | 2020-06-18 | 2020-10-09 | 中国三冶集团有限公司 | Net frame type combined lifting appliance |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103266779B (en) | A kind of sliding and lifting construction equipment and method thereof of crossing horizontal obstacle thing | |
| CN205114903U (en) | Demolition structure of tower crane counter weight | |
| CN203382365U (en) | Lifting appliance system for lifting thin, long and thin-wall equipment integrally | |
| CN205034948U (en) | Rack formula hanging beam device | |
| CN204324684U (en) | For the lifting tooling of nuclear power plant's fuel screen work | |
| CN204999517U (en) | Coal transporting trestle steel truss hoist device in power plant's chimney | |
| CN111042538A (en) | Hoisting and mounting method of buckling restrained brace | |
| CN204752012U (en) | Wall -hanging miniature hoist | |
| CN201678360U (en) | An equipment hoisting device | |
| CN208948679U (en) | Assembled hanger | |
| CN209127874U (en) | A kind of concurrent lifting device | |
| CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
| CN202679163U (en) | Lifting device for maintaining main transformer fan motor of transformer | |
| CN205170254U (en) | Tripod hoisting accessory | |
| CN204778565U (en) | Well lid handling device | |
| CN104528519A (en) | Clamping tool for assisting in hoisting cement electric poles | |
| CN105827071B (en) | The method for dismounting of magnet pole of rotor of hydraulic generator key and provision for disengagement | |
| CN210457169U (en) | Novel lifting appliance suitable for lifting all sections of steel trussed beams of suspension bridge | |
| CN210944589U (en) | Self-detaching attachment mechanism | |
| CN203997408U (en) | Gantry suspension hook storage rack of lifting steel scrap | |
| CN210825081U (en) | Be suitable for multi-functional hoist of finite space hoist and mount steel reinforcement cage | |
| CN201830104U (en) | Lifting frame for hanging magnetic pole of large hydrogenerator rotor | |
| CN202897785U (en) | Furnace shell hanger | |
| CN217759938U (en) | A special lifting device for attached lift scaffold demolishs in air | |
| CN217102742U (en) | A kind of hoisting equipment for flat aluminum alloy |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160217 |