KR200383309Y1 - Form system for construction of underground slab - Google Patents

Form system for construction of underground slab Download PDF

Info

Publication number
KR200383309Y1
KR200383309Y1 KR20-2005-0002629U KR20050002629U KR200383309Y1 KR 200383309 Y1 KR200383309 Y1 KR 200383309Y1 KR 20050002629 U KR20050002629 U KR 20050002629U KR 200383309 Y1 KR200383309 Y1 KR 200383309Y1
Authority
KR
South Korea
Prior art keywords
slurry wall
bracket
formwork
slab
fixed
Prior art date
Application number
KR20-2005-0002629U
Other languages
Korean (ko)
Inventor
박무용
황기수
이권주
성진경
장재호
Original Assignee
(주)한국건설공법
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to KR2020050000356 priority Critical
Application filed by (주)한국건설공법 filed Critical (주)한국건설공법
Priority to KR20-2005-0002629U priority patent/KR200383309Y1/en
Application granted granted Critical
Publication of KR200383309Y1 publication Critical patent/KR200383309Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/40Separate connecting elements
    • E04B1/41Connecting devices specially adapted for embedding in concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • E04B5/40Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element with metal form-slabs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/38Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts

Abstract

본 고안은 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체에 관한 것으로서, 데크 플레이트를 지지하기 위한 영구 구조체인 지지거더를 브라켓을 이용하여 슬러리 벽에 직접 고정하여 설치하고, 또한 상기 브라켓에 데크 플레이트를 지지하기 위한 별도의 보조지지수단을 상기 지지거더와 동일 높이로 하여 슬러리 벽을 따라 수평으로 길게 설치하며, 이와 같이 설치된 지지거더와 보조지지수단 위에 상기 데크 플레이트를 지지시켜서 구성한 슬래브 시공을 위한 거푸집 구조체에 관한 것이다.The present invention relates to a formwork for the slab construction of the basement layer to which the slurry wall is applied, and a support girder, which is a permanent structure for supporting the deck plate, is installed by fixing directly to the slurry wall using a bracket, and also on the deck plate A separate auxiliary support means for supporting the same height as the support girder is installed horizontally along the slurry wall, and the formwork for the slab construction by supporting the deck plate on the support girder and the auxiliary support means installed in this way It is about a structure.

상기한 본 고안의 거푸집 구조체에 의하면, 테두리보가 생략된 지하구조물의 시공이 가능해지고, 합판 거푸집 및 동바리가 불필요하여 그 사용에 따른 문제점이 해소될 수 있다. 또한, 거푸집 설치 면적 축소, 철근 사용량 감소, 철근 가공 및 조립의 간단화로 시공성 및 경제성이 향상될 수 있고, 별도의 해체작업이 필요 없어 시공성 개선 및 공기 단축이 가능해진다. According to the formwork structure of the present invention, it is possible to construct the structure of the underground structure without the rim beam, the need for plywood formwork and swivel can be eliminated and the problems caused by its use can be solved. In addition, the workability and economics can be improved by reducing the formwork installation area, reducing the amount of rebar, simplifying the processing and assembly of the reinforcing bar, and eliminating a separate dismantling operation, thereby improving workability and shortening the air.

Description

슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체{Form system for construction of underground slab} Form system for construction of slabs in underground layers with slurry walls

본 고안은 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체에 관한 것으로서, 더욱 상세하게는 데크 플레이트를 지지하기 위한 영구 구조체인 지지거더를 브라켓을 이용하여 슬러리 벽에 직접 고정하여 설치하고, 또한 상기 브라켓에 데크 플레이트를 지지하기 위한 별도의 보조지지수단을 상기 지지거더와 동일 높이로 하여 슬러리 벽을 따라 수평으로 길게 설치하며, 이와 같이 설치된 지지거더와 보조지지수단 위에 상기 데크 플레이트를 지지시켜서 구성한 슬래브 시공을 위한 거푸집 구조체에 관한 것이다.The present invention relates to a formwork for the slab construction of the basement layer to which the slurry wall is applied, and more particularly, a support girder, which is a permanent structure for supporting the deck plate, is installed by fixing directly to the slurry wall using a bracket, and also A separate auxiliary support means for supporting the deck plate on the bracket is installed at the same height as the support girder horizontally along the slurry wall, and the slab formed by supporting the deck plate on the support girder and the auxiliary support means installed in this way It relates to a formwork structure for construction.

일반적으로 지하구조물을 구축하는 방법에는 두 가지가 있다.In general, there are two ways to build underground structures.

즉, 지하구조물이 축조되는 지반에 흙막이 공사를 한 다음 지반을 굴착하면서 흙막이를 지지할 수 있는 가시설물을 설치하고 토사를 전부 반출한 뒤 맨 아래층에서부터 구조물을 축조해 올라가는 순타설공법과, 흙막이를 시공하고 1층 구조물을 축조한 뒤 그 구조물을 흙막이용 버팀대로 이용하여 상부에서 하부로 지반을 굴착하면서 구조물을 축조해 내려가는 역타설공법이 그것이다.In other words, after the earthquake work is made on the ground where the underground structure is constructed, the temporary erection method is installed to build up the structure from the bottom layer after installing the temporary facilities that can support the earthquake while excavating the ground, and then removing all the soil. It is the reverse casting method that constructs the structure by constructing the ground floor structure after constructing the ground floor and excavating the ground from the top to the bottom using the structure as a brace for the earth.

최근 토지 이용의 극대화 차원에서 지하공사가 점차 고심도화되고 있고, 특히 순타설공법에 의한 시공시에는 흙막이 붕괴의 위험이나 주변 건물들 침하 등으로 인한 균열 발생과 함께 시각적으로도 불안할 뿐만 아니라 공사기간이 길어지는 등 여러 문제가 있어서, 근래에는 역타설공법이 널리 적용되고 있다.In recent years, underground construction has been gradually intensified in order to maximize land use. Especially, when the construction is performed by the net pouring method, it is not only visually unstable as well as the occurrence of cracks due to the risk of earthquake collapse or settlement of surrounding buildings. There are various problems such as this lengthening. In recent years, the reverse pouring method has been widely applied.

이 역타설공법은 지하구조물 축조시에 지상 1층으로부터 지하층을 향하여 시공하여 나가는 방식이므로, 지하구조물과 지상구조물의 시공이 동시에 진행 가능하고, 지상 1층의 바닥을 작업장으로 활용할 수 있어 별도의 복공판이 불필요하며, 무지보 거푸집 작업이 가능하다는 장점이 있다.Since the reverse casting method is a method of constructing the ground structure from the ground floor to the underground floor when constructing the underground structure, the construction of the underground structure and the ground structure can proceed at the same time, and the floor of the ground floor can be used as a workshop. This is unnecessary and has the advantage of being able to work with solid formwork.

이러한 역타설공법으로는 지반을 정지한 상태에서 지반 위에 콘크리트 슬래브와 보를 타설하는 방법(Concrete on Grade)과, 지반을 어느 정도 굴착하고 지반을 고른 뒤 동바리를 세우고 거푸집을 설치하여 콘크리트를 타설하는 방법(Form on Supporting)과, 거푸집 지지를 위한 동바리를 세우지 않는 대신에 선(先) 시공한 상층의 콘크리트 슬래브에 거푸집 지지를 위한 거푸집 지지거더를 현수시켜 콘크리트를 타설하는 방법(무지보 역타설 현수 거푸집 공법) 등이 있다.Such a reverse casting method involves placing concrete slabs and beams on the ground while the ground is stopped (concrete on grade), and excaving the ground to some extent, selecting the ground, and then placing the clubs and installing the formwork to place the concrete. (Form on Supporting) and the method of placing concrete by suspending form support girders for form support on the upper concrete slab which is pre-constructed instead of erecting clubs for forming formwork. Construction method).

한편, 상기한 역타설 시공시에 지하층의 슬래브를 시공하는 과정에서 흙막이벽과 슬래브가 만나는 외곽 경계부분에는 띠장 또는 접합거더 역할을 하는 테두리보가 설치되고 있다.On the other hand, in the process of constructing the slab of the basement layer during the reverse casting construction, the outer border portion where the earth wall and the slab meet is provided with a rim beam that acts as a strip or a joining girder.

여기서, 종래기술에 따른 지하층의 슬래브 및 테두리보 시공을 위한 거푸집 구성 및 작업에 대하여 다음의 도면을 참조로 하여 설명하면 다음과 같다.Here, with reference to the drawings the form and operation of the formwork for the slab and rim beam construction of the basement layer according to the prior art will be described as follows.

첨부한 도 1은 종래기술에 따른 지하층의 슬래브 및 테두리보 시공을 위한 거푸집의 설치상태를 보여주는 단면도이다.1 is a cross-sectional view showing the installation of the formwork for the slab and rim beam construction of the basement layer according to the prior art.

이를 설명하면, 우선 흙막이벽(1)을 시공한 뒤 굴토작업을 먼저 하고, 버림 콘크리트(3)를 타설한 뒤 동바리(4)를 설치하여 테두리보 시공을 위한 거푸집을 지지시키게 된다.To explain this, the construction of the retaining wall (1) first and then the pit work, and then cast concrete (3) and then install the copper club (4) to support the formwork for the construction of the rim beam.

여기서, 시공하고자 하는 테두리보의 길이방향에 대해 그 횡방향으로 길게 배치되는 각재(5)를 복수개의 동바리(4)로 지지시키고, 이 각재(5) 위에는 테두리보 하면 성형을 위한 합판 거푸집(6)을 수평으로 배치하여 지지시키며, 이 수평의 합판 거푸집, 즉 거푸집 하판(6) 위로는 테두리보 측면 성형을 위한 합판 거푸집(거푸집 옆판, 미도시됨)을 수직으로 고정 배치하여 지지시킨다.Here, the lumber 5, which is arranged long in the transverse direction with respect to the longitudinal direction of the rim beam to be constructed, is supported by a plurality of copper wheels 4, and the rim beam is formed on the plywood formwork 6 when the rim beam is formed. ) Is horizontally arranged and supported, and the horizontal plywood formwork, ie, the formwork lower plate 6, is fixed and vertically supported by plywood formwork (formwork side plates, not shown) for forming the side beams.

이때, 상기 각재(5)는 다수개가 시공하고자 하는 테두리보의 길이방향을 따라 소정 간격을 두고 배치되는데, 각각의 각재(5)가 모두 도시한 바와 같이 복수개의 동바리(4)로 지지된다.At this time, the lumber (5) is arranged at a predetermined interval along the longitudinal direction of the rim beam to be constructed by a plurality, each of the angular materials (5) are all supported by a plurality of clubs (4).

또한, 종래의 슬래브 시공을 위한 거푸집 및 그 지지구조로서, 도면부호 7은 철골보 구조물인 지지거더를 나타내고, 도면부호 15는 지지거더(7)에 의해 지지되도록 하여 설치되는 슬래브 거푸집 구조체, 즉 데크 플레이트를 나타낸다.In addition, as a formwork and its supporting structure for a conventional slab construction, reference numeral 7 denotes a support girder which is a steel golbo structure, and reference numeral 15 denotes a slab formwork structure, that is, a deck plate installed to be supported by the support girder 7 Indicates.

상기 지지거더(7)로는 통상 H-형강을 사용하고 있고, 지지거더(7)의 단부 끝단에는 임베디드 플레이트(embedded plate)(8)가 용접 및/또는 고정 브라켓(9a)과 체결부재(9b)에 의해 수직으로 결합된다.The support girder (7) is generally used H-shaped steel, and at the end of the support girder (7) an embedded plate (8) is welded and / or fixed bracket (9a) and fastening member (9b) Combined vertically by

이와 같이 지지거더(7)가 설치되는 부분에서는 임베디드 플레이트(8)가 테두리보 측면 성형을 위한 거푸집의 역할을 하는 동시에 지지거더(7)에서 테두리보에 결합되는 구조체가 된다. In this way, in the portion where the support girder 7 is installed, the embedded plate 8 serves as a formwork for forming the rim beam side, and at the same time, the structure is coupled to the rim beam in the support girder 7.

