CN204530491U - A kind of high pier hydraulic climbing mould construction frame - Google Patents

A kind of high pier hydraulic climbing mould construction frame Download PDF

Info

Publication number
CN204530491U
CN204530491U CN201520091950.XU CN201520091950U CN204530491U CN 204530491 U CN204530491 U CN 204530491U CN 201520091950 U CN201520091950 U CN 201520091950U CN 204530491 U CN204530491 U CN 204530491U
Authority
CN
China
Prior art keywords
working platform
lifting post
hydraulic lifting
hydraulic
high pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520091950.XU
Other languages
Chinese (zh)
Inventor
张原军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd
Original Assignee
ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd filed Critical ZHEJIANG YONGFENG MOULD MANUFACTURING Co Ltd
Priority to CN201520091950.XU priority Critical patent/CN204530491U/en
Application granted granted Critical
Publication of CN204530491U publication Critical patent/CN204530491U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of high pier hydraulic climbing mould construction frame, comprise base, adjacent on described base the first hydraulic lifting post and the second hydraulic lifting post are installed; Top and first working platform of described first hydraulic lifting post are fixedly linked, and top and second working platform of described second hydraulic lifting post are fixedly linked; Described first working platform is provided with operating room, described operating room is provided with rotating base on the wall of described second working platform, described rotating base is provided with hydraulically extensible bar, the other end of described hydraulically extensible bar is connected with the template be placed on described second working platform.One of the present utility model high pier hydraulic climbing mould construction frame, does not need during construction to set up support in addition, is realized rising and the decline of working platform by the first hydraulic lifting post and the second hydraulic lifting post; The dismounting of template can be completed by manipulation hydraulically extensible bar accurately, avoid the high-altitude risky operation of workman, improve safety.

Description

A kind of high pier hydraulic climbing mould construction frame
technical field:
The utility model relates to a kind of high pier hydraulic climbing mould construction frame.
background technology:
Along with the develop rapidly of traffic and being showing improvement or progress day by day of bridge technology, modern bridge gradually to large span future development, in bridge design more than the bridge pier of hundred meters and the high Sarasota of hundreds of rice no longer rare.At present, bridge pier is built and is mainly adopted over-form construction.The traditional over-form construction method continued to use for a long time has the following disadvantages:
(1) operating platform must utilize and land scaffold or the climbing frame that makes separately and formed, and after pier stud construction reach a certain height, human users is absolutely unsafe, and similar security incident occurs now and then in practice of construction.
(2) handling of template need to rely on crane gear, and crane gear hangs secondary many, and efficiency is low, and model sheetinstallat error is comparatively large simultaneously, rectifies a deviation more difficult, constrains the quality of pier stud construction.
(3) often rising sections all must first with manually connecing high scaffold or promoting climbing frame in pier stud construction, and operating efficiency is low, also increases security risk simultaneously.
(4) wind loading rating is lower, and for ensureing safety, the actual job time will have a greatly reduced quality.
summary of the invention:
The purpose of this utility model is to solve the problems of the prior art, provides the high pier hydraulic climbing mould construction frame that the operating personnel of a kind of Stability Analysis of Structures, needs are few, safety factor is high.
In order to achieve the above object, the technical solution of the utility model is:
A kind of high pier hydraulic climbing mould construction frame, comprises base, adjacently on described base is provided with the first hydraulic lifting post and the second hydraulic lifting post; Top and first working platform of described first hydraulic lifting post are fixedly linked, and top and second working platform of described second hydraulic lifting post are fixedly linked; Described first working platform is provided with operating room, described operating room is provided with rotating base on the wall of described second working platform, described rotating base is provided with hydraulically extensible bar, the other end of described hydraulically extensible bar is connected with the template be placed on described second working platform.
Described first working platform is provided with guardrail; Described first working platform and the second working platform are fixedly linked by dismountable connector.
Described second working platform is provided with dismountable retainer ring.
Described first working platform is provided with the reinforced pole be connected with described first hydraulic lifting post, described second working platform is also provided with the reinforced pole be connected with described second hydraulic lifting post.
Described second working platform comprises main platform body, and the top of described second hydraulic lifting post is connected with described main platform body; The driving-belt that in described main platform body, installation 2 is parallel, the main platform body inside described driving-belt is provided with swingle.
The beneficial effects of the utility model are: one of the present utility model high pier hydraulic climbing mould construction frame, do not need to set up support in addition during construction, are realized rising and the decline of working platform by the first hydraulic lifting post and the second hydraulic lifting post; The dismounting of template can be completed by manipulation hydraulically extensible bar accurately, avoid the high-altitude risky operation of workman, improve safety.
accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structure for amplifying schematic diagram of the second working platform.
detailed description of the invention:
Embodiment 1
The high pier hydraulic climbing mould construction of one as shown in Figure 1-2 frame, comprises base 1, adjacently on described base 1 is provided with the first hydraulic lifting post 2 and the second hydraulic lifting post 3; Top and first working platform 4 of described first hydraulic lifting post 2 are fixedly linked, and top and second working platform 5 of described second hydraulic lifting post 3 are fixedly linked.Described first working platform 4 is provided with the reinforced pole 8 be connected with described first hydraulic lifting post 2, described second working platform 5 is also provided with the reinforced pole 8 be connected with described second hydraulic lifting post 3.Reinforced pole 8 makes the installation of the first working platform 4 and the second working platform 5 more firm, improves safety factor.
Described first working platform 4 is provided with operating room 41, and described operating room 41 is provided with rotating base 42 on the wall of described second working platform 5, and rotating base 42 can be able to rotate at vertical direction.Described rotating base 42 is provided with hydraulically extensible bar 43, and the other end of described hydraulically extensible bar 43 is connected with the template 51 be placed on described second working platform 5.
Described first working platform 4 is provided with guardrail 44; Described first working platform 4 and the second working platform 5 are fixedly linked by dismountable connector 6.Described second working platform 5 is provided with dismountable retainer ring 7.First working platform 4 is connected with the second working platform 5, and the second working platform 5 is connected with high pier by retainer ring 7 again, can improve the wind loading rating of scaffold entirety.When connector 6 is removed, the first working platform 4 and the second working platform 5 can rise to different height as required, and under the drive of rotating base 42, hydraulically extensible bar 43 and template 51 are in heeling condition, and can adjust as required.
Described second working platform 5 comprises main platform body 52, and the top of described second hydraulic lifting post 3 is connected with described main platform body 52; The driving-belt 53 that in described main platform body 52, installation 2 is parallel, the main platform body 52 inside described driving-belt 53 is provided with swingle 54.Described template 51 is placed on described driving-belt 53, and driving-belt 53 can be rotated in the horizontal direction by swingle 54, places template 51 and weares and teares in disassembly process.
The one high pier hydraulic climbing mould construction frame of the present embodiment, does not need during construction to set up support in addition, is realized rising and the decline of working platform by the first hydraulic lifting post and the second hydraulic lifting post; The dismounting of template can be completed by manipulation hydraulically extensible bar accurately, avoid the high-altitude risky operation of workman, improve safety.

