CN203794498U - Built-in self-elevating tower crane device - Google Patents
Built-in self-elevating tower crane device Download PDFInfo
- Publication number
- CN203794498U CN203794498U CN201420103850.XU CN201420103850U CN203794498U CN 203794498 U CN203794498 U CN 203794498U CN 201420103850 U CN201420103850 U CN 201420103850U CN 203794498 U CN203794498 U CN 203794498U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- truss
- built
- crane device
- open caisson
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000009194 climbing Effects 0.000 claims abstract description 32
- 230000000630 rising effect Effects 0.000 claims description 15
- 238000010276 construction Methods 0.000 abstract description 8
- 239000000463 material Substances 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 11
- 238000003466 welding Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
Description
Claims (8)
- One kind built-in from rising tower crane device, this tower crane device is set up in open caisson, comprise truss (10) and tower crane (20), described tower crane (20) is positioned at truss (10) top, and tower crane (20) bottom is welded into integral body with truss (10), it is characterized in that: described truss (10) is for cross, and tower crane (20) is positioned at right-angled crossing place; The below of truss (10) four ends is also all connected with a pair of climbing system (30), and described truss (10) four ends and described climbing system (30) are all fixed on open caisson madial wall.
- 2. as claimed in claim 1 a kind of built-in from rising tower crane device, it is characterized in that: described climbing system (30) comprises wall-attaching equipment (31), track (33) and the crossbeam that climbs (32), and described wall-attaching equipment (31) is fixed on open caisson madial wall;Described track (33) connects high direction along open caisson and lays, and is connected with wall-attaching equipment (31), and track (33) equidistantly offers slot (331) along laying direction;The described crossbeam that climbs (32) is connected with wall-attaching equipment (31) by latch (37), and the below of the crossbeam that climbs (32) is also connected with jack (34), described jack (34) two ends are provided with scalable fixture (341), and described scalable fixture (341) holds mutually with the slot (331) of track (33).
- 3. as claimed in claim 2 a kind of built-in from rising tower crane device, it is characterized in that: described climbing system (30) is also provided with service platform (35), described service platform (35) hangs on the crossbeam that climbs (32) below.
- 4. as claimed in claim 2 a kind of built-in from rising tower crane device, it is characterized in that: described wall-attaching equipment (31) is fixed on open caisson madial wall by pre-embedded bolt (36).
- 5. as claimed in claim 2 a kind of built-in from rising tower crane device, it is characterized in that: the position that described track (33) top contacts with wall-attaching equipment (31) is inserted with anti-dumping plate (38).
- 6. as claimed in claim 2 a kind of built-in from rising tower crane device, it is characterized in that: described in the climb end face of crossbeam (32) be provided with prepared screw-bolt hole (39), described prepared screw-bolt hole (39) locates to be provided with bolt, and the crossbeam that climbs (32) is connected with truss (10) by this bolt.
- 7. as claimed in claim 1 a kind of built-in from rising tower crane device, it is characterized in that: a pair of climbing system (30) of each below, end of described truss (10) is all symmetrical arranged along the horizontal median axis of its place truss (10).
- 8. a kind of built-in from rising tower crane device as described in any one in claim 1 to 7, it is characterized in that: open caisson madial wall is fixed on by bracket (12) in four ends of truss (10), one end of described bracket (12) is fixedly connected with truss (10) by bolt, and the other end is fixedly connected with the cone (11) of climbing in being embedded in open caisson by bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420103850.XU CN203794498U (en) | 2014-03-07 | 2014-03-07 | Built-in self-elevating tower crane device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420103850.XU CN203794498U (en) | 2014-03-07 | 2014-03-07 | Built-in self-elevating tower crane device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203794498U true CN203794498U (en) | 2014-08-27 |
Family
ID=51376732
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420103850.XU Expired - Lifetime CN203794498U (en) | 2014-03-07 | 2014-03-07 | Built-in self-elevating tower crane device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203794498U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652813A (en) * | 2015-01-30 | 2015-05-27 | 上海绿地建设(集团)有限公司 | Tower crane construction technology used for super high-rise building steel structure |
CN106144925A (en) * | 2016-07-22 | 2016-11-23 | 中建三局集团有限公司 | A kind of telescopic bracket device having enough to meet the need and using method thereof |
CN107697818A (en) * | 2017-10-17 | 2018-02-16 | 郑州科润机电工程有限公司 | A kind of prestressed concrete wind-power tower wall construction method and special construction apparatus |