그리고, 도 1은 지지거더(7)가 설치되는 위치에서의 종방향 단면도이기 때문에 테두리보 측면 성형을 위한 합판 거푸집, 즉 거푸집 옆판이 미도시되었으나, 이 거푸집 옆판은 시공하고자 하는 테두리보의 길이방향을 따라서 임베디드 플레이트(8)의 양 측방으로 길게 설치되며, 이는 각 지지거더(7) 끝단의 임베디드 플레이트(8)와 함께 테두리보 성형공간의 측면을 이루게 된다.And, Figure 1 is a longitudinal cross-sectional view at the position where the support girder 7 is installed, plywood formwork for forming the side beams, that is, the formwork side plate is not shown, this formwork side plate is the longitudinal direction of the edge beam to be constructed The length of the embedded plate 8 is installed along both sides, which forms the side of the rim beam forming space together with the embedded plate 8 at the end of each support girder 7.

또한, 테두리보용 콘크리트가 타설되는 성형공간, 즉 H-파일(2)을 포함한 흙막이벽(1), 거푸집 하판(6), 임베디드 플레이트(8) 및 미도시된 거푸집 옆판이 형성하는 사각 단면형상의 테두리보 성형공간 내에는 길이방향의 철근(11) 및 스터럽 철근(12)을 설치하는 배근작업을 하고, 테두리보 성형공간 내에서 흙막이벽(1)에 내장된 H-파일(2)의 측면에는 벽의 일부를 제거한 후 전단연결부재인 스터드 볼트(예, 3 ×2열 = 6개)(13)가 용접 시공된다.In addition, the square space of the cross-section formed by the molding space in which the frame for the concrete is poured, that is, the retaining wall (1) including the H- pile (2), the form lower plate (6), the embedded plate (8) and the formwork side plate (not shown) In the rim beam forming space, the reinforcing work is installed to install the reinforcing bars 11 and the stub reinforcing bars 12 in the longitudinal direction, and the side of the H-pile 2 embedded in the retaining wall 1 in the rim beam forming space. After removing part of the wall, the stud bolts (eg, 3 x 2 rows = 6) 13, which are shearing members, are welded.

또한, 테두리보 성형공간 내에서 상기 임베디드 플레이드(8)에도 전단 연결부재인 스터드 볼트(14)가 용접 시공되며, 상기와 같이 설치되는 스터드 볼트(13,14)는 테두리보 콘크리트 속에 매립되는 바, 이들은 H-파일(흙막이벽)(2)과 테두리보간, 그리고 테두리보와 임베디드 플레이트(지지거더)(8)간 상호 결착력을 증대시키기 위하여 시공되는 것들이다.In addition, the stud bolt 14, which is a shear connection member, is welded to the embedded plate 8 in the edge beam forming space, and the stud bolts 13 and 14 installed as described above are embedded in the edge beam concrete. These are the ones that are constructed to increase the interlocking force between the H-pile (2) and the edge interpolation and between the edge beam and the embedded plate (support girder) (8).

이와 같이 거푸집 등 구조체를 모두 설치하고 나면 콘크리트를 타설하여 슬래브 및 테두리보를 동시에 시공한다.In this way, after all the structures such as formwork is installed, the concrete is poured and the slab and the rim beam are constructed at the same time.

그리고, 콘크리트가 양생되고 나면, 동바리(4) 및 각재(5), 합판 거푸집(거푸집 하판 및 옆판)(6) 등은 해체하고, 철골보인 지지거더(7) 및 임베디드 플레이트(8) 등은 영구 구조체로 사용하게 된다. Then, after the concrete is cured, the copper bar (4) and the lumber (5), plywood formwork (form lower plate and side plate) (6), etc. are dismantled, the steel girders support girder (7) and embedded plate (8) is permanent It will be used as a structure.

그러나, 상기와 같이 구성되는 종래의 거푸집 구조체에는 다음과 같은 문제점이 있었다.However, the conventional formwork structure as described above has the following problems.

위에서 설명한 바와 같이 일반 합판 거푸집(6)과 동바리(4)를 이용함으로써, 동바리 설치에 따른 토공작업 지연과 콘크리트 타설시 가끔 거푸집 파괴 등에 의해 작업 차질이 많이 발생하고, 거푸집 설치작업이 복잡하여 시공성 저하 및 원가 증대의 문제가 발생한다. As described above, by using the general plywood formwork (6) and copper bar (4), due to the delay in the earthwork work due to the installation of the copper bar and the occasional concrete destruction when placing concrete, and the work of the formwork is complicated, the installation work is complicated, the workability is reduced And cost increase.

특히, 동바리(4)의 이용시에는 연약 지반상에서의 지지가 불안정하고, 또한 콘크리트 강도가 일정 이상으로 보양되지 않으면 해체가 불가하기 때문에 콘크리트 양생 중 동바리의 존치로 인해 아래층의 굴토공사가 진행되지 못하여 공기가 지연될 수 밖에 없다.In particular, when the copper barrier 4 is used, the support on the soft ground is unstable, and disassembly is impossible unless the concrete strength is maintained above a certain level. Is bound to be delayed.

더구나, 동바리 등 가설자재는 역타설 시공시 굴토작업장 외부로 반출한 뒤 굴토 후 다시 아래층으로 이동하여 설치해야 하고, 이를 각 층의 시공시마다 반복해야 하는 바, 이러한 작업을 반복 수행하는데 있어서 번잡한 문제점이 있게 된다.In addition, temporary materials such as dongbari should be moved to the lower floor after the excavation after installation to the outside of the gulto workshop during the construction of reverse casting, and this should be repeated for the construction of each floor. This will be.

또한, 동바리의 소운반 및 재조립에 소요되는 비용과 시간이 과다하여 비경제적일 뿐만 아니라, 모든 작업이 인력에 의존하는 노동집약적이기 때문에 기능공의 인력 부족이 점차 심화되는 현실에서 동바리 사용은 원가 절감을 어렵게 한다.In addition, due to the excessive cost and time required for transportation and reassembly of the group, it is not only economical, but also the labor-intensive labor-intensive all work depends on manpower. Makes it difficult.

그리고, 철골구조를 사용한 역타 공사시에 거푸집 작업을 위한 목공작업이 중간 중간에 실시되어야 하는 문제점도 있다.In addition, there is a problem that the woodworking work for the formwork at the time of reverse construction using the steel structure should be carried out in the middle.

특히, 최근 역타설 시공시에 데크 플레이트(15)를 설치하여 데크 슬래브를 시공하는 경우가 늘고 있는데 반하여 테두리보 시공을 위해 목재로 된 합판 거푸집(6)을 그대로 사용하는 경우 목공작업 인원이 단속적으로 투입되어야 한다. In particular, the recent installation of the deck slab by installing the deck plate (15) during reverse casting construction, while the woodworking personnel are intermittently used when the plywood formwork (6) is used as it is for the rim beam construction. It must be committed.

이와 같이 종래에는 철공공 외에 목공작업공의 이질공종 인력이 투입됨으로써, 공사원가가 상승함은 물론 인력 투입의 효율성이 크게 떨어지는 문제점을 가지고 있었다.As such, in the related art, as a result of inputting heterogeneous workers in woodworking workers in addition to ironworkers, construction cost increases and the efficiency of manpower input is greatly reduced.

또한, 테두리보와 철골보(지지거더)(7)의 접합부 부분 거푸집 작업시에 철골보(7)를 거푸집으로 지지하거나 선시공한 상층의 철골보에 매달아야 하므로 이 또한 시공성을 떨어뜨리는 요인이 되고 있고, 큰 춤의 철골보(7)와 테두리보의 접합을 위하여 테두리보 춤이 필요 이상으로 커지는 등 비경제적으로 설계되고 있다.In addition, since the steel beams (7) should be supported by formwork or hung on steel steel beams of the upper layer during formwork at the joining part of the rim beam and the steel frame (support girder) 7, this is also a factor of lowering the workability. For the joining of the cheolgolbo (7) and the rim of the dance is being designed economically, such as the rimbo dance is larger than necessary.

또한, 테두리보 철근 배근을 위한 철근 가공 및 조립이 복잡하고, 배근 설치를 위한 조립시간이 필요하여 공기 지연 및 공사비 증대의 요인이 되고 있다.In addition, rebar processing and assembly for the rim beam reinforcement is complicated, and the assembly time required for the installation of the reinforcement has become a factor of delaying the air and increase the construction cost.

또한, 거푸집 옆판 설치시에 거푸집 하판 등을 발판으로 하여 작업자가 그 위로 올라가 작업을 해야 하므로 안전사고의 위험성이 높은 문제가 있다. In addition, there is a high risk of safety accidents because the worker has to work on the formwork as a scaffold when the formwork side plate is installed as a scaffold.

따라서, 본 고안은 상기와 같은 문제점을 해결하기 위하여 고안한 것으로서, 합판 거푸집 및 동바리가 불필요하여 그 사용에 따른 문제점이 해소될 수 있고, 조립이 간단하여 시공성 및 경제성이 향상될 수 있으며, 거푸집 설치 면적 축소, 철근 물량 감소 및 공기 단축, 발판 작업의 위험성 해소 등이 가능해지는 지하층의 슬래브 시공을 위한 거푸집 구조체를 제공하는데 그 목적이 있다. Therefore, the present invention is devised to solve the above problems, the plywood formwork and the copper bar is unnecessary, the problems caused by its use can be solved, the assembly is simple, the construction and economical efficiency can be improved, the formwork installation It is an object of the present invention to provide a form structure for slab construction of the basement layer, which can reduce the area, reduce the rebar quantity and shorten the air, and eliminate the risk of scaffolding.

이하, 첨부한 도면을 참조하여 본 고안을 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

본 고안은, 슬러리 벽이 적용된 지하층의 슬래브를 시공하기 위한 거푸집 구조체에 있어서,The present invention, in the formwork for constructing the slab of the basement layer to which the slurry wall is applied,

횡부재와 종부재가 일체로 결합된 T자형 평면구조로 되어 있으면서 슬러리 벽의 내측면 각 위치에 상기 횡부재가 고정되어서 설치되는 브라켓과;A bracket having a T-shaped planar structure in which a transverse member and a longitudinal member are integrally coupled to each other and fixed to the transverse members at respective positions on the inner surface of the slurry wall;

상기 브라켓의 종부재에 단부가 고정되어서 상기 브라켓을 매개로 슬러리 벽 내측면에 직접 고정 지지되는 지지거더와;A support girder having an end fixed to the longitudinal member of the bracket to be directly fixed to the inner surface of the slurry wall via the bracket;

이웃한 상기 두 브라켓간에 상기 지지거더와 동일 높이로 횡배치되어 슬러리 벽을 따라 수평으로 길게 고정 설치되고, 양 단부가 상기 브라켓의 횡부재에 고정되는 제1보조지지수단과;First auxiliary support means horizontally disposed along the slurry wall and horizontally disposed at the same height as the support girder between two adjacent brackets, and both ends of which are fixed to the horizontal member of the bracket;

상기 지지거더와 제1보조지지수단 위로 설치되는 데크 플레이트;A deck plate installed over the support girder and the first auxiliary support means;

를 포함한 구성으로 되어, 상기 데크 플레이트에 콘크리트를 타설 및 양생하여 슬러리 벽에 직접 연결된 슬래브의 시공이 가능하도록 된 것을 특징으로 한다.It is configured to include, characterized in that the construction of the slab directly connected to the slurry wall by placing and curing concrete on the deck plate.

여기서, 본 고안은, 바람직한 실시예로서, 상기 브라켓의 횡부재가, 슬러리 벽 내측면 각 위치의 선시공된 무수측 그라우트 위에 접합된 상태로 하여, 슬러리 벽의 고정홀에 삽입 고정되는 복수개의 앵커에 의해 고정되는 것을 특징으로 한다.Here, the present invention, as a preferred embodiment, the lateral member of the bracket is bonded to a plurality of anchors inserted into the fixing hole of the slurry wall in a state that is bonded on the pre-installed anhydrous side grout at each position of the slurry wall inner surface. It is characterized by being fixed by.

그리고, 본 고안은, 다른 실시예로서, 상기 브라켓의 횡부재가, 그 배면에 용접 설치되어서 슬러리 벽 내부의 고정요소에 고정되는 복수개의 앵커 철근 또는 스터드에 의해 고정되고, 슬러리 벽 내측면에 매립된 상태로 슬러리 벽과 일체화 시공되는 것을 특징으로 한다.The present invention is, in another embodiment, a transverse member of the bracket is fixed by a plurality of anchor reinforcing bars or studs welded to the rear surface and fixed to a fixed element inside the slurry wall, and embedded in the slurry wall inner surface. It is characterized in that it is integrally constructed with the slurry wall.

