KR20110058359A - Splicing method of embedded type baseplate with steel column - Google Patents

Splicing method of embedded type baseplate with steel column Download PDF

Info

Publication number
KR20110058359A
KR20110058359A KR1020090115111A KR20090115111A KR20110058359A KR 20110058359 A KR20110058359 A KR 20110058359A KR 1020090115111 A KR1020090115111 A KR 1020090115111A KR 20090115111 A KR20090115111 A KR 20090115111A KR 20110058359 A KR20110058359 A KR 20110058359A
Authority
KR
South Korea
Prior art keywords
steel
column
welding
steel plate
fixing
Prior art date
Application number
KR1020090115111A
Other languages
Korean (ko)
Other versions
KR101131679B1 (en
Inventor
이창남
Original Assignee
이창남
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이창남 filed Critical 이창남
Priority to KR1020090115111A priority Critical patent/KR101131679B1/en
Publication of KR20110058359A publication Critical patent/KR20110058359A/en
Application granted granted Critical
Publication of KR101131679B1 publication Critical patent/KR101131679B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • E04H12/2276Clamping poles or posts on a stub
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Foundations (AREA)

Abstract

PURPOSE: A connection method of an embedded base plate and a steel column is provided to heighten the quality of construction work by fixing to leveling mortar on lean concrete before foundation work and performing freely without disturbance with other processes. CONSTITUTION: A connection method of an embedded base plate and a steel column comprises the steps of: arranging the bottom of a foundation and placing lean concrete; regulating the bottom level using leveling mortar on lean concrete; installing L-section steel(3) to two facing sides of the outermost end of a place where a reinforced concrete column is installed on the upper part of the leveling mortar, and installing a steel plate(2) to the remaining two sides in the orthogonal direction to the end of the L-section steel; forming a closed quadrangle by fixing the L-section steel with the steel plate by welding; forming a bolt hole in the L-section steel and fixing a set anchor(10) to the bottom; erecting a reinforcing bar piece to the corner of the closed quadrangle and fixing the reinforcing bar piece to the L-section steel and the steel plate by welding; installing an upper steel plate(2a) to the top of the reinforcing bar piece, welding the reinforcing bar piece to the inside and arranging a footing bar, and then placing concrete; installing a 1-joint column on the upper part of the upper steel plate; and connecting a joint steel plate(2b) to the lower part of the column by welding.

Description

매입형 베이스 플레이트와 철골기둥의 이음 방법{Splicing Method of Embedded type Baseplate with Steel Column}Splicing Method of Embedded type Baseplate with Steel Column

지금까지는 도 3과 같이, 철골기둥(5)은 기초(4)나 페데스털에 연결하기 위해 베이스 플레이트(7)를 활용하였고 기존 공법의 베이스 플레이트는 수직부재인 기둥 최하단에 수평 방향으로 부착하는 바닥 강판으로 사용하였다. 베이스 플레이트의 표준형은 도 3과 같이 강판을 기둥 끝단에 수평으로 용접하고, 기초에 묻어둔 앵커볼트(9)와 긴결하기 위한 볼트구멍을 뚫고 볼트구멍들 사이 빈 공간에는 기둥과 베이스 플레이트 사이에 수직방향으로 리브플레이트를 용접하여 보강한 것이다. 베이스 플레이트는 기초나 페데스털(pedestal, 짧은 기둥) 최상단에 얹어놓아 시공하는 것이 일반적이어서 바닥 위에 돌출되는 리브(8)와 앵커볼트는 녹이 나기 쉽고 미관상에도 좋지 않다.Up to now, as shown in Figure 3, the steel column (5) utilizes the base plate (7) to connect to the base (4) or pedestal, and the base plate of the existing construction method is attached to the horizontal bottom in the vertical direction of the column of the vertical member Used as a bottom steel sheet. Standard type of the base plate is to weld the steel plate to the end of the column horizontally, as shown in Figure 3, drilled a bolt hole for tightening the anchor bolt (9) buried in the foundation and in the empty space between the bolt hole perpendicular to the pillar and base plate It is reinforced by welding rib plate in the direction. The base plate is generally installed on top of a foundation or pedestal, so the ribs 8 and anchor bolts protruding from the bottom are rusted and not good in appearance.

