CN203756202U - Rapid feeder for vertical anchor cable - Google Patents

Rapid feeder for vertical anchor cable Download PDF

Info

Publication number
CN203756202U
CN203756202U CN201420112762.6U CN201420112762U CN203756202U CN 203756202 U CN203756202 U CN 203756202U CN 201420112762 U CN201420112762 U CN 201420112762U CN 203756202 U CN203756202 U CN 203756202U
Authority
CN
China
Prior art keywords
anchor cable
cable
wire rope
anchor
rope device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420112762.6U
Other languages
Chinese (zh)
Inventor
陈永刚
彭少引
吴海涛
赵龙飞
罗鸿铸
齐界夷
杨军
马崇杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201420112762.6U priority Critical patent/CN203756202U/en
Application granted granted Critical
Publication of CN203756202U publication Critical patent/CN203756202U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a rapid feeder for a vertical anchor cable. The rapid feeder for the vertical anchor cable comprises an anchor cable body. A steel wire rope is fixedly bound on the anchor cable body through a plurality of cable clamping devices. An anchor cable hole is formed in an arch of a cavern. A pulley is fixed next to the anchor cable hole through an anchor rod. One end of the steel wire rope is wound around the pulley and connected to a hoist. Each cable clamping device comprises two semicircular cable clamping rings. The two ends of each semicircular cable clamping ring are provided with a connecting rod which extends outwards. The anchor cable body is clamped between the two semicircular cable clamping rings of each cable clamping device, and the corresponding connecting rods are fastened through bolts and nuts. The connecting rod at one end of each cable clamping device is further provided with a U-shaped bolt, and the steel wire rope is clamped at the bottom of a groove of each U-shaped bolt. According to the rapid feeder for the vertical anchor cable, the anchor cable body and the steel wire rope are fixed together in a spaced mode through the cable clamping devices, and the anchor cable is fed into the anchor cable hole quickly through the hoist and the pulley in a traction mode; mechanical operation is realized, construction efficiency is improved by multiple times, and the rapid feeder is convenient and fast to arrange, safe, reliable, easy and continent to operate, and capable of being widely applied to underground engineering.

Description

A kind of vertical anchor cable send rope device fast
Technical field
The utility model relates to a kind of anchor cable and send rope device, and particularly the vertical anchor cable of a kind of underground chamber crown send rope device fast.
Background technology
In underground construction, cavern's crown is generally designed with the darker anchor cable of vertical extension, and conventional anchor cable send rope construction to take to set up framed bent as operating platform, the operation of Chain block cooperation manual type.Because anchor cable arranges that quantity is more, framed bent demand is large, it is long to take the cycle of tearing open, affects Excavation traffic, exists potential safety hazard larger; And anchor cable length is dark, deadweight is larger, conventional anchor cable send that Suo Fangfa efficiency of construction is low, work efficiency is slow.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of vertical anchor cable and send fast rope device, can significantly improve efficiency of construction, and arrange convenient and swift, safe and reliable, easy and simple to handle.
In order to solve the problems of the technologies described above, the technical solution of the utility model is: a kind of vertical anchor cable send rope device fast, comprise anchor cable, wire rope passes through multiple folder rope device fixation bindings on anchor cable, the crown place of cavern is provided with anchor cable hole, pulley is fixed on by anchor cable hole by anchor pole, and one end of wire rope is walked around pulley and is connected to hoist engine.
Described folder rope device comprises two semicircular Carcel rings, the two ends of semicircle Carcel ring are provided with outward extending connecting rod, in the middle of two Carcel rings are clamped in anchor cable, and by screw bolt and nut by fastening corresponding connecting rod, on the connecting rod of folder rope device one end, U-bolt is also installed, the bottom portion of groove clamping of U-bolt has wire rope.By this folder rope device, wire rope is carried out to relative fixing with anchor cable, good fixing effect, and by bolton, be easy to dismounting.
This device also comprises the mobile crane that is positioned at cavern, and the hanging basket of mobile crane is positioned at anchor cable hole below.
Described folder rope device is arranged every the even interval of 2 ~ 3m along anchor cable length direction.
The utility model is owing to adopting said structure design, anchor cable is held together by folder rope device and rope coil, pull wire rope by pulley, hoist engine, rope traction anchor cable is sent in anchor cable hole, do not need to set up any framed bent operating platform, adopt mechanized construction, can improve efficiency of construction and reach 5 times, and arrange convenient and swift, safe and reliable.
brief description of the drawings
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the use state diagram of folder rope device.
Detailed description of the invention
As shown in Figure 1-2, the utility model comprises anchor cable 5, and wire rope 3 is by multiple folder rope device 1 fixation binding on anchor cable 5, and the crown place of cavern 6 is provided with anchor cable hole 7, it is other that pulley 2 is fixed on anchor cable hole 7 by anchor pole 8, and one end of wire rope 3 is walked around pulley and is connected to hoist engine 4.Cavern excavation face is arranged, is fixed on to described hoist engine.
Described folder rope device 1 comprises two semicircular Carcel rings 11, the two ends of semicircle Carcel ring 11 are provided with outward extending connecting rod 12, in the middle of two Carcel rings 11 are clamped in anchor cable 5, and by screw bolt and nut by fastening corresponding connecting rod, on the connecting rod 12 of folder rope device 1 one end, U-bolt 13 is also installed, the bottom portion of groove clamping of U-bolt 13 has wire rope 3.
This device also comprises the mobile crane 9 that is positioned at cavern 6, and the hanging basket 91 of mobile crane 9 is positioned at anchor cable hole 7 belows.
Described folder rope device 1 is along anchor cable 5 length directions every the even interval of 2 ~ 3m layout, and good fixing effect, keeps at a certain distance away and arrange, the convenient folder rope device 1 of dismantling close pulley in the process of traction.
While using the utility model, utilize hoist engine 4, pulley 2 trailer systems that anchor cable 5 is at the uniform velocity promoted facing to anchor cable aperture, anchor cable 5 is sent in hole, every rising 2 ~ 3m, constructor stands in the hanging basket at mobile crane top, a folder rope 1 of bottom, anchor cable aperture is installed to dismounting, then rise, remove, by that analogy, until anchor cable 5 all send in hole.