한편, 본 고안은 상기 제1보조지지수단이 상기 브라켓의 횡부재에 용접 설치되는 L-형강인 것을 특징으로 한다.On the other hand, the present invention is characterized in that the first auxiliary support means is L-shaped steel welded to the lateral member of the bracket.

또한, 본 고안은 상기 지지거더의 단부와 상기 브라켓의 종부재가 중첩된 대응면끼리 서로 볼트로 체결되되, 설치작업의 원활화 및 슬러리 벽으로부터 작용하는 토압이 지지거더가 아닌 슬래브로 전달될 수 있도록, 상기 종부재에서 볼트가 체결되는 각 홀은 지지거더의 길이방향으로 길게 형성된 슬롯홀 형태로 형성 구비되는 것을 특징으로 한다.In addition, the present invention is the end of the support girder and the end face of the bracket is fastened to each other overlapping bolts with each other, so that the installation work and the earth pressure acting from the slurry wall can be transferred to the slab rather than the support girder, Each hole to which the bolt is fastened in the longitudinal member is characterized in that formed in the form of a slot hole formed long in the longitudinal direction of the support girder.

그리고, 본 고안은 상기 지지거더와 동일 높이로 횡배치되어 슬러리 벽을 따라 수평으로 길게 고정 설치되되, 일단부가 상기 브라켓의 종부재에, 타단부가 상기 지지거더의 단부 내측에 설치된 거싯 플레이트에 각각 고정되고, 위로 상기 데크 플레이트를 지지하게 되는 제2보조지지수단을 더 포함하는 것을 특징으로 한다.In addition, the present invention is horizontally arranged at the same height as the support girder is installed horizontally fixed along the slurry wall, one end to the end member of the bracket, the other end to the gusset plate installed inside the end of the support girder, respectively It is fixed, characterized in that it further comprises a second auxiliary support means for supporting the deck plate.

그리고, 본 고안은 상기 제2보조지지수단이 상기 브라켓과 거싯 플레이트에 중첩된 대응면끼리 서로 볼팅되어 체결되는 H-형강인 것을 특징으로 한다.In addition, the present invention is characterized in that the second auxiliary support means is an H-shaped steel bolted to each other and the corresponding surfaces superimposed on the bracket and gusset plate.

이하, 첨부한 도면을 참조하여 본 고안을 더욱 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

본 고안은 테두리보가 생략된 지하층의 슬래브 시공을 위한 거푸집 구조체에 관한 것으로서, 특히 흙막이벽으로서 슬러리 벽(slurry wall)이 시공된 경우에 적용될 수 있는 슬래브 거푸집 구조체에 관한 것이다.The present invention relates to a formwork structure for the slab construction of the basement layer omitted the rim beam, in particular to a slab formwork structure that can be applied when the slurry wall (slurry wall) is constructed as a retaining wall.

본 고안에 따른 슬래브 시공을 위한 거푸집 구조체는, 테두리보 설치에 따른 종래의 여러 문제점을 해소하기 위하여, 데크 플레이트를 지지하기 위한 영구 구조체인 지지거더를 브라켓을 이용하여 슬러리 벽에 직접 고정하여 설치하고, 또한 상기 브라켓에 데크 플레이트를 지지하기 위한 별도의 보조지지수단을 상기 지지거더와 동일 높이로 하여 슬러리 벽을 따라 수평으로 길게 설치하며, 이와 같이 설치된 지지거더와 보조지지수단 위에 상기 데크 플레이트를 지지시켜서 구성함으로써, 테두리보가 생략되는 동시에 슬러리 벽과 슬래브가 일체로 직결된 구조의 지하구조물을 구축할 수 있도록 한 것에 주안점이 있는 것이다.Formwork structure for the slab construction according to the present invention, in order to solve the various problems of the conventional rim beam installation, the support girder, which is a permanent structure for supporting the deck plate fixed to the slurry wall using a bracket and installed Further, a separate auxiliary support means for supporting the deck plate on the bracket is installed at the same height as the support girder horizontally along the slurry wall, and supports the deck plate on the support girder and the auxiliary support means thus installed The main focus is to allow the construction of the underground structure of the structure in which the edge beam is omitted and the slurry wall and the slab are directly connected together.

또한, 본 발명은, 또 다른 실시예로서, 슬러리 벽이 적용된 지하층의 슬래브를 시공하기 위한 거푸집 구조체에 있어서,In addition, the present invention, as another embodiment, in the formwork for the construction of the slab of the basement layer applied slurry wall,

횡부재와 종부재가 일체로 결합된 T자형 평면구조로 되어 있으면서 슬러리 벽의 내측면 각 위치에 상기 횡부재가 고정되어서 설치되는 브라켓과;A bracket having a T-shaped planar structure in which a transverse member and a longitudinal member are integrally coupled to each other and fixed to the transverse members at respective positions on the inner surface of the slurry wall;

상기 브라켓의 종부재에 단부가 고정되어서 상기 브라켓을 매개로 슬러리 벽 내측면에 직접 고정 지지되는 지지거더와;A support girder having an end fixed to the longitudinal member of the bracket to be directly fixed to the inner surface of the slurry wall via the bracket;

상기 지지거더의 단부 끝단쪽 상단에 형성된 절개부위의 내측에 지지된 상태로 슬러리 벽 내측면을 따라 수평으로 길게 설치되고, 하기 데크 플레이트를 지지하는 동시에 슬러리 벽과 슬래브간 연결부를 따라 슬래브 하측으로 돌출된 구조의 철근 콘크리트 보강부를 형성하기 위한 L-형강과;It is installed horizontally along the inner surface of the slurry wall while being supported inside the incision formed at the upper end of the end of the support girder, and supports the following deck plate and protrudes downward along the connection between the slurry wall and the slab. L-shaped steel for forming the reinforced concrete reinforcement of the structure;

상기 지지거더와 L-형강 위로 설치되는 데크 플레이트;A deck plate installed over the support girder and the L-shaped steel;

를 포함한 구성으로 되어, 상기 데크 플레이트 및 L-형강 내측으로 콘크리트를 타설 및 양생하여 슬러리 벽에 상기 보강부를 매개로 연결된 슬래브의 시공이 가능하도록 된 것을 특징으로 한다.It is configured to include, characterized in that the construction of the slab connected via the reinforcement to the slurry wall by placing and curing concrete inside the deck plate and L-shaped steel.

이하, 본 고안에 따른 거푸집 구조체의 구성에 대하여 다음의 각 도면을 참조하여 상술하기로 한다.Hereinafter, the configuration of the formwork structure according to the present invention will be described in detail with reference to the following drawings.

첨부한 도 2는 본 고안에 따른 슬래브 시공을 위한 거푸집 구조체의 일 실시예를 도시한 사시도이고, 도 3은 도 2의 선 'A-A'를 따라 취한 단면도이며, 도 4는 도 2의 선 'B-B'를 따라 취한 단면도이다.2 is a perspective view showing an embodiment of the formwork for the slab construction according to the present invention, Figure 3 is a cross-sectional view taken along the line 'A-A' of Figure 2, Figure 4 is a line of Figure 2 Sectional view taken along 'B-B'.

또한, 첨부한 도 5는 도 2 ~ 도 4에 도시한 일 실시예의 요부 평면도이다.5 is a plan view of main parts of one embodiment shown in FIGS. 2 to 4.

도면부호 100은 슬러리 벽을 나타내고, 도면부호 101은 본 고안의 거푸집 구조체에 의해 상기 슬러리 벽(100)에 테두리보 없이 직접 연결 시공된 슬래브를 나타낸다. Reference numeral 100 denotes a slurry wall, and reference numeral 101 denotes a slab which is directly connected to the slurry wall 100 without a border beam by the formwork of the present invention.

도 5에서는 본 고안의 거푸집 구조체를 평면 구조로 보여주기 위하여 슬러리 벽(100)에 대하여 횡방향으로 단면한 상태를 도시하였다.5 illustrates a cross-sectional view of the formwork structure of the present invention in a transverse direction with respect to the slurry wall 100 in order to show a planar structure.

또한, 슬래브(101)의 시공을 위한 것으로서, 도면부호 120은 슬러리 벽(100)에 직접 고정되는 본 고안에서의 지지거더를 나타내며, 도면부호 140은 상기 지지거더(120)와 후술하는 보조지지수단에 의해 지지되도록 설치되는 슬래브 구축용 거푸집 구조체인 데크 플레이트를 나타낸다. In addition, for the construction of the slab 101, reference numeral 120 denotes a support girder in the present invention that is fixed directly to the slurry wall 100, reference numeral 140 denotes the support girder 120 and the auxiliary support means described later The deck plate which is the formwork structure for slab construction installed so that it may be supported by this is shown.

상기 지지거더(120)는 통상과 같이 H-형강으로 실시될 수 있다.The support girder 120 may be made of H-shaped steel as usual.

먼저, 각 도면에 도시한 바와 같이, 데크 플레이트(140)를 지지하기 위한 지지거더(120)를 지지하도록 상기 지지거더(120)의 단부가 볼팅되어 결합되는 브라켓(110)이 슬러리 벽(100)에 고정 설치된다.First, as shown in each drawing, the end of the support girder 120 is bolted to the bracket 110 to support the support girder 120 for supporting the deck plate 140, slurry wall 100 It is fixed to the installation.

즉, 슬러리 벽(100)에 지지거더(120)의 설치 높이에 맞추어 지지거더의 단부를 지지하기 위한 브라켓(110)을 소정 높이로 고정 설치하되, 상기 브라켓(110)이 고정 설치되는 슬러리 벽(100) 내측면의 각 위치에 무수축 그라우트(grout)를 선시공하고, 이와 같이 선시공된 무수축 그라우트(112) 위로 브라켓(110)을 복수개의 앵커(114)를 이용하여 고정한다.That is, while fixing the bracket 110 for supporting the end of the support girder to a predetermined height in accordance with the installation height of the support girder 120 on the slurry wall 100, the slurry wall (110) is fixed fixedly installed ( 100) Pre-construction of the non-constricted grout (grout) at each position of the inner surface, and to fix the bracket 110 using a plurality of anchors 114 on the non-constricted grout (112) pre-installed in this way.

상기 브라켓(110)으로는 횡부재(116)와 종부재(118)가 수직으로 일체 결합된 T자형 평면구조를 가지는 브라켓이 사용될 수 있으며, 횡부재(116)를 슬러리 벽(100) 내측면의 선시공된 무수축 그라우트(112) 면 위에 접합시킨 후 앵커(114)를 상기 횡부재(116) 및 그라우트(112)에 관통시켜 슬러리 벽(100)에 고정 설치함으로써, 상기 브라켓(110)을 슬러리 벽(100)에 완전 고정한다.As the bracket 110, a bracket having a T-shaped flat structure in which the horizontal member 116 and the vertical member 118 are vertically integrally coupled to each other may be used, and the horizontal member 116 may be formed on the inner surface of the slurry wall 100. After bonding to the pre-constructed non-shrink grout (112) surface and anchor 114 through the transverse member 116 and the grout (112) to be fixed to the slurry wall 100, thereby fixing the bracket 110 to the slurry wall Fully secured to 100.

상기와 같이 각 브라켓(110)을 설치함에 있어서, 횡부재(116)와 종부재(118)를 분리된 상태로 준비하여, 우선 슬러리 벽(100)에 횡부재(116)를 고정 설치하고, 이후 고정된 횡부재(116)에 종부재(118)를 수직으로 현장 용접하여 설치한다.In installing the brackets 110 as described above, the transverse member 116 and the longitudinal member 118 are prepared in a separated state, and the transverse member 116 is fixedly installed on the slurry wall 100 first, and then The vertical member 118 is vertically welded to the fixed horizontal member 116 and installed.