재래식 베이스 플레이트(7)는 기둥이나 페데스털 최하단에 수평으로 용접하는 강판인데 기둥에서 내려오는 큰 축방향 하중을 콘크리트 기초에 안전하게 분산시켜 전달하는 중간단계의 강판이다. 철골기둥의 단위면적당 압축력은 콘크리트에 비해 크므로 베이스 플레이트의 면적은 기둥의 단면적보다 커야 하며 베이스 플레 이트가 구부러지지 않도록 하려면 두꺼운 강판을 사용하거나 리브플레이트로 보강하여 강판 두께를 줄이기도 한다. 또한 베이스 플레이트와 기초는 앵커볼트(9)로 긴결하며, 베이스 플레이트와 기초 사이의 공간은 고강도 무수축 모르터(13)로 채운다.Conventional base plate (7) is a steel plate welded horizontally to the lower end of the column or pedestal is an intermediate steel plate to safely distribute and transfer the large axial load from the column to the concrete foundation. Since the compressive force per unit area of the steel column is larger than that of concrete, the area of the base plate should be larger than the cross-sectional area of the column. To prevent the base plate from bending, the thickness of the steel plate may be reduced by using thick steel plate or by reinforcing with rib plate. In addition, the base plate and the base are tightly anchored with anchor bolts 9, and the space between the base plate and the base is filled with a high strength non-shrink mortar (13).

베이스 플레이트를 리브 보강 없이 두꺼운 강판으로만 설계할 수 있다면 바닥에 리브가 돌출하지 않아서 좋다. 그러나 베이스 플레이트의 두께를 줄이려면 리브를 부착하여 보강하여야 하므로 바닥 상부로 돌출하는 것을 피할 수 없게 된다. 따라서 바닥 상부로 베이스 플레이트, 리브 및 볼트가 돌출하지 않고 두껍지도 않은 베이스 플레이트가 필요하다.If the base plate can only be designed as a thick steel plate without rib reinforcement, the ribs do not protrude from the bottom. However, in order to reduce the thickness of the base plate, it is necessary to attach and reinforce the ribs, so it is inevitable to protrude to the top of the floor. Thus, there is a need for a base plate that does not protrude from the base plate, ribs and bolts to the bottom and is not thick.

기초(4)와 지중보 철근 배근을 한 후 콘크리트를 타설하기 전 정확한 위치에 앵커볼트(9)를 부착 고정하는 것이 쉽지 않은데 콘크리트를 타설하는 과정에서도 위치 이동이 일어나는 것을 염려하지 않아도 되는 공사방법이 필요하다. 앵커볼트의 위치와 수직도가 부정확하면 베이스 플레이트(7)에 뚫은 볼트구멍과 맞지 않아 부실시공으로 이어지기 때문에 베이스 플레이트를 기초 상단에 얹을 때 높이와 방향성이 부정확한 것을 강판 쐐기(일부 감리가 소홀한 현장에서는 합판 등을 끼우는 경우도 있음)를 끼워서 보정하고 무수축 모르터(13)를 채우는 것이 표준상세인데 이 같은 번거로움에서 벗어나는 새로운 방법이 필요하다.After laying the foundation (4) and underground beam reinforcement, it is not easy to fix the anchor bolt (9) at the correct position before placing the concrete. need. If the anchor bolt's position and verticality are incorrect, it will not match the bolt hole drilled in the base plate (7), which will lead to sub-holes. Therefore, when the base plate is placed on the top of the foundation, the height and direction are incorrect. In the field, it is standard to insert plywood, etc.), and to fill the non-shrink mortar 13, and a new method of eliminating this hassle is necessary.