CN109399432A (en) * | 2018-11-23 | 2019-03-01 | 燕山大学 | A kind of hoistway job platform that climbs certainly |
WO2019057267A1 (en) | 2017-09-19 | 2019-03-28 | Tms Tüfekçioglu Mühendislik Sanayi Ve Ticaret Anonim Sirketi | Device and method for the construction of high rising building structures |
CN112960566A (en) * | 2021-03-15 | 2021-06-15 | 广州市恒盛建设工程有限公司 | Construction method of built-in tower crane of super high-rise building |
CN113526372A (en) * | 2021-06-11 | 2021-10-22 | 浙江省建设工程机械集团有限公司 | Double-pier-body construction tower crane and viaduct construction method |
-
2014
- 2014-03-07 CN CN201420103850.XU patent/CN203794498U/en not_active Expired - Lifetime
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652813A (en) * | 2015-01-30 | 2015-05-27 | 上海绿地建设(集团)有限公司 | Tower crane construction technology used for super high-rise building steel structure |
CN106144925A (en) * | 2016-07-22 | 2016-11-23 | 中建三局集团有限公司 | A kind of telescopic bracket device having enough to meet the need and using method thereof |
CN106144925B (en) * | 2016-07-22 | 2018-01-16 | 中建三局集团有限公司 | A kind of telescopic bracket device having enough to meet the need and its application method |
WO2019057267A1 (en) | 2017-09-19 | 2019-03-28 | Tms Tüfekçioglu Mühendislik Sanayi Ve Ticaret Anonim Sirketi | Device and method for the construction of high rising building structures |
CN107697818A (en) * | 2017-10-17 | 2018-02-16 | 郑州科润机电工程有限公司 | A kind of prestressed concrete wind-power tower wall construction method and special construction apparatus |
CN107697818B (en) * | 2017-10-17 | 2023-10-17 | 郑州科润机电工程有限公司 | Construction method and special construction equipment for wall of prestressed concrete wind power tower |
CN109399432A (en) * | 2018-11-23 | 2019-03-01 | 燕山大学 | A kind of hoistway job platform that climbs certainly |
CN109399432B (en) * | 2018-11-23 | 2019-12-03 | 燕山大学 | A kind of hoistway job platform that climbs certainly |
CN112960566A (en) * | 2021-03-15 | 2021-06-15 | 广州市恒盛建设工程有限公司 | Construction method of built-in tower crane of super high-rise building |
CN113526372A (en) * | 2021-06-11 | 2021-10-22 | 浙江省建设工程机械集团有限公司 | Double-pier-body construction tower crane and viaduct construction method |
CN113526372B (en) * | 2021-06-11 | 2024-01-12 | 浙江省建设工程机械集团有限公司 | Double pier body construction tower crane and viaduct construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203794498U (en) | Built-in self-elevating tower crane device | |
CN104141383B (en) | A kind of Bailey beam pendent form support system and construction thereof | |
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN103046473A (en) | Construction method for constructing double-limb hollow high-pier mould side hydraulic jacking creeping formwork and double-limb hollow high-pier | |
CN102251483B (en) | Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane | |
CN203947771U (en) | A kind of Bailey beam pendent form support system | |
CN106545172A (en) | A kind of installation method of high-altitude long-span steel truss | |
CN207314624U (en) | A kind of network frame house cap accumulation slippage mounting structure | |
CN102587659A (en) | Construction method for using concrete columns to support structures on both sides of post-pouring strip | |
CN103572763B (en) | Large-span steel supports pattern foundation pit supporting structure Demolition Construction method | |
CN103967284B (en) | The steel column installation method of reserved stigma docking | |
CN112324131B (en) | One-frame dual-purpose large-span stiff beam construction structure and construction method thereof | |
CN105019664B (en) | High-altitude sliding installation method for box room type electric room | |
CN107663916A (en) | A kind of network frame house cap accumulation slippage mounting structure and construction method | |
CN205296803U (en) | Elevator automatic lifting operation panel | |
CN111017698A (en) | Hoisting and overturning method for rectangular pipe joint with super-large section and applicable device thereof | |
CN104947604A (en) | Rapid beam-replacing construction method for high speed railway 900 t concrete box beam | |
CN105293322A (en) | Lifting method of rolling mill housings | |
CN205369229U (en) | But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid | |
CN102486051A (en) | Manual demolishing method of large-area spherical net rack | |
CN103615198A (en) | Construction method for using parallel double-mast half-turning method to hoist large box type derrick | |
CN104499706A (en) | Elevator well template platform and construction method thereof | |
CN204645809U (en) | Inner steel cylinder of chimney burst slides assembled positioning apparatus | |
CN102425115A (en) | Control method for actively overcoming dead weight and line shape of vice cable saddle buttress concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD. Effective date: 20150226 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20150226 Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No. Patentee after: CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP Co.,Ltd. Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer Patentee before: CHINA RAILWAY MAJOR BRIDGE ENGINEERING Co.,Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20140827 |
|
CX01 | Expiry of patent term |