이때, 상기 횡부재(116)를 슬러리 벽(100)에 고정하기 위한 앵커(114)로서 케미컬 앵커(chemical anchor,홀 내부 접착 고정형 앵커) 또는 셋 앵커(set anchor,확장형 앵커)가 사용될 수 있는데, 시공된 슬러리 벽(100)에 앵커(114)가 삽입될 고정홀(미부호)을 각 앵커 위치에 시공하고, 이어 횡부재(116)를 그라우트(112) 면 위에 갖다 댄 뒤, 앵커(114)를 횡부재(116)에 관통시켜 상기 고정홀에 삽입 및 고정한다. In this case, as the anchor 114 for fixing the cross member 116 to the slurry wall 100, a chemical anchor (chemical anchor, fixed anchor anchor inside the hole) or a set anchor (extended anchor) may be used. A fixing hole (unsigned) into which the anchor 114 is to be inserted into the constructed slurry wall 100 is installed at each anchor position, and then the transverse member 116 is placed on the grout 112 surface, and then the anchor 114 is mounted. It penetrates through the horizontal member 116 is inserted into and fixed to the fixing hole.

또한, 상기 브라켓(110)의 종부재(118)에 H-형강으로 된 지지거더(120)의 단부 수직면을 접합시킨 상태에서 중첩되는 대응면끼리 서로 볼팅하여 지지거더(120)의 단부를 브라켓(110)의 종부재(118)에 결합하고, 이에 의해 지지거더(120)가 지지되도록 한다.In addition, the end faces of the support girders 120 are bolted to each other by mutually overlapping corresponding surfaces in the state in which the end vertical surfaces of the support girders 120 made of H-shaped steel are joined to the longitudinal member 118 of the bracket 110. It is coupled to the longitudinal member 118 of 110, thereby supporting the support girder 120.

상기와 같이 브라켓(110)의 종부재(118)에 지지거더(120)의 단부를 볼팅함에 있어서, 브라켓(110)의 종부재(118)에서 볼트(119b)가 체결되는 복수개의 홀(119a)은 지지거더(120)의 길이방향으로 길게 형성하여 각각 슬롯홀 형태로 구비하는 것이 바람직하며, 상기 종부재(118)의 각 슬롯홀(119a)을 지지거더(120)의 해당 체결홀(미부호)과 일치시킨 뒤 볼트(119b)를 체결하여 연결하게 된다.As described above, in bolting the end portion of the support girder 120 to the longitudinal member 118 of the bracket 110, a plurality of holes 119a to which the bolt 119b is fastened to the longitudinal member 118 of the bracket 110. Is formed in the longitudinal direction of the support girder 120 is preferably provided in the form of slot holes, respectively, each of the slot holes (119a) of the longitudinal member 118 corresponding fastening holes (unsigned) of the support girder 120 ) And then bolts (119b) to connect.

위와 같이 종부재(118)에서 볼트(119b)가 체결되는 홀(119a)을 지지거더(120)의 길이방향으로 길게 형성된 슬롯홀 형태로 형성함으로써, 현장에서 지지거더(120)를 보다 용이하게 브라켓(110)의 종부재(118)에 체결할 수 있게 된다.As described above, by forming the hole 119a to which the bolt 119b is fastened in the longitudinal member 118 in the form of a slot hole formed in the longitudinal direction of the support girder 120, the support girder 120 is more easily bracketed in the field. Can be fastened to the longitudinal member 118 of (110).

즉, 각 지지거더(120)의 길이 또는 단부 체결홀 위치에 미세한 차이가 있을 수 있는 바, 종부재(118)의 홀(119a)을 슬롯홀 형태로 구비함으로써, 종부재(118)에서 볼트 체결점을 적절히 조정할 수 있고, 이에 의해 지지거더(120) 마다 그 체결홀 위치에 미세한 차이가 있더라도 종부재(118)의 볼트 체결점을 조정하여 체결을 보다 용이하게 할 수 있으며, 현장에서의 설치작업이 보다 원활해지게 된다. That is, there may be a slight difference in the length of the support girder 120 or the position of the end fastening hole, by providing the hole 119a of the longitudinal member 118 in the form of a slot hole, bolt fastening in the longitudinal member 118 The point can be adjusted appropriately, thereby making it easier to tighten by adjusting the bolt fastening point of the longitudinal member 118 even if there is a slight difference in the fastening hole position for each support girder 120, This will be more smooth.

그리고, 볼트 체결점이 이동 가능하므로, 슬러리 벽(100)으로부터 전달되는 수평하중, 즉 토압이 지지거더(120)에 직접 전달되는 것을 어느 정도 차단할 수 있는 바, 토압이 지지거더(120)가 아닌 슬래브(101)로만 전달되도록 할 수 있고, 지지거더(120)에는 슬래브(101)에서 전달되는 수직하중만 작용되도록 할 수 있다. In addition, since the bolt fastening point is movable, the horizontal load transmitted from the slurry wall 100, that is, the earth pressure can be blocked to a certain degree from being directly transmitted to the support girder 120, and the earth pressure is not the support girder 120. It can be to be transmitted only to 101, the support girder 120 can be made to act only the vertical load transmitted from the slab (101).

도시한 바에 따르면, 지지거더(120)의 일단부 결합구조만이 도시되었으나, 본 고안에서 상기 지지거더(120)는 양 단부가 동일하게 본 고안에서의 상기 T자형 브라켓(110)에 동일한 결합구조로 결합될 수 있고, 이와 같이 하여 상기 지지거더(120)가 슬러리 벽(100)에 직접 지지 및 고정 설치된다.As shown, only one end coupling structure of the support girder 120 is shown, in the present invention, the support girder 120 has the same coupling structure to both ends of the T-shaped bracket 110 in the present invention. The support girder 120 is thus directly supported and fixed to the slurry wall 100.

한편, 본 고안의 거푸집 구조체는 상기 지지거더(120) 외에 데크 플레이트(140)의 슬러리 벽(100)쪽 끝단 테두리를 지지하기 위한 또 다른 지지수단, 즉 보조지지수단을 포함하며, 이 보조지지수단으로는 L-형강(130a)이 사용될 수 있다.On the other hand, the formwork structure of the present invention includes another support means for supporting the end edge of the slurry wall 100 side of the deck plate 140 in addition to the support girder 120, that is, the auxiliary support means, this auxiliary support means As the L-shaped steel 130a may be used.

상기 L-형강(130a)은 데크 플레이트(140)가 지지거더(120)와 L-형강(130a)에 의해 동시에 지지될 수 있도록 지지거더(120)와는 동일 높이에서 횡배치되어 슬러리 벽(100)을 따라 근접 위치에서 수평으로 길게 설치된다.The L-shaped steel 130a is horizontally disposed at the same height as the support girder 120 so that the deck plate 140 may be simultaneously supported by the support girder 120 and the L-shaped steel 130a. It is installed horizontally long in the proximity position along.

이때, 상기 L-형강(130a)은 단부가 상기 브라켓(110)에 고정되어서 지지 및 설치되는 바, 이웃한 양측의 두 상기 브라켓(110)간에 설치되며, 양 단부가 이웃한 각 브라켓(110)의 횡부재(116)에 용접됨으로써 고정된다. At this time, the L-shaped steel (130a) is the end is fixed to the bracket 110 is supported and installed, it is installed between the two brackets (110) on both sides adjacent, both ends of each bracket (110) It is fixed by welding to the horizontal member 116 of.

즉, 상기 각 브라켓(110)의 횡부재(116)에서 좌우 양쪽 부분에 L-형강(130a)의 단부가 용접되며, 이와 같이 상기 이웃한 두 브라켓(110)의 횡부재(116)에 L-형강(130a)의 양 단부가 용접됨으로써, 상기 L-형강(130a)이 이웃한 두 브라켓(110)간에 고정 설치될 수 있는 것이다.That is, the ends of the L-shaped steel 130a are welded to both left and right portions of the horizontal members 116 of the respective brackets 110, and thus L − to the horizontal members 116 of the two adjacent brackets 110. By welding both ends of the shaped steel 130a, the L-shaped steel 130a may be fixedly installed between two adjacent brackets 110.

여기서, 각 브라켓(110)을 중심으로 양 측의 두 L-형강(130a)은 슬러리 벽(100)을 따라 일직선 형태로 수평 배치된다. Here, two L-shaped steels 130a on both sides about each bracket 110 are horizontally arranged in a straight line along the slurry wall 100.

한편, 슬러리 벽(100)에서의 위치에 따라, 즉 슬래브(101)가 시공되는 위치에 따라서, 상기 브라켓(110)에는 L-형강(130a)의 보조지지수단과, 이와는 별개로 H-형강(130b)으로 실시되는 또 다른 보조지지수단이 동시에 설치될 수 있다. On the other hand, depending on the position in the slurry wall 100, i.e., the position in which the slab 101 is constructed, the bracket 110 has an auxiliary supporting means of the L-shaped steel 130a and a separate H-shaped steel ( Another auxiliary supporting means implemented in 130b) may be installed at the same time.

첨부한 도 6은 본 고안에서 L-형강과 H-형강의 보조지지수단이 동시에 설치된 예를 도시한 평면도이고, 도 7은 도 6의 선 'C-C'를 따라 취한 단면도이다.6 is a plan view showing an example in which the auxiliary support means of the L-beam and H-beam in the present invention is installed at the same time, Figure 7 is a cross-sectional view taken along the line 'C-C' of FIG.

도 6에서는 슬러리 벽(100)을 횡방향으로 단면한 상태에서 보이는 L-형강(130a)의 결합구조를 도시하였다.In FIG. 6, the coupling structure of the L-shaped steel 130a shown in the cross-sectional view of the slurry wall 100 is illustrated.

이에 도시한 바와 같이, 지하층의 슬러리 벽(100) 모퉁이 부분, 즉 종횡의 두 슬러리 벽(100)이 만나는 모퉁이 부분의 안쪽 위치에 지지거더(120)가 지지 및 결합되는 상기 브라켓(110)이 동일하게 고정 설치되고, 이 브라켓(110)에서 슬러리 벽(100)쪽의 접합면이 되는 횡부재(116)에는 한쪽 방향으로 L-형강(130a)의 보조지지수단이 용접 설치되는 한편, 상기 브라켓(110)에서 종부재(118)에는 상기 L-형강(130a)의 보조지지수단과 대략 직각 배치되는 H-형강(130b)의 보조지지수단이 볼트로 체결되어 설치된다.As shown in the figure, the bracket 110 in which the support girder 120 is supported and coupled to the inner side of the corner portion of the slurry wall 100 of the basement layer, that is, the corner portion where the two vertical and horizontal slurry walls 100 meet, is the same. And the auxiliary supporting means of the L-shaped steel 130a in one direction is welded to the lateral member 116 which is fixedly installed, and becomes the joint surface of the slurry wall 100 from the bracket 110, while the bracket ( In 110, the longitudinal member 118 is installed by fastening the auxiliary supporting means of the H-shaped steel 130b which is disposed substantially perpendicular to the auxiliary supporting means of the L-shaped steel 130a.

이때, 상기 L-형강(130a)과 H-형강(130b)은 지지거더(120)와는 동일 높이에서 횡배치되어 슬러리 벽(100)을 따라 근접 위치에서 수평으로 길게 설치되며, L-형강(130a)과 H-형강(130b)이 모두 지지거더(120)와 동일하게 상측의 데크 플레이트(140)를 지지하게 된다.At this time, the L-shaped steel (130a) and the H-shaped steel (130b) is horizontally arranged at the same height as the support girder 120 is installed horizontally long in the proximal position along the slurry wall 100, L-shaped steel (130a) ) And the H-shaped steel (130b) is to support the upper deck plate 140, the same as the support girder 120.