기둥 최하단부에 강판 베이스 플레이트(7)를 수평으로 용접하여 앵커볼트(9)로 기초(4)에 부착하는 방법 대신 지상에서 기둥을 서로 이음하는 것과 같은 방식을 그대로 적용할 수 있도록 바꾼다. 매입형 베이스 플레이트는 기초공사 이전 버림 콘크리트(12) 위의 레벨링 모르터(11)에 고정하여 철근조립, 거푸집 등 다른 공정과 간섭 없이 자유롭게 시행할 수 있게 하여 공사의 품질을 높인다.Instead of attaching the steel plate base plate 7 horizontally to the bottom of the column and attaching it to the foundation 4 with the anchor bolt 9, the same method as that of connecting the pillars with each other on the ground is applied. The buried base plate is fixed to the leveling mortar 11 on the discarded concrete 12 before the foundation work so that the quality of the construction can be freely performed without interference with other processes such as reinforcing bars and formwork.

철근토막(1a), 상부강판(2a) 또는 기둥토막(6)을 용접하여 버림 콘크리트(12) 위의 레벨링 모르터(11)에 고정하면, 기초공사 후 정확한 위치에서 1절 기둥을 잇는 작업이 가능하므로 공사품질이 향상되고 공사 기간과 공사비 절감도 가능하다. 기둥 재료로 사용하는 철골이나 철근은 추가 부담금과 대기시간을 감수하여야 필요한 길이로 주문생산이 가능하여 일반적으로는 정해진 길이의 제품을 사다가 필요한 길이로 잘라서 제작한다. 그러므로 본 발명의 매입형 베이스 플레이트에서 사용하는 기둥토막과 철근토막(1a)은 자투리 재료를 활용할 수 있어서 공사비 절감에 도움이 된다. 매입형 베이스 플레이트는 일반 베이스 플레이트(7)에서 필수적으로 사용해야 하는 고강도의 값비싼 무수축 모르터(13)를 사용할 필요가 없으므로 경제적이다.Reinforcement 1a, upper steel plate 2a, or column 6 is welded and fixed to leveling mortar 11 on discarded concrete 12, so that it is possible to connect 1 column at the correct position after foundation work. As a result, construction quality can be improved and construction period and construction cost can be reduced. Steel frame or reinforcing steel used as a pillar material can be customized to the required length by paying additional charges and waiting time. Therefore, the pillar and reinforcement (1a) used in the buried base plate of the present invention can be used to reduce the cost of construction because it can utilize the scab material. The buried base plate is economical because it does not require the use of high strength, expensive non-shrink mortars 13, which must be used essentially in the general base plate 7.

매입형 베이스 플레이트를 활용하여 철근 선조립 기둥(5a) 또는 철골기둥(5)을 기초(4)에 고정하는 구체적인 내용은 다음과 같다.Specific details of fixing the reinforcing line assembly column 5a or the steel frame column 5 to the base 4 by using the embedded base plate are as follows.

1. 기초 토공사가 종료되면 도 1과 같이 기초 하면의 바닥을 평활하게 정리 하고, 버림 콘크리트(12)를 타설한다.1. When the foundation earthwork is finished, smooth the bottom of the bottom surface of the foundation as shown in Figure 1, and cast the discarded concrete (12).

2. 버림 콘크리트 위에 철근 선조립 기둥 또는 철골기둥 설치 위치에 레벨링 모르터(11)를 타설한다.2. Place the leveling mortar (11) on the reinforcement prefabricated column or steel column installation position on the discarded concrete.

3. 도 1과 같이, ㄱ형강(3)과 강판(2), 철근토막(1a), 상부강판(2a) 또는 기둥토막(6)을 사용하여 매입형 베이스 플레이트를 제작한다. 각 단계별 구체적인 방법을 정리하면 아래와 같다.3. As shown in FIG. 1, a buried base plate is manufactured by using a-beam (3) and steel sheet (2), reinforced membrane (1a), upper steel plate (2a), or pillar-like membrane (6). The detailed method of each step is as follows.

