CN203756202U - Rapid feeder for vertical anchor cable - Google Patents
Rapid feeder for vertical anchor cable Download PDFInfo
- Publication number
- CN203756202U CN203756202U CN201420112762.6U CN201420112762U CN203756202U CN 203756202 U CN203756202 U CN 203756202U CN 201420112762 U CN201420112762 U CN 201420112762U CN 203756202 U CN203756202 U CN 203756202U
- Authority
- CN
- China
- Prior art keywords
- anchor cable
- cable
- wire rope
- anchor
- rope device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000027455 binding Effects 0.000 claims description 3
- 238000009739 binding Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 7
- 229910000831 Steel Inorganic materials 0.000 abstract 4
- 239000010959 steel Substances 0.000 abstract 4
- 238000009412 basement excavation Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model provides a rapid feeder for a vertical anchor cable. The rapid feeder for the vertical anchor cable comprises an anchor cable body. A steel wire rope is fixedly bound on the anchor cable body through a plurality of cable clamping devices. An anchor cable hole is formed in an arch of a cavern. A pulley is fixed next to the anchor cable hole through an anchor rod. One end of the steel wire rope is wound around the pulley and connected to a hoist. Each cable clamping device comprises two semicircular cable clamping rings. The two ends of each semicircular cable clamping ring are provided with a connecting rod which extends outwards. The anchor cable body is clamped between the two semicircular cable clamping rings of each cable clamping device, and the corresponding connecting rods are fastened through bolts and nuts. The connecting rod at one end of each cable clamping device is further provided with a U-shaped bolt, and the steel wire rope is clamped at the bottom of a groove of each U-shaped bolt. According to the rapid feeder for the vertical anchor cable, the anchor cable body and the steel wire rope are fixed together in a spaced mode through the cable clamping devices, and the anchor cable is fed into the anchor cable hole quickly through the hoist and the pulley in a traction mode; mechanical operation is realized, construction efficiency is improved by multiple times, and the rapid feeder is convenient and fast to arrange, safe, reliable, easy and continent to operate, and capable of being widely applied to underground engineering.
Description
Technical field
The utility model relates to a kind of anchor cable and send rope device, and particularly the vertical anchor cable of a kind of underground chamber crown send rope device fast.
Background technology
In underground construction, cavern's crown is generally designed with the darker anchor cable of vertical extension, and conventional anchor cable send rope construction to take to set up framed bent as operating platform, the operation of Chain block cooperation manual type.Because anchor cable arranges that quantity is more, framed bent demand is large, it is long to take the cycle of tearing open, affects Excavation traffic, exists potential safety hazard larger; And anchor cable length is dark, deadweight is larger, conventional anchor cable send that Suo Fangfa efficiency of construction is low, work efficiency is slow.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of vertical anchor cable and send fast rope device, can significantly improve efficiency of construction, and arrange convenient and swift, safe and reliable, easy and simple to handle.
In order to solve the problems of the technologies described above, the technical solution of the utility model is: a kind of vertical anchor cable send rope device fast, comprise anchor cable, wire rope passes through multiple folder rope device fixation bindings on anchor cable, the crown place of cavern is provided with anchor cable hole, pulley is fixed on by anchor cable hole by anchor pole, and one end of wire rope is walked around pulley and is connected to hoist engine.
Described folder rope device comprises two semicircular Carcel rings, the two ends of semicircle Carcel ring are provided with outward extending connecting rod, in the middle of two Carcel rings are clamped in anchor cable, and by screw bolt and nut by fastening corresponding connecting rod, on the connecting rod of folder rope device one end, U-bolt is also installed, the bottom portion of groove clamping of U-bolt has wire rope.By this folder rope device, wire rope is carried out to relative fixing with anchor cable, good fixing effect, and by bolton, be easy to dismounting.
This device also comprises the mobile crane that is positioned at cavern, and the hanging basket of mobile crane is positioned at anchor cable hole below.
Described folder rope device is arranged every the even interval of 2 ~ 3m along anchor cable length direction.
The utility model is owing to adopting said structure design, anchor cable is held together by folder rope device and rope coil, pull wire rope by pulley, hoist engine, rope traction anchor cable is sent in anchor cable hole, do not need to set up any framed bent operating platform, adopt mechanized construction, can improve efficiency of construction and reach 5 times, and arrange convenient and swift, safe and reliable.
brief description of the drawings
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the use state diagram of folder rope device.
Detailed description of the invention
As shown in Figure 1-2, the utility model comprises anchor cable 5, and wire rope 3 is by multiple folder rope device 1 fixation binding on anchor cable 5, and the crown place of cavern 6 is provided with anchor cable hole 7, it is other that pulley 2 is fixed on anchor cable hole 7 by anchor pole 8, and one end of wire rope 3 is walked around pulley and is connected to hoist engine 4.Cavern excavation face is arranged, is fixed on to described hoist engine.
Described folder rope device 1 comprises two semicircular Carcel rings 11, the two ends of semicircle Carcel ring 11 are provided with outward extending connecting rod 12, in the middle of two Carcel rings 11 are clamped in anchor cable 5, and by screw bolt and nut by fastening corresponding connecting rod, on the connecting rod 12 of folder rope device 1 one end, U-bolt 13 is also installed, the bottom portion of groove clamping of U-bolt 13 has wire rope 3.