상기 H-형강(130b)의 경우 일단부가 브라켓(110)의 종부재(118)에, 타단부가 지지거더(120)의 단부 내측에 별도로 용접 설치된 거싯 플레이트(122)에 각각 중첩되는 대응면끼리 서로 볼팅되어 체결됨으로써 브라켓(110)과 지지거더(120)간에 지지 및 고정 설치되며, 이때 지지거더(120)가 지지된 브라켓(110)에서의 종부재(118)에는 지지거더(120)의 단부와, 이 지지거더(120) 및 거싯 플레이트(122)를 매개로 하여 보조지지수단인 H-형강(130b)의 단부가 지지되고, 그 횡부재(116)에는 H-형강(130b)의 반대쪽으로 L-형강(130a)의 단부가 앞서 설명한 바와 같이 용접되어 지지되게 된다.In the case of the H-shaped steel 130b, one end portion of the corresponding surface overlaps each other on the gusset plate 122 separately welded to the longitudinal member 118 of the bracket 110 and the other end is welded inside the end of the support girder 120. By being bolted and fastened to each other, the support 110 is fixed and installed between the bracket 110 and the support girder 120. At this time, an end of the support girder 120 is attached to the longitudinal member 118 in the bracket 110 on which the support girder 120 is supported. The end of the H-shaped steel 130b, which is an auxiliary supporting means, is supported via the support girder 120 and the gusset plate 122, and the transverse member 116 is opposite to the H-shaped steel 130b. The ends of the L-shaped steel 130a are welded and supported as described above.

결국, 본 고안의 거푸집 구조체를 이용하여 슬러리 벽(100)에 슬래브(101)를 직접 연결 시공하기 위해서는, 먼저 상기 브라켓(110)을 슬러리 벽(100)의 각 위치에 설치하고, 이어 지지거더(120)와 L-형강(130a), 그리고 H-형강(130b)을 전술한 바와 같이 각 위치에서 브라켓(110)을 매개로 하여 슬러리 벽(100)에 직접 지지시켜 설치한 다음, 그 위로 데크 플레이트(140)를 설치하며, 이와 같이 데크 플레이트(140)를 포함한 슬래브 시공을 위한 거푸집 구조체를 모두 구축한 상태에서 콘크리트를 타설 및 양생하게 된다. As a result, in order to directly connect the slab 101 to the slurry wall 100 using the formwork of the present invention, the bracket 110 is first installed at each position of the slurry wall 100, and then the support girder ( 120 and L-shaped steel 130a and H-shaped steel 130b are installed by directly supporting the slurry wall 100 via the bracket 110 at each position as described above, and then deck plate thereon. 140 is installed, and in this way, the concrete is poured and cured in a state in which all the formwork structures for the slab construction including the deck plate 140 are constructed.

한편, 첨부한 도 8은 본 고안에서 브라켓을 고정하기 위하여 앵커 철근이 사용된 실시예를 도시한 단면도이고, 도 9a와 도 9b는 본 고안에서 브라켓과 앵커 철근을 도시한 측면도 및 사시도로서, 이들 도면은 브라켓을 고정하기 위한 다른 구조 및 방법을 도시한 것이다. On the other hand, Figure 8 is a cross-sectional view showing an embodiment in which anchor reinforcement is used to fix the bracket in the present invention, Figures 9a and 9b is a side view and a perspective view showing the bracket and anchor reinforcement in the present invention, these The figure shows another structure and method for fixing the bracket.

이에 도시한 바와 같이, 브라켓(110)의 횡부재(116)를, 슬러리 벽의 고정홀 시공이 필요한 앵커가 아닌, 철근(이하, 앵커 철근이라 칭함)(117)을 사용하여 슬러리 벽(100)에 고정할 수 있다.As shown therein, the lateral member 116 of the bracket 110 is a slurry wall 100 by using a reinforcing bar (hereinafter referred to as anchor reinforcing bar) 117 rather than an anchor that requires fixing hole construction of the slurry wall. Can be fixed at

앞서 설명한 앵커의 사용예가 슬러리 벽의 시공 완료 후 고정홀을 뚫어 이 고정홀에 앵커를 삽입 고정하는 방식으로 브라켓의 횡부재를 고정하는 방법이었다면, 상기 앵커 철근(117)을 사용하여 브라켓(110)을 설치하는 방법은, 슬러리 벽 시공 과정에서 콘크리트 타설 전에 상기 브라켓(110)의 횡부재(116)를 앵커 철근(117)을 사용해 시공하려는 슬러리 벽(100) 내부의 고정요소에 고정하고, 이후 콘크리트를 타설하여, 슬러리 벽(100)과 브라켓(110)의 횡부재(116)를 동시에 일체화 시공하는 방법이다.If the use example of the anchor described above was a method of fixing the transverse member of the bracket in a manner of inserting and fixing the anchor hole in the fixing hole after completion of the construction of the slurry wall, using the anchor reinforcement 117 bracket 110 How to install the, before the concrete in the slurry wall construction process, the horizontal member 116 of the bracket 110 is fixed to the fixing element inside the slurry wall 100 to be constructed using the anchor reinforcing bars 117, and then concrete And pouring the slurry wall 100 and the transverse member 116 of the bracket 110 at the same time integrated construction.

슬러리 벽을 시공하는 과정에서 콘크리트를 타설하기 전에 슬러리 벽 내에는 통상 보조철근을 포함한 다수의 철근들을 설치하는 배근작업을 하는데, 본 고안에서 상기 브라켓의 횡부재(116)를 슬러리 벽 내의 고정요소, 즉 보조철근 등에 고정할 수가 있는 것이다. In the process of constructing the slurry wall, before placing concrete, a slurry reinforcing work is usually installed in the slurry wall including a plurality of reinforcing bars. In the present invention, the transverse member 116 of the bracket includes a fixing element in the slurry wall, In other words, it can be fixed to secondary rebars.

보다 상세하게는, 상기 브라켓(110)의 횡부재(116) 배면에 ㄱ자 형상으로 절곡 가공한 복수개의 앵커 철근(117)들을 용접하여 설치하고, 횡부재(116)를 슬러리 벽(100)의 브라켓 설치위치에 위치시켜 상기 앵커 철근(117)들을, 슬러리 벽(100) 내에 설치된 보조철근 등의 고정요소에 와이어 등으로 묶어서 위치 고정시킨다. More specifically, the plurality of anchor reinforcing bars 117 bent in the L-shape is installed on the rear surface of the transverse member 116 of the bracket 110, and the transverse member 116 is installed on the bracket of the slurry wall 100. The anchor reinforcing bars 117 are positioned in an installation position, and are secured by being tied to a fixing element such as an auxiliary reinforcing bar installed in the slurry wall 100 by a wire or the like.

이후 콘크리트를 타설하여 슬러리 벽(100)을 형성하는 바, 시공이 완료된 슬러리 벽(100)에는 앵커 철근(117)을 매개로 브라켓(110)의 횡부재(116)가 일체로 결합된 상태로 있게 되며, 이러한 과정을 통하여 슬러리 벽(100)과 브라켓(110)의 횡부재(116)가 동시에 일체화 시공될 수 있게 된다.After the concrete is poured to form a slurry wall 100, the construction of the slurry wall 100 is completed, so that the transverse member 116 of the bracket 110 is integrally coupled to each other via the anchor reinforcing bars 117. Through this process, the slurry member 100 and the transverse member 116 of the bracket 110 can be integrated at the same time.

도 8을 참조하면, 상기 횡부재(116)가 슬러리 벽(100) 내측면에 매립된 상태로 일체화 시공되었음을 볼 수 있다.Referring to FIG. 8, it can be seen that the transverse member 116 is integrally constructed with the slurry wall 100 embedded in the inner surface.

이와 같이 횡부재(116)가 시공된 상태에서 전술한 바와 동일하게 종부재(118)를 현장 용접한 후 지지거더(120)를 지지시키게 된다.As described above, the longitudinal member 118 is welded in the same manner as described above in the state in which the horizontal member 116 is constructed to support the support girder 120.

도 9a와 도 9b에서는 횡부재(116)와 종부재(118)가 결합된 상태에서 앵커 철근(117)이 설치된 상태를 보여주고 있는데, 실제로 브라켓(110)을 설치할 때에는 횡부재(116)에 앵커 철근(117)만 용접 설치한 상태로 하여 상기 횡부재(116)를 슬러리 벽 내 고정요소에 고정하며, 종부재(118)는 슬러리 벽(100) 및 횡부재(116)의 시공이 완료된 후 따로 현장 용접하여 결합한다. 9A and 9B, the anchor reinforcing bars 117 are shown in a state in which the horizontal member 116 and the longitudinal member 118 are coupled to each other. When the bracket 110 is actually installed, the anchor member is anchored to the horizontal member 116. The transverse member 116 is fixed to the fixing element in the slurry wall by welding only the reinforcing bar 117, and the longitudinal member 118 is separately completed after the construction of the slurry wall 100 and the transverse member 116 is completed. Join by field welding.

도 8, 도 9a 및 도 9b에서 ㄱ자 형상의 절곡 가공된 앵커 철근(117)이 도시되어 있으나, 이 앵커 철근(117)은 슬러리 벽 내 설치된 고정요소, 예컨대 보조철근 등에 고정할 수 있는 기타 다양한 형상으로 실시될 수 있으며, 또한 앵커 철근(117)은 첨부한 도 9c에 도시한 바와 같이 스터드(117a)로 대체가 가능하다.8, 9A and 9B, the B-shaped bent anchor reinforcement 117 is shown, but the anchor reinforcement 117 has various other shapes that can be fixed to a fixed element installed in the slurry wall, such as an auxiliary rebar. In addition, the anchor reinforcing bar 117 may be replaced with a stud 117a as shown in Figure 9c attached.

즉, 브라켓(110)의 횡부재(116)에 앵커 철근(117) 대신 복수개의 스터드(117a)를 용접하여 사용할 수 있고, 이때 앵커 철근(117)과 마찬가지로 각 스터드(117a)는 끝단을 횡부재(116) 배면에 용접하여 고정 설치한다.That is, a plurality of studs 117a may be welded to the transverse member 116 of the bracket 110 instead of the anchor reinforcing bars 117. In this case, like the anchor reinforcing bars 117, each stud 117a has a transverse member at its end. (116) It is fixed to the back by welding.

상기 각 스터드(117a)는 콘크리트 타설 전에 시공하고자 하는 슬러리 벽 내부의 미리 설치된 고정요소(철근 등)에 와이어 고정, 용접 고정 또는 기타 여러 방법을 이용하여 쉽게 고정할 수 있다. Each stud 117a can be easily fixed by wire fixing, welding fixing, or other methods to pre-installed fixing elements (rebars, etc.) inside the slurry wall to be installed before concrete pouring.

상기한 앵커 철근의 사용예에 따르면, 슬러리 벽 시공 과정에서 브라켓(110)의 횡부재(116)를 간단히 철근을 통해 고정하여 슬러리 벽(100)과 일체화 시공할 수 있게 되며, 슬러리 벽 시공 후 실시하는 작업, 즉 앵커 고정홀을 뚫는 작업, 그라우트 시공 작업(그라우트 삭제됨), 앵커 설치 작업 등이 삭제될 수 있는 바, 브라켓 설치 작업이 보다 용이해지고 간편해진다. According to the use example of the anchor reinforcing bar, in the slurry wall construction process, the transverse member 116 of the bracket 110 can be fixed simply through reinforcing bars to be integrated with the slurry wall 100, and be carried out after the slurry wall construction. Work, ie drilling anchor fixing hole, grout construction work (groove deleted), anchor installation work can be deleted bar, bracket installation work becomes easier and simpler.

특히, 앵커 고정홀을 뚫는 작업에 드는 비용을 줄일 수 있고, 슬러리 벽 시공 후 벽 내부의 철근을 피해 고정홀을 뚫어야 하는 노력이 불필요하며, 그라우트 시공 및 앵커 사용에 따른 비용을 줄일 수 있는 장점도 있다.In particular, the cost of drilling anchor fixing holes can be reduced, and efforts to drill the fixing holes to avoid the reinforcing bars inside the wall after slurry wall construction are unnecessary, and the cost of grout construction and the use of anchors can be reduced. have.

이와 같이 하여, 본 고안에 따른 지하층의 슬래브 시공을 위한 거푸집 구조체에 따르면, 흙막이벽으로서 슬러리 벽이 시공된 경우에 상기 브라켓 및 보조지지수단을 사용하여 테두리보가 생략되면서 슬러리 벽에 직접 연결되는 슬래브의 시공이 가능해지며, 테두리보 설치에 따른 종래의 여러 문제점들이 해소될 수 있게 된다.Thus, according to the formwork for the slab construction of the basement layer according to the present invention, when the slurry wall is constructed as a retaining wall of the slab directly connected to the slurry wall while the rim beam is omitted using the bracket and the auxiliary support means Construction is possible, and various problems in the conventional installation of the rim beam can be solved.