a. 매입형 베이스 플레이트의 형상은 기둥이 설치될 위치의 레벨링 모르터 상부 마주보는 두 변에 ㄱ형강(3)을 배열하고, 나머지 두 변에는 강판(2)을 ㄱ형강 끝단에 직각방향으로 설치하여 폐쇄형 사각형을 이룬다.a. The shape of the recessed base plate is arranged by arranging the A-beams (3) on two sides facing the upper part of the leveling mortar at the position where the column is to be installed, and by installing the steel plate (2) at right angles to the ends of the A-beams on the other two sides. Form a rectangle.

b. ㄱ형강과 강판을 용접하고, ㄱ형강에 볼트구멍을 뚫고 셋앵커(10)로 고정하며, 폐쇄형 4각형 구석에 철근토막(1a)을 세워서 용접한다(도 1).b. Welding the a-beam and the steel plate, a bolt hole in the a-beam and fixed with a set anchor (10), and welded by setting up a reinforcement (1a) in a closed square corner (Fig. 1).

c. 철근 선조립 기둥(5a)의 경우 도 1과 같이 철근토막(1a) 상부에는 4각형 상부강판(2a)으로 폐쇄형을 형성하고 내부에는 철근토막(1a)을 용접한다. 상부강판(2a) 위에는 본 기둥인 철근 선조립 기둥 1절이 연결되도록 하고, 본 기둥 하부에는 이음강판(2b)을 하부의 상부강판(2a)과 동일한 크기와 두께로 설치하여 두 강판을 외부에서 용접으로 고정한다. 이때 이음강판 내부에는 본 기둥의 철근(1)이 용접으로 고정된다.c. In the case of the rebar prefabricated column (5a) as shown in Figure 1 to form a closed type on the upper portion of the reinforcement membrane (1a) with a square upper steel plate (2a) and to weld the reinforcement (1a) inside. On the upper steel plate 2a, one reinforcing line assembly column, which is the main column, is connected, and at the bottom of the main column, a joint steel plate 2b is installed in the same size and thickness as the lower upper steel plate 2a to weld the two steel plates from the outside. Secure with. At this time, the reinforcing bar 1 of the pillar is fixed inside the joint steel plate by welding.

d. 철골기둥(5)의 경우 도 2와 같이 철근토막(1a) 상단에 H형강의 기둥토막(6)을 설치한다. 철근토막은 H형강의 기둥토막 내측으로 삽입하여 용접한다. 기둥토막의 플랜지 끝단에는 직각방향으로 상부강판(2a)을 용접하고, 상부 철골기둥(5) 과 기둥토막을 용접으로 이음한다. 또한 기둥토막에는 필요에 따라 스터드 등의 전단연결재를 부착한다.d. In the case of the steel column (5) as shown in Figure 2 to install the pillars 6 of the H-shaped steel on the top of the reinforcement (1a). Reinforced pieces are inserted into the column of H-beam and welded. The flange end of the pillar stud is welded to the upper steel plate (2a) in a right angle direction, and the upper steel column (5) and the pillar stub by welding. In addition, a shear connector such as a stud is attached to the column head as necessary.

4. 철근 선조립 기둥(5a)의 철근토막(1a)과 철골기둥(5)의 H형강 기둥토막(6) 길이는 기초 상부로 일정한 높이만큼 돌출되어 본 기둥인 1절 기둥과 이음이 용이하도록 하며, 돌출 길이는 약 1m 전후로 한다. 상기 단계가 종료되면 기초 철근을 배근하고, 콘크리트를 타설한다.4. The length of the reinforcing bar (1a) of the reinforcing line assembly column (5a) and the H-beam column (6) of the steel frame column (5) protrudes to a certain height to the upper part of the foundation to facilitate the connection with the first section of the column The protruding length is about 1m. When the step is completed, reinforce the foundation reinforcement, and pour concrete.

5. 매입형 베이스 플레이트 하단 ㄱ형강 및 강판으로 이루어진 4각형 상자 내부에는 필요 시 기초 콘크리트 타설 전 모르터를 주입하여 보강한다. 또한 철근 선조립 기둥(5a)과 철골기둥(5)의 철근토막(1a)은 구조계산에 의해 모서리와 모서리 사이 중앙부에 적당한 간격으로 추가한다.5. Inside the hexagonal box consisting of a-beam and steel plate at the bottom of the embedded base plate, reinforce it by injecting mortar before placing the concrete. In addition, the reinforcing line prefabricated column (5a) and the reinforcing bar (1a) of the steel column (5) is added to the center between the edge and the edge by a suitable calculation at a suitable interval.