This device also comprises the mobile crane 9 that is positioned at cavern 6, and the hanging basket 91 of mobile crane 9 is positioned at anchor cable hole 7 belows.
Described folder rope device 1 is along anchor cable 5 length directions every the even interval of 2 ~ 3m layout, and good fixing effect, keeps at a certain distance away and arrange, the convenient folder rope device 1 of dismantling close pulley in the process of traction.
While using the utility model, utilize hoist engine 4, pulley 2 trailer systems that anchor cable 5 is at the uniform velocity promoted facing to anchor cable aperture, anchor cable 5 is sent in hole, every rising 2 ~ 3m, constructor stands in the hanging basket at mobile crane top, a folder rope 1 of bottom, anchor cable aperture is installed to dismounting, then rise, remove, by that analogy, until anchor cable 5 all send in hole.
Claims (4)
1. a vertical anchor cable send rope device fast, it is characterized in that: comprise anchor cable (5), wire rope (3) passes through multiple folder rope devices (1) fixation binding on anchor cable (5), the crown place of cavern (6) is provided with anchor cable hole (7), it is other that pulley (2) is fixed on anchor cable hole (7) by anchor pole (8), and one end of wire rope (3) is walked around pulley and is connected to hoist engine (4).
2. vertical anchor cable according to claim 1 send rope device fast, it is characterized in that: described folder rope device (1) comprises two semicircular Carcel rings (11), the two ends of semicircle Carcel ring (11) are provided with outward extending connecting rod (12), in the middle of two Carcel rings (11) are clamped in anchor cable (5), and by screw bolt and nut by fastening corresponding connecting rod, on the connecting rod (12) of folder rope device (1) one end, U-bolt (13) is also installed, the bottom portion of groove clamping of U-bolt (13) has wire rope (3).
3. vertical anchor cable according to claim 1 send rope device fast, it is characterized in that: this device also comprises the mobile crane (9) that is positioned at cavern (6), and the hanging basket (91) of mobile crane (9) is positioned at anchor cable hole (7) below.
4. vertical anchor cable according to claim 1 send rope device fast, it is characterized in that: described folder rope device (1) is arranged every the even interval of 2 ~ 3m along anchor cable (5) length direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420112762.6U CN203756202U (en) | 2014-03-13 | 2014-03-13 | Rapid feeder for vertical anchor cable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420112762.6U CN203756202U (en) | 2014-03-13 | 2014-03-13 | Rapid feeder for vertical anchor cable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203756202U true CN203756202U (en) | 2014-08-06 |
Family
ID=51251489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420112762.6U Expired - Lifetime CN203756202U (en) | 2014-03-13 | 2014-03-13 | Rapid feeder for vertical anchor cable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203756202U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111878087A (en) * | 2020-07-30 | 2020-11-03 | 中铁五局集团有限公司 | Karst cave section anchor cable construction method based on karst cave underground river environment tunnel construction |
CN112195941A (en) * | 2020-09-18 | 2021-01-08 | 中铁隧道集团一处有限公司 | Quick installation method for overlong vertical upward prestressed anchor cable of underground cave depot |
-
2014
- 2014-03-13 CN CN201420112762.6U patent/CN203756202U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111878087A (en) * | 2020-07-30 | 2020-11-03 | 中铁五局集团有限公司 | Karst cave section anchor cable construction method based on karst cave underground river environment tunnel construction |
CN112195941A (en) * | 2020-09-18 | 2021-01-08 | 中铁隧道集团一处有限公司 | Quick installation method for overlong vertical upward prestressed anchor cable of underground cave depot |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203756202U (en) | Rapid feeder for vertical anchor cable | |
CN202461363U (en) | Disc steel bar straightening machine for building | |
CN202094562U (en) | Suspension type synchronous hoisting system for pipe type bus | |
CN202197048U (en) | Double angle steel hanging point lifting and connecting tool for tower use | |
CN103822026A (en) | Mine self-rooting cable hook device | |
CN203096597U (en) | Bridge suspender connecting device | |
CN104724615A (en) | Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane | |
CN103001154A (en) | Net bush | |
CN202940524U (en) | Strain insulator assembly with wedge cable clamp | |
CN202268651U (en) | Fixing device of transmission wire lifter | |
CN202834394U (en) | Quick-mounting U-shaped clip for electric wire conduit of steel workshop | |
CN102629744A (en) | Wire releasing and tightening operation platform of pole and tower | |
CN202163982U (en) | Novel simple mining reel | |
CN202474699U (en) | Portable heavy object transmitter for telegraph pole | |
CN201695968U (en) | Pipeline holding clamp | |
CN203614662U (en) | Rope separation frame | |
CN204125839U (en) | A kind of tight cable device for the construction of suspension bridge tight cable | |
CN102022020B (en) | A kind of tower lifting tackles connector and hoisting method | |
CN202302323U (en) | Vertical shaft pipeline fixing device | |
CN202851081U (en) | Hanging connecting device | |
CN203568632U (en) | Tail rope suspension device for skip bucket | |
CN105449587A (en) | Communication equipment installation and construction auxiliary device | |
CN102554070A (en) | Simple straightening device for reinforcing bar coils | |
CN210661211U (en) | Device for fastening steel wire rope head | |
CN202671033U (en) | Cable coupling device of electric hoist |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140806 |