한편, 첨부한 도 10은 본 고안에 따른 슬래브 시공을 위한 거푸집 구조체의 또 다른 실시예를 도시한 단면도이고, 도 11은 도 10의 선 'D-D'를 따라 취한 단면도로서 데크 플레이트가 설치되기 전의 상태를 도시하였다. On the other hand, Figure 10 is a cross-sectional view showing another embodiment of the formwork structure for the slab construction according to the present invention, Figure 11 is a cross-sectional view taken along the line 'D-D' of FIG. The previous state is shown.

도 10 및 도 11에 도시한 실시예는 지지거더(120)가 브라켓(110)을 매개로 슬러리 벽(100)의 내측면에 직접 고정 지지되는 점이 앞서 설명한 실시예와 동일하다.10 and 11 are the same as the above-described embodiment in that the support girder 120 is directly fixed to the inner surface of the slurry wall 100 via the bracket 110.

단, 보조지지수단의 L-형강(130c)이 후술하는 철근 콘크리트 보강부(102)의 거푸집 역할을 할 수 있도록 설치된다.However, the L-shaped steel 130c of the auxiliary support means is installed to serve as a formwork of the reinforced concrete reinforcement portion 102 to be described later.

즉, 도 10과 도 11에 도시한 바와 같이, L-형강(130c)이 도 1의 실시예와 비교할 때 상하가 거꾸로 뒤집힌 상태로 설치되는데, 특히 상기 L-형강(130c)이 지지거더(120) 단부의 절개부위(120a) 내측에 설치 및 지지되고, 상기 L-형강(130c) 내부로 철근 시공 및 슬래브와 동시에 콘크리트 시공이 이루어질 경우, 슬러리 벽(100)과 데크 슬래브(101)간 연결부에 상대적으로 두께가 두꺼운 철근 콘크리트 보강부(102)가 시공될 수 있게 되어 있다.That is, as shown in FIGS. 10 and 11, the L-shaped steel 130c is installed upside down when compared to the embodiment of FIG. 1, in particular, the L-shaped steel 130c is supported by the support girder 120. When installed and supported inside the incision 120a of the end, and concrete construction simultaneously with the reinforcement construction and the slab into the L-shaped steel (130c), the connection portion between the slurry wall 100 and the deck slab 101 Relatively thick reinforced concrete reinforcement 102 can be constructed.

상기 보강부(102)는 L-형강(130c)의 형상에 따라 슬래브(101) 하측으로 돌출된 사각형의 단면구조를 가지며, 슬러리 벽(100)과 데크 슬래브간(101) 연결부를 따라, 즉 슬러리 벽(100)과 데크 슬래브(101)가 만나는 슬래브 외곽 경계부분을 따라 연속된 형태로 시공되어진다.The reinforcement portion 102 has a rectangular cross-sectional structure protruding downward from the slab 101 according to the shape of the L-shaped steel 130c, and is connected along the connection between the slurry wall 100 and the deck slab 101, that is, the slurry. It is constructed in a continuous form along the outer edge of the slab where the wall 100 and the deck slab 101 meet.

이와 같이 슬러리 벽(100)과 데크 슬래브(101)가 만나는 부분을 보강부(102)로 하여 데크 슬래브(101)보다 두껍게 시공함으로써, 도 1의 실시예에 의해 시공된 슬래브에 비해 강성을 보다 증대시킬 수 있고, 슬래브 균열을 방지할 수 있게 된다. Thus, by constructing the portion where the slurry wall 100 and the deck slab 101 meets as a reinforcing portion 102 to be thicker than the deck slab 101, the rigidity is increased more than the slab constructed by the embodiment of FIG. Can be prevented, and the slab crack can be prevented.

이하, 도 10 및 도 11의 실시예에 대하여 좀더 상세히 설명하기로 한다.Hereinafter, the embodiment of FIGS. 10 and 11 will be described in more detail.

도시한 바와 같이, 브라켓(110)을 슬러리 벽(100)에 고정하기 위한 일체화 연결부재로서 도 9c에 도시한 스터드(117a)를 사용한 예를 들어 설명하고자 하며, 물론 이 스터드(117a)는 앞서 설명한 바와 동일하게 앵커 철근으로 대체가 가능하다(도 9a 및 도 9b 참조).As shown, an example using the stud 117a shown in FIG. 9C as an integrated connecting member for fixing the bracket 110 to the slurry wall 100 will be described. Of course, the stud 117a is described above. It is possible to replace it with an anchor bar in the same manner as described above (see FIGS. 9A and 9B).

상기 브라켓(110)은 앞서 설명한 실시예와 동일하게 횡부재(116)와 종부재(118)가 일체로 결합된 T자형 평면구조로 되어 있으며, 슬러리 벽(100)의 내측면 각 위치에 상기 횡부재(116)가 고정되어서 설치된다.The bracket 110 has a T-shaped flat structure in which the transverse member 116 and the longitudinal member 118 are integrally coupled to each other in the same manner as the above-described embodiment, and the transverse members are disposed at respective positions on the inner surface of the slurry wall 100. The member 116 is fixedly installed.

상기 브라켓(110)을 설치하기 위하여, 우선 브라켓(110)의 횡부재(116) 배면에 복수개의 스터드(117a)들을 용접하여 설치하고, 횡부재(116)를 슬러리 벽(100)의 브라켓 설치위치에 위치시킨 후, 스터드(117a)들을 슬러리 벽(100) 내에 설치된 보조철근 등의 고정요소에 와이어 등으로 묶는 방법으로 상기 횡부재(116)를 위치 고정시킨다. In order to install the bracket 110, first, a plurality of studs 117a are installed on the rear surface of the lateral member 116 of the bracket 110, and the lateral member 116 is installed on the bracket of the slurry wall 100. After positioning in, the transverse member 116 is fixed in position by tying studs 117a with a wire or the like to a fixing element such as an auxiliary reinforcing bar installed in the slurry wall 100.

이후 콘크리트를 타설하여 슬러리 벽(100)을 형성하는 바, 시공이 완료된 슬러리 벽(100)에는 스터드(117a)를 매개로 브라켓(110)의 횡부재(116)가 그 전면이 노출된 채 일체 결합된 상태로 있게 되며, 이러한 과정을 통하여 슬러리 벽(100)과 브라켓(110)의 횡부재(116)가 일체화 시공될 수 있게 된다.After the concrete is poured to form the slurry wall 100, the construction of the slurry wall 100 is completed, the cross member 116 of the bracket 110 through the stud 117a is integrally coupled with the front surface exposed In this state, the lateral member 116 of the slurry wall 100 and the bracket 110 can be integrally constructed through this process.

도 10을 참조하면, 횡부재(116)가 슬러리 벽(100) 내측면에 매립된 상태로 일체화 시공됨을 볼 수 있다.Referring to FIG. 10, it can be seen that the cross member 116 is integrally constructed with the slurry wall 100 embedded in the inner surface.

이와 같이 횡부재(116)가 슬러리 벽(100) 내측면에 매립 시공된 상태에서 종부재(118)를 현장 용접하게 된다.As such, the horizontal member 116 is welded to the vertical member 118 in a state in which the horizontal member 116 is embedded in the inner surface of the slurry wall 100.

물론, 상기 브라켓(110)의 횡부재(116)는 슬러리 벽(100) 내측면 각 위치의 선시공된 무수측 그라우트 위에 접합된 상태로 하여 슬러리 벽의 고정홀에 삽입 고정되는 복수개의 앵커에 의해 고정될 수 있다(도 3 참조).Of course, the transverse member 116 of the bracket 110 is fixed by a plurality of anchors inserted and fixed in the fixing hole of the slurry wall in a state of being bonded on the pre-installed anhydrous side grout at each position of the inner side of the slurry wall 100. May be (see FIG. 3).

다음으로, 상기 브라켓(110)의 종부재(118)에 단부를 결합하는 방식으로 지지거더(120)를 연결하여 지지시키게 된다.Next, the support girder 120 is connected and supported by coupling the end portion to the longitudinal member 118 of the bracket 110.

여기서, 종부재(118)와 지지거더(120)의 단부가 결합되는 구조는 앞서 설명한 각 실시예와 동일하다.Here, the structure in which the end of the longitudinal member 118 and the support girder 120 is coupled is the same as each embodiment described above.

즉, 브라켓(110)의 종부재(118)에 지지거더(120)의 단부 수직면을 접합시킨 상태에서 중첩되는 대응면끼리 서로 볼팅하여 지지거더(120)의 단부를 브라켓(110)의 종부재(118)에 결합하고, 이에 의해 지지거더(120)가 지지되도록 한다.That is, in the state in which the end vertical surfaces of the support girders 120 are joined to the longitudinal members 118 of the bracket 110, the corresponding surfaces overlapping each other are bolted to each other to terminate the ends of the support girders 120 with the longitudinal members of the bracket 110 ( 118), thereby supporting the support girder 120.

상기와 같이 브라켓(110)의 종부재(118)에 지지거더(120)의 단부를 볼팅함에 있어서, 브라켓(110)의 종부재(118)에서 볼트(119b)가 체결되는 복수개의 홀(119a)은 지지거더(120)의 길이방향으로 길게 형성하여 각각 슬롯홀 형태로 구비하며, 상기 종부재(118)의 각 슬롯홀(119a)을 지지거더(120)의 해당 체결홀(미부호)과 일치시킨 뒤 볼트(119b)를 체결하여 연결하게 된다.As described above, in bolting the end portion of the support girder 120 to the longitudinal member 118 of the bracket 110, a plurality of holes 119a to which the bolt 119b is fastened to the longitudinal member 118 of the bracket 110. Is formed long in the longitudinal direction of the support girders 120 and provided in the form of slot holes, respectively, and match each of the slot holes 119a of the longitudinal member 118 with the corresponding fastening holes (unsigned) of the support girders 120. After the bolt 119b is fastened to connect.

그리고, 도 10 및 도 11의 실시예에서는 지지거더(120)의 단부가 보다 견고히 지지될 수 있도록 브라켓(110)의 횡부재(118)에 지지거더(120) 끝단을 하측에서 지지하는 받침 앵글(121)을 용접 설치한다.In addition, in the embodiment of FIGS. 10 and 11, the support angle 120 supporting the end of the support girder 120 to the horizontal member 118 of the bracket 110 so that the end of the support girder 120 is more firmly supported. Weld 121).

상기 받침 앵글(121)은 L-형강을 필요한 길이만큼 절단 가공하여 제작한 것을 사용할 수 있다.The support angle 121 may be produced by cutting the L-shaped steel to the required length.

그리고, 브라켓(110)에 의해 고정되는 지지거더(120)는 단부 끝단쪽 상단을 보강부 시공을 위한 L-형강(130c)의 높이에 맞추어 절개한 후 설치되며, 이 절개부위(120a) 내측으로 상기 L-형강(130c)이 설치된다.Then, the support girder 120 fixed by the bracket 110 is installed after cutting the upper end end side to the height of the L-shaped steel (130c) for the construction of the reinforcement portion, this cut portion 120a inside The L-shaped steel 130c is installed.

상기 L-형강(130c)은 지지거더(120)와는 횡으로 배치되어 슬러리 벽(100) 내측면을 따라 수평으로 길게 설치되며, 지지거더(120)의 절개부위(120a) 상측으로 얹혀져 지지된다.The L-shaped steel 130c is horizontally disposed with the support girder 120 and installed horizontally along the inner surface of the slurry wall 100, and is supported by being placed on the cutout portion 120a of the support girder 120.

상기 L-형강(130c)은 지지거더(120)의 절개부위(120a) 상측으로 지지되어 브라켓(110)의 횡부재(116)와 지지거더(120)에 용접되며, 그 상단의 높이를 지지거더(120) 상단의 높이와 동일 높이로 하여 상기 L-형강(130c)의 상단에도 데크 플레이트(140)가 지지될 수 있도록 한다.The L-shaped steel 130c is supported above the cutout portion 120a of the support girder 120 and welded to the horizontal member 116 and the support girder 120 of the bracket 110, and supports the height of the upper end of the support girder 120. The height of the upper end of the 120 may be such that the deck plate 140 may be supported on the upper end of the L-shaped steel 130c.