Claims (5)

1. a high pier hydraulic climbing mould construction frame, is characterized in that: comprise base (1), and described base (1) is above adjacent is provided with the first hydraulic lifting post (2) and the second hydraulic lifting post (3); Top and first working platform (4) of described first hydraulic lifting post (2) are fixedly linked, and top and second working platform (5) of described second hydraulic lifting post (3) are fixedly linked; Described first working platform (4) is provided with operating room (41), described operating room (41) is provided with rotating base (42) on the wall of described second working platform (5), described rotating base (42) is provided with hydraulically extensible bar (43), the other end of described hydraulically extensible bar (43) is connected with the template (51) be placed on described second working platform (5).
2. one according to claim 1 high pier hydraulic climbing mould construction frame, is characterized in that: described first working platform (4) is provided with guardrail (44); Described first working platform (4) and the second working platform (5) are fixedly linked by dismountable connector (6).
3. one according to claim 1 high pier hydraulic climbing mould construction frame, is characterized in that: described second working platform (5) is provided with dismountable retainer ring (7).
4. one according to claim 1 high pier hydraulic climbing mould construction frame, it is characterized in that: described first working platform (4) is provided with the reinforced pole (8) be connected with described first hydraulic lifting post (2), described second working platform (5) is also provided with the reinforced pole (8) be connected with described second hydraulic lifting post (3).
5. one according to claim 1 high pier hydraulic climbing mould construction frame, is characterized in that: described second working platform (5) comprises main platform body (52), and the top of described second hydraulic lifting post (3) is connected with described main platform body (52); The driving-belt (53) that the upper installation 2 of described main platform body (52) is parallel, the main platform body (52) of described driving-belt (53) inner side is provided with swingle (54).
CN201520091950.XU 2015-02-10 2015-02-10 A kind of high pier hydraulic climbing mould construction frame Expired - Fee Related CN204530491U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520091950.XU CN204530491U (en) 2015-02-10 2015-02-10 A kind of high pier hydraulic climbing mould construction frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520091950.XU CN204530491U (en) 2015-02-10 2015-02-10 A kind of high pier hydraulic climbing mould construction frame

Publications (1)

Publication Number Publication Date
CN204530491U true CN204530491U (en) 2015-08-05

Family

ID=53744513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520091950.XU Expired - Fee Related CN204530491U (en) 2015-02-10 2015-02-10 A kind of high pier hydraulic climbing mould construction frame

Country Status (1)

Country Link
CN (1) CN204530491U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948274A (en) * 2017-05-11 2017-07-14 中交二公局萌兴工程有限公司 A kind of adjacent high pier circulation of bridge pours climb construction machinery and construction technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106948274A (en) * 2017-05-11 2017-07-14 中交二公局萌兴工程有限公司 A kind of adjacent high pier circulation of bridge pours climb construction machinery and construction technology

Similar Documents

Publication Publication Date Title
CN203794498U (en) Built-in self-elevating tower crane device
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN204530493U (en) A kind of high pier over-form construction platform
CN105780995A (en) Curved surface space pipe truss structure and mounting method thereof
CN105275253A (en) Equal-diameter rod erecting device and application method thereof
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN102493666A (en) High-altitude translation installation and construction method for super-large super-heavy member
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN104895335A (en) Method for mounting hanging pillar
CN104481194A (en) Reversed assembling method of upright cylindrical equipment
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN204530491U (en) A kind of high pier hydraulic climbing mould construction frame
CN101838986A (en) Disassembling tool type lattice column and construction method thereof
CN204530492U (en) A kind of hydraulic climbing mould construction platform
CN203795311U (en) Multi-leg high pier and slip form construction device
CN107795185A (en) Chimney reinforces pylon high-altitude installation node security construction method
CN104499706A (en) Elevator well template platform and construction method thereof
CN204401995U (en) Encorbelment support system in a kind of center of installing for dome structure
CN204474202U (en) Large-tonnage steel member integrated hoisting fixture
CN105239804A (en) Assembly and lift-erecting method of indirect air-cooling system stretching platforms
CN202729645U (en) Tower crane with elevator
CN204530490U (en) A kind of hydraulic climbing mould construction frame
CN204277366U (en) For the hydraulic lifting apparatus of vertical type tubular equipment upside-down mounting
CN102733612B (en) Mounting method of electric hoist orbit
CN206034874U (en) Elevartor shaft combination formula integrally lift up operation platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150805

Termination date: 20160210