도 1은 매입형 베이스 플레이트와 철근 선조립 1절 기둥과의 이음 개념도와 단면도,1 is a conceptual diagram and a cross-sectional view of the joint between the embedded base plate and the rebar line assembly section 1 column,

도 2는 매입형 베이스 플레이트와 철골 1절 기둥과의 이음 개념도와 단면도,2 is a conceptual diagram and a cross-sectional view of the joint between the embedded base plate and steel frame 1 pillar,

도 3은 재래식 베이스 플레이트의 개념도와 단면도,3 is a conceptual diagram and a cross-sectional view of a conventional base plate,

<도면의 부호에 대한 간단한 설명><Brief description of the symbols in the drawings>

1 ; 철근 1a ; 철근토막 One ; Rebar 1a; Rebar

2 ; 강판 2a ; 상부강판 2 ; Steel sheet 2a; Upper steel plate

2b ; 이음강판 2b; Joint plate

3 ; ㄱ형강 4 ; 기초 3; A-beam 4; Foundation

5 ; 철골기둥 5a ; 철근 선조립 기둥 5; Steel column 5a; Rebar prefabricated columns

6 ; 기둥토막 6; Pillar

7 ; 베이스 플레이트 8 ; 리브 7; Base plate 8; live

9 ; 앵커볼트 10 ; 셋앵커 9; Anchor bolt 10; Set anchor

11 ; 레벨링 모르터 12 ; 버림 콘크리트11; Leveling mortar 12; Abandoned concrete

13 ; 무수축 모르터13; Non-shrink mortar

Claims (3)