물론, 데크 플레이트(140)를 지지하는 주된 구성요소는 지지거더(120)가 되며, L-형강(130c)은 데크 플레이트(140)를 지지하면서 보강부를 시공하기 위한 거푸집 역할을 하게 된다.Of course, the main component supporting the deck plate 140 is the support girder 120, the L-shaped steel 130c serves as a formwork for constructing the reinforcement while supporting the deck plate 140.

상기와 같이 설치된 L-형강(130c)의 내측으로는 철근(131)을 설치하는 배근작업을 하며, 이와 같이 브라켓(110), 지지거더(120), 받침 앵글(121), L-형강(130c), 데크 플레이트(140)가 모두 설치된 뒤에는 데크 플레이트(140) 및 L-형강(130c) 내측으로 콘크리트를 타설하여 데크 슬래브(101) 및 보강부(102)를 시공하게 된다.The reinforcement work for installing the reinforcing bars 131 inside the L-shaped steel 130c installed as described above, and thus the bracket 110, the support girder 120, the support angle 121, and the L-shaped steel 130c. After the deck plate 140 is installed, the deck slab 101 and the reinforcement 102 are constructed by pouring concrete into the deck plate 140 and the L-shaped steel 130c.

도 10에서 도면부호 100a는 콘크리트 속에 매립되어 슬러리 벽(100)에서 슬래브(101)를 지지하는 동시에 슬러리 벽(100)과 슬래브(101)를 구조적으로 연결하는 도우웰(dowel) 철근을 나타낸다.In FIG. 10, reference numeral 100a denotes a dowel reinforcing bar which is embedded in concrete to support the slab 101 at the slurry wall 100 and at the same time structurally connect the slurry wall 100 and the slab 101.

이 도우웰 철근(100a)은 슬러리 벽(100)의 철근 설치시에 일부가 슬래브 공간으로 노출되도록 설치되며, 슬래브(101) 시공시에 나머지 부분이 슬래브(101)와 보강부(102)의 콘크리트 속에 매립되면서 슬래브(101) 및 보강부(102)를 슬러리 벽(100)과 구조적으로 연결하게 된다.The dowel reinforcing bar (100a) is installed so that a portion of the slurry wall 100 is exposed to the slab space when installing the reinforcing bar, and when the slab 101 is constructed, the remaining portion of the slab 101 and the reinforcement portion 102 of the concrete The slab 101 and the reinforcement 102 are structurally connected to the slurry wall 100 while being embedded in the inside.

슬러리 벽(100)의 철근 설치시에 상기 도우웰 철근(100a)은 복수개가 소정의 상하 간격으로 두고 각 높이에 설치되며, 특히 슬러리 벽(100)의 수직 시공 오차가 발생하는 경우 슬러리 벽에 대한 슬래브 시공 높이에 다소 차이가 발생할 수 있기 때문에 상하로 여분의 도우웰 철근을 추가 매립한다.When the reinforcing bars of the slurry wall 100 are installed, the dowel reinforcing bars 100a are installed at respective heights with a plurality of spaced apart from each other by a predetermined vertical distance. In particular, when vertical construction errors of the slurry wall 100 occur, Because extra differences in slab construction height may occur, additional dowel rebar is added up and down.

첨부한 도 12a와 도 12b는 추가 매립된 도우웰 철근의 이용상태를 설명하기 위한 도면으로서, 브라켓 및 지지거더가 설치되지 않은 위치에서의 단면도이다.12A and 12B are diagrams for explaining a state of use of additional embedded dowel reinforcing bars, and are cross-sectional views of brackets and support girders in a position where no support girder is installed.

이에 도시한 바와 같이, 슬러리 벽(100)의 수직 시공 오차를 고려하여 상하로 여분의 도우웰 철근(100a)을 추가 매립하여, 도 12a에서와 같이 슬러리 벽(100)에 대하여 정위치 높이에 슬래브(101)가 설치되는 경우 최상측 1개를 제외한 나머지 하측 3개의 도우웰 철근(100a)을 슬래브(101)와 연결하고, 도 12b에서와 같이 슬러리 벽(100)의 수직 시공 오차로 인해 슬러리 벽(100)에 대하여 정위치보다 위에 슬래브(101)가 설치되는 경우 최하측 1개를 제외한 나머지 상측 3개의 도우웰 철근(100a)을 슬래브(101)와 연결한다.As shown in FIG. 12A, additional dowel reinforcing bars 100a are additionally buried in consideration of the vertical construction error of the slurry wall 100, and the slab is disposed at a height higher than that of the slurry wall 100 as shown in FIG. 12A. When the 101 is installed, the lower three dowel reinforcing bars 100a except for the uppermost one are connected with the slab 101, and as shown in FIG. 12B, due to the vertical construction error of the slurry wall 100, the slurry wall When the slab 101 is installed above the correct position with respect to the 100, the three upper dowel reinforcing bars 100a except for the lowermost one are connected to the slab 101.

이상에서 설명한 바와 같이, 본 고안에 따른 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체는, 데크 플레이트를 지지하기 위한 영구 구조체인 지지거더를 브라켓을 이용하여 슬러리 벽에 직접 고정하여 설치하고, 또한 상기 브라켓에 데크 플레이트를 지지하기 위한 별도의 보조지지수단을 상기 지지거더와 동일 높이로 하여 슬러리 벽을 따라 수평으로 길게 설치하며, 이와 같이 설치된 지지거더와 보조지지수단 위에 상기 데크 플레이트를 지지시켜서 구성한 것으로, 다음과 같은 장점을 제공하게 된다.As described above, the formwork structure for the slab construction of the basement layer to which the slurry wall is applied according to the present invention, the support girder, which is a permanent structure for supporting the deck plate is installed by fixing directly to the slurry wall using a bracket, The auxiliary supporting means for supporting the deck plate on the bracket is installed at the same height as the support girder and horizontally installed along the slurry wall, and the deck plate is supported on the supporting girder and the auxiliary supporting means. This provides the following advantages.

1) 상기 브라켓 및 보조지지수단을 사용하여 테두리보가 생략되면서 슬러리 벽에 직접 연결되는 슬래브의 시공이 가능해지며, 테두리보 설치에 따른 종래의 여러 문제점들이 해소될 수 있게 된다.1) The construction of the slab connected directly to the slurry wall is possible by using the bracket and the auxiliary support means can be omitted, and various problems in the conventional installation of the rim beam can be solved.

2) 합판 거푸집 및 동바리가 불필요하여 그 사용에 따른 문제점이 해소되고, H-빔 철골보인 지지거더의 단부가 본 고안의 브라켓에 의해 지지되기 때문에 지지거더를 거푸집으로 지지시키거나 선시공된 상측의 지지거더에 현수시킬 필요가 없으며, 따라서 시공성이 현저히 향상된다. 2) Since the plywood formwork and the copper bar are unnecessary, the problem caused by its use is eliminated, and since the end of the H-beam steel beam support girder is supported by the bracket of the present invention, the support girder is supported by formwork or pre-built There is no need to suspend the girders, and therefore the workability is remarkably improved.

3) 거푸집 옆판 등을 설치하기 위한 발판 작업이 불필요하므로 안전 관리에 절대적으로 유리하다. 3) It is absolutely advantageous for safety management because scaffolding work for installing formwork side panels is unnecessary.

4) 목공작업이 불필요하고, 그에 따른 설치작업의 간단화, 시공성 개선 및 공기 단축이 가능해진다.4) No woodworking is required, thereby simplifying installation work, improving workability and shortening air.

5) 거푸집 해체작업이 불필요하므로 작업 및 시공성 개선, 그로 인한 공기 단축이 가능해진다.5) Since no form dismantling work is required, work and workability can be improved, resulting in shortening of air.

6) 테두리보가 없어지므로 테두리보에 사용되던 거푸집의 삭제, 스터럽 및 보강 철근량 절감이 가능하여 비용 측면에서 매우 유리하고, 슬래브의 두께를 얇게 할 수도 있다.6) Since the edge beams are eliminated, the formwork used for the edge beams can be deleted, the stirrups and rebars can be reduced, which is very advantageous in terms of cost, and the slab thickness can be made thinner.

도 1은 종래기술에 따른 지하층의 슬래브 및 테두리보 시공을 위한 거푸집의 설치상태를 보여주는 단면도,1 is a cross-sectional view showing the installation of the formwork for the slab and rim beam construction of the basement layer according to the prior art,

도 2는 본 고안에 따른 슬래브 시공을 위한 거푸집 구조체의 일 실시예를 도시한 사시도, Figure 2 is a perspective view showing an embodiment of a formwork structure for slab construction according to the present invention,

도 3은 도 2의 선 'A-A'를 따라 취한 단면도, 3 is a cross-sectional view taken along the line 'A-A' of FIG.

도 4는 도 2의 선 'B-B'를 따라 취한 단면도,4 is a cross-sectional view taken along the line 'B-B' of FIG.

도 5는 도 2 ~ 도 4에 도시한 일 실시예의 요부 평면도,5 is a plan view of main parts of one embodiment shown in FIGS. 2 to 4;

도 6은 본 고안에서 L-형강과 H-형강의 보조지지수단이 동시에 설치된 예를 도시한 평면도, Figure 6 is a plan view showing an example in which the auxiliary support means of the L-beam and H-beam in the present invention is installed at the same time,

도 7은 도 6의 선 'C-C'를 따라 취한 단면도,7 is a cross-sectional view taken along the line 'C-C' of FIG. 6,

도 8은 본 고안에서 브라켓을 고정하기 위하여 앵커 철근이 사용된 예를 도시한 단면도,8 is a cross-sectional view showing an example in which anchor reinforcement is used to fix the bracket in the present invention;

도 9a와 도 9b는 본 고안에서 브라켓과 앵커 철근을 도시한 측면도 및 사시도. 9a and 9b is a side view and a perspective view showing the bracket and anchor reinforcement in the present invention.

도 9c는 본 고안에서 브라켓과 스터드를 도시한 측면도,Figure 9c is a side view of the bracket and stud in the present invention,

도 10은 본 고안에 따른 슬래브 시공을 위한 거푸집 구조체의 또 다른 실시예를 도시한 단면도, 10 is a cross-sectional view showing another embodiment of a formwork structure for slab construction according to the present invention,

도 11은 도 10의 선 'D-D'를 따라 취한 단면도,11 is a cross-sectional view taken along the line 'D-D' of FIG. 10,

도 12a와 도 12b는 추가 매립된 도우웰 철근의 이용상태를 설명하기 위한 도면.12A and 12B are views for explaining a state of use of additional embedded dowel rebar;

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

100 : 슬러리 벽 110 : 브라켓100: slurry wall 110: bracket

116 : 횡부재 118 : 종부재116: horizontal member 118: longitudinal member

120 : 지지거더 121 : 받침 앵글120: support girder 121: support angle

130a : L-형강 130b : H-형강130a: L-shaped steel 130b: H-shaped steel

130c : L-형강 140 : 데크 플레이트130c: L-shaped steel 140: deck plate

Claims (12)

