CN203531381U - Temporary hanging and supporting device used for steel bar truss formworks - Google Patents

Temporary hanging and supporting device used for steel bar truss formworks Download PDF

Info

Publication number
CN203531381U
CN203531381U CN201320597506.6U CN201320597506U CN203531381U CN 203531381 U CN203531381 U CN 203531381U CN 201320597506 U CN201320597506 U CN 201320597506U CN 203531381 U CN203531381 U CN 203531381U
Authority
CN
China
Prior art keywords
wire rope
bar truss
steel
steel wire
mould plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320597506.6U
Other languages
Chinese (zh)
Inventor
朱小六
武科
高涛
曾德骅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201320597506.6U priority Critical patent/CN203531381U/en
Application granted granted Critical
Publication of CN203531381U publication Critical patent/CN203531381U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a temporary hanging and supporting device used for steel bar truss formworks. The temporary hanging and supporting device has the advantages of being capable of saving a large mount of manpower and a large number of material resources, enabling materials to be conveniently and rapidly circulated, and being short in construction cycle and obvious in economical benefit. The temporary hanging and supporting device used for the steel bar truss formworks comprises a supporting steel piece arranged below the formworks, and hanging assemblies are connected to the supporting steel piece at L intervals. Each hanging assembly comprises a steel wire rope a, a connecting piece and a steel wire rope b, wherein the steel wire rope a penetrates through the corresponding formwork to be connected with the supporting steel piece, the connecting piece and the steel wire rope b are arranged above the corresponding formwork, the steel wire rope a is connected with one end of the connecting piece, the middle portion of the steel wire rope b is connected with the other end of the connecting piece, and the two ends of the steel wire rope b are connected to two fixed beams located above the corresponding formwork.

Description

Interim hanging bracing or strutting arrangement for reinforcement bar truss mould plate
Technical field
The utility model relates to a kind of bracing or strutting arrangement of reinforcement bar truss mould plate, belongs to building operations auxiliary equipment field.
Background technology
During the construction of reinforcement bar truss mould plate, have one maximum without supporting span, surpass to set without supporting span, template without support place in cast vibrated concrete process can produce downwarp, for avoiding the downwarp of template, must be before building floorslab concrete, at the together reliable temporary supporting of template span centre setting.
At present, reinforcement bar truss mould plate temporary supporting generally all adopts full hall scaffold formula to support, and on lower floor has constructed floor, sets up full hall scaffold, and top adopts adjustable jacking, be arranged vertically in flitch or the steel pipe upper support of reinforcement bar truss mould plate below and live template, this supporting way, needs a large amount of steel pipe scaffold and associated materials, also needs a large amount of manpowers, material turnover pressure is large, construction period is longer, and economic benefit is lower, cannot embody the economic advantages of reinforcement bar truss mould plate.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of interim hanging bracing or strutting arrangement, for the supporting of reinforcement bar truss mould plate, can save a large amount of manpower materials, makes material turnover convenient and swift, shortens construction period, promotes economic benefit.
The utility model is for the interim hanging bracing or strutting arrangement of reinforcement bar truss mould plate, comprise the supporting steel that is placed in template below, on described supporting steel, every spacing L, be connected with a suspending assembly, described in each, suspending assembly comprises the wire rope a being connected with supporting steel through template, connector and the wire rope b that is positioned at template top, wire rope a is connected with one end of connector, the middle part of wire rope b is connected with the other end of connector, and the two ends of wire rope b are connected respectively on two clamped beams that are positioned at template top.
The utility model is for the interim hanging bracing or strutting arrangement of reinforcement bar truss mould plate, and wherein said connector adopts flower basket bolt.
The utility model is for the interim hanging bracing or strutting arrangement of reinforcement bar truss mould plate, and the two ends of wherein said wire rope b are all connected with clamped beam by jig, and described jig is connected on clamped beam, and the end of described wire rope b is connected on jig.
The utility model is for the interim hanging bracing or strutting arrangement of reinforcement bar truss mould plate, and wherein said spacing L is 2m.
The utility model is for the interim hanging bracing or strutting arrangement of reinforcement bar truss mould plate, and wherein said supporting steel adopts steel pipe.
The utility model for the interim hanging bracing or strutting arrangement difference from prior art of reinforcement bar truss mould plate be the utility model for the interim hanging bracing or strutting arrangement of reinforcement bar truss mould plate by being located at the supporting steel support shuttering of template below, and by many groups suspending assembly, supporting steel is upwards sling and is fixed on the clamped beam that is positioned at template top, simple in structure, material requested is less, saved artificial, shorten construction period, improved economic benefit.
Below in conjunction with accompanying drawing, the interim hanging bracing or strutting arrangement for reinforcement bar truss mould plate of the present utility model is described further.
Accompanying drawing explanation
Fig. 1 is that the utility model is for the front view of the interim hanging bracing or strutting arrangement of reinforcement bar truss mould plate;
Fig. 2 is that the utility model is for the top view of the interim hanging bracing or strutting arrangement of reinforcement bar truss mould plate.
The specific embodiment
As shown in Figure 1, 2, present embodiment comprises for the interim hanging bracing or strutting arrangement of reinforcement bar truss mould plate the supporting steel 2 that is placed in template 1 below, and present embodiment supporting steel adopts steel pipe, on supporting steel 2, every spacing L, is connected with a suspending assembly, and L is set to 2m.
Each suspending assembly comprises the wire rope a3 being connected with supporting steel 2 through template 1, be positioned at connector 4 and the wire rope b5 of template 1 top, the standard component flower basket bolt that connector 4 adopts on the market, wire rope a is connected with one end of flower basket bolt, the middle part of wire rope b is connected with the other end of flower basket bolt, the two ends of wire rope b are connected with the clamped beam 6 that is positioned at template 1 top by jig 7 respectively, jig 7 is provided with through hole, the end of wire rope b is through through hole and fixedly link on jig through dop, by the threaded adjusting bar adjustable steel wire rope a of rotation flower basket bolt and the distance between wire rope b, adapt to the distance between template and clamped beam, jig wherein, dop all can adopt the standard component being connected and fixed for wire rope on the market.
Above-described embodiment is described preferred embodiment of the present utility model; not scope of the present utility model is limited; do not departing under the prerequisite of the utility model design spirit; various distortion and improvement that those of ordinary skills make the technical solution of the utility model, all should fall in the definite protection domain of the utility model claims.