철근 선조립 기둥(5a)을 기초에 고정함에 있어서,In fixing the rebar prefabricated columns 5a to the foundation, a) 기초(4) 하면의 바닥을 정리하고, 버림 콘크리트(12)를 타설하는 단계 ;a) arranging the bottom of the lower surface of the foundation 4 and placing the discarded concrete 12; b) 상기 버림 콘크리트 위에 레벨링 모르터(11)를 이용하여 바닥 레벨을 조정하는 단계 ;b) adjusting the floor level using the leveling mortar (11) on the discarded concrete; c) 상기 레벨링 모르터 상부에 철근 선조립 기둥이 설치될 위치의 최외단 마주 보는 두 변에 ㄱ형강(3)을 설치하고, 나머지 두 변에는 강판(2)을 ㄱ형강 끝단에 직각방향으로 설치하여 사각형을 이루는 단계 ;c) A-beams (3) are installed on the two outermost sides of the leveling mortar on the uppermost side of the position where the reinforcing line assembly pillars are to be installed, and on the other two sides, a steel plate (2) is installed at right angles to the A-beam ends. Forming a rectangle; d) 상기 ㄱ형강과 강판을 용접으로 고정하여 폐쇄형 4각형을 형성하고, ㄱ형강에는 볼트구멍을 뚫고 셋앵커(10)를 바닥에 고정하는 단계 ;d) fixing the a-beam and the steel sheet by welding to form a closed quadrilateral, and drilling a bolt hole in the a-beam to fix the set anchor 10 to the floor; e) 상기폐쇄형 4각형 구석에 철근토막(1a)을 세우고, ㄱ형강과 강판에 철근토막을 용접으로 고정하는 단계 ;e) erecting the reinforcing bar (1a) in the closed quadrilateral corner, fixing the reinforcing bar on the a-beam and steel sheet by welding; f) 상기 철근토막(1a) 상단에 상부강판(2a)을 설치하고, 내부에는 철근토막(1a)을 용접하고 기초(4) 철근을 배근하여 콘크리트를 타설하는 단계 ;f) installing the upper steel plate (2a) on the top of the reinforcement (1a), and welds the reinforcement (1a) therein and reinforces the foundation (4) reinforcement; g) 상기 상부강판(2a) 상부에 1절의 기둥을 설치하고, 기둥 하부에는 이음강판(2b)을 상부강판과 동일한 크기로 제작하여 외부에서 용접으로 이음하는 단계 ;g) installing one column on the upper part of the upper steel plate 2a, and connecting the lower part of the column to the same size as the upper steel plate by welding the joint steel plate 2b; 를 포함하는 것을 특징으로 하는 매입형 베이스 플레이트와 철골기둥의 이음 방법Recessed base plate and the joint method of the steel frame characterized in that it comprises a 철골기둥(5)을 기초에 고정함에 있어서,In fixing the steel column (5) to the foundation, a) 기초(4) 하면의 바닥을 정리하고, 버림 콘크리트(12)를 타설하는 단계 ;a) arranging the bottom of the lower surface of the foundation 4 and placing the discarded concrete 12; b) 상기 버림 콘크리트 위에 레벨링 모르터(11)를 이용하여 바닥 레벨을 조정하는 단계 ;b) adjusting the floor level using the leveling mortar (11) on the discarded concrete; c) 상기 레벨링 모르터 상부에 철근 선조립 기둥이 설치될 위치의 최외단 마주 보는 두 변에 ㄱ형강(3)을 설치하고, 나머지 두 변에는 강판(2)을 ㄱ형강 끝단에 직각방향으로 설치하여 사각형을 이루는 단계 ;c) A-beams (3) are installed on the two outermost sides of the leveling mortar on the uppermost side of the position where the reinforcing line assembly pillars are to be installed, and on the other two sides, a steel plate (2) is installed at right angles to the A-beam ends. Forming a rectangle; d) 상기 ㄱ형강과 강판을 용접으로 고정하여 폐쇄형 4각형을 형성하고, ㄱ형강에는 볼트구멍을 뚫고 셋앵커(10)를 바닥에 고정하는 단계 ;d) fixing the a-beam and the steel sheet by welding to form a closed quadrilateral, and drilling a bolt hole in the a-beam to fix the set anchor 10 to the floor; e) 상기폐쇄형 4각형 구석에 철근토막(1a)을 세우고, ㄱ형강과 강판에 철근토막을 용접으로 고정하는 단계 ;e) erecting the reinforcing bar (1a) in the closed quadrilateral corner, fixing the reinforcing bar on the a-beam and steel sheet by welding; f) 상기 철근토막(1a) 상단에 H형강의 기둥토막(6)을 설치하고, 기둥토막 내부에는 철근토막(1a)을 용접하는 단계 ;f) installing the pillar 6 of the H-shaped steel on the top of the reinforced soil 1a, and welding the reinforced soil 1a inside the pillar; g) 상기 기둥토막(6)의 플랜지 끝단에는 직각방향으로 상부강판(2a)을 용접하고, 기초 철근을 배근하여 콘크리트를 타설하는 단계 ;g) welding the upper steel plate 2a at right angles to the flange end of the pillar 6 and placing the concrete by reinforcing the basic reinforcing bars; h) 상기 기둥토막(6) 상부에 1절의 철골기둥(5)을 설치하고, 철골기둥과 기둥토막(6)을 용접으로 이음하는 단계 ;h) installing the steel column (5) of the first section on the pillar stub (6), and joining the steel pillar and pillar stub (6) by welding; 를 포함하는 것을 특징으로 하는 매입형 베이스 플레이트와 철골기둥의 이음 방법Recessed base plate and the joint method of the steel frame characterized in that it comprises a 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, ㄱ형강(3)과 강판(2)으로 구성된 매입형 베이스 플레이트 내부는 기초 콘크리트 타설 전 시멘트 모르터를 선 타설하는 것을 특징으로 하는 매입형 베이스 플레이트와 철골기둥의 이음 방법The embedded base plate consisting of a steel (3) and a steel plate (2) is a joint method of the embedded base plate and the steel column, characterized in that the cement mortar before the foundation concrete
KR1020090115111A 2009-11-26 2009-11-26 Splicing Method of Embedded type Baseplate with Steel Column KR101131679B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090115111A KR101131679B1 (en) 2009-11-26 2009-11-26 Splicing Method of Embedded type Baseplate with Steel Column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090115111A KR101131679B1 (en) 2009-11-26 2009-11-26 Splicing Method of Embedded type Baseplate with Steel Column