슬러리 벽이 적용된 지하층의 슬래브를 시공하기 위한 거푸집 구조체에 있어서,In the formwork for the construction of the slab of the basement layer to which the slurry wall is applied, 횡부재와 종부재가 일체로 결합된 T자형 평면구조로 되어 있으면서 슬러리 벽의 내측면 각 위치에 상기 횡부재가 고정되어서 설치되는 브라켓과;A bracket having a T-shaped planar structure in which a transverse member and a longitudinal member are integrally coupled to each other and fixed to the transverse members at respective positions on the inner surface of the slurry wall; 상기 브라켓의 종부재에 단부가 고정되어서 상기 브라켓을 매개로 슬러리 벽 내측면에 직접 고정 지지되는 지지거더와;A support girder having an end fixed to the longitudinal member of the bracket to be directly fixed to the inner surface of the slurry wall via the bracket; 이웃한 상기 두 브라켓간에 상기 지지거더와 동일 높이로 횡배치되어 슬러리 벽을 따라 수평으로 길게 고정 설치되고, 양 단부가 상기 브라켓의 횡부재에 고정되는 제1보조지지수단과;First auxiliary support means horizontally disposed along the slurry wall and horizontally disposed at the same height as the support girder between two adjacent brackets, and both ends of which are fixed to the horizontal member of the bracket; 상기 지지거더와 제1보조지지수단 위로 설치되는 데크 플레이트;A deck plate installed over the support girder and the first auxiliary support means; 를 포함한 구성으로 되어, 상기 데크 플레이트에 콘크리트를 타설 및 양생하여 슬러리 벽에 직접 연결된 슬래브의 시공이 가능하도록 된 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.Formed to include, the formwork for the slab construction of the basement layer applied to the slurry wall, characterized in that the construction of the slab directly connected to the slurry wall by placing and curing concrete on the deck plate. 청구항 1에 있어서,The method according to claim 1, 상기 브라켓의 횡부재가, 슬러리 벽 내측면 각 위치의 선시공된 무수측 그라우트 위에 접합된 상태로 하여, 슬러리 벽의 고정홀에 삽입 고정되는 복수개의 앵커에 의해 고정되는 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.The lateral member of the bracket is fixed by a plurality of anchors inserted into and fixed to the fixing hole of the slurry wall in a state in which it is bonded on the pre-installed anhydrous side grout at each position of the slurry wall inner surface. Formwork for slab construction of basement floor. 청구항 1에 있어서,The method according to claim 1, 상기 브라켓의 횡부재가, 그 배면에 용접 설치되어서 슬러리 벽 내부의 고정요소에 고정되는 복수개의 앵커 철근 또는 스터드에 의해 고정되고, 슬러리 벽 내측면에 매립된 상태로 슬러리 벽과 일체화 시공되는 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.The cross member of the bracket is welded to its rear surface and fixed by a plurality of anchor bars or studs fixed to a fixed element inside the slurry wall, and is integrally constructed with the slurry wall while being embedded in the slurry wall inner surface. Formwork for the slab construction of the basement layer to which the slurry wall is applied. 청구항 1에 있어서,The method according to claim 1, 상기 제1보조지지수단이 상기 브라켓의 횡부재에 용접 설치되는 L-형강인 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.Formwork structure for the slab construction of the basement layer is applied to the slurry wall, characterized in that the first auxiliary supporting means is L-shaped steel welded to the transverse member of the bracket. 청구항 1에 있어서,The method according to claim 1, 상기 지지거더의 단부와 상기 브라켓의 종부재가 중첩된 대응면끼리 서로 볼트로 체결되되, 설치작업의 원활화 및 슬러리 벽으로부터 작용하는 토압이 지지거더가 아닌 슬래브로 전달될 수 있도록, 상기 종부재에서 볼트가 체결되는 각 홀은 지지거더의 길이방향으로 길게 형성된 슬롯홀 형태로 형성 구비되는 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.The end face of the support girder and the corresponding surface of the vertical member of the bracket are fastened to each other by bolts, so that the installation work and the earth pressure acting from the slurry wall can be transmitted to the slab instead of the support girder. Each hole to be fastened is formed in the form of a slot hole formed in the longitudinal direction of the support girder formwork for the slab construction of the basement layer applied to the slurry wall. 청구항 1에 있어서,The method according to claim 1, 상기 지지거더와 동일 높이로 횡배치되어 슬러리 벽을 따라 수평으로 길게 고정 설치되되, 일단부가 상기 브라켓의 종부재에, 타단부가 상기 지지거더의 단부 내측에 설치된 거싯 플레이트에 각각 고정되고, 위로 상기 데크 플레이트를 지지하게 되는 제2보조지지수단을 더 포함하는 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.Horizontally arranged at the same height as the support girder and fixedly installed horizontally along the slurry wall, one end of which is fixed to the end member of the bracket and the other end of which is fixed to a gusset plate installed inside the end of the support girder. Formwork structure for the slab construction of the basement layer is applied to the slurry wall, characterized in that it further comprises a second auxiliary support means for supporting the deck plate. 청구항 6에 있어서,The method according to claim 6, 상기 제2보조지지수단이 상기 브라켓과 거싯 플레이트에 중첩된 대응면끼리 서로 볼팅되어 체결되는 H-형강인 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.Forming structure for the slab construction of the basement layer is applied to the slurry wall, characterized in that the second auxiliary support means is H-shaped steel bolted to each other and the corresponding surfaces overlapping the bracket and gusset plate. 슬러리 벽이 적용된 지하층의 슬래브를 시공하기 위한 거푸집 구조체에 있어서,In the formwork for the construction of the slab of the basement layer to which the slurry wall is applied, 횡부재와 종부재가 일체로 결합된 T자형 평면구조로 되어 있으면서 슬러리 벽의 내측면 각 위치에 상기 횡부재가 고정되어서 설치되는 브라켓과;A bracket having a T-shaped planar structure in which a transverse member and a longitudinal member are integrally coupled to each other and fixed to the transverse members at respective positions on the inner surface of the slurry wall; 상기 브라켓의 종부재에 단부가 고정되어서 상기 브라켓을 매개로 슬러리 벽 내측면에 직접 고정 지지되는 지지거더와;A support girder having an end fixed to the longitudinal member of the bracket to be directly fixed to the inner surface of the slurry wall via the bracket; 상기 지지거더의 단부 끝단쪽 상단에 형성된 절개부위의 내측에 지지된 상태로 슬러리 벽 내측면을 따라 수평으로 길게 설치되고, 하기 데크 플레이트를 지지하는 동시에 슬러리 벽과 슬래브간 연결부를 따라 슬래브 하측으로 돌출된 구조의 철근 콘크리트 보강부를 형성하기 위한 L-형강과;It is installed horizontally along the inner surface of the slurry wall while being supported inside the incision formed at the upper end of the end of the support girder, and supports the following deck plate and protrudes downward along the connection between the slurry wall and the slab. L-shaped steel for forming the reinforced concrete reinforcement of the structure; 상기 지지거더와 L-형강 위로 설치되는 데크 플레이트;A deck plate installed over the support girder and the L-shaped steel; 를 포함한 구성으로 되어, 상기 데크 플레이트 및 L-형강 내측으로 콘크리트를 타설 및 양생하여 슬러리 벽에 상기 보강부를 매개로 연결된 슬래브의 시공이 가능하도록 된 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.The slab construction of the basement layer is applied to the slurry wall, characterized in that the construction of the slab connected to the deck plate and the L-shaped steel inside the concrete and the slab connected via the reinforcement to the slurry wall through Formwork for construction. 청구항 8에 있어서,The method according to claim 8, 상기 브라켓의 횡부재에는 상기 지지거더의 끝단을 하측에서 지지하는 받침 앵글이 용접 설치되는 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.Forming structure for the slab construction of the basement layer applied to the slurry wall, characterized in that the supporting angle for supporting the end of the support girder in the horizontal member of the bracket is installed. 청구항 8에 있어서,The method according to claim 8, 상기 브라켓의 횡부재가, 슬러리 벽 내측면 각 위치의 선시공된 무수측 그라우트 위에 접합된 상태로 하여, 슬러리 벽의 고정홀에 삽입 고정되는 복수개의 앵커에 의해 고정되는 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.The lateral member of the bracket is fixed by a plurality of anchors inserted into and fixed to the fixing hole of the slurry wall in a state in which it is bonded on the pre-installed anhydrous side grout at each position of the slurry wall inner surface. Formwork for slab construction of basement floor. 청구항 8에 있어서,The method according to claim 8, 상기 브라켓의 횡부재가, 그 배면에 용접 설치되어서 슬러리 벽 내부의 고정요소에 고정되는 복수개의 앵커 철근 또는 스터드에 의해 고정되고, 슬러리 벽 내측면에 매립된 상태로 슬러리 벽과 일체화 시공되는 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.The cross member of the bracket is welded to its rear surface and fixed by a plurality of anchor bars or studs fixed to a fixed element inside the slurry wall, and is integrally constructed with the slurry wall while being embedded in the slurry wall inner surface. Formwork for the slab construction of the basement layer to which the slurry wall is applied. 청구항 8에 있어서,The method according to claim 8, 상기 지지거더의 단부와 상기 브라켓의 종부재가 중첩된 대응면끼리 서로 볼트로 체결되되, 상기 종부재에서 볼트가 체결되는 각 홀은 지지거더의 길이방향으로 길게 형성된 슬롯홀 형태로 형성 구비되는 것을 특징으로 하는 슬러리 벽이 적용된 지하층의 슬래브 시공을 위한 거푸집 구조체.The ends of the support girder and the corresponding surfaces on which the vertical members of the bracket overlap each other are fastened to each other by bolts, and each hole to which the bolts are fastened by the vertical members is formed in the shape of a slot hole formed in the longitudinal direction of the support girder. Formwork for the slab construction of the basement layer to which the slurry wall is applied.
KR20-2005-0002629U 2005-01-06 2005-01-28 Form system for construction of underground slab KR200383309Y1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR2020050000356 2005-01-06
KR20-2005-0002629U KR200383309Y1 (en) 2005-01-06 2005-01-28 Form system for construction of underground slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2005-0002629U KR200383309Y1 (en) 2005-01-06 2005-01-28 Form system for construction of underground slab

Publications (1)

Publication Number Publication Date
KR200383309Y1 true KR200383309Y1 (en) 2005-05-03

Family

ID=43684846

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0002629U KR200383309Y1 (en) 2005-01-06 2005-01-28 Form system for construction of underground slab

Country Status (1)

Country Link
KR (1) KR200383309Y1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100701197B1 (en) 2005-12-22 2007-03-29 재단법인 포항산업과학연구원 Floor system for dismantling and enable to be reduced the story height of steel structure
KR100927344B1 (en) * 2007-09-21 2009-11-19 박무용 Construction method for connecting underground structure and underground structure using connection structure for underground construction
KR101849940B1 (en) * 2017-04-27 2018-04-18 (주)하경엔지니어링 Bracket structure and construction method there of

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100701197B1 (en) 2005-12-22 2007-03-29 재단법인 포항산업과학연구원 Floor system for dismantling and enable to be reduced the story height of steel structure
KR100927344B1 (en) * 2007-09-21 2009-11-19 박무용 Construction method for connecting underground structure and underground structure using connection structure for underground construction
KR101849940B1 (en) * 2017-04-27 2018-04-18 (주)하경엔지니어링 Bracket structure and construction method there of

Similar Documents

Publication Publication Date Title
KR101295740B1 (en) Joint of Steel Column
US20060070803A1 (en) Prestressed scaffolding system
KR100634726B1 (en) Form system for construction of underground slab and method for constructing underground slab and breast wall using the same
KR100927344B1 (en) Construction method for connecting underground structure and underground structure using connection structure for underground construction
KR20110032687A (en) Construction method for joining steel or reinforced steel concrete column and beam with reinforcing end part
KR101011252B1 (en) Rigid-frame bridge frame for reinforcing negative moment part and rigid-frame bridge having it
KR200370107Y1 (en) Forms for edge girder construction
KR101221970B1 (en) Construction Method for Basement Structure without Temporary Structure
KR200370135Y1 (en) Forms for edge girder construction
KR200381303Y1 (en) Form system for joint between retaining wall and slab of basement floor
KR100383268B1 (en) method for underground construction of building by using permanent structural member as strut for support retaining wall
KR200383309Y1 (en) Form system for construction of underground slab
KR101735077B1 (en) Bridge deck using precast concrete panel
KR20060023915A (en) Method for constructing underground slabs and walls using erection piles without preliminary wall-attached supports
KR101006411B1 (en) System and method for underground downward construction using concrete filled tube
KR100856723B1 (en) System and method for underground downward construction using cantilever type steel frame
KR200385376Y1 (en) Form system for construction of underground slab
KR200469319Y1 (en) Construction structure for joining steel or reinforced steel concrete column and beam with reinforcing end part
KR101521946B1 (en) Enlarged capital of steel framed reinforced concrete column
KR20110052360A (en) Downward construction method of underground structure that enables continuous basement wall using non-wale and diaphragm action of concrete slab
KR100694762B1 (en) Method for constructing underground slabs and walls without preliminary wall-attached supports
KR100775359B1 (en) Concrete-mold assembly and construction method using the same
KR100694763B1 (en) Construction methods of underground structure adopting concrete-composite crossbeam
KR102269141B1 (en) Deck plate wall installation method using underground pavement
JP6855296B2 (en) Building foundation structure and its construction method

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
EXTG Extinguishment
T601 Decision on revocation of utility model registration