Claims (5)

1. the interim hanging bracing or strutting arrangement for reinforcement bar truss mould plate, it is characterized in that: comprise the supporting steel (2) that is placed in template (1) below, described supporting steel (2) is upper is connected with a suspending assembly every spacing L, described in each, suspending assembly comprises the wire rope a(3 being connected with supporting steel through template), be positioned at connector (4) and the wire rope b(5 of template top), wire rope a(3) be connected with one end of connector (4), wire rope b(5) middle part is connected with the other end of connector (4), wire rope b(5) two ends are connected respectively on two clamped beams (6) that are positioned at template top.
2. the interim hanging bracing or strutting arrangement for reinforcement bar truss mould plate according to claim 1, is characterized in that: described connector (4) adopts flower basket bolt.
3. the interim hanging bracing or strutting arrangement for reinforcement bar truss mould plate according to claim 1, it is characterized in that: two ends described wire rope b(5) are all connected with clamped beam (6) by jig (7), described jig (7) is connected on clamped beam, described wire rope b(5) end be connected on jig (7).
4. according to the interim hanging bracing or strutting arrangement for reinforcement bar truss mould plate described in claims 1 to 3 any one, it is characterized in that: described spacing L is 2m.
5. the interim hanging bracing or strutting arrangement for reinforcement bar truss mould plate according to claim 4, is characterized in that: described supporting steel (2) adopts steel pipe.
CN201320597506.6U 2013-09-23 2013-09-23 Temporary hanging and supporting device used for steel bar truss formworks Expired - Fee Related CN203531381U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320597506.6U CN203531381U (en) 2013-09-23 2013-09-23 Temporary hanging and supporting device used for steel bar truss formworks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320597506.6U CN203531381U (en) 2013-09-23 2013-09-23 Temporary hanging and supporting device used for steel bar truss formworks

Publications (1)

Publication Number Publication Date
CN203531381U true CN203531381U (en) 2014-04-09

Family

ID=50417605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320597506.6U Expired - Fee Related CN203531381U (en) 2013-09-23 2013-09-23 Temporary hanging and supporting device used for steel bar truss formworks

Country Status (1)

Country Link
CN (1) CN203531381U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277993A (en) * 2018-01-08 2018-07-13 中国二十冶集团有限公司 A kind of steel bar truss floor support plate hanging brace device and its assembling production method
CN108532968A (en) * 2018-06-05 2018-09-14 上海绿地建设(集团)有限公司 A kind of assembled support device of steel bar truss floor support plate composite floor system
CN113653315A (en) * 2021-07-20 2021-11-16 中建科技有限公司华东分公司 Truss plate pouring concrete upward-pulling soft support construction device and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277993A (en) * 2018-01-08 2018-07-13 中国二十冶集团有限公司 A kind of steel bar truss floor support plate hanging brace device and its assembling production method
CN108532968A (en) * 2018-06-05 2018-09-14 上海绿地建设(集团)有限公司 A kind of assembled support device of steel bar truss floor support plate composite floor system
CN113653315A (en) * 2021-07-20 2021-11-16 中建科技有限公司华东分公司 Truss plate pouring concrete upward-pulling soft support construction device and construction method thereof

Similar Documents

Publication Publication Date Title
CN103669655B (en) Deformation joint both walls body concrete pouring construction process
CN203531381U (en) Temporary hanging and supporting device used for steel bar truss formworks
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN203113793U (en) Large formwork installation system of oblique structure
CN210562223U (en) Slope protection template with arch framework
CN204781931U (en) Early support system that tears open of plastic formwork
CN208197158U (en) A kind of reinforcing bar tire suspender of precast segment box beam
CN103552911A (en) Movable hoisting apparatus and construction installation method used by same
CN203701596U (en) Scissor-type connecting-rod keel-supporting system
CN207727978U (en) Girderless floor bolumn cap template reinforcing device
CN205034948U (en) Rack formula hanging beam device
CN215368358U (en) Balcony faces limit protective structure convenient to installation
CN204960324U (en) Suspension type floor formwork support device
CN211846865U (en) Device for hoisting corrugated pipe
CN203961258U (en) Builder's jack foot guard structure
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN203795845U (en) Portable support for hoisting form board for pipeline blocking
CN103397779B (en) A kind of method for supporting of large height shear wall formwork
CN203394035U (en) Plugging reinforcing device for reserved hole formworks of concrete platforms
CN204525727U (en) A kind of pre-cast hollow slab internal mould supporter
CN203755642U (en) Cantilever scaffold profile steel anchoring device
CN207228610U (en) The template that a kind of novel house construction uses
CN204530489U (en) A kind of high pier creeping formwork hydraulic lifting apparatus
CN204826220U (en) Location built -in fitting with U type groove

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140409

Termination date: 20180923

CF01 Termination of patent right due to non-payment of annual fee