Publications (2)

Publication Number Publication Date
KR20110058359A true KR20110058359A (en) 2011-06-01
KR101131679B1 KR101131679B1 (en) 2012-04-23

Family

ID=44393877

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090115111A KR101131679B1 (en) 2009-11-26 2009-11-26 Splicing Method of Embedded type Baseplate with Steel Column

Country Status (1)

Country Link
KR (1) KR101131679B1 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605799A (en) * 2012-04-17 2012-07-25 中国轻工业长沙工程有限公司 Connection structure and method of column feet and foundation of thermal power plant boiler
CN103205937A (en) * 2013-04-25 2013-07-17 中铁八局集团第一工程有限公司 Universal member pre-buried node and installing method thereof
KR101292068B1 (en) * 2013-02-27 2013-08-01 주식회사 서브원 The construction method of vibration damping structure
WO2014189184A1 (en) * 2013-05-23 2014-11-27 Lee Seung Wu Joint of prefabricated steel frame for reinforced concrete using l-shaped steel
CN104234070A (en) * 2014-07-23 2014-12-24 冠鲁建设股份有限公司 Steel structure and foundation pre-burying connection structure and construction method
CN104805860A (en) * 2015-05-12 2015-07-29 中国电力工程顾问集团中南电力设计院有限公司 Inclined column straight-excavating bottom-expanding big board foundation for transmission line
CN105275253A (en) * 2015-11-11 2016-01-27 国网河北阜城县供电公司 Equal-diameter rod erecting device and application method thereof
CN106436739A (en) * 2016-08-26 2017-02-22 江苏铭远杆塔有限公司 Underground prefabricated foundation of communication tower and mounting method of underground prefabricated foundation
CN115075284A (en) * 2022-06-28 2022-09-20 中国二十二冶集团有限公司 Non-split heads construction method for adding waterproof plate reinforcing steel bars to independent column bases in frame structure foundation
CN116856453A (en) * 2023-05-29 2023-10-10 中国建筑第二工程局有限公司 Novel steel lattice column elevator foundation back-supporting device and construction method thereof

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619376B (en) * 2012-04-18 2015-04-08 二十三冶建设集团有限公司 Method for installing inner barrel of reinforced concrete tail gas chimney and lifting system for method
CN103498481B (en) * 2013-09-03 2015-07-08 青岛中天斯壮科技有限公司 Multidirectional stress high-frequency porcelain insulator supporting base
CN106368235B (en) * 2016-10-11 2018-11-16 北京健安诚岩土工程有限公司 The prestressed cylinder-shaped basis of replaceable anchor bolt
CN106351247B (en) * 2016-10-11 2018-11-16 北京健安诚岩土工程有限公司 The anchor cage ring formula basis of replaceable anchor bolt
CN108755735A (en) * 2018-06-13 2018-11-06 中国二十二冶集团有限公司 Wind power foundation prestress wire preformed hole construction method and its special withdrawing stick
KR102197106B1 (en) 2020-04-06 2020-12-30 조정래 Slab unit implanted with means for pressing pile and the method for carrying out the construction of the steel column using it
KR102197107B1 (en) 2020-04-06 2020-12-30 조정래 Slab unit implanted with means for pressing pile and the method for carrying out the construction of the reinforced concrete column using it
KR102197109B1 (en) 2020-05-04 2020-12-30 조정래 Slab unit implanted with means for pressing pile and the method for carrying out the construction of the retaining wall using it

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100346960B1 (en) * 1999-04-20 2002-07-31 (주)씨.에스 구조 엔지니어링 An apparatus and method for anchoring steel column to concrete