Claims (4)

1. a vertical anchor cable send rope device fast, it is characterized in that: comprise anchor cable (5), wire rope (3) passes through multiple folder rope devices (1) fixation binding on anchor cable (5), the crown place of cavern (6) is provided with anchor cable hole (7), it is other that pulley (2) is fixed on anchor cable hole (7) by anchor pole (8), and one end of wire rope (3) is walked around pulley and is connected to hoist engine (4).
2. vertical anchor cable according to claim 1 send rope device fast, it is characterized in that: described folder rope device (1) comprises two semicircular Carcel rings (11), the two ends of semicircle Carcel ring (11) are provided with outward extending connecting rod (12), in the middle of two Carcel rings (11) are clamped in anchor cable (5), and by screw bolt and nut by fastening corresponding connecting rod, on the connecting rod (12) of folder rope device (1) one end, U-bolt (13) is also installed, the bottom portion of groove clamping of U-bolt (13) has wire rope (3).
3. vertical anchor cable according to claim 1 send rope device fast, it is characterized in that: this device also comprises the mobile crane (9) that is positioned at cavern (6), and the hanging basket (91) of mobile crane (9) is positioned at anchor cable hole (7) below.
4. vertical anchor cable according to claim 1 send rope device fast, it is characterized in that: described folder rope device (1) is arranged every the even interval of 2 ~ 3m along anchor cable (5) length direction.
CN201420112762.6U 2014-03-13 2014-03-13 Rapid feeder for vertical anchor cable Expired - Lifetime CN203756202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420112762.6U CN203756202U (en) 2014-03-13 2014-03-13 Rapid feeder for vertical anchor cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420112762.6U CN203756202U (en) 2014-03-13 2014-03-13 Rapid feeder for vertical anchor cable

Publications (1)

Publication Number Publication Date
CN203756202U true CN203756202U (en) 2014-08-06

Family

ID=51251489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420112762.6U Expired - Lifetime CN203756202U (en) 2014-03-13 2014-03-13 Rapid feeder for vertical anchor cable

Country Status (1)

Country Link
CN (1) CN203756202U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111878087A (en) * 2020-07-30 2020-11-03 中铁五局集团有限公司 Karst cave section anchor cable construction method based on karst cave underground river environment tunnel construction
CN112195941A (en) * 2020-09-18 2021-01-08 中铁隧道集团一处有限公司 Quick installation method for overlong vertical upward prestressed anchor cable of underground cave depot

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111878087A (en) * 2020-07-30 2020-11-03 中铁五局集团有限公司 Karst cave section anchor cable construction method based on karst cave underground river environment tunnel construction
CN112195941A (en) * 2020-09-18 2021-01-08 中铁隧道集团一处有限公司 Quick installation method for overlong vertical upward prestressed anchor cable of underground cave depot

Similar Documents

Publication Publication Date Title
CN203756202U (en) Rapid feeder for vertical anchor cable
CN202461363U (en) Disc steel bar straightening machine for building
CN202094562U (en) Suspension type synchronous hoisting system for pipe type bus
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN103822026A (en) Mine self-rooting cable hook device
CN203096597U (en) Bridge suspender connecting device
CN104724615A (en) Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane
CN103001154A (en) Net bush
CN202940524U (en) Strain insulator assembly with wedge cable clamp
CN202268651U (en) Fixing device of transmission wire lifter
CN202834394U (en) Quick-mounting U-shaped clip for electric wire conduit of steel workshop
CN102629744A (en) Wire releasing and tightening operation platform of pole and tower
CN202163982U (en) Novel simple mining reel
CN202474699U (en) Portable heavy object transmitter for telegraph pole
CN201695968U (en) Pipeline holding clamp
CN203614662U (en) Rope separation frame
CN204125839U (en) A kind of tight cable device for the construction of suspension bridge tight cable
CN102022020B (en) A kind of tower lifting tackles connector and hoisting method
CN202302323U (en) Vertical shaft pipeline fixing device
CN202851081U (en) Hanging connecting device
CN203568632U (en) Tail rope suspension device for skip bucket
CN105449587A (en) Communication equipment installation and construction auxiliary device
CN102554070A (en) Simple straightening device for reinforcing bar coils
CN210661211U (en) Device for fastening steel wire rope head
CN202671033U (en) Cable coupling device of electric hoist

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140806