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605799A (en) * 2012-04-17 2012-07-25 中国轻工业长沙工程有限公司 Connection structure and method of column feet and foundation of thermal power plant boiler
KR101292068B1 (en) * 2013-02-27 2013-08-01 주식회사 서브원 The construction method of vibration damping structure
CN103205937A (en) * 2013-04-25 2013-07-17 中铁八局集团第一工程有限公司 Universal member pre-buried node and installing method thereof
CN103205937B (en) * 2013-04-25 2015-07-29 中铁八局集团第一工程有限公司 The mounting method of the pre-buried node of a kind of universal rod body
WO2014189184A1 (en) * 2013-05-23 2014-11-27 Lee Seung Wu Joint of prefabricated steel frame for reinforced concrete using l-shaped steel
CN104234070A (en) * 2014-07-23 2014-12-24 冠鲁建设股份有限公司 Steel structure and foundation pre-burying connection structure and construction method
CN104805860A (en) * 2015-05-12 2015-07-29 中国电力工程顾问集团中南电力设计院有限公司 Inclined column straight-excavating bottom-expanding big board foundation for transmission line
CN105275253A (en) * 2015-11-11 2016-01-27 国网河北阜城县供电公司 Equal-diameter rod erecting device and application method thereof
CN106436739A (en) * 2016-08-26 2017-02-22 江苏铭远杆塔有限公司 Underground prefabricated foundation of communication tower and mounting method of underground prefabricated foundation
CN115075284A (en) * 2022-06-28 2022-09-20 中国二十二冶集团有限公司 Non-split heads construction method for adding waterproof plate reinforcing steel bars to independent column bases in frame structure foundation
CN115075284B (en) * 2022-06-28 2023-07-07 中国二十二冶集团有限公司 No-split heads construction method for adding waterproof plate steel bars to independent column bases in frame structure foundation
CN116856453A (en) * 2023-05-29 2023-10-10 中国建筑第二工程局有限公司 Novel steel lattice column elevator foundation back-supporting device and construction method thereof

Also Published As

Publication number Publication date
KR101131679B1 (en) 2012-04-23

Similar Documents

Publication Publication Date Title
KR20110058359A (en) Splicing method of embedded type baseplate with steel column
KR101295740B1 (en) Joint of Steel Column
KR101600845B1 (en) The horizontal structural frame and the underground construction methods using it
KR101339946B1 (en) Precast bridge post
KR20100005830A (en) Development of a set bridge post connector using unit filled concrete with internally confined hollow and a method for construction
KR101274481B1 (en) Pre-embedded anchor frame equipped with coupler and anchoring method of steel column thereof
JP5574328B2 (en) Tokai seismic wall and its construction method
JP3899354B2 (en) Seismic isolation building
KR101631447B1 (en) Top-Down method of underground structure using the CFT and the Composite Beam
KR101006411B1 (en) System and method for underground downward construction using concrete filled tube
KR101521946B1 (en) Enlarged capital of steel framed reinforced concrete column
KR102595835B1 (en) Seismic retrofit system using foundation integrated PC panel
JP6703816B2 (en) Footing foundation structure
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
KR200383309Y1 (en) Form system for construction of underground slab
JP6368630B2 (en) Foundation construction method
JP2004011203A (en) Precast src-column joining section structure
KR101772938B1 (en) Precast foundation structure buried support of road facility and method for constructing this same
KR101485563B1 (en) The horizontal structural frame
KR20170123370A (en) the rigid connection structure without concrete between the upper precast concrete column and the lower precast concrete column and the rigid connection structure between precast concrete column and precast concrete beam
KR100346960B1 (en) An apparatus and method for anchoring steel column to concrete
KR20170123371A (en) the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure between precast concrete column and precast concrete beam
JP2021063340A (en) Pile foundation structure
JP2006188862A (en) Construction method of structure, and foundation structure used for the same
KR102197109B1 (en) Slab unit implanted with means for pressing pile and the method for carrying out the construction of the retaining wall using it

Legal Events

Date Code Title Description
A201 Request for examination
E601 Decision to refuse application
X091 Application refused [patent]
AMND Amendment
X701 Decision to grant (after re-examination)
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150305

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160310

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170410

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20200310

Year of fee payment: 9